CCR2005020.
.
.
COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION #020-2005
APPROVAL OF FEE SCHEDULE
FOR DEPARTMENT OF PUBLIC WORKS
WHEREAS, It was determined by the Public Works Committee that fees for work
performed by the Department of Public Works be increased as reflected on the
attached schedule; and
WHEREAS, Chapter 8 of the Municipal Code provides that fees referred to in said
chapter shall be from time to time established by Resolution of the Common Council.
NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of
Muskego, upon the recommendation of the Public Works Committee, does hereby
approve the attached Fee Schedule for the Department of Public Works effective
immediately.
DATED THIS 25th DAY OF Januarv ,2005
SPONSORED BY:
PUBLIC WORKS COMMITTEE
Ald. Chris Buckmaster
Ald. Nancy Salentine
Ald. Neil Borgman
This is to certify that this is a true and accurate copy of Resolution #020-2005
which was adopted by the Common Council of the City of Muskego.
1/2005jmb
'...
. . .
FEE SCHEDULE
DEPARTMENT OF PUBLIC WORKS
WORK PERFORMED 1999 RATE 2000 RATE 2003 RATE 2005 RATE
Lot Mowing $ 57.60/hr. $ 60.00/hr. $ 70.00/hr. $ 75.00/hr
Snow plowing/Private Drives $ 50AO/hr. $ 54.00/hr. $ 65.00/hr. $ 70.00/hr
Culvert Reset in Private Drives $250.00 $ 275.00 $ 300.00 $ 400.00/hr
Grading/Private Drives $ 45.00/hr. $ 52.00/hr. $ 65.00/hr. $ 70.00/hr.
New Culverts 12" X 20' $525.60 $ 565.00 $ 600.00 $ 625.00
Additional footage $ 19.08/ft. $ 20.00 $ 26.00 $ 30.00/ft
Culvert band $ 8.13/ea. $ 9.00 $ 14.00 $ 18.00
15" X 20' $576.00 $ 615.00 $ 650.00 $ 675.00
Additional footage $ 21.60/ft. $ 22.00 $ 30.00 $ 34.00
Culvert band $ 10.02/ea. $ 10.50 $ 15.00 $ 20.00
18" X 20' $633.60 $ 675.00 $ 715.00 $ 745.00
Additional footage $ 24A8/ft. $ 25.00 $ 34.00 $ 38.00/ft.
Culvert band $ 11.94/ea. $ 12.50 $ 18.00 $ 26. OO/ft.
21" X 20' $699.60 $ 750.00 $ 800.00 $ 825.00
Additional footage $ 27.78/ft. $ 28.50 $ 36.00 $ 40.00/ft.
Culvert band $ 13.89/ea. $ 14.50 $ 21.00 $ 28.00
24" X 20' $775.00 $ 825.00 $ 900.00 $ 930.00
Additional footage $ 31.55/ft. $ 32.50 $ 38.00 $ 41.00/ft.
Culvert band $ 15.81/ea. $ 16.50 $ 24.00 $ 30.00
. . .
WORK PERFORMED 1999 RATE 2000 RATE 2003 RATE 2005 RATE
Concrete Inverts 5" X 2' X l' $ 6.48/ft. $ 9.50/ft. $ 10.00/ft. $ 15.50/ft.
5" X 3' X l' $ 8.64/ft. $ 11.80/ft. $ 12.20/ft. $ 20.00/ft.
5" X 4' X l' $ 10.08/ft. $ 13.25/ft. $ 15.00/ft. $ 25.00/ft.
Road Opening Permits
(1/2 of road width not to exceed
36" in width) $576.00 $ 615.00 $ 700.00 $ 750.00
(entire road width not to exceed
36" in width) $864.00 $ 925.00 $1000.00 $ 1100.00
4" Pipe $ 3.60 $ 4.25 $ 5.00
Dual 4" Pipe $ 4.50 $ 5.50 $ 6.25
Greater than 36" wide or any unforeseen damages billed at the discretion
of the Public Works Superintendent
Ditch Bonds - Deposit $ 288.00 $ 315.00 $ 345.00 $ 345.00
- Inspection Fee $ 36.00 $ 40.00 $ 45.00 $ 50.00
Curb/Gutter Restoration
- Deposit $ 288.00 $ 315.00 $ 345.00 $ 345.00
- Inspection Fee $ 36.00 $ 40.00 $ 45.00 $ 50.00
Endwalls Installed $ 144.00 $ 165.00 $ 225.00 $ 300.00
Labor $ 24.00/hr. $ 27.00/hr. $ 30.00/hr. $ 32.00/hr.
Cruz Aire $ 60.00/hr. $ 85.00/hr. $ 85.00/hr. $ gO.OO/hr.
"I
. .
WORK PERFORMED 1999 RATE 2000 RATE 2003 RATE 2005 RATE
Patrol/Dump Truck $ 40.00/hr. $ 65.00/hr. $ 65.00/hr. $ 85.00/hr.
Camera Truck $ 75.00/hr. $ 78.00/hr.
Vactor $ 85.00/hr $ gO.OO/hr.
Cityhali/Engineering/Public Works/DPW Fees
.