CCR2004061-
COMMON COUNCIL. CITY OF MUSKEGO
RESOLUTION #061.2004
RESOLUTION TO ESTABLISH FEES
(Fee for Building Permits and Engineering Review)
WHEREAS, Chapter 30 of the Municipal Code of the City of Muskego provides that
applicable fees shall be, as from time to time, established by Resolution of the Common
Council; and
WHEREAS, The Finance Committee reviewed an amendment to Table #1 located in the
Building Code (Chapter 30), as attached, and has recommended approval.
THEREFORE, BE IT RESOLVED, That the Common Council of the City of Muskego, upon
the recommendation of the Finance Committee, does hereby establish building- permit fees
as outlined in Table #1, as attached, effective upon adoption of this Resolution.
DATED THIS 13th DAY OF April 2004
SPONSORED BY:
- FINANCE COMMITTEE
Ald. Rick Petfalski
Ald. Nancy Salentine
Ald. Eric Schroeder
This is to certify that this is a true and accurate copy of Resolution #061-2004 which was
adopted by the Common Council of the City of Muskego.
4/04jmb
-
-
TABLE #1
CITY OF MUSKEGO
SCHEDULE OF BUILDING PERMIT AND ENGINEERING REVIEW FEES
AMENDED APRIL 13, 2004
A. Residential 1 & 2 family & attached garages, new const. and additions, (see F. for
alterations ).
B. Apartments 3 family and over, row houses, other
Multi-family dwellings and institutional
buildings with attached garages, new const. and
additions, (see F. for alterations).
C. Local business, commercial buildings, retail stores,
office buildings, hotels, restaurants, etc., new
const. and additions, (see F. for alterations).
D. Detached garages and other accessory structures,
new construction or additions, (see F. for alterations).
-
E. Alterations, repairs, residing, re-roofing or other
work where sq. ft. cannot be calculated.
1.) Residential
2.) Commercial (Re-roofing $250.00 maximum per bldg.)
F. Foundation early start permit:
(REQUIRES FINANCE COMMITTEE)
1.) Multifamily/commercial/industrial
2.) 1 & 2 Family dwellings
G. Heating units, incinerators, fireplaces and other
wood burning appliances:
1.) First 150,000 STUs
a.) Each additional 50,000 BTUs/fraction
$750.00 maximum per unit.
H. Air conditioning:
1.) First 36,000 STUs or 3 TONS
a.) Each additional 12,000 BTUs, 1 TON
or fraction, $750.00 maximum per unit.
-
I. HV AC distribution systems:
1.) Each 100 sq. ft. of temperature controlled
area.
$.26 sq.ft.
.30 sq.ft.
.28 sq.ft.
.26 sq.ft.
50.00 min.
$9.00/$1000
$9.00/$1000
1000.00 ea.
250.00 ea.
50.00 ea.
15.00 ea.
50.00 ea.
15.00 ea.
$50.00 min.
1.50 ea.
Page 2 Schedule of Building Peffi1it & Engineering Review Fees 4/13/2004
J. Exhaust hoods and similar systems, comm. or indo 75.00 ea.
-
K. Wrecking or razing:
(fee may be waived if structure subject to condemnation)
1.) Base fee
a.) Then add sq. ft. charge (total area)
NOTE: Fee not to exceed $500.00 maximum per bldg.
100.00 ea.
.05 ea.
L. Moving building over public ways:
1.) Principal bldg. base fee
a.) Then add sq. ft. charge (total area)
2.) Accessory bldg. base fee
a.) Then add sq. ft. charge (total area)
100.00 ea.
.05 ea.
50.00 ea.
.03 ea.
M. Fuel tanks, remove or install, (registration only) 30.00 ea.
-
N. Plan examination:
1.) 1 & 2 family new const.
(includes living areas all levels & garage)
a.) Base fee per building
2.) 3 family and over new const.
a.) Base fee per building
b.) Then add per dwelling unit
3.) Residential additions or alterations
4.) Accessory or agricultural over 240 sq. ft.
5.) Commercial, industrial:
a.) New construction
b.) Additions
c.) Alterations over 1500 sq. ft.
d.) Alterations under 1500 sq. ft.
6.) HVAC plans, commercial, industrial
7.) Decks (over 120 sq. ft.), swim pools
8.) Fire Department Review (All Commercial)
Fire Department Review
(Sprinkler system with 50 heads or more)
(Sprinkler system with less than 50 heads)
Fire Department Review
(Fire and Smoke Detection Systems)
125.00 ea.
175.00 ea.
250.00 ea.
50.00 ea.
50.00
50.00
300.00 ea.
250.00 ea.
250.00 ea.
200.00 ea.
50.00 ea.
30.00 ea.
200.00 ea.
200.00 ea.
100.00 ea.
100.00 ea.
O. Wisconsin Uniform Permit seals 40.00 ea.
- P. House numbers:
1.) Complete set
2.) Each individual letter
3.) Each frame (regardless of size)
20.00 ea.
2.00 ea.
4.00 ea.
Page 3 Schedule of Building Permit & Engineering Review Fees 4/13/2004
- Q. Occupancy permit:
1.) Residential (per unit)
2.) Commercial, industrial, business
3.) Temporary Occupancy Permits (6 months or less) - Commercial
4.) Temporary Occupancy Permits (6 months or less) - Residential
50.00 ea.
200.00 ea.
1000.00 ea.
R. Pools, above ground, in ground, spas, hot tubs
($50 minimum even if combined with deck)
$50.00 min.
8.00/$1000
S. Decks $50.00 ea.
T. Signs billed each sq. ft. face, (inc. base if new construction) $50.00 base fee
$1.00 sq.ft.
U. Erosion Control/Land Disturbing Fees:
1.) 1 & 2 family lots
2.) 3 family and over
a.) Base fee per building
b.) Then add per 1000 sq. ft. of
disturbed lot area.
$2,000.00 maximum per building.
150.00 ea.
200.00 ea.
8.00/1000
- 3.) Commercial, industrial, institutional
a.) Base fee per building
b.) Then add per 1000 sq. ft. of
disturbed lot area.
$2,000.00 maximum per building.
300.00 ea.
8.00/1000
4.) Land disturbing permit (no const.)
a.) Base fee
b.) Then add for each acre over 4 acres
5.) Utility installations (annual permit)
6.) Other misc. small projects
150.00 ea.
10.00/acre
1000.00 ea.
50.00 ea.
Ua. Erosion Control/Deposits:
1.) One/two Family (one acre and less)
2.) One/two Family (greater than one acre)
500.00 ea. 400 refund
600.00ea. 500 refund
3.) Multi-Family (Not less than 1,000 ea.)
4.) Commercial Business
750.00ea 600 refund
1000ea.800refund
-
V. Permit reimbursement fee
(no money refunded if any inspections made)
50.00 ea.
Page 4 Schedule of Building Permit & Engineering Review Fees 4/13/2004
-
W. *Failure to call for inspection 100.00 ea.
X. Inspections outside of normal hours/workdays 200.00 ea.
Xa. Re-inspection (after 1 follow-up) 75.00 ea.
Xb. Minimum charge for anyone permit 50.00 ea.
Xc. ** Penalty fees
Y. Re-submission of previously approved plans 50.00 ea.
z. Engineering Review Per Hour or fraction thereof
,....
1. Director of Engineering
2. Engineer I
3. Engineering Tech II
4. Engineering Tech I
5. Land Surveyor *
6. Administrative Assistant
7. Survey Equipment Fee
8. Capital Charges
80.00 hr
65.00 hr
50.00 hr
40.00 hr
65.00 hr
30.00 hr
150.00 day
20.00 ea.
*New Classification
* FAILURE TO CALL FOR INSPECTION: An additional fee shall be
assessed, as listed in
the table above, when work covered, or new installation utilized prior to approved
inspection.
** PENALTY FEES: A penalty, which amount shall equal three (3) times the
applicable
permit fee (min. $150), shall be paid when work is started prior to permit being
issued.
Amended by Resolution #18-2001, January 23,2001
Amended by Resolution #195-2000, September 26,2000
Amended by Resolution #28-2002, January 22, 2002
Amended by Resolution # 061-2004, April 13, 2004
CITYHALLIMUNICIPALCODEIT ABLE#1
-