Loading...
CCR1996003COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #3-96 RESOLUTION TO ESTABLISH FEES (Building Permit Fees) WHEREAS, Chapter 30 of the Municipal Code of the City of Muskego provides that various building permit fees and penalties be, as from time to time, established by Resolution; and WHEREAS, the Finance Committee has recommended that Table #1, which contains said fees and penalties, be amended and adopted, as attached. NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby approve Table #1 which contains building permit fees and penalties, as attached. DATED THIS DAY OF , 1996. SPONSORED BY: FINANCE COMMITTEE Ald. Domonic D'Acquisto Ald. David J. Sanders Ald. Patrick A. Patterson This is to certify that this is a true and accurate copy of City of Muskego. Resolution #3-96 which was adopted by the Common Council of the City Clerk 1/96 jmb COMMON COUNCIL - CITY OF MUSKEG0 RESOLUTION #3-96 RESOLUTION TO ESTABLISH FEES (Building Permit Fees) WHEREAS, Chapter 30 of the Municipal Code of the City of Muskego provides that various building permit fees and penalties be, as from time to time, established by Resolution; and WHEREAS, the Finance Committee has recommended that Table #1, which contains said fees and penalties, be amended and adopted, as attached. NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby approve Table #1 which contains building permit fees and penalties, as attached. DATED THIS 9th DAY OF JANUARY , 1996 SPONSORED BY: FINANCE COMMITTEE Ald. Domonic D'Acquisto Ald. Patrick A. Patterson Ald. David J. Sanders This is to certify that this is a true and accurate copy of Resolution #3-96 which was adopted by the Common Council of the City of Muskego. 1/96 jmb TABLE 81 Page 1 CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES A. B. I C. i ~ ~ E. 19 D. ~ G. i H. I. J. Residential 1 & 2 family & attached garages, $ new const. and additions, (see F. for alterations). Apartments 3 family and over, row houses, other other multi family dwellings and institutional buildings with attached garages, new const. and additions, (see F. for alterations). Local business, commercial buildings, retail stores, office buildings, hotels, restaurants, etc., new const. and additions, (see F. for alterations). Manufacturing facilities, industrial factories, warehouses, new const. and additions, (OFFICES per C.), (see F. for alterations, EXCEPT OFFICE AREAS). Detached garages and other accessory structures, new construction or additions, (see F. for alterations). Alterations, repairs, residing, re-roofing or other work where sq.ft. cannot be calculated. Re-roofing $250.00 maximum per bldg. .18 sq.ft. -18 sq.ft. 16 sq.ft. .10 sq.ft. .10 sq.ft. 7.00 /$lo00 Foundation early start permit: (REQUIRES FINANCE COMMITTEE OR PUBLIC SAFETY APPROVAL) 200.00 ea. 100.00 ea. .- 2.) 1 & 2 Family dwellings 1.) Multi family/commercial/industrial Heating units, incinerators, fireplaces and other wood burning appliances: 1.) First 150,000 BTUs a.) Each additional 50,000 BTUs/fractn $750.00 maximum per unit. Air conditioning: 1.) First 36,000 BTUs or 3 TONS or fraction $750.00 maximum per unit. a.) Each additional 12,000 BTUs, 1 TON HVAC distribution systems: 1.) Each 100 sq.ft. of temperature controlled area, (minimum $25) Exhaust hoods and similar systems, comm. or ind. 30.00 ea. 10.00 ea. 30.00 ea. 10.00 ea. 1.00 ea. 50.00 ea. CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES TABLE 81 Page 2 continued 6 M. N. 0. P. Q. R. S. T. U. V. Wrecking or razing: (fee may be waived if structure subject to condemnation) 1.) Base fee 30.00 ea. a.) Then add sq.ftg. charge (total area) .02 ea. NOTE: Fee not to exceed $250 maximum per bldg. Moving building over public ways: 1.) Principal bldg. base fee 50.00 ea. a.) Then add sq.ftg. charge (total area) .03 ea. 2.) Accessory bldg. base fee 5.00 ea. a.) Then add sq. ftg. charge (total area) .03 ea. Fuel tanks, remove or install, (registration only) 30.00 ea. Code compliance inspections (1 follow-up insp. inc.) 75.00 ea. Plan examination: 1.) 1 L 2 family new const. a.) Base fee per building (includes living areas all levels L garage) 75.00 ea. a.) Base fee per building 75.00 ea. b.) Then add per dwelling unit 20.00 ea. 3.) Residential additions or alterations 40.00 ea. 4.) Accessory or agricultural over 240 sq.ft. 20.00 ea. 5.) Commercial, industrial: a.) New construction 150.00 ea. b.) Additions 100.00 ea. c.) Alterations over 1500 sq.ft. 100.00 ea. d.) Alterations under 1500 sq.ft. 50.00 ea. 6.) HVAC plans, commercial, industrial 30.00 ea. 7.) Decks (over 240 sq.ft.), swim pools 20.00 ea. Wisconsin Uniform Permit seals 30.00 ea. 2.) 3 family and over new const. House numbers: 2.) Each individual letter 1.) Complete set 3.) Each frame (regardless of size) 15.00 ea. 1.15 ea. 1.93 ea. Occupancy permit: 1.) Residential (per unit) 30.00 ea. 2.) Commercial, industrial, business 75.00 ea. Pools, above ground, in ground, spas, hot tubs 7.00/$1000 ($30 minimum even if combined with deck) Decks 30.00 ea. Signs billed each sq.ft. face, (inc. base if new 1.00 ea. construction) CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES TABLE X1 Page 3 continued W. Erosion control: 1. ) 1 & 2 family lots 2.) 3 family and over b.) Then add per 1000 sq.ft. of a.) Base fee per building disturbed lot area. $2,000.00 maximum per building. 3.) Commercial, industrial, institutional b.) Then add per 1000 sq.ft. of a.) Base fee per building disturbed lot area. $2,000.00 maximum per building. 4.) Land disturbing permit a. ) Base fee 5.) Utility installations b.) Then add for each 6.) Other misc. small proj (no const. ) acre over 4 acres (annual permit) ects X. Permit reimbursement fee (no monies refunded if any inspections made) Y. *Failure to call for inspection Inspections outside of normal hours/workdays 4:. Re-inspection (after 1 follow-up) Zb. Minimum charge for any one permit 100.00 ea. 150.00 ea. 5.00/1000 150.00 ea. 5.00 ea. 100.00 ea. 6.00 ea. 200.00 ea. 30.00 ea. 30.00 ea. 50.00 ea. 100.00 ea. 30.00 ea. 30.00 ea. Zc. ** Penalty fees *** ea. FAILURE TO CALL FOR INSPECTION: An additional fee shall be assessed, as listed in the table above, when work covered, or new installation utilized prior to approved inspection. the applicable permit fee (min. $go), shall be paid when work is started ** PENALTY FEES: A penalty, which amount shall equal three (3) times prior to permit being issued.