CCR1991047COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION #47-91
BUILDING CODE (PERMIT FEES)
AMENDMENT TO CHAPTER 30
WHEREAS, Chapter 30, Section 30.05(8) of the Municipal Code
provides that fees for permits required by this Chapter shall be
as from time to time established by resolution of the Common
Council, and
WHEREAS, the Public Safety Committee has recommended approval of
the attached amendments to Chapter 30.
NOW, THEREFORE, BE IT RESOLVED that the Common Council Of the
City of Muskego, upon the recommendation of the Public Safety
Committee, does hereby amend Table 1, Chapter 30 as attached.
BE IT FURTHER RESOLVED that the attached fees are in effect as
of the date of adoption of this resolution.
DATED THIS 12TH DAY OF MARCH, 1991.
PUBLIC SAFETY COMMITTEE
Ald. David D. Taube
Ald. Patrick A. Patterson
ATTEST:
City Clerk
Ald. William T. Simmons
3/91
cac
.. I~
A.
B.
C.
0.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
TABLE NO. 1
Minimum permit fee for all permits ..... $30.00
Residence - One & Two family,
Accessory building &garages ........... $5.50/1,000 cu. ft. or fraction thereof.
Residences & Apartments, Three
Multiple family dwellings,
family & over, Row Housing,
Institutional,. ....................... .$5.50/1,000 cu. ft. or fraction thereof.
Residences - Additions ................. $6.50/1,000 cu. ft. or fraction therof.
buildings or additi,ons thereto.. ..$6.00/1,000 cu. ft. or fraction thereof.
Local business, Office
Manufacturing or Industrial
(Office areas to be included
under E). ............................. .$4.50/1,000 cu. ft. or fraction thereof.
.....
Permit to start construction of footinqs and foundations ............... $75.00 Multi-family & Ind./Commercial - $50.00 One & Two Families
Agriculture buildings.. ............... .$2.50/1,000 cu. ft. or fraction thereof.
All other buildings, structures,
alterations, residing, reroofing,
repairs where cubic contents cannot
be calculated .......................... $6.00/$1,000 valuation.
Heating & Incinerator Units ............ $25.00/unit, up to & including 150,000
input BTU units. Additional fee of
$4.00/each 50,000 BTU or fraction thereof.
Commercial/Industrial exhaust
hoods & exhaust systems.. .............. $25.00/uni t.
Heating & Air Conditioning
Distribution Systems.. ................ .41.00/100 sq. ft. of conditioned area with
a '$15.00 minimum.
Alr Conditioning - Other than
wall units ............................ .$25.0O/unit up to 3 tons or 36,000 BTU's.
Additional fee of $4.00/each ton or 12,000
BTU's or fraction thereof.
Permanently installed wall units ....... $lO.OO/unit.
Wrecking or razing - Building
structure is condemned.. .$30.00 minimum plus $l.OO/l,OOO til. ft.
inspector may waive fee if ..............
..
-,
0. Moving buildings over public ways.. .... $50.00 plus $1.50/1,000 cu. ft. for
principal buildings. $3.00 plus
$1.50/1,000 cu. ft. for accessory
buildings.
P. Fuel Tanks ............................. $8.00/1,000 gal. for installation with
$100 maximurn/tank.
$30.00/tank removal, repairs of
a1 terations. I
Q. Reinspections.. ....................... .$30 .o$nspection.
R. Plan Examination:
1. One & Two family residence ......... $50.00 up to 50,000 cubic ft./$75 over
2. Apartment, three family residence, 50,000 cubic
row housing, multiple family bldg..S40.00 plus $5.00/unit. feet
NOTE: Heating plans submitted ~
separately.. ................. .$25.00
3. Commercial - Industrial
Alterations & Additions.. .......... $60.00 4. Additions, alterations to 1 & 2....$20.00
5. Accessory building, 240 sq. ft.
or more.. ......................... .$20.00
S. Special Inspections.. ................. .SlOO.OO
T. Wisconsin Unform Bldg. Permit Seal ..... $25.00 8 Note 1 - Permits may be obtained individually or on one form in the categories
of construction, heating, ventilation & air conditioning, electrical 8
pl umbi ng .
Note 2 - An additional fee for plan review may be assessed at the time of
application for renewal of the permit.
U. Occupancy Permit - Residential ......... $25.OO/unit - Commercial & Industria1 .... $50.00
V. Pools - Inground/Above Ground/Spas. .. ..$5.00/$1,000’ valuation
$30.00 minimum
W. Decks.. ................................ $30.00
X. Double fees: Upon failure to obtain a permit before work on a building has been
started, except in emergency cases, the total fee shall be doubled
the fees charged.
NOTE: Cubic contents shall be defined as follows: The volume of the buildng
enclosed by the outer surface of the exterior walls from the top of the
footing to the average height of the roof.
NOTE: In determining costs, all construction shall be included with the
exception of heating, air conditioning, electrical or plumbing work.
'. : -
NOTE: Check with local municipality regarding fee schedule.
- - -
The recommended approval of amendments, code changes, products, systems or quality
control agencies by the Code Committees and the Wisconsin Uniform Code Associations
does not constitute an approval or acceptance by any local community. Such
acceptance is a function of local government administered by the designated local
officials without the necessity of submitting further data because it is supported
by factual reports describing the nature and use of the product or system and its
performance under designated standard tests by recognized testing agencies.