CCR1984040RESOLUTION #40-84
(As Amended)
ACCEPTANCE OF BID
KURTZE LANE SEWER PROJECT
WHEREAS, on January 24, 1984, the Council rejected all bids
which had been received for the Kurtze Lane Sewer Project and
directed the City Engineers to rebid the project, and
WHEREAS, the following bids have been received:
Mainline Sewer and Water $340,298.00
Michels Pipeline 367,336.00
Super Excavators
378,625.00
369,065 .OO
Globe Contractors
Rawson Contractors
394,363.50, and
WHEREAS, the Public Sewer Committee, Finance Committee and City
Engineers have recommended the low bid of $340,298.00 from
Mainline Sewer and Water be accepted with the following
provisions: e 1. Since no sub-contractors were listed in their
will be allowed to work on this project
proposal form, only representatives from Mainline
(including the electrical and fencing work at the
sewage pumping station site).
2. The restoration work shall be closely supervised.
3. Only the base-bid suppliers for the sewage
be accepted.
pumping station and the standby generator shall
THEREFORE, BE IT RESOLVED that the Common Council of the City
of Muskego, upon the recommendation of the Public Sewer
Committee and the Finance Committee does hereby accept the low
bid of $340,298.00 from Mainline Sewer and Water with the
provisions listed above, with funds from TID #4.
BE IT FURTHER RESOLVED that the Mayor and Clerk are authorized to execute the necessary documents in the name of the City.
BE IT FURTHER RESOLVED that the required contract and insurance
certificate must be submitted by Mainline prior to the start of
construction.
Resolution 840-84
Page Two
BE IT FURTHER RESOLVED that pursuant to written requests by the
recommendations as to whether or not the subcontractor will be contractor to the City Engineer, the City Engineer shall make
allowed to do certain work on the project and if they recommend
they be allowed to do the work, the subcontractors shall be
allowed to do it upon the Mayor‘s approval.
DATED THIS 27th DAY OF March FINANCE CO~ITTEE
1984.
a ATTEST :
Ald. Edwin P. Dumke
Aldy Mitchel_Peqovich
Ald. Charles Colburn f-”
RESOLUTION #40-84
ACCEPTANCE OF BID
KURTZE LANE SEWER PROJECT
WHEREAS, on January 24, 1984, the Council rejected all bids
which had been received for the Kurtze Lane Sewer Project and
directed the City Engineers to rebid the project, and /
WHEREAS, the following bids have been received: /'
Mainline Sewer and Water $340,298 LOO
Michels Pipeline 367,336'.00
Super Excavators 369,465 .OO
Rawson Contractors 378,625.00
Globe Contractors 394,363.50, and
/
WHEREAS, the Public Sewer Committee, Finance Committee and City
Engineers have recommended the low bid of $340,298.00 from
Mainline Sewer and Water be accepted with,the following
provisions:
1. Since no sub-contractors were listed in their
proposal form, only representatives from Mainline
will be allowed to work on this project
(including the electrical and fencing work at the
2. The restoration work shall be closely supervised.
sewage pumping station site).
3. Only the base-bid suppliers for the sewage
pumping station and the standby generator shall
be accepted.
THEREFORE, BE IT RESOLVED that the Common Council of the City
of Muskego, upon the recommendation of the Public Sewer
Committee and the Finance Committee does hereby accept the low
bid of $340,298.00 from Mainline Sewer and Water with the
provisions listed above, ,with funds from TID #4.
BE IT FURTHER RESOLVED khat the Mayor and Clerk are authorized
to execute the necessary documents in the name of the City.
BE IT FURTHER RESOLVED that the required contract and insurance certificate must be' submitted by Mainline prior to the start of
construction. i
DATED THIS a&,'.' DAY OF I"_u,e-M*an/ , 1984.
/
d
e ATTEST :
Ald. Edwin P. Dumke
Ald. Mitchel Penovich
Ald. Charles Colburn
City Clerk
2/28
jm