CCR1976027I-
I #: R.ESOLUTION #?.7-76
AUTHCR.IZING REFUND TO K'LNNETH L4RSE.N
FOR CULVERT COST
(S65 W13234 LongfeLlow Lane)
WHEREAS, it is the City of Musk,ego's respons.ib.il;i.ty to properly
size and arrange for Brookfield Culvert Co. to pk-ovide and place
driveway culverts for new homes constructed in the C.ity of Muskego,
and , to construct a new home on the northeast corner of Longfellow Lane
WHEREAS, Mr. Kenneth Larsen had contract,ed with BieI..insk~i Builders
and Saroyan Road faci.ng Longfe.L.Low Lane!, and
WHEREAS, Bielinski Builders, on November 5, 1.974, obtained a
building permit and paid $380.00 for the cul.vert i,nstalled by the
City of Muskego, and
WHEREAS, constructi-an of the basement was begun on November 21,
1974, includingexcavation, footings, basement walls, backfilling 0 and delivery of framing materials, and
WHEREAS, only after considerable construc,t,.i.on was Mr. Larsen, and
subsequently Bielinski Builders, not.if.ied that the c~ity had erred
and the culvert had been placed fur his driveway, anU
WHEREAS, the culvert as origina1.l~ sized amounted to a 30" pipe
at a cost of $380.00, and
WHEREAS, the resized culvert consisted of two 52" arched culverts
at a cost of $1,300.00, said cu1.verts to accommodate not only tlie
normal drainage on Longfellow L.ar,e but also the storm wa.ter carried
through the main Fountainwood drainage dit:ch Irom New Berlin, and
WHEREAS, the normal culvert as originally sized and placed at a
cost of $380.~00 would accommodate the normal. dra.inage on L.ongfellow
Lane, and
WHEREAS, as the additional capacity of the rfsl.zed two 52" arched
culvert is required to hand1.e the storm water from New Berlin
through the Fountainwood Drainage d.i,tch,
THEREFORE, BE IT RESOLVED that the C.i.ty of Musk.ego shall share the cost
of the oversized culvert in the amount of $650.00.
DATED THIS 34 DAY OF TA
ATTEST:
City Clerk
1/76
je/p jk