Loading...
CCR1971184RESOLUTION #184-71 ACCEPTANCE OF LOW BID FOR THE CONSTRUCTION OF CITY HALL/LIBRARY WHEREAS, on August 6, 1971, the bids for the new City Hall/Library complex were opened, and WHEREAS, after consultations with the City's architects, several items were eliminated or substituted, and WHEREAS, the Building Committee of the Common Council has recommended that all low bids be accepted bringing the total cost of the building to $233,279.35 plus approximately $10,000.00 in architect's fees, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon the recommendation of the Building Committee does hereby accept and award the following bids and contracts: e E. D. WESLEY COMPANY BASE BID $ 16,988.00 -Eliminate gravel backfill, use excavated materials 100.00 -Change inside C.I. storm & sanitary sewer to clay pipe 120.00 -Substitute T29 Nibco valves in lieu of type specified 75.00 -Delete washroom accessories 475.00 -Delete pipe covering, cover cold water exposed and compression tank only 300.00 -Delete color code and valve tags 35.00 -Change duplex sump pump to simplex (same capacity) to Weil F921 - 314 hp., W.O. high water alarm 150.00 TOTAL CONTRACT $ 15,733.00 "EL SHEET METAL h HEATING CO.. INC. BASE BID $ 35,966.00 12'-0'' Alternate Addition (add) + 380.00 Alternate B15-A, Electrical Controls (deduct) -840.00 TOTAL CONTRACT $ 35,506.00 Resolution #184-71 - Cont'd. ZINNER ELECTRIC CO. BASE BID Alternate 16C Deduct Sound System Eliminate "N" fixtures Eliminate finishing in Rooms B-3, B-4, Eliminate "B" fixtures and substitute "A" fixtures Substitute "GI' fixtures for "B" units Substitute (2) "A" fixtures for (4) type "B" fixtures Add, 12'-0" alternate Markstone units in soffit B-5 & B-8 TOTAL CONTRACT $23,914.00 - 309.10 -2,462.00 - 327.90 - 193.80 - 283.05 - 26.30 - 3.50 + 485.00 $ 20,793.35 TRI-COUNTY CONSTRUCTION, INC. QUALINE CONSTRUCTION, INC . BASE BID $ 161,670.00 -Alternate "B" (12'-0'' Addition) + 7,050.00 -Alternate 4A-C (Utility Size Brick) - 3,000.00 - Substitute 24" Concrete Block in Lieu of Standard 16" - 300.00 - Eliminate 12'-0" Masonry Wall in Lower Level at Stairway and Use Frame Walls - 300.00 - Delete Cabinets in Lounge B5 and Door & Frame No. B9 - 275.00 - Delete Common Stud Partitions in Lower Level Separating Rooms B3, B4, B5 & B8 - 110.00 (IncludPs furring of 1st Floor Walls) - Delete Painting in Lower Level, except - Delete Acoustic Tile Ceilings in Lower - Delete Soundboard except at Main Dividing stairway enclosure - 312.00 Level Rooms B5. & B8 Only - 286.00 Walls at Library & Council Chambers; drywall to extend upwards for sound control - 1,836.00 Glass in lieu of Specified - 1,000.00 TOTAL CONTRACT $161,247.00 e - Substitute Quaker #lo0 wl 1" insulating BE IT FVRTHER RESOLVED that the City Clerk and Mayor are authorized to execute the necessary documents in the name of the city, subject to approval by the City Attorney. n DATED THIS /:/ DAY OF , 1971. BUILDING COMMITTEE FINANCE COMMITTEE ATTEST: