CCR1965036RESOLUTION # 36
0 AWARDING OF BID FOR REPAIR OF BLDG. AT HORN FIELD
WHEREAS THE INTERIOR OF THE BUILDING AT HORN FIELD IS IN NEED
OF REPAIR,
WHEREAS A CONTRACT TO REPAIR THE EXTERIOR OF THE BUILDING HAS
BEEN AWARDED TO MR. GREGORY BOEHM OF MUSKEGO
WHEREAS MR. GREGORY BOEHM HAS INDICATED HE CAN REPAIR THE IN-
FOLLOWS: 1. DRO CEILING TO 9' LEVEL
2. FI J ISH CEILING WITH ACCOUSTICAL TILE
3. LUAN PANELING ALL WALLS 4. FINISH WINDOWS AND DOORS 5. NEW BASE AND SHOE
6. ENCLOSE FURNACE ROOM
7. FIX FLOOR WHERE NEEDED
TERIOR OF THE BUILDING TO THE FOLLOWING EXTENT FOR $825.00 AS
0
THEREFORE BE IT RESOLVED THAT THE COMMON COUNCIL OF THE CITY OF
MUSKEGO DOES HEREBY AUTHORIZE THE FOLLOWING WORK 1-7 TO BE DONE
BY MR. GREGORY BOEHM AT A COST NOT TO EXCEED $025.00
PUBLIC WELFARE COMMITTEE