CCR2009027-Dedication-Woodland Creek
COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION #027-2009
DEDICATION AND ACCEPTANCE OF PUBLIC IMPROVEMENTS IN AND FOR
WOODLAND CREEK ESTATES SUBDIVISION
WHEREAS, Woodland Creek Estates LLC, hereafter called “DEVELOPER” has
constructed public improvements which include public street improvements on Cardinal Drive,
Cardinal Court, Acorn Drive, Creekside Drive and Creekside Court, the sanitary sewer lift
station located on Outlot 3 (tax key number 2242-063), the sanitary sewer lines and water main
lines installed within the right-of-way of Racine Avenue and all other sanitary sewer, water main
and storm sewer facilities, including any and all equipment and appurtenances which may in any
way be a part thereof or pertain to, in and for the Woodland Creek Estates Subdivision; and
WHEREAS, the DEVELOPER has completed the construction and installation of the
following improvements:
Sanitary Sewer
896 LF at $ 143 /LF of 8” PVC SDR-18 Sanitary Sewer
3,380 LF at $ 59 /LF of 8” PVC SDR-35 Sanitary Sewer
1,961 LF at $ 40 /LF of 6” PVC Sanitary Laterals (60)
183 VF at $ 60 /LF of 6” Sanitary Risers (14 Each)
4,400 LF at $ 72 /LF of 6” PVC Forcemain
26 EACH at $ 2,900 /EACH Sanitary Manholes
1 EACH at $ 4,000 /EACH Sanitary Drop Manhole
1 EACH at $ 268,000 Lift Station with Portable Generator
1 EACH at $ 14,000 /EACH Junction Manhole for Forcemain and Connect to Existing Forcemain
1 EACH at $ 5,000 /EACH Connection to Existing Manhole and Sanitary Sewer
Watermain
1,475 LF at $ 103 /LF of 16” watermain pipe
3,900 LF at $ 42 /LF of 8” watermain pipe
158 LF at $40 /LF of 6” Hydrant Leads
15 EACH at $ 1,900 /EACH of Hydrants
15 EACH at $ 700 /EACH of 6” valves
11 EACH at $ 900 /EACH of 8” valves
5 EACH at $ 1,800 /EACH of 16” valves
1 EACH at $ 400 /EACH of 2” Air Release
2 EACH at $ 400 /EACH of Anti–Seep Collar on 16” Watermain
60 EACH at $ 150 /EACH 1-1/4” Brass Sets
2,091 LF at $ 29 /LF 1-1/4” Water Service
Storm Sewer
213 LF at $ 61 /LF of 30” Concrete Storm Sewer
1,194 LF at $ 44 /LF of 21” Concrete Storm Sewer
Reso. #027-2009 Page 2
952 LF at $ 41 /LF of 18” Concrete Storm Sewer
1,011 LF at $ 36 /LF of 15” Concrete Storm Sewer
2,429 LF at $ 35 /LF of 12” Concrete Storm Sewer
62 EACH at $ 1,300 /EACH of Storm Manholes and Inlets
4 EACH at $ 3,600 /EACH of Pond Outfall Structures
1 EACH at $ 1,500 /EACH of 30” End Section
2 EACH at $ 1,300 /EACH of 21” End Section
3 EACH at $ 1,200 /EACH of 18” End Section
9 EACH at $ 1,000 /EACH of 12” End Section
440 LF at $ 19 /LF of 6” Storm Sump Line
1,495 LF at $ 22 /LF of 6” Storm Laterals (60)
3 EACH at $ 450 /EACH of Sump Cleanouts
Paving
3,900 C/L LF of roadway including 8” of gravel base course,
30” Mountable and Vertical face curb and gutter,
4” of Asphaltic Concrete Binder Course
at a lump sum of $ 239,667
750 C/L LF of Pedestrian Path including 6” of gravel base course,
2” of Asphaltic Concrete Pavement Course
at a lump sum of $ 11,250
Note: Final Lift of 1 1/2” Asphaltic Concrete Pavement Surface
Course has not been installed as of the date of this
Dedication
and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision
of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and
the City Engineer has certified the systems’ acceptability except for the final lift of asphalt
pavement; and
WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally
give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all
encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and
appurtenances which relate directly to the utilization of such IMPROVEMENTS; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated
against any defects due to faulty materials or workmanship which appear within a period of one
(1) year from the date of dedication and shall pay for any damages resulting therefrom to the
CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought
against the CITY at any time arising out of the alleged defects or other failure of this guarantee;
and
WHEREAS, the DEVELOPER must complete the installation of the final lift of asphalt,
per the subdivider’s agreement, and such installation must meet all City requirements, and this
improvement will be considered complete upon approval of the City Engineer; and
Reso. #027-2009 Page 3
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of
Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication
and acceptance of the public improvements in and for the Woodland Creek Estates Subdivision.
TH
DATED THIS 10 DAY of MARCH , 2009
SPONSORED BY:
FINANCE COMMITTEE
Ald. Tina Schaefer
Ald. Tracy Snead
Ald. Keith Werner
This is to certify that this is a true and accurate copy of Resolution #027-2009 which was
adopted by the Common Council of the City of Muskego.
_____________________________
Janice Moyer, Clerk-Treasurer