WHEREAS, Belle Chasse, LLC, hereafter called “DEVELOPER” has constructed the
following public improvements: water main, storm sewer, curb and gutter and the binder course
of asphalt pavement in Belle Chasse Parkway from Durham Drive to a point 1,500 feet west of
Durham Drive, Stags Leap Court, and Broken Arrow Court at the following development:
LEGAL DESCRIPTION FOR LANDS LYING TO THE WEST OF DURHAM DRIVE:
All of Parcel 1 and Parcel 2 of Certified Survey Map No. 1524 together with unplatted lands, all of which
are located in part of the Southeast Quarter (SE 1/4) of the Southwest Quarter (SW 1/4) and the
Southwest Quarter (SW 1/4) of the Southeast Quarter (SE 1/4) of Section 11, Township 5 North, Range
20 East, in the City of Muskego, Waukesha County Wisconsin; being more particularly described as
follows: Commencing at the Southwest corner of the Southeast Quarter (SE 1/4); thence North 01°06'07"
West along the West line of the Southeast Quarter (SE 1/4) 25.00 feet to the point of beginning of the
lands hereinafter to be described; thence North 87°50'16" East along a line parallel to and 25.00 feet
North of the South line of the Southeast Quarter (SE 1/4) 1138.82 feet; thence North 47°24'44" West
200.06 feet to the beginning of a curve of radius 333.00 feet, the center of which lies to the East; thence
Northerly along the arc of said curve 147.64 feet, the chord of which bears North 34°42'40" West 146.43
feet; thence South 87°50'16" West 197.38 feet; thence North 02°09'44" West 106.07 feet; thence North
87°50'16" East 175.83 feet; thence North 09°21'41" West 941.34 feet to the South line of Certified Survey
Map No. 9347; thence South 87°48'47" West along the said South line 467.90 feet to the West line of said
Certified Survey Map 9347; thence North 07°00'43" West along the said West line 1.55 feet to the South
one sixteenth (S 1/16) line of the Southeast Quarter (SE 1/4); thence South 87°49'02" West along the said
(S 1/16) line 286.25 feet to the South one quarter (S 1/4) line; thence South 87°58'00" West along the
South one sixteenth (S 1/16) line of the Southwest Quarter (SW 1/4) 1313.27 feet to the East right-of-way
line of Mystic Drive; thence South 01°07'40" East along the said right-of-way line 1301.95 feet; thence
North 88°07'53" East along a line parallel to and 25.00 feet North of the South line of the Southwest
Quarter (SW 1/4) 1312.62 feet to the point of beginning, containing 64.7969 Acres,
WHEREAS, the DEVELOPER has completed the construction and installation of the
following improvements:
Water Main
2145.7 LF at $45.00 /LF of 8” diameter pvc water main pipe
460.8 LF at $32.00/LF of 6” diameter pvc water main and hydrant lead pipe
11 EACH at $900.00 /EACH of 8” diameter butterfly valves with valve boxes
10 EACH at $700.00 /EACH of 6” diameter butterfly valves on hydrant lead pipe
9 EACH at $3,000.00/EACH of fire hydrants
1749.8 LF at $25.00 /LF of 1-1/4” diameter H.D.P.E. water service pipe
45 EACH at $280.00 /EACH of 1-1/4” diameter valves and valve boxes on service connections
Storm Sewer
214.0 LF at $40.00 /LF of 12” diameter reinforced concrete storm sewer pipe
1099.2 LF at $42.00 /LF of 15” diameter reinforced concrete storm sewer pipe
1211.8 LF at $44.00/LF of 18” diameter reinforced concrete storm sewer pipe
Reso. #038-2008 Page 2
390.9 LF at $46.00 /LF of 21” diameter reinforced concrete storm sewer pipe
598.9 LF at $48.00 /LF of 24” diameter reinforced concrete storm sewer pipe
533.3 LF at $50.00 /LF of 30” diameter reinforced concrete storm sewer pipe
878.5 LF at $18.00 /LF of 6” diameter pvc storm sewer laterals
974.0 LF at $18.00 /LF of 6” diameter pvc storm sewer pipe for clean-outs
10 EACH at $1,500.00 /EACH of concrete storm sewer manholes
1 EACH at $5,000.00 /EACH of reinforced concrete box structure
26 EACH at $568.00 /EACH of storm sewer catch basins
10 EACH at $600.00 /EACH of storm sewer end sections
6 EACH at $500.00 /EACH of storm sewer clean-outs
and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision
of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY” and
the City Engineer has certified the systems’ acceptability; and
WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally
give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all
encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and
appurtenances which relate directly to the utilization of such utilities; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated
against any defects due to faulty materials or workmanship which appear within a period of one
(1) year from the date of dedication and shall pay for any damages resulting therefrom to the
CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought
against the CITY at any time arising out of the alleged defects or other failure of this guarantee.
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of
Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication of
the public improvements within the Belle Chasse Subdivision Phase One Development.
TH
DATED THIS 12 DAY of FEBRUARY , 2008
SPONSORED BY:
FINANCE COMMITTEE
Ald. Bob Melcher
Ald. Neil Borgman
Ald. Keith Werner
This is to certify that this is a true and accurate copy of Resolution #038-2008 which was
adopted by the Common Council of the City of Muskego.
__________________________
Janice Moyer, Clerk-Treasurer