Loading...
PLAN COMMISSION Packet - 11/8/2018CITY OF MUSKEGO PLAN COMMISSION AGENDA 11/08/2018 6:00 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF THE MINUTES Approval of Minutes of the October 2, 2018 Meetings CONSENT BUSINESS RESOLUTION PC 056-2018 Approval of an Annual Review for Pick 'n Save located at S74 W17005 Janesville Road / Tax Key No. 2199.999.065. RESOLUTION PC 058-2018 Approval of an Accessory Structure for the Sterzinger property located at W145 S9620 Groveway Lane / Tax Key No. 2261.994. NEW BUSINESS FOR CONSIDERATION RESOLUTION PC 057-2018 Recommendation to Council to Rezone a portion of the former Parks Garage property from PI-1 Park & Recreation Lands District to B-3 General Business District located at W180 S7732 Pioneer Drive / Tax Key No. 2196.976. RESOLUTION PC 059-2018 Approval of a Building Site and Operation Plan Amendment for Heritage Muskego/MSP located at S64 W13780 Janesville Road / Tax Key No. 2162.996.003. MISCELLANEOUS BUSINESS ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136. Packet Page 1 Unapproved CITY OF MUSKEGO PLAN COMMISSION MINUTES October 2, 2018 6:00 PM City Hall, W182 S8200 Racine Avenue CALL TO ORDER Alderperson Wolfe called the meeting to order at 6:03 PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Alderpersons Wolfe and Kubacki, Commissioners Graf and Jacques, and Planner Trzebiatowski Absent: Mayor Chiaverotti, Commissioners Peardon, Buckmaster and Bartlett STATEMENT OF PUBLIC NOTICE The meeting was noticed in accordance with the open meeting laws. APPROVAL OF THE MINUTES Approval of the minutes of September 4, 2018. Commissioner Jacques made a motion to approve the minutes of the September 4, 2018 meeting. Ald. Kubacki seconded. Motion passed unanimously. NEW BUSINESS FOR CONSIDERATION RESOLUTION PC 048-2018 Approval of a Preliminary Plat for Muskego Lakes Estates (f/k/a Hunter's Ridge) located on Ryan Drive and Boxhorn Drive / Tax Key No. 2261.999 Commissioner Jacques made a motion to Approve Resolution PC 048-2018. Ald. Kubacki seconded. Upon a roll call vote, Resolution PC 048-2018 passed unanimously. MISCELLANEOUS BUSINESS ADJOURNMENT Commissioner Jacques made a motion to adjourn at 6:10 PM. Ald. Kubacki seconded. Motion carried unanimously. Respectfully Submitted, Wendy Fredlund Transcribing Secretary Page 1 of 1 Approval of Minutes of the October 2, 2018 Meetings Packet Page 2 City of Muskego Plan Commission Supplement PC 056-2018 For the meeting of: November 8, 2018 REQUEST: Renewal of Outdoor Display/Sales for Pick ’n Save Tax Key No. 2199.999.065/ S74 W17005 Janesville Road SW ¼ of Section 10 PETITIONER:Tammy Koch, Roundy’s Supermarkets, Inc. INTRODUCED: November 8, 2018 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 056-2018 The petitioner is requesting to renew their previous approval allowing them to be allowed to display and sell christmas trees, wreaths, evergreen planters, pumpkins, flowers, and hanging baskets during the corresponding seasons. The products would continue to be displayed on the sidewalk by the store entry. The application states that no sales or display will occur in the parking lot and they state that they understand that the display must only contain natural materials. Pick ‘n Save received initial approval for outdoor display and sales under PC 063-2018 on December 5, 2017. That approval required a re-review in the Fall of 2018. DISCUSSION PC 056-2018 Over this past year there was one time when we had to ask the store to remove some non-allowed items from outside the front of the store, but the store promptly corrected the issues and has been in compliance since that time. In general there are some other stores in Muskego that have requested similar approvals within the City in the past. In general, the City has not had issues with outdoor display/sales at retail locations as long as they first receive proper approvals and as long as they are done in a neat and orderly way. The resolution states the following conditions of approval to ensure the sales on this site meet the aesthetic standards the City has come to adopt with outdoor sales/display. 1. Any signage for the products must be kept to a minimum and well maintained at all times. 2. No banners or other larger signage is allowed without a temporary sign permit, which requires Planning Division review. 3. The sidewalk area in front of the store must remain safe and passible at all times for proper egress. 4. The area must be kept in a neat and clean order at all times. 5. Any complaints or observations of litter or unsightliness resulting from the proposed outdoor sales/display may result in Plan Commission re-review of this proposal at any time which could result in revocation of this approval OR further contingencies. 6. This approval is good for one additional year to make sure the site stays in compliance and the allowance of outdoor sales/display will need to be re-reviewed in Fall of 2019 to see if further sales/display will be allowed on this property. Also, the resolution states that the allowed items for sale are meant to be for natural material (plants, flowers, trees, etc.) and not meant for packaged items (salt, fire wood, fertilizer, propane etc.) to ensure that the outdoor sales/display do not expand beyond what is being requested. Also, this approval does not specifically allow donations boxes on site, as items such as that would need separate Plan Commission approval.Page 1 of 6 RESOLUTION PC 056-2018 Packet Page 3 STAFF RECOMMENDATION PC 056-2018 Approval of the outdoor storage/sales renewal with the contingencies noted above and in the resolution, most specifically with noting that this approval is only valid through November 2019 at which time a re- review will be required if the store would like to continue outdoor storage/display. Failure to seek re-review would not allow any outdoor sales/display after November 2019. If the display/sales proceed with no issues during the end of 2018 and through the first three-quarters of 2019, then further reviews may not be required after the November 2019 review. Page 2 of 6 RESOLUTION PC 056-2018 Packet Page 4 MUSKEGOthe City of Area of InterestI0330660 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 056-2018 Pick 'n SaveS74 W17005 Janesville Rd. JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 11/1/2018 Page 3 of 6 RESOLUTION PC 056-2018 Packet Page 5 RESOLUTION #P.C. 056-2018 APPROVAL OF RENEWAL OF OUTDOOR DISPLAY/SALES FOR PICK ‘N SAVE LOCATED IN THE SW ¼ OF SECTION 10 (S74 W17005 JANESVILLE RD / TAX KEY NO. 2199.999.065) WHEREAS, On December 5, 2017 the Plan Commission approved a Building, Site and Operation Plan amendment to allow outdoor display/sales of products through Resolution #P.C.063-2017, and WHEREAS, Said approval required a re-review in the Fall of 2018 and as such, the applicant has now submitted for the required re-review, and WHEREAS, The request is to be allowed to display and sell christmas trees, wreaths, evergreen planters, pumpkins, flowers and hanging baskets during the corresponding seasons, and WHEREAS, The products are proposed to be displayed on the sidewalk by the store entry, and WHEREAS, No sales or display will occur in the parking lot, and WHEREAS, There was one issue found in 2018 relating to non-approved products being displayed/sold on this property but upon notification the store promptly correctly the issues. THEREFORE BE IT RESOLVED, That the Plan Commission re-approves the request from Pick ‘n Save located at S74 W17005 Janesville Road for the outdoor display and sale of seasonal products subject to the following conditions: 1. Any signage for the products must be kept to a minimum and well maintained at all times. 2. No banners or other larger signage is allowed without a temporary sign permit, which requires Planning Division review. 3. The sidewalk area in front of the store must remain safe and passible at all times for proper egress. 4. The area must be kept in a neat and clean order at all times. 5. Any complaints or observations of litter or unsightliness resulting from the proposed outdoor sales/display may result in Plan Commission re-review of this proposal at any time which could result in revocation of this approval OR further contingencies. 6. This approval is good for one additional year to make sure the site stays in compliance and the allowance of outdoor sales/display will need to be re-reviewed in Fall of 2019 to see if further sales/display will be allowed on this property. BE IT FURTHER RESOLVED, The allowed items for sale are meant to be for natural material (plants, flower, trees, etc.) and not meant for packaged items (salt, fire wood, fertilizer, propane, etc.). BE IT FURTHER RESOLVED, This approval does not specifically allow donations boxes on site, as items such as that would need separate Plan Commission approval. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: November 8, 2018 ATTEST: Adam Trzebiatowski AICP, Planning Manager Page 4 of 6 RESOLUTION PC 056-2018 Packet Page 6 Page 5 of 6 RESOLUTION PC 056-2018 Packet Page 7 Page 6 of 6 RESOLUTION PC 056-2018 Packet Page 8 City of Muskego Plan Commission Supplement PC 058-2018 For the meeting of: November 8, 2018 REQUEST: Metal Accessory Structure Tax Key No. 2261.994 / W145 S9260 Groveway Lane NE ¼ of Section 26 PETITIONER: Ralph & Ann Sterzinger INTRODUCED: November 8, 2018 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 058-2018 The petitioner proposes to construct a 30’ x 40’ accessory structure (totaling 1,200 square feet) on their 3.7 acre lot. The applicant is proposing a steel clad structure and since said materials do not match the home Plan Commission approvals are required. Plans are attached for your review. Plan Commission may waive the architectural requirements for accessory structures when any of the following are met: 1. The structure is screened from view, 2. The principal structure is composed of materials, colors, or styles that are inappropriate in their applications to an accessory structure, 3. The Plan Commission finds other circumstances to be present which would result in no undue harm to the property or its surroundings, 4. When the area is not found to be predominately residential. Plan Commission may approve the materials as submitted, or require modifications prior to release of building permits. PLAN CONSISTENCY PC 058-2018 Comprehensive Plan:The 2020 Plan depicts the area for low density residential land use. The proposal for this residential outbuilding is consistent with the Plan. Zoning: The property is zoned RSE – Suburban Estate District. Accessory structures totaling about 3,243 square feet are permitted on the subject property. The current proposal measures 1,200 square feet in area. There are no existing accessory structures that exist on this lot. The proposal meets the bulk requirements of the Zoning Code. STAFF DISCUSSION PC 058-2018 The architectural requirements state that the accessory structure should have similar materials and colors as the principal residence. Planning Commission approval is being sought due to this concern. The petitioner is proposing a steel sided and steel roofed structure. The colors of the steel siding will be ash grey, the soffits will be white, and the roof will be black, which will be similar to the home, per the owner. The proposed building location will be over 200’ from the road. The building is shown containing decorative elements such as a pedestrian door, windows, shutters, and a cupola. The petitioner has stated that the newly proposed building will be used only for personal storage.Page 1 of 12 RESOLUTION PC 058-2018 Packet Page 9 The Resolution states the following items: BE IT FURTHER RESOLVED, That the building cannot be used for the operations of any business activities. BE IT FURTHER RESOLVED, That the floor of the entire building must be concrete or asphalt, unless a specific portion is only to be used by animals. BE IT FURTHER RESOLVED, The depth of the over hangs on all sides of the building must at least twelve (12) inches in depth. BE IT FURTHER RESOLVED, The colors of the building must be similar to the home. STAFF RECOMMENDATION PC 058-2018 Approval of Resolution #PC 058-2018, finding that there will be no undue harm to the surrounding properties, the building being over 200’ from the road, and due to similar buildings existing in the general area. Page 2 of 12 RESOLUTION PC 058-2018 Packet Page 10 MUSKEGOthe City of Area of InterestI0140280 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 058-2018 Ralph & Ann SterzingerW145 S9620 Groveway Ln. JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 11/1/2018 Page 3 of 12 RESOLUTION PC 058-2018 Packet Page 11 RESOLUTION #P.C. 058-2018 APPROVAL OF A METAL ACCESSORY STRUCTURE FOR THE STERZINGER PROPERTY LOCATED IN THE NE ¼ OF SECTION 26 (TAX KEY NO. 2261.994 / W145 S9260 GROVEWAY LANE) WHEREAS, A site plan and building drawings were submitted to construct a 30’ x 40’ metal accessory structure (totaling 1,200 square feet) on the Sterzinger property located at W145 S9620 Groveway Lane (Tax Key No. 2261.994), and WHEREAS, The property is zoned RSE – Suburban Estate District, and whereas said structure is a permitted accessory use and subject to Plan Commission review due to the proposed architectural materials shown, more specifically due to a proposed steel roof and steel siding, and WHEREAS, A home residence currently resides on the property with no existing accessory structure, and WHEREAS, The total square footage of 1,200 square feet (existing and proposed) is within the total allowable square footage for accessory structures on this property of about 3,243 square feet and said proposal meets the bulk requirements of the Zoning Code, and WHEREAS, The accessory structure will be used for personal storage, and WHEREAS, The proposed height is approximately 13.5 feet, as measured by code, which is allowed in said zoning district due to the size of the lot, and WHEREAS, The structure is proposed to be clad with steel vertical wall panels and a steel roof and said proposal does not meet the Plan Commission’s standards for administrative approval of residential accessory structures as the roofing does not match the materials to be used on the primary residence, and WHEREAS, The colors of the steel siding will be ash grey, the soffits will be white, and the roof will be black, which will be similar to the home, per the owner, and WHEREAS, The building is shown containing decorative elements such as a pedestrian door, windows, shutters, and a cupola, and WHEREAS, The structure is located over 200’ from the road. THEREFORE BE IT RESOLVED, The Plan Commission approves of a 1,200 square foot metal accessory structure for the Sterzinger property located at W145 S9620 Groveway Lane (Tax Key No. 2261.994). BE IT FURTHER RESOLVED, The building cannot be used for the operations of any business activities. BE IT FURTHER RESOLVED, The floor of the entire building must be concrete or asphalt, unless a specific portion is only to be used by animals. BE IT FURTHER RESOLVED, The depth of the over hangs on all sides of the building must at least twelve (12) inches in depth. BE IT FURTHER RESOLVED, The colors of the building must be similar to the home. BE IT FURTHER RESOLVED, That the Plan Commission approves of the accessory structure due to no undue harm to the surrounding properties, the building is located over 200’ from the road, and due to similar buildings existing in the general area. BE IT FURTHER RESOLVED, That failure to comply with the terms of this resolution and the approved site plans shall result in the issuance of fines of $100 per day per violation, the initiation of legal action, or both. Plan Commission City of Muskego Page 4 of 12 RESOLUTION PC 058-2018 Packet Page 12 Adopted: Defeated: Deferred: Introduced: November 8, 2018 ATTEST: Adam Trzebiatowski AICP, Planning Manager Page 5 of 12 RESOLUTION PC 058-2018 Packet Page 13 Page 6 of 12 RESOLUTION PC 058-2018 Packet Page 14 Page 7 of 12 RESOLUTION PC 058-2018 Packet Page 15 Page 8 of 12 RESOLUTION PC 058-2018 Packet Page 16 Page 9 of 12 RESOLUTION PC 058-2018 Packet Page 17 Page 10 of 12 RESOLUTION PC 058-2018 Packet Page 18 Page 11 of 12 RESOLUTION PC 058-2018 Packet Page 19 Page 12 of 12 RESOLUTION PC 058-2018 Packet Page 20 City of Muskego Plan Commission Supplement PC 057-2018 For the meeting of: November 8, 2018 REQUEST: Rezoning from PI-1 (Park & Recreation Lands District) to B-3 (General Business District) for the PI-1 portion of 2196.976 and a Comprehensive Plan Amendment from Institutional to Commercial (for all of Lots 2196.976 & 2196.988) Tax Key Nos. 2196.976 & 2196.988 / W180 S7732 Pioneer Drive SE ¼ of Section 9 PETITIONER: City of Muskego INTRODUCED: November 8, 2018 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 057-2018 The City is proposing to rezoning from PI-1 (Park & Recreation Lands District) to B-3 (General Business District) for the PI-1 portion of 2196.976 and a Comprehensive Plan Amendment from Institutional to Commercial (for all of Lots 2196.976 & 2196.988). PLAN CONSISTENCY PC 057-2018 Comprehensive Plan:The 2020 Comprehensive Plan shows the area as institutional uses. The proposal is to change that to commercial uses. Zoning: The property is currently PI-1 (Park & Recreation Lands District). The zoning being requested is B-3 (General Business District) for the PI-1 portion of 2196.976. Park and Conservation Plan: No acquisitions are proposed in this area. The proposal is consistent with the Plan. Street System Plan: The proposal is consistent with the Plan. Adopted 208 Sanitary Sewer Service Area: This area is served by municipal sewer. The proposal is consistent with the Plan. Water Capacity Assessment District: This area is served by municipal water. The proposal is consistent with the Plan. DISCUSSION PC 057-2018 The City is petitioning for a rezoning for the former Parks Garage property. The request includes rezoning of all of the PI-1 portion of Tax Key Number 2196.976. The 2020 Comprehensive Plan needs to also be modified as part of this request from Institutional uses to Commercial uses (for all of Tax Key Nos. 2196.976 & 2196.988). A public hearing for this request was held on October 23, 2018. There was one question raised at the public hearing relating to what types of uses would be allowed in the proposed zoning district. Staff talked with the neighbors that had questions after the public hearing and explained the general uses allowed in the B-3 district. One further question related to if multi-family would be allowed and it was explained that the B-3 district does not allow multi-family uses. It was also explained that any new business user of the site would need to apply for a business registration and would most likely need Plan Commission approval for the use of the site. STAFF RECOMMENDATION PC 057-2018 Page 1 of 4 RESOLUTION PC 057-2018 Packet Page 21 Approval of Resolution PC 057-2018 Page 2 of 4 RESOLUTION PC 057-2018 Packet Page 22 MUSKEGOthe City of Area of InterestI0190380 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 057-2018 City of MuskegoParks GarageW180 S7732 Pioneer Dr. JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 11/1/2018 Page 3 of 4 RESOLUTION PC 057-2018 Packet Page 23 RESOLUTION #P.C. 057-2018 RECOMMENDATION TO COUNCIL TO REZONE A PORTION OF THE FORMER PARKS GARAGE PROPERTY FROM PI-1 PARK & RECREATION LANDS DISTRICT TO B-3 GENERAL BUSINESS DISTRICT FOR THE PROPERTY LOCATED IN THE SE 1/4 OF SECTION 9 (PART OF TAX KEY NO. 2196.976 & 2196.988 / W180 S7732 PIONEER DRIVE) WHEREAS, The City is proposing to rezone the PI-1 portion of the former Parks Garage property from the PI-1 Park & Recreation Lands District to B-3 General Business District, and WHEREAS, The 2020 Comprehensive Plan also needs to be amended for this entire property (for all of lots 2196.976 & 2196.988) from Institutional Uses to Commercial Uses, and WHEREAS, A Public Hearing for the rezoning was heard before the Common Council on October 23, 2018, and WHEREAS, There was one question brought up at the Public Hearing relating to what types of uses could be allowed in the B-3 district, and WHEREAS, The City is going to be selling this property and as part of that process the City wanted to get the proper zoning setup for a possible future commercial user. THEREFORE BE IT RESOLVED, That the Plan Commission does hereby recommend approval to the Common Council for the rezoning the PI-1 portion of the former Parks Garage property from the PI-1 Park & Recreation Lands District to B-3 General Business District and recommend approval to the Common Council for the amendment to the 2020 Comprehensive Plan for this entire property (for all of lots 2196.976 & 2196.988) from Institutional Uses to Commercial Uses. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: November 8, 2018 ATTEST: Adam Trzebiatowski AICP, Planning Manager Page 4 of 4 RESOLUTION PC 057-2018 Packet Page 24 City of Muskego Plan Commission Supplement PC 059-2018 For the meeting of: November 8, 2018 REQUEST: Building, Site, and Operation Plan Amendment for Heritage Muskego / MSP Real Estate Tax Key No. 2162.996.003 / S64 W13780 Janesville Road NW ¼ of Section 1 PETITIONER: Mark Hammond of MSP Real Estate Group INTRODUCED: November 8, 2018 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 059-2018 A BSO amendment submittal was received from Mark Hammond of MSP Real Estate Group, the developer/owner of Heritage Muskego, for their new Muskego facility located at S64 W13780 Janesville Road. The amendment review is required due to issues that were discovered with their new building upon the Planning Division occupancy inspection. Upon that inspection it was discovered that the amount of masonry on the built structure did not match that as was shown on the Plan Commission approved plans and the building permit approved plans. There was a masonry reduction that occurred on almost all façade areas of the building. Upon finding this major issue, the development team was notified. Once the development team was notified they explained that their designer, along with themselves, altered the original design since they thought it needed to be modified to have a better architectural appearance. See the applicant’s submittal for full details on their explanation and reasoning behind the alteration. The developer stated that they did not know that these changes never made it onto the plans approved by the State and the City. The developer has stated that these changes not being incorporated into the City approved plans was an inadvertent error. Due to this significant issue, staff was not able to issue any type of occupancy until the developer at least applied for Plan Commission review of this topic. Once the applicant applied for this re-review, then the City issued temporary occupancy for a portion of the building in an effort to be accommodating to residents that were previously scheduled to move in. As part of the developer’s amendment request, they state the following, “…we hereby acknowledge that we need Plan Commission approval in order for the City to issue us a permanent Certificate of Occupancy and understand that we may have to work with that body to come to a reasonable solution that is acceptable to all parties involved.” This development originally received BSO approvals through the Plan Commission on September 6, 2016 under PC 057-2016. The full building permit for this project was issued on May 26, 2017. STAFF DISCUSSION PC 059-2018 A situation like this, where a developer changed their design/material quantity without first seeking City approval, has never occurred in the City before. The City was very surprised when this issue was discovered upon the Planning Division occupancy inspections. This situation is a concern to the City for numerous reason, including, but not limited to, what type of precedent might be set, how did this affect the cost/bottom line of the project, why a change was made without City review, how we prevent this from occurring in the future, and what happens if the Plan Page 1 of 26 RESOLUTION PC 059-2018 Packet Page 25 Commission does not accept the un-approved alterations. STAFF RECOMMENDATION PC 059-2018 The Plan Commission needs to discuss and decide how they would best like to proceed in this situation. A situation like this has never occurred before in the City before. While some of the reductions are not extremely significant in view, they most likely resulted in a significant savings for the developer. It is previously unheard of in the City to have a developer/builder of a commercial building to reduce a material quantity will out first seeking staff and/or Plan Commission approvals. If the Plan Commission does not approve of the reduction to the approved masonry, then they will need to determine what they are going to require the developer to do to rectify the issue. Page 2 of 26 RESOLUTION PC 059-2018 Packet Page 26 MUSKEGOthe City of Area of InterestI0330660 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 059-2018 Heritage Muskego/MSPS64 W13780 Janesville Rd. JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 11/1/2018 Page 3 of 26 RESOLUTION PC 059-2018 Packet Page 27 RESOLUTION #P.C. 059-2018 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR HERITAGE MUSKEGO/MSP LOCATED AT S64 W13780 JANESVILLE ROAD / TAX KEY NO. 2162.996.003 WHEREAS, A BSO amendment submittal was received from Mark Hammond of MSP Real Estate Group, the developer/owner of Heritage Muskego, for their new Muskego facility located at S64 W13780 Janesville Road / Tax Key No. 2162.996.003, and WHEREAS, This development originally received BSO approvals through the Plan Commission on September 6, 2016 under PC 057-2016, and WHEREAS, The full building permit for this project was issued on May 26, 2017, and WHEREAS, Once Planning Division occupancy inspections were occurring it was discovered that the amount of certain materials shown on the approved building plans did not match the building that was built on site, and WHEREAS, More specifically, the amount of masonry on the building was reduced/lowered on most facades of the building, and WHEREAS, The developer notes in their submittal that their designer, and along with themselves, altered the original design as they thought it needed to be modified to have a better architectural appearance, and WHEREAS, The developer has stated that these changes not being incorporated into City approved plans was an inadvertent error, and WHEREAS, Due to the change in the Plan Commission approved plans and the City approved plans, Plan Commission re-review is require in order for this project to proceed and to be allowed final occupancy. THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building, Site and Operation Plan for Heritage Muskego located at S64 W13780 Janesville Road / Tax Key No. 2162.996.003. BE IT FURTHER RESOLVED, Final Occupancy of this facility cannot be granted until the decision of the Plan Commission on this topic has been fully complied with. BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of this plan shall be followed and maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution, in the timeframes established by the Plan Commission, shall result in the imposition of fines, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Denied: Deferred: November 8, 2018 ATTEST: Adam Trzebiatowski AICP, Planning Manager Page 4 of 26 RESOLUTION PC 059-2018 Packet Page 28 From:Mark Hammond To:Adam Trzebiatowski Cc:Scott Kroeger Subject:Re: Heritage Muskego Building Elevation Revisions Date:Thursday, September 27, 2018 3:23:53 PM Adam,   MSP Real Estate is committed to securing plan commission approval of our project. We believe that, after presenting our as-built project, they will appreciate the changes we made as an improvement from what they had approved and therefor will feel comfortable approving it. However, in the event that our project as-built is not approved, we do not want to assume or predict what Plan Commission might feel is appropriate in order to approve the project. Therefore, we hereby acknowledge that we need Plan Commission approval in order for the City to issue us a permanent Certificate of Occupancy and understand that we may have to work with that body to come to a reasonable solution that is acceptable to all parties involved.   Thanks, Mark   From: Adam Trzebiatowski <ATrzebiatowski@cityofmuskego.org> Date: Thursday, September 27, 2018 at 2:22 PM To: Mark Hammond <mhammond@msphousing.com> Cc: Scott Kroeger <SKroeger@cityofmuskego.org> Subject: RE: Heritage Muskego Building Elevation Revisions   Mark,   I received your two email messages.  I’ll look them over this afternoon or earlier tomorrow.  I’ll get back with you once I have gone over them.   Without looking them over yet, we hope you included your “fix/solution” if this is not approved by the Plan Commission as this is a must have for us to consider temporary occupancy.  Please include those that in detail if you have not already.   Thanks,   Adam Trzebiatowski, AICP Planning Manager City of Muskego Department of Public Works & Development Page 5 of 26 RESOLUTION PC 059-2018 Packet Page 29 Planning Services Division W182 S8200 Racine Avenue Phone: (262) 679-4136 Fax: (262) 679-5614 Email: adamt@cityofmuskego.org Web: www.cityofmuskego.org   This message originates from Adam Trzebiatowski. It contains information that may be confidential or privileged and is intended only for the individual named above. It is prohibited for anyone to disclose, copy, distribute or use the contents of this message without permission, except as allowed by Wisconsin Public Records Laws. If this message is sent to a quorum of a governmental body, my intent is the same as though it were sent by regular mail and further distribution is prohibited. All personal messages express views solely of the sender, which are not attributed to the municipality I represent, and may not be copied or distributed without this disclaimer.       From: Mark Hammond [mailto:mhammond@msphousing.com] Sent: Wednesday, September 26, 2018 6:09 PM To: Adam Trzebiatowski Cc: Scott Kroeger Subject: Heritage Muskego Building Elevation Revisions   [I received a notice that my last email was not deliverable, so I am resending as two separate emails. This is email 1 of 2]   Hi Adam,   I shared with our architect, Jerry Bourquin, AIA, your comments regarding the changes to the building elevations in our building as constructed compared to what was submitted to the City. I have attached a copy of Jerry’s letter for your files (file name ‘Dimension IV Design Group letter to MSP Real Estate 9.26.18’). For convenience, and because Jerry is able to better articulate the design progression than I am able to, I will provide the body of Jerry’s letter directly below:   Dear Mark,   As the final design details were developed, minor adjustments were made on the proportions of the materials to balance the design and strengthen the importance of the design elements.  The finish materials were not changed, nor were new materials added.  The proportions had only minor adjustments.    The bays that project from the building, the corner tower, and the main entrance are the most visible and important accents of the design.  Minor revisions were made to highlight these areas.  The percent of masonry on the building went from 52% to 50%.   A traditional building has a base, a middle/body, and a top/cap.  The middle/body is the largest area.  The proportions, especially with the larger masonry base on the front of the building, were out of balance; the base and top were larger than the middle body.  The masonry bay was extended lower to where the grades at the front of the building were Page 6 of 26 RESOLUTION PC 059-2018 Packet Page 30 lowered.  It became heavier.  To balance the proportions, the middle cement siding was lowered part way down the windows to create a larger middle area.  This was only done on the background walls.  These are the walls that create a backdrop for the more important projected bays.  This also had the added benefit of reducing the visual presence of the AC sleeves in the wall, as the stone masonry cap now runs across the top of these units.  In effect, the AC sleeves are now hidden by the band and appear as a support for the band, rather than a punched opening in the middle of the wall.   The deck supports had taken on a stronger visible presence than they should have.  They were adjusted to have a masonry base and cement panels similar to the main entrance.  This is more consistent with the Craftsman character of the project.   An additional projected bay was added to the west elevation, south corner, to break up the blank wall, add more masonry, and extend the character of the front elevation around the corner.  This is a visible corner at an entrance drive.   On the east elevation end, a projected bay was also added to break up the wall on this area which is visible as one drives in.    To emphasize the importance of the front entrance, the entrance projected bay was widened with additional masonry.    These minor changes were made to improve the traditional image of the project and strengthen the importance of the accented building elements, the street image, and the entrances.   Sincerely,   DIMENSION IV MADISON DESIGN GROUP Jerry Bourquin, AIA Principal   As I mentioned to you on the phone previously, the fact that these changes were not incorporated in the plans that I submitted to you for the building permit was an inadvertent error on our behalf. I simply missed that they were not reflected in the permit set as I thought they had been (the architect made these changes while the plans were at the State being reviewed). We all felt that, on the whole, the designed progression marked an improvement over what was presented at Plan Commission: a more balanced building with additional natural stone. As a result, it was not on my radar to flag these changes to you because I thought they were uncontroversial and I thought they were incorporated into the permit set. I hope that after reviewing all of this, you’ll agree that we have designed and constructed a more aesthetically pleasing building than what we had presented to Plan Commission.   Finally, as you more specifically requested, attached, please also find the following items to provide addition context and support for the building elevation revisions that took place following our Plan Page 7 of 26 RESOLUTION PC 059-2018 Packet Page 31 Commission approval (the headings on bold refer to the file name of the attachment):    Heritage Muskego – Comparison Sheets – BSO Submittal vs As-built – These sheets are intended to illustrate as clearly as possible how the design progressed following approval by Plan Commission. Each sheet includes each of the following for each primary elevation that was included in our BSO Submittal:   The top image is a photo of the actual building as it stands today The middle image is the elevation of the building as constructed The bottom image is the elevation from the BSO Submittal   Heritage Muskego - BSO Submittal Elevations - Exterior Materials - Manual Calculation – These are the elevations from our BSO Submittal that was approved by Plan Commission. Masonry has been highlighted in red and James Hardie Fiber Cement in blue. The square footage take offs are shown in each section (you may need to zoom in a bit to see them). These totals are then provided in the supplemental excel spreadsheet discussed below.    Heritage Muskego - As-built Elevations - Exterior Materials - Manual Calculation - These are the elevations from our as-built plans. Masonry has been highlighted in red and James Hardie Fiber Cement in blue. The square footage take offs are shown in each section (again, you may need to zoom in). These totals are then provided in the supplemental excel spreadsheet discussed below.   Heritage Muskego Masonry Comparison Calculation – BSO vs. As-built – This spreadsheet provides the total calculation of masonry and siding corresponding to attachments #3 and #4 above. As you will see, our BSO submittal was at 52% and our as-builts are at 50%. I am sending this as an excel file in the event you would like to independently verify the architect’s calculations.    In summary, although our design progressed from what the City had approved, the changes resulted in a more aesthetically pleasing building that we feel is a fine example of traditional Craftsman-style architecture, with a base, middle, and top that are in proper proportion to each other. Our use of masonry is appropriately balanced to exude quality without feeling heavy. We believe the building, as constructed, contributes very positively to the landscape of the City of Muskego. We hope you agree.   Please let me know if you have any questions, would like any additional information, or would like me to present this information to Plan Commission.   Best regards, Mark     Page 8 of 26 RESOLUTION PC 059-2018 Packet Page 32 --  Mark Hammond Vice President of Development MSP Real Estate, Inc. Heritage Senior Living, LLC 7901 West National Avenue West Allis, WI 53214 Direct: 414.259.2108 Mobile: 612.868.9997   Confidentiality Notice: This message contains confidential information and is intended only for the individual named. If you are not the named addressee, you should not disseminate, distribute or copy this email. Please notify the sender immediately by email if you have received this email by mistake and delete this email from your system. Email transmission cannot be guaranteed to be secure or error-free, as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender, therefore, does not accept liability for any errors or omissions in the contents of this message which arise as a result of email transmission. If verification is required, please request a hard-copy version.   Page 9 of 26 RESOLUTION PC 059-2018 Packet Page 33 Page 10 of 26 RESOLUTION PC 059-2018 Packet Page 34 Page 11 of 26 RESOLUTION PC 059-2018 Packet Page 35 City/State Approved Building Permit Plans (3 Pages) Page 12 of 26 RESOLUTION PC 059-2018 Packet Page 36 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" RSTN CST CHIMNEY BS FCP ASH CST FCT PFG FCT FCT FCT LS-2 FCTPFG FCT FCT LS-2 FCT LS-1 CST BRKCST CST RSTNCSTCST CST FCT FCT RSTN CST CSTCST RSTN BRK CST CST LS-1 BRK CST CST CST FCT BS FCP CEDAR PERGOLA PFG FCT FCTCSTLS-1FCP BRK CST CSTLS-1 FCT PFG FCT FCT LS-2ASH FCP FCT FCP FCT CST RSTN FCT FCP FCT BS FCP CST FCT CST ASH FCT ? CST CST CST RSTN RSTN CST FCP ASHFCTFCPPFG RSTN FCT FCP FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" FCT PFG ASH CEDAR PERGOLA FCP FCT BS FCP CST CST ASH LS-2 PFG FCT CST CST BRK CST LS-1 FCT FCT CSTRSTN CST CSTFCP BS FCT ASH FCT BS FCP FCT CEDAR PERGOLA LS-2 FCT LS-1 PFG FCT FCT ASH FCT PFG FCT FCT FCT LS-2 CSTCST BRK BRK CST CST CEDAR PERGOLA CHIMNEYRSTNASH CSTFCT PFG FCT LS-2CST BRKCSTFCT LS-1 FCTCSTBRK ASH FCP FCT BS ASH FCT FCT ASH FCT LS-2 FCT LS-1 CST BRKCSTRSTNCST PFG FCT FCT LS-2 FCT CSTBRKCSTCSTCST BRK FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" RSTN BRK FCT FCP CEDAR PERGOLA ASH FCT FCP FCT FCT FCT LS-2 LS-1 ASH CST CST BRK BRKCSTCST LS-1 FCT CEDAR PERGOLAPFGFCT FCP RSTN CSTCST FCT FCP BS FCT CST ASH CEDAR PERGOLA LS-2 FCT PFG FCT FCT LS-2 LS-1 CEDAR PERGOLA FCP FCT FCP BS CST PFG FCT LS-1 CST BRK CST FCT ASH PFG CEDAR PERGOLAFCT FCT LS-2 FCT LS-1 FCT ASH CSTBRK BRKCST CSTCST CST FCP RSTN ASH PFG FCT FCP BS FCT CST FCT ASH FCT CST RSTN CSTCST FCT FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" CEDAR PERGOLA ASH FCT FCT FCT LS-1 FCT CSTCSTBRK FCT RSTN BRK FCP FCT FCP BRK CSTLS-1 LS-2CEDAR PERGOLA ASH FCT FCP BS ASHFCT CST FCT FCT CST CST RSTN CEDAR PERGOLA PFG FCT LS-2 FCTLS-1 FCTBRKCST LS-1CSTBRK BRK CST CST CST PFG FCT ASH FCT LS-2 FCT BRKCSTLS-1 FCT LS-2 ASH PFG CEDAR PERGOLA FCT FCT FCP BS FCT FCP CST FCT CSTCSTRSTNBRKCST CEDAR PERGOLA ASH PFG FCT FCTLS-2 FCT FCP LS-1 CEDAR PERGOLA FCT FCP LS-2 FCP FCT RSTN BRK BRKBRKCST CST CST LS-1 FCT FCT FCT PFG FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" RSTN CST FCP FCT FCT BRK CST CST LS-1 FCT LS-2 PFG ASH FCT FCT ASH FCT EXTERIOR ELEVATIONS GENERAL NOTES AND LEGEND LEGEND MASONRY COLOR BRK BRICK TRIANGLE NORTHHAMPTON UTILITY STN THIN STONE VENEER DUTCH QUALITY TORINO STACK LEDGE RSTN REAL STONE COLOR - BROOKFIELD - 80% FOND DU LAC - 20% CMU SPLIT FACE CMU WALNUT SVT STONE VENEER TRIM N/A CST CAST STONE HERITAGE CAST STONE - BUFF • 4" @ WINDOW SILL TYP. • 8" @ WINDOW HEAD TYP. • 8" @ BAND TYP. CJ CONTROL JOINT CIP CAST IN PLACE CONCRETE SIDING & ROOFING LS-1 FIBER CEMENT LAP SIDING LIGHT GREY LS-2 FIBER CEMENT LAP SIDING CREAM/TAN FCP FIBER CEMENT PANEL GREEN ASH ASPHALT SHINGLES TRIM FCT FIBER CEMENT TRIM COTTAGE WHITE • 4" @ OUTSIDE CORNER • 4" @ WINDOW SIDE TRIM • 6" @ FRIEZE BOARD (LAP SIDING)• 8" @ WINDOW HEAD TRIM • 8" @ FRIEZE BOARD (BRICK)• 8" @ BAND BS • 2" BATTEN STRIP COTTAGE WHITE METAL PFM PRE FIN. METAL FASCIA COLOR TO MATCH TRIM PFG PRE FIN. GUTTERS COLOR TO MATCH TRIM DS PRE FIN. DOWNSPOUTS COLOR TO MATCH TRIM ARS ALUMINUM RAILING RIDEAU BROWN FPV FIREPLACE VENT A. NOT ALL MASONRY PENETRATIONS SHOWN, COORDINATE WITH MEP CONTRACTORS. B. AT 135 DEGREE OUTSIDE CORNERS PROVIDE 135 DEGREE BRICK CORNER UNITS. C. REFER TO WINDOW TYPE SHEET A6.2 FOR ALL WINDOW INFORMATION. D. CONTROL JOINTS CONTINUOUS FROM TOP OF FOUNDATION TO TOP OF WALL. E. PROVIDE AC GRILL COVER @ ALL THROUGH WALL AC UNITS. COLOR TO MATCH ADJACENT MATERIAL. GENERAL NOTES A2.0 A2.1 A2.0 1 7 9 A2.2 21 A2.0 8 A2.115 A2.2 19 A2.218 A2.0 6 A2.1 17 2422 23 A2.1 11 A2.1 12 A2.113 A2.0 3 A2.0 2 A2.05 A2.1 10 A2.2 20 A2.02 Si m A2.1 16 A2.1 14 /P A2.1 /P A2.1 /N A2.0 /M A2.0 /L A2.0 /K A2.0 /J A2.0 /H A2.0 /G A2.0 /G A2.0 /G A2.0 /G A2.0 /F A2.0 /E A2.0 /D A2.0 /C A2.0 /B A2.0 /B A2.0 /A A2.0 /LL A2.2 /KK A2.2 /JJ A2.2 /HH A2.2 /GG A2.2 /GG A2.2 /FF A2.2 /EE A2.2 /CC A2.1 /BB A2.1 /DD A2.1 /AA A2.1 /AA A2.1 /Z A2.1 /Y A2.1 /X A2.1/U A2.1 /V A2.1 /W A2.1 /T A2.1 /S A2.1 /S A2.1 /S A2.1 /R A2.1 OPP. OPP. OPP. OPP. OPP. OPP.OPP. /NN A2.2 /NN A2.2OPP. /MM A2.2 /MM A2.2OPP. /27 A2.2 /26 A2.2 ASH FCT ? FCT FCT FCP BS CEDAR PERGOLA CST FCT RSTN ASH PFG FCT FCT FCT LS-2 CST BRK FCT CEDAR PERGOLA ASH PFG FCT FCT FCP BS CST FCT RSTN ASH FCT PFG FCT FCT FCP BS CST RSTN ASH DS PFG FCT FCT FCT BS CST BRK DS ASH FCT FCT PFG DS FCT BS CST BRK ASH FCT PFG CEDAR PERGOLA FCT CST FCT RSTN FCP FCP FCT BRK CEDAR PERGOLA ASH FCT PFG FCT FCT FCP CST FCT RSTN BS CEDAR PERGOLA ASH FCT PFG FCT FCT FCP BS CST FCT RSTN ASH PFG FCT FCT LS-2 CST BRK ASH PFG FCT FCT LS-2 CST BRK ASH FCT PFG FCT FCT FCP CST FCT RSTN CEDAR PERGOLA BS ASH FCT PFG FCT FCP CST FCT RSTN CEDAR PERGOLA BS FCT FCT FCP BS PROJECT # DATE OF ISSUE: REVISIONS: 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 www.dimensionivmadison.com E: \ R e v i t \ L o c a l F i l e s \ 1 6 0 3 1 - M S P - M u s k e g o 2 0 1 7 _ n k i r s c h t @ d i m e n s i o n i v m a d i s o n . c o m . r v t 2/ 1 5 / 2 0 1 7 3 : 1 7 : 3 0 P M A2.0 EXTERIOR ELEVATIONS 16031 FEB. 14, 2017 MSP − MUSKEGO WEST JANESVILLE ROAD MUSKEGO, WI 53150 1/8" = 1'-0"1 EAST ELEVATIONS AT MAIN ENTRANCE 0'4'8'2' 1/8" = 1'-0"3 EAST ELEVATION AT PORCH COUCHERE 1/8" = 1'-0"2 SOUTH ELEVATION AT PORCH COUCHERE 1/8" = 1'-0"6 EAST ELEVATION AT AL WING 1/8" = 1'-0"7 SOUTH ELEVATION AT AL WING 1/8" = 1'-0"8 WEST ELEVATION AT AL WING 1/8" = 1'-0"5 SOUTH ELEVATION A 1/8" = 1'-0"A HIDDEN ELEVATION 1/8" = 1'-0"B HIDDEN ELEVATION 1/8" = 1'-0"C HIDDEN ELEVATION 1/8" = 1'-0"D HIDDEN ELEVATION 1/8" = 1'-0"E HIDDEN ELEVATION 1/8" = 1'-0"F HIDDEN ELEVATION 1/8" = 1'-0"G HIDDEN ELEVATION 1/8" = 1'-0"H HIDDEN ELEVATION 1/8" = 1'-0"J HIDDEN ELEVATION 1/8" = 1'-0"K HIDDEN ELEVATION 1/8" = 1'-0"L HIDDEN ELEVATION 1/8" = 1'-0"M HIDDEN ELEVATION 1/8" = 1'-0"N HIDDEN ELEVATION 1/8" = 1'-0"4 WEST ELEVATION AT PORCH COUCHERE Page 13 of 26 RESOLUTION PC 059-2018 Packet Page 37 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" BRK ASH RSTN ASHLS-2 BRKBRK CST BRK FCP FCT CSTCSTBRKLS-1 LS-2ASH FCTFCP CSTBRKCSTBRKLS-1 LS-2 FCT ASH FCT LS-1FCTLS-2 ? ? FCP FCP FCT FCT BRK BRK CST FCPBS BSBS CST CST FCP FCTFCT FCT CSTCST LS-1 CST FCT FCT CST FCT PFG CEDAR PERGOLA DS CHIMNEY CST CIP A2.2 27 BS FCP FCT CSTCSTCSTBRK ASH BRKCST LS-1CSTBRKLS-2 LS-1 CST CST BRK FCT LS-1 LS-2 ASHFCT LS-1 LS-2 FCT FCP FCT ASH CST BRK ASHASHASH PFG PFGPFGLS-2PFGPFGASHPFGFCTBRKFCT FCT BRKCSTCSTLS-1LS-2 FCTBRK CST BRK CST CST FCT PFGASH CST FCTFCTBRKCSTCSTFCT CST PFG CIP CIP EXTERIOR ELEVATIONS GENERAL NOTES AND LEGEND LEGEND MASONRY COLOR BRK BRICK TRIANGLE NORTHHAMPTON UTILITY STN THIN STONE VENEER DUTCH QUALITY TORINO STACK LEDGE RSTN REAL STONE COLOR - BROOKFIELD - 80% FOND DU LAC - 20% CMU SPLIT FACE CMU WALNUT SVT STONE VENEER TRIM N/A CST CAST STONE HERITAGE CAST STONE - BUFF • 4" @ WINDOW SILL TYP. • 8" @ WINDOW HEAD TYP. • 8" @ BAND TYP. CJ CONTROL JOINT CIP CAST IN PLACE CONCRETE SIDING & ROOFING LS-1 FIBER CEMENT LAP SIDING LIGHT GREY LS-2 FIBER CEMENT LAP SIDING CREAM/TAN FCP FIBER CEMENT PANEL GREEN ASH ASPHALT SHINGLES TRIM FCT FIBER CEMENT TRIM COTTAGE WHITE • 4" @ OUTSIDE CORNER • 4" @ WINDOW SIDE TRIM • 6" @ FRIEZE BOARD (LAP SIDING)• 8" @ WINDOW HEAD TRIM • 8" @ FRIEZE BOARD (BRICK)• 8" @ BAND BS • 2" BATTEN STRIP COTTAGE WHITE METAL PFM PRE FIN. METAL FASCIA COLOR TO MATCH TRIM PFG PRE FIN. GUTTERS COLOR TO MATCH TRIM DS PRE FIN. DOWNSPOUTS COLOR TO MATCH TRIM ARS ALUMINUM RAILING RIDEAU BROWN FPV FIREPLACE VENT A. NOT ALL MASONRY PENETRATIONS SHOWN, COORDINATE WITH MEP CONTRACTORS. B. AT 135 DEGREE OUTSIDE CORNERS PROVIDE 135 DEGREE BRICK CORNER UNITS. C. REFER TO WINDOW TYPE SHEET A6.2 FOR ALL WINDOW INFORMATION. D. CONTROL JOINTS CONTINUOUS FROM TOP OF FOUNDATION TO TOP OF WALL. E. PROVIDE AC GRILL COVER @ ALL THROUGH WALL AC UNITS. COLOR TO MATCH ADJACENT MATERIAL. GENERAL NOTES FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" BRK LS-1 FCTFCT LS-2 CST ASH ASH ASH ASH ASH FCT PFG CST BRK FCT BRK CST FCT PFG PFG CST CST CSTCSTBRKCST BRK CST FCT LS-1 CST FCT PFG FCT FCT LS-2 FCT LS-1 CST CSTCSTBRK CSTFCTLS-1CST ASH PFG FCT LS-2 CSTBRKCSTCST FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" BRK CST CST CST PFG FCT ASH FCT FCT FCP BS DSBRK CST CSTCSTCSTCSTBRKCST CST BRK CST CSTCSTBRK ASH FCT CEDAR PERGOLA FCT FCT BRK BRK A2.0 A2.1 A2.0 1 7 9 A2.2 21 A2.0 8 A2.115 A2.2 19 A2.218 A2.0 6 A2.1 17 2422 23 A2.1 11 A2.1 12 A2.113 A2.0 3 A2.0 2 A2.05 A2.1 10 A2.2 20 A2.02 Si m A2.1 16 A2.1 14 /P A2.1 /P A2.1 /N A2.0 /M A2.0 /L A2.0 /K A2.0 /J A2.0 /H A2.0 /G A2.0 /G A2.0 /G A2.0 /G A2.0 /F A2.0 /E A2.0 /D A2.0 /C A2.0 /B A2.0 /B A2.0 /A A2.0 /LL A2.2 /KK A2.2 /JJ A2.2 /HH A2.2 /GG A2.2 /GG A2.2 /FF A2.2 /EE A2.2 /CC A2.1 /BB A2.1 /DD A2.1 /AA A2.1 /AA A2.1 /Z A2.1 /Y A2.1 /X A2.1/U A2.1 /V A2.1 /W A2.1 /T A2.1 /S A2.1 /S A2.1 /S A2.1 /R A2.1 OPP. OPP. OPP. OPP. OPP. OPP.OPP. /NN A2.2 /NN A2.2OPP. /MM A2.2 /MM A2.2OPP. /27 A2.2 /26 A2.2 ASH CST FCT PFG FCT CST CST CST CST CST BRK BRK ASH PFG FCT FCT CST CST BRK CST CST CST ASH CEDAR PERGOLA FCT FCP CST FCT BRK FCT PFG DS BS FCT FCP BRK ASH PFG FCT FCT CEDAR PERGOLA FCP CST FCT BRK DS BS FCT FCP BRK CST CEDAR PERGOLA ASH FCT PFG FCT FCT BS CST FCT BRK BRK BRK FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" ASH PFG FCT CEDAR PERGOLA FCT DS CST FCT BRK BS FCP FCT BRK CST CIP CIP ASH PFG FCT FCT DS CST BRK BS ASH FCT PFG FCT FCT DS BS CST BRK ASH FCT PFG FCT FCT FCP CST DS BRK BS CEDAR PERGOLA FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" ASH PFG FCT FCT LS-2 FCT LS-1CSTCSTBRK FCT FCP BS FCT FCT CST RSTNCSTCST FCP FCT CST CST BRK BRKCSTCSTLS-1 FCT LS-2 ASH FCT CEDAR PERGOLA CEDAR PERGOLA FCT PFG ASH PFG CEDAR PERGOLA ASH FCT LS-2 LS-1 FCP RSTN BRK CST CST FCT FCT FCP DS BRKCSTFCPFCT CST FCP FCT DS ASH PFG FCT FCT FCP RSTN CST FCT CEDAR PERGOLA BRK CST FCP FCT CEDAR PERGOLA ASH FCT PFG FCT FCT DS FCP BS CST FCT BRK FCT FCP BRK CST CEDAR PERGOLA ASH PFG FCT LS-2 DS CST FCT BRK FCP FCT CST BRK ASH PFG FCT FCT LS-2 FCT LS-1 CST BRK CEDAR PERGOLA ASH PFG FCT CST LS-2 DS FCT BRK FCP FCT FCT BRK FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" BRKCSTCSTLS-1FCT LS-2FCTFCTPFG DSFCPFCPFCTFCTBS DS FCT ASHFCTCEDAR PERGOLA LS-2 LS-1CSTFCTBRKCSTCST FCTCEDAR PERGOLA LS-2 LS-1FCT BRK BRKDS RSTN CHIMNEY ASH CEDAR PERGOLA ASH FCT PFG FCT FCT FCP BS CST FCT BRK FCT FCP CEDAR PERGOLA ASH FCT PFG FCT FCT FCP CST FCT BRK BS FCT FCP CST BRK CST PROJECT # DATE OF ISSUE: REVISIONS: 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 www.dimensionivmadison.com E: \ R e v i t \ L o c a l F i l e s \ 1 6 0 3 1 - M S P - M u s k e g o 2 0 1 7 _ n k i r s c h t @ d i m e n s i o n i v m a d i s o n . c o m . r v t 2/ 1 5 / 2 0 1 7 3 : 1 7 : 3 5 P M A2.1 EXTERIOR ELEVATIONS 16031 FEB. 14, 2017 MSP − MUSKEGO WEST JANESVILLE ROAD MUSKEGO, WI 53150 1/8" = 1'-0"10 WEST ELEVATION AT IL WING B 1/8" = 1'-0"15 NORTH ELEVATION AT IL WING 0'4'8'2' 1/8" = 1'-0"11 SOUTH ELEVATION AT POOL WING 1/8" = 1'-0"12 WEST ELEVATION AT POOL WING 1/8" = 1'-0"13 NORTH ELEVATION AT POOL WING 1/8" = 1'-0"16 NE CORNER ELEV 1/8" = 1'-0"14 NW CORNER ELEV 1/8" = 1'-0"X HIDDEN ELEVATION 1/8" = 1'-0"W HIDDEN ELEVATION 1/8" = 1'-0"V HIDDEN ELEVATION 1/8" = 1'-0"U HIDDEN ELEVATION 1/8" = 1'-0"T HIDDEN ELEVATION 1/8" = 1'-0"S HIDDEN ELEVATION 1/8" = 1'-0"R HIDDEN ELEVATION 1/8" = 1'-0"9 NORTH ELEVATION AT AL WING 1/8" = 1'-0"P HIDDEN ELEVATION 1/8" = 1'-0"Y HIDDEN ELEVATION 1/8" = 1'-0"Z HIDDEN ELEVATION 1/8" = 1'-0"AA HIDDEN ELEVATION 1/8" = 1'-0"DD HIDDEN ELEVATION 1/8" = 1'-0"17 EAST ELEVATIONS AT IL WING 2 1/8" = 1'-0"CC HIDDEN ELEVATION 1/8" = 1'-0"BB HIDDEN ELEVATION Page 14 of 26 RESOLUTION PC 059-2018 Packet Page 38 EXTERIOR ELEVATIONS GENERAL NOTES AND LEGEND LEGEND MASONRY COLOR BRK BRICK TRIANGLE NORTHHAMPTON UTILITY STN THIN STONE VENEER DUTCH QUALITY TORINO STACK LEDGE RSTN REAL STONE COLOR - BROOKFIELD - 80% FOND DU LAC - 20% CMU SPLIT FACE CMU WALNUT SVT STONE VENEER TRIM N/A CST CAST STONE HERITAGE CAST STONE - BUFF • 4" @ WINDOW SILL TYP. • 8" @ WINDOW HEAD TYP. • 8" @ BAND TYP. CJ CONTROL JOINT CIP CAST IN PLACE CONCRETE SIDING & ROOFING LS-1 FIBER CEMENT LAP SIDING LIGHT GREY LS-2 FIBER CEMENT LAP SIDING CREAM/TAN FCP FIBER CEMENT PANEL GREEN ASH ASPHALT SHINGLES TRIM FCT FIBER CEMENT TRIM COTTAGE WHITE • 4" @ OUTSIDE CORNER • 4" @ WINDOW SIDE TRIM • 6" @ FRIEZE BOARD (LAP SIDING)• 8" @ WINDOW HEAD TRIM • 8" @ FRIEZE BOARD (BRICK)• 8" @ BAND BS • 2" BATTEN STRIP COTTAGE WHITE METAL PFM PRE FIN. METAL FASCIA COLOR TO MATCH TRIM PFG PRE FIN. GUTTERS COLOR TO MATCH TRIM DS PRE FIN. DOWNSPOUTS COLOR TO MATCH TRIM ARS ALUMINUM RAILING RIDEAU BROWN FPV FIREPLACE VENT A. NOT ALL MASONRY PENETRATIONS SHOWN, COORDINATE WITH MEP CONTRACTORS. B. AT 135 DEGREE OUTSIDE CORNERS PROVIDE 135 DEGREE BRICK CORNER UNITS. C. REFER TO WINDOW TYPE SHEET A6.2 FOR ALL WINDOW INFORMATION. D. CONTROL JOINTS CONTINUOUS FROM TOP OF FOUNDATION TO TOP OF WALL. E. PROVIDE AC GRILL COVER @ ALL THROUGH WALL AC UNITS. COLOR TO MATCH ADJACENT MATERIAL. GENERAL NOTES FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" BRKCSTCSTBRKBRK CEDAR PERGOLA LS-2PFG LS-1 PFG ASH FCT FCT LS-2 DS FCT CST FCT LS-1 CST BRK LS-2 FCTASH ASH CST CST DS CST CST BRK CST FCT LS-2 CEDAR PERGOLA LS-2 FCTLS-1CST BRK FCTFCTDS CEDAR PERGOLA DSCSTFCTLS-1 CSTFCP CST FCP FCT CST BRK CST FCP FCT FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" BRK CST FCT LS-2 PFG ASH CEDAR PERGOLA BRKBRKCST ASH ASHPFGCEDAR PERGOLA FCT FCTFCT LS-1 FCT LS-2BRKCSTFCT CSTLS-2 BRK CST FCT LS-2 PFG ASH FCT DS DS DS DSCST BRK FCP CST FCT FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" BRK LS-2 FCT FCT LS-1 FCT LS-2 FCT PFG FCT ASH DS BRK CST LS-1 CST BRKCSTFCTFCT ASH ASHPFGFCTLS-2 CST CST CST CST CST FCT ASH CEDAR PERGOLAPFGLS-2 FCT LS-2 FCT LS-1 CST FCT BRK CST FCT FCP BRK FCT BRKCSTFCPFCPFCTCSTBRK A2.0 A2.1 A2.0 1 A2.1 7 9 5X A2.2 21 A2.0 8 A2.115 A2.2 19 A2.218 A2.0 6 A2.1 17 2422 23 A2.1 11 A2.1 12 A2.113 A2.0 3 A2.0 2 A2.05 A2.1 10 A2.2 20 A2.02 Si m A2.1 16 A2.1 14 /P A2.1 /P A2.1 /N A2.0 /M A2.0 /L A2.0 /K A2.0 /J A2.0 /H A2.0 /G A2.0 /G A2.0 /G A2.0 /G A2.0 /F A2.0 /E A2.0 /D A2.0 /C A2.0 /B A2.0 /B A2.0 /A A2.0 /LL A2.2 /KK A2.2 /JJ A2.2 /HH A2.2 /GG A2.2 /GG A2.2 /FF A2.2 /EE A2.2 /CC A2.1 /BB A2.1 /DD A2.1 /AA A2.1 /AA A2.1 /Z A2.1 /Y A2.1 /X A2.1/U A2.1 /V A2.1 /W A2.1 /T A2.1 /S A2.1 /S A2.1 /S A2.1 /R A2.1 OPP. OPP. OPP. OPP. OPP. OPP.OPP. /NN A2.2 /NN A2.2OPP. /MM A2.2 /MM A2.2OPP. /27 A2.2 /26 A2.2 ASH PFG FCT FCT FCP CST BRK ASH PFG FCT CEDAR PERGOLA FCT FCP CST FCT BRK ASH PFG FCT CEDAR PERGOLA FCT LS-2 CST FCT BRK DS CST BRK FCT FCP DS BRK CST FCT LS-2 FCT FCT PFG ASH ASH PFG FCT FCT FCT LS-2 FCT LS-1 CST BRK BRK CST FCT ASH PFG FCT LS-2 DS ASH PFG FCT CEDAR PERGOLA FCT LS-2 CST FCT BRK CST FCT FCP CST BRK FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" ASHFCPBSFCT BRK CST RSTNCSTCSTRSTN CST BRK CST LS-1 FCT LS-2 FCT PFG FCT FCT CEDAR PERGOLAPFGFCTFCTFCTBSFCP CST BRKCSTRSTNCSTBRK CST LS-1 FCT LS-2 FCP FCT CST ASH CEDAR PERGOLA FCT RSTN CST BRK FCT DS PFG FCT BS FCP FCT FCP CST BRK FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" FCTPFGFCTFCTFCTLS-2 FCT LS-1 CST BRK CST ASH PFG FCT FCT DS BS CST RSTN CST CST BRK RSTN FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" FCP BS FCT BRK PFG PFG FCT LS-1CSTCST FCT LS-2 FCT LS-1 CST RSTNCST CSTRSTNCSTCSTCSTRSTNCSTRSTNBRK CST LS-1 FCT FCT LS-2 FCT FCT FCTASH ASH FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" PFG FCT FCT FCT LS-2 FCT LS-1 CST BRK CST CST BRK COORDINATE FOOTING ELEVATION WITH CIVIL. PROVIDE MIN. 4' - 0" OF COVER (TYP.) BRK CST 1/2" FCT FCP C.I.P. PIER 100' - 0" 104' - 0" 110' - 9 1/4" 6" STONE CAP 115' - 8" 119' - 4" 1/2" 1/2" 1' - 4" FCT FCP FCT 4 5 / 8 " 5" 3' - 0" 3/ 4 " 4 7 / 8 " 11/16" 6' - 0 " 3/4" 4" 6 7/8" r = 5 ' - 1 0 " 1' - 4 " 5 ' - 6 " 8" 1' - 6" 2' - 6 " 1' - 3 " 1 3 5 . 0 0 ° 1 1 / 2 " 1 1/2" 3" 3 1/2" 1' - 4 " 1' - 4" CAST STONE ACCENT ALIGN W/ CENTER OF WINDOW ABOVE CENTER BETWEEN WINDOWS CEDAR PERGOLA BRK CST CEDAR BOTTOM RAIL CEDAR PICKETS CEDAR TOP RAIL AND CAP FCT FCP CEDAR PERGOLA CEDAR PICKETS CEDAR TOP RAIL AND CAP BRK CST FCP FCT CEDAR BOTTOM RAIL (4) EQUAL GATE SECTIONS CEDAR BOARDS ON STEEL GATE FRAME PIPE COLUMNS BEYOND FINISH GRADE CANE BOLTS AND SUPPORT WHEELS 18' - 0" CAST STONE COPING PRE FINISHED METAL FLASHING W. HEMMED DRIP EDGE BRICK VENEER 6' - 0 " 4" CONCRETE PAD 3' - 1 0 " CONCRETE FOUNDATION SEE STRUCTURAL 1' - 0"1' - 0" PROVIDE PIPE BOLLARDS AT EACH SIDE OF GATE AS REQUIRED TO PROTECT MASONRY WALL 20' - 4" CMU WALL 3' - 1 0 " ANCHOR TOP OF PIPE COLUMN TO CMU WALL WITH STEEL BRACKET ANCHOR PIPE COLUMN INTO FOUNDATION WALL BELOW 4" 10 3/4" PROJECT # DATE OF ISSUE: REVISIONS: 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 www.dimensionivmadison.com E: \ R e v i t \ L o c a l F i l e s \ 1 6 0 3 1 - M S P - M u s k e g o 2 0 1 7 _ n k i r s c h t @ d i m e n s i o n i v m a d i s o n . c o m . r v t 2/ 1 5 / 2 0 1 7 3 : 1 7 : 3 8 P M A2.2 EXTERIOR ELEVATIONS 16031 FEB. 14, 2017 MSP − MUSKEGO WEST JANESVILLE ROAD MUSKEGO, WI 53150 1/8" = 1'-0"18 NORTH ELEVATION AT IL WING 2 1/8" = 1'-0"19 EAST ELEVATION AT IL WING 1/8" = 1'-0"20 SOUTH ELEVATION AT IL WING 0'4'8'2' 1/8" = 1'-0"LL HIDDEN ELEVATION 1/8" = 1'-0"KK HIDDEN ELEVATION 1/8" = 1'-0"JJ HIDDEN ELEVATION 1/8" = 1'-0"HH HIDDEN ELEVATION 1/8" = 1'-0"GG HIDDEN ELEVATION 1/8" = 1'-0"FF HIDDEN ELEVATION 1/8" = 1'-0"EE HIDDEN ELEVATION 1/8" = 1'-0"21 WEST COURTYARD ELEVATION AT AL WING 1/8" = 1'-0"MM HIDDEN ELEVATION 1/8" = 1'-0"22 NORTH COURTYARD ELEVATION AT AL WING 1/8" = 1'-0"NN HIDDEN ELEVATION 1/8" = 1'-0"23 EAST COURTYARD ELEVATION AT AL WING 1/8" = 1'-0"24 SOUTH COURTYARD ELEVATION AT AL WING 1/2" = 1'-0"28 BALCONY PIER DETAIL 1/2" = 1'-0"31 EAVE BRACKET DETAIL 1 3/4" = 1'-0"30 EAVE BRACKET DETAIL 2 3/4" = 1'-0"29 STONE PENDANT DETAIL 1/8" = 1'-0"27 MECH SCREEN ELEVATION A 1/8" = 1'-0"26 MECH SCREEN ELEVATION B 1/4" = 1'-0"25 TRASH ENCLOSURE DETAIL - MASONRY Page 15 of 26 RESOLUTION PC 059-2018 Packet Page 39 Existing Photos, As-Built Plans, & PC Approved Plans (5 Pages) Page 16 of 26 RESOLUTION PC 059-2018 Packet Page 40 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 26 ' - 1 0 1 / 8 " EQ EQ BR-1CSTB-1CMULS-1LS-2 FCT ASH 1 SOUTH ELEVATION BRK LS-2 FCT FCT LS-1 FCT LS-2 FCT PFG FCT ASH CST FCT LS-1 CST BRKFCTFCT ASH ASHPFGFCTLS-2 CSTCST FCT ASHPFGLS-2 FCT LS-2 LS-1 FCT DS CST A8.2 1A8.2 1 DSDS DS CST BRK DSEJEJEJEJ A8.2 1 20 SOUTH ELEVATION AT IL WING J SOUTH ELEVATION SET BACK FROM SOUTH JANESVILLE ROAD Page 17 of 26 RESOLUTION PC 059-2018 Packet Page 41 26 ' - 9 5 / 8 " EQ EQ BR-1STNFCPCSTFCTLS-1LS-2 ASH 2 EAST ELEVATION - MAIN ENTRY FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" TSTN PFM CHIMNEY BS FCP ASH CST FCT PFG FCT LS-2 LS-1 PFG FCT LS-2 LS-1 CST BRKCST CST RSTNCSTCST CST FCT RSTN RSTN CSTCST RSTN DS CST BRK CSTCST CST FCT BS FCP PFG FCTLS-1 BRK CST ?FCT FCT PFG FCT LS-2ASH A8.2 1 BRACKET - SEE /9 A2.0 DSFCTCST LS-1 FCT EJEJEJEJEJ FCT FCT CST RSTN FCT FCP 1 EAST ELEVATIONS AT MAIN ENTRANCE 0'4'8'2' RE 1/8" = 1'-0" 1/8" = 1'-0" EAST ELEVATION AT MAIN ENTRANCE Page 18 of 26 RESOLUTION PC 059-2018 Packet Page 42 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 33 ' - 3 1 / 4 " BR-1 LS-1 LS-2 26 ' - 4 3 / 4 " EQ EQEQ EQ STN ASH CMUSTMLS-1LS-2 CST 3 EAST ELEVATION 1/4 STSTN PFM CHIMNEY ASHLS-1 CST CST BRACKET - SEE /9 A2.0 FCT PFG ASH FCT BS FCP CST CST ASH DS PFG FCT CSTCST LS-1 FCT LS-2 CSTRSTN CSTCSTFCP BS FCT ASH FCT BS FCP FCT LS-2 LS-1 PFGFCT ASH FCT PFGFCT FCT LS-2 CSTFCTCST BRK CST CST CHIMNEYTSTNASH PFMFCT PFGLS-2 CST BRKLS-1 FCT FCTCSTCST ASH FCP FCT BS ASH FCT FCT ASH FCT LS-2 FCT FCT LS-1BRKCSTRSTNCST PFG FCTFCT LS-2 LS-1 CSTFCTCSTCSTCST BRK A8.3 1 A8.2 1 DSDSDSBRKCSTEJEJEJEJEJEJ 1' - 2" 3' - 4"2' - 8"3' - 4"3' - 4"2' - 8" 1' - 6" 8" 8" 8" 8" 8" 8" A8.2 1 6 EAST ELEVATION AT AL WING B 1/F 1/8" = 1'-0"G EAST ELEVATION VISIBLE FROM SOUTH JANESVILLE ROAD NORTHEAST CORNER SOUTHEAST CORNER Page 19 of 26 RESOLUTION PC 059-2018 Packet Page 43 ASH FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" EQ EQ 30 ' - 9 3 / 4 " BR-1LS-1LS-2 STN CMUCSTFCT ASH 4 SOUTH ELEVATION BS FCP FCT FCT ASH FCTFCP FCT LS-2 LS-1 PFGFCT ASH FCT PFGFCT FCT LS-2 CHIMNEYTSTNASH PFMFCT PFGLS-2 FCT ASH FCP FCT BS FCT RSTN ASH FCP FCT FCT LS-1 LS-2 ASH CST FCTBRK BRKCSTLS-1 FCT PFG FCT RSTNCSTCST FCT FCP BS FCT CST ASH LS-2 FCT PFG FCT FCT LS-2 LS-1 FCP FCT FCP BS CST PFG LS-1 CSTBRK DS ASH PFG LS-2 DS LS-1 FCT ASH CSTBRK BRKCSTCSTCST CST FCP RSTN ASH PFG FCT FCP BS FCT CST FCT ASH CST RSTNCSTCST A8.3 1 FCT DS A8.3 1 BRACKET - SEE /9 A2.0 CSTFCT FCT FCT DSDS EJEJEJEJEJ EJ EJ EJ TOP OF PEIR ELEV = 94'-0" 2' - 0"3' - 4"4' - 8"7' - 4"2' - 0"4' - 6" TOP OF PIER ELEV = 94' - 0" NO LEDGE REQUIRED FOR STONE A8.3 1A8.3 1 A8.3 1 8" 8" 8" 8" 8" 96' - 0" 96' - 8" BRK TOP OF PIER ELEV = 96' - 8" BRICK LEDGE AT PIER ELEV = 97' - 4" 7 SOUTH ELEVATION AT AL WING 1/8" = 1'-0"8 1/8" =G HID SOUTH ELEVATION ALONG SOUTH JANESVILLE ROAD SOUTHEAST CORNER SOUTHWEST CORNER Page 20 of 26 RESOLUTION PC 059-2018 Packet Page 44 ASH FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" CST LS-1LS-2STNBR-1FCTCMUSTM ASH 30 ' - 1 1 3 / 4 " EQ EQ EQ EQ 26 ' - 1 1 / 2 " 5 WEST ELEVATIONS FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" ASH FCT FCT LS-1 FCT CSTBRK FCT RSTN FCP CSTLS-1 LS-2ASH FCP BS ASHFCT CST FCT FCT CSTCST RSTN PFG FCT LS-2 FCTFCT CSTCST BRK LS-1 CST BRK CSTCST CST PFG FCT ASH FCT LS-2 FCT CSTFCT FCT LS-2 ASH PFG FCP BS FCT FCP CST FCT CSTCSTRSTN BRK LS-1 ASH FCT LS-2 FCT FCP LS-2 RSTN BRKBRKCST CST CST LS-1 LS-1 FCT PFG PFG A8.3 1 FCT DS A8.3 1 A8.2 1 FCT DSDS DS DS FCT BRK FCT LS-1 EJ EJ EJEJEJ 96' - 8" TOP OF PIER ELEV = 96' - 8" BRICK LEDGE AT PIER ELEV = 97' - 4" 97' - 4"11' - 4" 98' - 8"99' - 4" BRICK LEDGE AT PIERS ELEV = 98' 8" A8.3 1 A8.2 1 A8.2 1 A2.0 A2.0 6 A2.0 3 A2.0 2 2 8 WEST ELEVATION AT AL WING WEST ELEVATION VISIBLE FROM SOUTH JANESVILLE ROAD Page 21 of 26 RESOLUTION PC 059-2018 Packet Page 45 As-Built Plans with Calcs (4 Pages) Page 22 of 26 RESOLUTION PC 059-2018 Packet Page 46 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 100 SF 302 SF 564 SF 310 SF 55 SF 163 SF 142 SF 87 SF 309 SF 88 SF 126 SF 193 SF 3 SF (2) ELEVATIONS - SEE KEY PLAN 251 SF 87 SF 320 SF 274 SF 62 SF 177 SF 328 SF 124 SF 320 SF 274 SF 282 SF 27 SF 73 SF 86 SF 62 SF 177 SF 22 SF 37 SF 329 SF 86 SF 269 SF 330 SF403 SF 214 SF 566 SF 701 SF 403 SF 214 SF 316 SF 385 SF FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 153 SF 251 SF 274 SF 411 SF 86 SF 230 SF 72 SF 177 SF 353 SF 124 SF 320 SF 274 SF 247 SF 87 SF EJ 84 SF 291 SF 44 SF 25 SF EXTERIOR ELEVATIONS GENERAL NOTES AND LEGEND LEGEND MASONRY COLOR BRK BRICK TRIANGLE NORTHHAMPTON UTILITY RSTN REAL THIN STONE COLOR - BROOKFIELD - 80% FOND DU LAC - 20% CMU SPLIT FACE CMU WALNUT SVT STONE VENEER TRIM N/A CST CAST STONE HERITAGE CAST STONE - BUFF • 4" @ WINDOW SILL TYP. • 8" @ WINDOW HEAD TYP. • 8" @ BAND TYP. EJ MASONRY EXPANSION JOINT CIP CAST IN PLACE CONCRETE SIDING & ROOFING COLOR LS-1 FIBER CEMENT LAP SIDING LIGHT GREY LS-2 FIBER CEMENT LAP SIDING CREAM/TAN FCP FIBER CEMENT PANEL GREEN LAT LATTICE WHITE ASH ASPHALT SHINGLES TRIM FCT FIBER CEMENT TRIM COTTAGE WHITE • 4" @ OUTSIDE CORNER • 4" @ WINDOW SIDE TRIM • 6" @ FRIEZE BOARD (LAP SIDING)• 8" @ WINDOW HEAD TRIM • 8" @ FRIEZE BOARD (BRICK)• 8" @ BAND BS • 2" BATTEN STRIP COTTAGE WHITE METAL PFM PRE FIN. METAL FASCIA COLOR TO MATCH TRIM PFG PRE FIN. GUTTERS COLOR TO MATCH TRIM DS PRE FIN. DOWNSPOUTS COLOR TO MATCH TRIM ARS ALUMINUM RAILING RIDEAU BROWN FPV FIREPLACE VENT A. NOT ALL MASONRY PENETRATIONS SHOWN, COORDINATE WITH MEP CONTRACTORS. B. AT 135 DEGREE OUTSIDE CORNERS PROVIDE 135 DEGREE BRICK CORNER UNITS. C. REFER TO WINDOW TYPE SHEET A6.2 FOR ALL WINDOW INFORMATION. D. CONTROL JOINTS CONTINUOUS FROM TOP OF FOUNDATION TO TOP OF WALL. E. PROVIDE AC GRILL COVER AT ALL THROUGH WALL AC UNITS. COLOR TO MATCH ADJACENT MATERIAL. F. PROVIDE EXPANSION JOINTS AT ALL MASONRY INSIDE CORNERS AND WHERE SHOWN ON ELEVATIONS. CONTINUE EXPANSION JOINTS FROM TOP OF FOUNDATION WALL THROUGH CAST STONE CAP AT TOP OF MASONRY WYTHE. GENERAL NOTES A2.0 A2.1 A2.0 1 7 9 A2.2 21 A2.0 8 A2.115 A2.2 19 A2.218 A2.0 6 A2.1 17 2422 23 A2.1 11 A2.1 12 A2.113 A2.0 3 A2.0 2 A2.05 A2.2 20 A2.02 Si m A2.1 16 A2.1 14 /P A2.1 /P A2.1 /N A2.0 /M A2.0 /L A2.0 /K A2.0 /J A2.0 /H A2.0 /G A2.0 /G A2.0 /G A2.0 /G A2.0 /F A2.0 /E A2.0 /D A2.0 /C A2.0 /B A2.0 /B A2.0 /A A2.0 /LL A2.2 /KK A2.2 /JJ A2.2 /HH A2.2 /GG A2.2 /GG A2.2 /FF A2.2 /EE A2.2 /CC A2.1 /BB A2.1 /DD A2.1 /AA A2.1 /Z2 A2.1 /Z A2.1 /Y A2.1 /X A2.1/U A2.1 /V A2.1 /W A2.1 /T A2.1 /S A2.1 /S A2.1 /S A2.1 /R A2.1 OPP. OPP. OPP. OPP. OPP. OPP. /NN A2.2 /NN A2.2OPP. /MM A2.2 /MM A2.2OPP. /26 A2.2 /25 A2.2 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 80 SF 45 SF 30 SF 15 SF (2) ELEVATIONS - SEE KEY PLAN 80 SF 45 SF 80 SF 45 SF FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 44 SF 76 SF 44 SF 82 SF 16 SF 76 SF FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 92 SF 28 SF28 SF 80 SF 15 SF 30 SF 15 SF 30 SF 45 SF 80 SF 28 SF 73 SF 1' - 6" 2' - 6 " 1' - 3 " 1 3 5 . 0 0 ° 1 1 / 2 " 1 1/2" 3" 3 1/2" PROJECT # DATE OF ISSUE: REVISIONS: 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 www.dimensionivmadison.com APRIL 11, 2017 \\ d i m i v s e r v e r 0 1 \ D i m e n s i o n I V M a d i s o n \ P r o j e c t s \ 1 6 0 3 1 - M S P - M u s k e g o \ 5 - R e v i t M o d e l \ R e v i t E x p o r t s \ D e t a c h e d M o d e l \ 1 6 0 3 1 - M S P - M u s k e g o 2 0 1 7 _ E x t e r i o r S h e l l r v t . r v t 9/ 2 5 / 2 0 1 8 1 0 : 4 0 : 0 5 A M A2.0 EXTERIOR ELEVATIONS 16031 HERITAGE MUSKEGO WEST JANESVILLE ROAD MUSKEGO, WI 53150 1/8" = 1'-0"1 EAST ELEVATIONS AT MAIN ENTRANCE 0'4'8'2' 1/8" = 1'-0"3 EAST ELEVATION AT PORCH COUCHERE 1/8" = 1'-0"2 SOUTH ELEVATION AT PORCH COUCHERE 1/8" = 1'-0"6 EAST ELEVATION AT AL WING 1/8" = 1'-0"7 SOUTH ELEVATION AT AL WING 1/8" = 1'-0"8 WEST ELEVATION AT AL WING 1/8" = 1'-0"5 SOUTH ELEVATION A 2 CB #2 6/27/17 3 CB #3 9/7/17 1/8" = 1'-0"A HIDDEN ELEVATION 1/8" = 1'-0"B HIDDEN ELEVATION 1/8" = 1'-0"C HIDDEN ELEVATION 1/8" = 1'-0"D HIDDEN ELEVATION 1/8" = 1'-0"E HIDDEN ELEVATION 1/8" = 1'-0"F HIDDEN ELEVATION 1/8" = 1'-0"G HIDDEN ELEVATION 1/8" = 1'-0"H HIDDEN ELEVATION 1/8" = 1'-0"J HIDDEN ELEVATION 1/8" = 1'-0"K HIDDEN ELEVATION 1/8" = 1'-0"L HIDDEN ELEVATION 1/8" = 1'-0"M HIDDEN ELEVATION 1/8" = 1'-0"N HIDDEN ELEVATION 1/8" = 1'-0"4 WEST ELEVATION AT PORCH COUCHERE 3/4" = 1'-0"9 EAVE BRACKET DETAIL 2 Page 23 of 26 RESOLUTION PC 059-2018 Packet Page 47 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 120 354 185 108 74 450 247 92 342 208 116 132277 199 115 37 133 479248 186 54 24 151 118303 108 81 72 EXTERIOR ELEVATIONS GENERAL NOTES AND LEGEND LEGEND MASONRY COLOR BRK BRICK TRIANGLE NORTHHAMPTON UTILITY RSTN REAL THIN STONE COLOR - BROOKFIELD - 80% FOND DU LAC - 20% CMU SPLIT FACE CMU WALNUT SVT STONE VENEER TRIM N/A CST CAST STONE HERITAGE CAST STONE - BUFF • 4" @ WINDOW SILL TYP. • 8" @ WINDOW HEAD TYP. • 8" @ BAND TYP. EJ MASONRY EXPANSION JOINT CIP CAST IN PLACE CONCRETE SIDING & ROOFING COLOR LS-1 FIBER CEMENT LAP SIDING LIGHT GREY LS-2 FIBER CEMENT LAP SIDING CREAM/TAN FCP FIBER CEMENT PANEL GREEN LAT LATTICE WHITE ASH ASPHALT SHINGLES TRIM FCT FIBER CEMENT TRIM COTTAGE WHITE • 4" @ OUTSIDE CORNER • 4" @ WINDOW SIDE TRIM • 6" @ FRIEZE BOARD (LAP SIDING)• 8" @ WINDOW HEAD TRIM • 8" @ FRIEZE BOARD (BRICK)• 8" @ BAND BS • 2" BATTEN STRIP COTTAGE WHITE METAL PFM PRE FIN. METAL FASCIA COLOR TO MATCH TRIM PFG PRE FIN. GUTTERS COLOR TO MATCH TRIM DS PRE FIN. DOWNSPOUTS COLOR TO MATCH TRIM ARS ALUMINUM RAILING RIDEAU BROWN FPV FIREPLACE VENT A. NOT ALL MASONRY PENETRATIONS SHOWN, COORDINATE WITH MEP CONTRACTORS. B. AT 135 DEGREE OUTSIDE CORNERS PROVIDE 135 DEGREE BRICK CORNER UNITS. C. REFER TO WINDOW TYPE SHEET A6.2 FOR ALL WINDOW INFORMATION. D. CONTROL JOINTS CONTINUOUS FROM TOP OF FOUNDATION TO TOP OF WALL. E. PROVIDE AC GRILL COVER AT ALL THROUGH WALL AC UNITS. COLOR TO MATCH ADJACENT MATERIAL. F. PROVIDE EXPANSION JOINTS AT ALL MASONRY INSIDE CORNERS AND WHERE SHOWN ON ELEVATIONS. CONTINUE EXPANSION JOINTS FROM TOP OF FOUNDATION WALL THROUGH CAST STONE CAP AT TOP OF MASONRY WYTHE. GENERAL NOTES /2 A2.1 322322 85 85 183 107 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 552 313 TRUSS BEARING 120' - 4 1/2" 552 A2.0 A2.1 A2.0 1 7 9 A2.2 21 A2.0 8 A2.115 A2.2 19 A2.218 A2.0 6 A2.1 17 2422 23 A2.1 11 A2.1 12 A2.113 A2.0 3 A2.0 2 A2.05 A2.2 20 A2.02 Si m A2.1 16 A2.1 14 /P A2.1 /P A2.1 /N A2.0 /M A2.0 /L A2.0 /K A2.0 /J A2.0 /H A2.0 /G A2.0 /G A2.0 /G A2.0 /G A2.0 /F A2.0 /E A2.0 /D A2.0 /C A2.0 /B A2.0 /B A2.0 /A A2.0 /LL A2.2 /KK A2.2 /JJ A2.2 /HH A2.2 /GG A2.2 /GG A2.2 /FF A2.2 /EE A2.2 /CC A2.1 /BB A2.1 /DD A2.1 /AA A2.1 /Z2 A2.1 /Z A2.1 /Y A2.1 /X A2.1/U A2.1 /V A2.1 /W A2.1 /T A2.1 /S A2.1 /S A2.1 /S A2.1 /R A2.1 OPP. OPP. OPP. OPP. OPP. OPP. /NN A2.2 /NN A2.2OPP. /MM A2.2 /MM A2.2OPP. /26 A2.2 /25 A2.2 33 71 71 33 30 57 57 30 30 57 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 30 57 30 57 30 57 (3) ELEVATIONS - SEE KEY PLAN 30 SF 88 SF FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 389 SF 134 SF 214 SF 267 SF 190 SF 554 SF 45 80 57 30 22 6157 15 22 64 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" /1 A2.1 185 248 81 72 303 10884 265 27 130185 45 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 57 30 57 30 4 5 / 8 " 5" 3' - 0" 3/ 4 " 4 7 / 8 " 11/16" 6' - 0 " 3/4" 4" 6 7/8" r = 5 ' - 1 0 " 1' - 4 " 5 ' - 6 " 8" 1' - 4 " 1' - 4" CAST STONE ACCENT ALIGN W/ CENTER OF WINDOW ABOVE CENTER BETWEEN WINDOWS 57 15 PROJECT # DATE OF ISSUE: REVISIONS: 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 www.dimensionivmadison.com APRIL 11, 2017 \\ d i m i v s e r v e r 0 1 \ D i m e n s i o n I V M a d i s o n \ P r o j e c t s \ 1 6 0 3 1 - M S P - M u s k e g o \ 5 - R e v i t M o d e l \ R e v i t E x p o r t s \ D e t a c h e d M o d e l \ 1 6 0 3 1 - M S P - M u s k e g o 2 0 1 7 _ E x t e r i o r S h e l l r v t . r v t 9/ 2 5 / 2 0 1 8 1 0 : 4 0 : 0 9 A M A2.1 EXTERIOR ELEVATIONS 16031 HERITAGE MUSKEGO WEST JANESVILLE ROAD MUSKEGO, WI 53150 1/8" = 1'-0"10 WEST ELEVATION AT IL WING A 1/8" = 1'-0"15 NORTH ELEVATION AT IL WING 0'4'8'2' 1/8" = 1'-0"11 SOUTH ELEVATION AT POOL WING 1/8" = 1'-0"12 WEST ELEVATION AT POOL WING 1/8" = 1'-0"13 NORTH ELEVATION AT POOL WING 2 CB #2 6/27/17 3 CB #3 9/7/17 6 CB #6 4/4/18 1/8" = 1'-0"16 NE CORNER ELEV 1/8" = 1'-0"14 NW CORNER ELEV 1/8" = 1'-0"X HIDDEN ELEVATION 1/8" = 1'-0"W HIDDEN ELEVATION 1/8" = 1'-0"V HIDDEN ELEVATION 1/8" = 1'-0"U HIDDEN ELEVATION 1/8" = 1'-0"T HIDDEN ELEVATION 1/8" = 1'-0"S HIDDEN ELEVATION 1/8" = 1'-0"R HIDDEN ELEVATION 1/8" = 1'-0"9 NORTH ELEVATION AT AL WING 1/8" = 1'-0"P HIDDEN ELEVATION 1/8" = 1'-0"Y HIDDEN ELEVATION 1/8" = 1'-0"Z HIDDEN ELEVATION 1/8" = 1'-0"AA HIDDEN ELEVATION 1/8" = 1'-0"DD HIDDEN ELEVATION 1/8" = 1'-0"17 EAST ELEVATIONS AT IL WING 2 1/8" = 1'-0"CC HIDDEN ELEVATION 1/8" = 1'-0"BB HIDDEN ELEVATION 1/2" = 1'-0"1 EAVE BRACKET DETAIL 1 3/4" = 1'-0"2 STONE PENDANT DETAIL 1/8" = 1'-0"Z2 HIDDEN ELEVATION ENTIRE SHEET REVISED Page 24 of 26 RESOLUTION PC 059-2018 Packet Page 48 EXTERIOR ELEVATIONS GENERAL NOTES AND LEGEND LEGEND MASONRY COLOR BRK BRICK TRIANGLE NORTHHAMPTON UTILITY RSTN REAL THIN STONE COLOR - BROOKFIELD - 80% FOND DU LAC - 20% CMU SPLIT FACE CMU WALNUT SVT STONE VENEER TRIM N/A CST CAST STONE HERITAGE CAST STONE - BUFF • 4" @ WINDOW SILL TYP. • 8" @ WINDOW HEAD TYP. • 8" @ BAND TYP. EJ MASONRY EXPANSION JOINT CIP CAST IN PLACE CONCRETE SIDING & ROOFING COLOR LS-1 FIBER CEMENT LAP SIDING LIGHT GREY LS-2 FIBER CEMENT LAP SIDING CREAM/TAN FCP FIBER CEMENT PANEL GREEN LAT LATTICE WHITE ASH ASPHALT SHINGLES TRIM FCT FIBER CEMENT TRIM COTTAGE WHITE • 4" @ OUTSIDE CORNER • 4" @ WINDOW SIDE TRIM • 6" @ FRIEZE BOARD (LAP SIDING)• 8" @ WINDOW HEAD TRIM • 8" @ FRIEZE BOARD (BRICK)• 8" @ BAND BS • 2" BATTEN STRIP COTTAGE WHITE METAL PFM PRE FIN. METAL FASCIA COLOR TO MATCH TRIM PFG PRE FIN. GUTTERS COLOR TO MATCH TRIM DS PRE FIN. DOWNSPOUTS COLOR TO MATCH TRIM ARS ALUMINUM RAILING RIDEAU BROWN FPV FIREPLACE VENT A. NOT ALL MASONRY PENETRATIONS SHOWN, COORDINATE WITH MEP CONTRACTORS. B. AT 135 DEGREE OUTSIDE CORNERS PROVIDE 135 DEGREE BRICK CORNER UNITS. C. REFER TO WINDOW TYPE SHEET A6.2 FOR ALL WINDOW INFORMATION. D. CONTROL JOINTS CONTINUOUS FROM TOP OF FOUNDATION TO TOP OF WALL. E. PROVIDE AC GRILL COVER AT ALL THROUGH WALL AC UNITS. COLOR TO MATCH ADJACENT MATERIAL. F. PROVIDE EXPANSION JOINTS AT ALL MASONRY INSIDE CORNERS AND WHERE SHOWN ON ELEVATIONS. CONTINUE EXPANSION JOINTS FROM TOP OF FOUNDATION WALL THROUGH CAST STONE CAP AT TOP OF MASONRY WYTHE. GENERAL NOTES FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 138 173 195 85 48 607 265 94 290 147 290 147 255512 79142 195 85 A2.0 A2.1 A2.0 1 A2.1 7 9 10 A2.2 21 A2.0 8 A2.115 A2.2 19 A2.218 A2.0 6 A2.1 17 2422 23 A2.1 11 A2.1 12 A2.113 A2.0 3 A2.0 2 A2.05 A2.2 20 A2.02 Si m A2.1 16 A2.1 14 /P A2.1 /P A2.1 /N A2.0 /M A2.0 /L A2.0 /K A2.0 /J A2.0 /H A2.0 /G A2.0 /G A2.0 /G A2.0 /G A2.0 /F A2.0 /E A2.0 /D A2.0 /C A2.0 /B A2.0 /B A2.0 /A A2.0 /LL A2.2 /KK A2.2 /JJ A2.2 /HH A2.2 /GG A2.2 /GG A2.2 /FF A2.2 /EE A2.2 /CC A2.1 /BB A2.1 /DD A2.1 /AA A2.1 /Z2 A2.1 /Z A2.1 /Y A2.1 /X A2.1/U A2.1 /V A2.1 /W A2.1 /T A2.1 /S A2.1 /S A2.1 /S A2.1 /R A2.1 OPP. OPP. OPP. OPP. OPP. OPP. /NN A2.2 /NN A2.2OPP. /MM A2.2 /MM A2.2OPP. /26 A2.2 /25 A2.2 31 16 31 16 22 62 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" 57 30 15 39 (2) ELEVATIONS - SEE KEY PLAN 57 30 22 62 A8.2 1 EJEJ FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" A8.2 1 EJEJEJEJEJEJ A8.3 4 A8.3 4 EJEJ FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" TRUSS BEARING 120' - 4 1/2" EJ EJ EJ EJ EJ EJ CEDAR BOTTOM RAIL CEDAR PICKETS CEDAR TOP RAIL AND CAP FCT FCP 12' - 2"12' - 2" (2) 2X10 PERGOLA HEADER (TYPICAL) NOTCH JOIST AT CENTER HEADER (2) 2X10 PERGOLA HEADER (TYPICAL) CEDAR PICKETS CEDAR TOP RAIL AND CAP BRK CST FCP FCT CEDAR BOTTOM RAIL 12' - 5 1/4" KNIFE PLATE BETWEEN 2X10s & ANCHORED TO EXTERIOR WALL FRAMING 2X8 PERGOLA JOIST 2X4 FRAMING ON TOP OF CENTER PERGOLA JOIST HEADER PROJECT # DATE OF ISSUE: REVISIONS: 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 www.dimensionivmadison.com APRIL 11, 2017 \\ d i m i v s e r v e r 0 1 \ D i m e n s i o n I V M a d i s o n \ P r o j e c t s \ 1 6 0 3 1 - M S P - M u s k e g o \ 5 - R e v i t M o d e l \ R e v i t E x p o r t s \ D e t a c h e d M o d e l \ 1 6 0 3 1 - M S P - M u s k e g o 2 0 1 7 _ E x t e r i o r S h e l l r v t . r v t 9/ 2 5 / 2 0 1 8 1 0 : 4 0 : 1 2 A M A2.2 EXTERIOR ELEVATIONS 16031 HERITAGE MUSKEGO WEST JANESVILLE ROAD MUSKEGO, WI 53150 1/8" = 1'-0"18 NORTH ELEVATION AT IL WING 2 1/8" = 1'-0"19 EAST ELEVATION AT IL WING 1/8" = 1'-0"20 SOUTH ELEVATION AT IL WING 0'4'8'2' 2 CB #2 6/27/17 3 CB #3 9/7/17 6 CB #6 4/4/18 1/8" = 1'-0"LL HIDDEN ELEVATION 1/8" = 1'-0"KK HIDDEN ELEVATION 1/8" = 1'-0"JJ HIDDEN ELEVATION 1/8" = 1'-0"HH HIDDEN ELEVATION 1/8" = 1'-0"GG HIDDEN ELEVATION 1/8" = 1'-0"FF HIDDEN ELEVATION 1/8" = 1'-0"EE HIDDEN ELEVATION Page 25 of 26 RESOLUTION PC 059-2018 Packet Page 49 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 322 521 297 328 94 115 327 320 100 43 102 266 61 85 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 102 315 223 375 972 908 374 152 213 133 206 213 217 140 195 136 134 85 329 200 164 86233 170 EXTERIOR ELEVATIONS LEGEND LEGEND BR-1 MODULAR BRICK STN NATURAL STONE CMU PRE-COLORED SPLIT FACE CONCRETE MASONRY UNITS STM STONE TRIM CST CAST STONE TRIM LS-1 FIBER CEMENT LAP SIDING - 6" EXPOSURE LS-2 FIBER CEMENT LAB SIDING - 4" EXPOSURE FCP FIBER CEMENT PANEL WITH BATTENS FCT FIBER CEMENT TRIM ASH ASPHALT SHINGLES A2.0 A2.03A2.0 4 5 A2.02 A2.0 1 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 125 301 594 307 FIRST FLOOR 100' - 0" SECOND FLOOR 111' - 3 7/8" 448 497 112 38124 328 94 127 328 273 135 197 PROJECT # DATE OF ISSUE: PRELIMINARY Not for Construction 6515 Grand Teton Plaza, Suite 120 Madison, Wisconsin 53719 p608.829.4444 f608.829.4445 dimensionivmadison.com A2.0 EXTERIOR ELEVATIONS 16031 08.22.2016 MSP − MUSKEGO WEST JANESVILLE ROAD 1/8" = 1'-0"3 EAST ELEVATION 1/8" = 1'-0"4 SOUTH ELEVATION 1/8" = 1'-0"2 EAST ELEVATION - MAIN ENTRY 1/8" = 1'-0"1 SOUTH ELEVATION - COURTYARD 1/8" = 1'-0"5 WEST ELEVATIONS Page 26 of 26 RESOLUTION PC 059-2018 Packet Page 50