Loading...
PLAN COMMISSION Packet - 11/5/2019CITY OF MUSKEGO PLAN COMMISSION AGENDA 11/05/2019 6:00 PM Muskego City Hall, Council Chambers, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF THE MINUTES Approval of the minutes of the October 1, 2019 meeting. PUBLIC HEARING Public Hearing for Presbyterian Homes Wisconsin/Senior Housing Partners requesting a Conditional Use Grant in accordance with the Muskego Zoning Ordinance to allow a senior housing campus development including independent living units, assisted living units and memory care units for the property located at W147 S6800 Durham Place / Tax Key No. 2168.961. Public Hearing for Kwik Trip requesting a Conditional Use Grant in accordance with the Muskego Zoning Ordinance for the purpose of allowing a gas station for the property located at S63 W13510 Janesville Road / Tax Key No. 2162.999.002. CONSENT BUSINESS RESOLUTION PC 064-2019 Approval of an Annual Review for Pick 'n Save located at S74 W17005 Janesville Road / Tax Key No. 2199.999.065. NEW BUSINESS FOR CONSIDERATION RESOLUTION PC 062-2019 Recommendation to Council to rezone property from I-1 Government and Institutional District to a Planned Development District, Approval of a Conditional Use Grant and a Building, Site and Operations Plan for Presbyterian Homes Wisconsin/Senior Housing Partners located at W147 S6800 Durham Place / Tax Key No. 2168.961. RESOLUTION PC 063-2019 Approval of a Conditional Use Grant and Building, Site and Operation Plan for Kwik Trip, Inc located at S63 W13510 Janesville Road / Tax Key No. 2162.999.002. RESOLUTION PC 065-2019 Recommendation of Approval of a Final Plat for the Waters of Lake Denoon Subdivision located along Crowbar Drive / Tax Key No. 2283.999. Packet Page 1 Plan Commission Agenda 2 11/5/2019 6:00:00 PM MISCELLANEOUS BUSINESS ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136. Packet Page 2 UNAPPROVED CITY OF MUSKEGO PLAN COMMISSION MINUTES 10/01/2019 6:00 PM Muskego City Hall, Council Chambers, W182 S8200 Racine Avenue CALL TO ORDER Mayor Chiaverotti Called the meeting to order at 6:00 PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Mayor Chiaverotti, Alderman Kubacki, Commissioners Graf, Oliver, Jacques, Buckmaster, Bartlett and Planner Trzebiatowski. Absent: Commissioner Buckmaster STATEMENT OF PUBLIC NOTICE The meeting was noticed in accordance with the open meeting laws. APPROVAL OF THE MINUTES Approval of the minutes of the September 3, 2019 meeting. Commissioner Jacques made a motion to approve the minutes of the September 3, 2019 meeting. Alderman Kubacki seconded. Motion passed unanimously. CONSENT BUSINESS Resolution PC 056-2019 Approval of a two-lot Certified Survey Map for Kevin Malchine located at Muskego Dam Road & Loomis Drive / Tax Key No. 2295.999.010. Resolution PC 057-2019 Approval of a Building, Site and Operations Plan Amendment for Vintage Grounds located at S74 W16825 Janesville Road / Tax Key No. 2199.999.063. Resolution PC 058-2019 Approval of a two-lot Certified Survey Map for James & Suzanne Blixt located at S101 W13704 Loomis Drive / Tax Key No. 2259.995.003. Alderman Kubacki made a motion to approve the consent business engross. Commissioner Jacques seconded. Motion passed unanimously. NEW BUSINESS FOR CONSIDERATION Resolution PC 059-2019 Approval of a Building, Site and Operations Plan Amendment for Page 1 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 3 Plan Commission Minutes 2 10/1/2019 6:00:00 PM Bass Bay Brewhouse located at S79 W15851 Aud Mar Drive / Tax Key No. 2217.999.002. Planner Trzebiatowski explained that as part of the ongoing improvements at Bass Bay Brewhouse. This application is to add a covered pergola/gazebo structure with open sides and a galvanized roof to cover the recently installed outdoor bar area on the patio. Additionally, a recently approved and installed patio area to be a crushed gravel was installed as concrete. Stormwater calculations were based on this area being hard surface, so this change was already accounted for as far as stormwater. A second improvement that has occurred is they enclosed outdoor seating area under an existing overhang area. The materials used fit the motif and character of the building and is mostly windows. Commissioner Graf asked if this was an expansion. Planner Trzebiatowski explained this was not an expansion, but just enclosing and existing overhang. Commissioner Jacques made a motion to approve Resolution PC 059-2019. Alderman Kubacki seconded. Motion passed unanimously with Commissioner Bartlett abstaining. Resolution PC 060-2019 Approval of a Building, Site and Operations Plan for Muskego School Apartments, LLC located at S75 W17476 Janesville Road / Tax Key No. 2193.104. Planner Trzebiatowski provided an explanation of the proposed development. The development will rehabilitate the Muskego Elementary School building with additional rental units. The Planned Development zoning was previously granted in December 2018 subject to approval of a Building, Site and Operation Plan. The plan will include 22 residential units in the Muskego Elementary School building (10 single bedroom and 12 two-bedroom units) in addition to two additional townhouse buildings totaling 18 units (one ten unit and one eight unit building) and each of these units will be three bedrooms with an attached garage and separate multi-space detached garages. Access will be limited to two points on either end of the property with all other existing access points be closed and restored. The internal drive will be private with curb and gutter. Staff is recommending mountable curb and gutter on the east side of the drive to match the west side. Sidewalks are shown on-site to connect all of the units with a sidewalk. Parking is provided with enclosed parking attached to the townhouse units and four separate enclosed detached garages for a total of 58 enclosed parking stalls. Additional parking is provided in front of the attached garages for another vehicle to safely park in front of the attached garages, typical to what the City has approved before. Considering the surface parking and the space in front of the attached garages there is 96 total stalls or 2.4 stalls per unit. The existing school building will remain substantially the same with some cleaning and repairing of the building, re-installation of some windows that were previously removed and adding a small canopy on the back entrance. The townhouse buildings will be two stories with a gable roof. Each unit will have individual entrance with a small porch. The exterior of the townhouses will be masonry covering the first floor with alternating patterns of siding. The masonry averages 54% for the townhouses meeting the design standards of 50% masonry. The detached garages have a band of masonry to match the attached housing but lack design or character. Staff recommends additional design elements on the backsides of the detached garages. Lighting is proposed that meets the City specifications as far as height and cutoff requirements. A monument sign is proposed along Janesville Road that appears to meet the City standards, but will need formal sign approval. Two trash enclosures are proposed. Page 2 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 4 Plan Commission Minutes 3 10/1/2019 6:00:00 PM Details of all mechanicals will be needed with proper screening approved by the City. A landscape plan was provided and will be subject to formal review by the City Forester prior to permits being issued. Utilities will require coordination with the engineering department for a water main extension. There are additional notes in the resolution regarding phasing and outdoor storage including parking of junk vehicles, boats, campers, trailers, etc. Public Comments: Jack Belke, Bay Breeze Condo Association – (S75 W17651 Harbor Circle) Condo Association supports projects but have concerns including: o Shortage of parking – Worried about overflow parking on Park Drive. Ask for nor parking on west side of the street. o Landscaping – More could be added especially along the rear of the garages. o Lighting – Hope there is more low-profile lighting to eliminate glaring on condo units. o Sign – Worried cars will accidentally pull into Park Drive. Could a sign be added identifying Michi Drive as entrance. o Park – Ask that Park Drive remains open during construction. Planner Trzebiatowski addressed sign being shown located in the center of the school building. Could ask developer to move the sign more east to more easily show the entrance location. Mike Bode (S75 W17657 Harbor Circle) o Which units will be senior housing and which units will be open to everyone. Planner Trzebiatowski addressed that senior housing will be limited to the school building. o Concerns with traffic on Janesville Road with this development along with all of the other developments on Janesville under construction. o Has a study on the number of senior housing units been completed? Charlotte Coubal (S74 W17407 Richard Lane) o Michi is a narrow street. Concerned with parking on Michi when vehicles will be parked on the street. o Concerned where people will play. Matt Keough (S74 W17382 Lake Drive) o Traffic is getting heavy, especially police and fire. o Property is not developable as proposed. Lake Drive is not a street but an alley. Traffic is becoming intolerable. o How many additional employees will the city need for with additional long term large projects? Eighteen more units into an area will put more people in to an area everyone loves. Eighteen more units is more than the number of houses that currently use the roads in that area. o How many employees will be needed if federal money is coming to the City for projects? o Rezoning was voted on 4-1. o Concerned with runoff into the lake. Additional housing will cause many more problems with quality of runoff into the lake. o Last weeks rains caused the lake to raise two feet. Additional developments cause rain to run directly into the lake and watershed. o School - Schooling has changed Muskego Elem. and this property have been used for many things for over 100 years and this is not the best way develop a prime property in the City. Page 3 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 5 Plan Commission Minutes 4 10/1/2019 6:00:00 PM o Eighteen apartments across the street from long term residents is not a good idea. o If low income loan or federally funded project… Planner Trzebiatowski noted federal funding or not is not what the Plan Commission can consider and could be extremely discriminatory. Mayor Chiaverotti explained the City is not receiving any federal funding. Muskego-Norway School District owns the property and put out an RFP and this is what they chose as the best proposal. This is a Building, Site and Operation plan consideration. During the rezoning process the City Attorney explained that federal funding cannot be part of the consideration. o If the city continues to support the development of large projects, the city will have to take on federal money, without a choice which will require additional city employees. So has the City asked any existing landlords if they have an interest in federal money? The city is building too many large communities that are not owned. o If the city adds 36 rentals in the area there will be many issues. o Why isn’t the city putting more time into adding condos,ownership. Mayor Cheverotti explained this is multifamily. Regardless of condo or rental units and the City doesn’t control ownership verses rental. The City does not need to approve rental units converting to condominiums. o Parking. Turning left onto Lannon is dangerous. Shut Michi Drive off. o Many people are going to be affected by this development. o Worried about the future of the people living near the property to be developed. o Understands if this was turned into a long-term care facility. o Grassland should be developed with a walking path rather than eighteen apartments that will cause issues for the police and neighbors. The residents are already facing a huge rise in crime in this area. o Where are these people going that they should be so centrally located rather than the other areas of the City? People that live there have made long term investments in the city. o Apartments bring transient people. They don’t care about other residents. o Decision forcing more people into an area that is already stuck. Too much traffic. o This development will bring too many people and nobody will be able to turn left onto either street. Does not like this proposal and thinks there is better use for property than eighteen units. o He pays is taxes and utilities on time and does not understand the direction of the community. Doesn’t want to live in Chicago…traffic is ridiculous and schools are growing and will need another $40 million referendum. Mayor Chiaverotti said there are a few things to be addressed. Mayor Chiaverotti asked if additional on-site parking can be addressed. Planner Trzebiatowski said the Plan Commission could discuss, but would encourage developer to discuss this as there has not been anything submitted that relates to the amount of parking needed on site for this type of development. Mayor Chiaverotti asked if there is a way to add left-in/right-out. Planner Trzebiatowski added that the Plan Commission could require the developer to angle the entrance to Michi Drive to encourage traffic to turn right out the development towards Janesville Road. Things on the street that happen on the street like left turn only or no parking the Plan Commission can give a recommendation to the Public Works and Safety Committee for any signage in public roadways. Page 4 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 6 Plan Commission Minutes 5 10/1/2019 6:00:00 PM Mayor Chiaverotti said storm water must be addressed. Planner Trzebiatowski noted that MMSD and the DNR regulate the storm water and they must approve the plans for both the quantity and quality of water that leaves that site. Commissioner Graf asked if there will be stormwater management on-site. Planner Trzebiatowski said that a detention basin is included in the proposal on the north side of the school. On a Plan Commission level this is not to be decided, but engineering staff will extensively review the stormwater. Commissioner Bartlett mentioned that discussion was started about preserving the park and if they are working with the City to preserve the park. Planner Trzebiatowski said this is a private development. Commissioner Bartlett asked about the location of the northern access point and parking and cannot support the plan as presented due to drive access, landscaping, parking, signage moved, public way walkway connections. Dumpster location is odd between the two buildings and would like to see adjusted so it is not visible from Michi Drive. Window adjustments and placement for new use would likely be needed. Planner Trzebiatowski explained that they are confident with their interior layout that the existing windows will remain. Bartlett said roof pitches vary and would like some consistency of rooflines between buildings and specifically garages. Planner Trzebiatowski explained the code regulations regarding spacing of driveways and specifically the northern driveway to the lot line. As for the dumpsters, transformer pads are shown that must be fully screened with dense landscaping, so the area between the buildings will definitely be screened with materials subject to final landscaping review. For the pedestrian sidewalks, the Plan Commission could amend the resolution to require connection of the sidewalks. Alderman Kubacki asked about the sidewalks. Planner Trzebiatowski explained there is a sidewalk along Janesville Road that connects to the sidewalks on site, but nothing connecting to the east. Alderman Kubacki appears the playground area is solely for the residents of the site via a crosswalk. Developer representative said the playground is intended to be used by private for use by residents and visitors. It is the largest greenspace on property for play and made the most sense for that location. Alderman Kubacki confirmed there are 96 parking stalls. Planner Trzebiatowski explained that recent apartment approvals did not have any individual garages so it is tough to compare the proposals. However, typically the driveways are counted as guest parking, so the parking space count does include the spaces in front of the attached garages. Alderman Kubacki asked about experience with the roof pitch. Bartlett also said that he would like to see a 4/12 pitch. Developer was okay with changing the roof pitch and adding dormers to the rear of the Michi Road garages as part of the four-sided architecture. Developer was okay with moving sign to the east and screening the mechanicals. For the parking there experience is for seniors is parking stalls on one-bedroom is 0.8 stalls per unit Page 5 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 7 Plan Commission Minutes 6 10/1/2019 6:00:00 PM and two-bedroom units are typically one car per unit for 20 stalls for the senior parking. Parking stalls in the garages are assigned per unit. Commissioner Bartlett asked if the City can address parking on Michi Drive. Planner Trzebiatowski explained that the Plan Commission could provide a recommendation to the Public Works and Safety Committee. Commissioner Graf said there is not an abundance of parking on-site so when an event occurs, people will park where possible closer to where they are going and will end up on the street unless other areas are designated for visitor parking. Overflow will go to street parking. Commissioner Graf suggests this does go to Public Works to look at the parking as far as safety. Commissioner Bartlett brought up the issue of people using their garage as storage and parking outside. Planner Trzebiatowski said the developer explained that they are not allowed to use the garages for storage. The developer also added that the school building is designed for each unit to have an inside storage unit within the building. Commissioner Bartlett said it would be nice to see visitor parking spread throughout the lot. Developer suggested they could add surface parking near the playground area as well as along the northwest side of the private drive north of the detached garages. Developer addressed the stormwater management. They are actually decreasing the amount of hard surface on the property. Additionally they are converting much of the hard surface with roof, which are actually seen as cleaner runoff than a paved area. They also meeting the MMSD requirements. Commissioner Oliver asked if there are restrictions regarding things like a car with a flat tire or other items in the parking area. Additionally, snow removal locations to ensure that there are adequate areas to plow the snow on this property. Planner Trzebiatowski said the parking junk vehicles, trailers, campers, boats, outdoor storage, etc. is addressed in the resolution outside of the garbage enclosures. As for a business truck, the ordinance allows this as one per unit. Commissioner Jacques made a motion to approve Resolution PC 060-2019. Commissioner Bartlett seconded. Alderman Kubacki made a motion to amend Resolution PC 060-2019 to address the northern access point along Michi Drive, adjusting the roof pitch of the attached garages, moving the sign toward the east, and adding parking in the two locations on-site. Commissioner Graf seconded. Motion to amend resolution passed unanimously. Motion to approve amended Resolution #060-2019 passed unanimously. Recommendation from the Plan Commission for Public Works to look into street parking along the west side of Park and no/limited parking on Michi Drive. PC 061-2019 Conceptual Rezoning for discussion of proposed senior community at the former Tess Corners Elementary School located at W147 S6800 Durham Place / Tax Key No. 2168.961. There are no approvals for a conceptual discussion. Planner Trzebiatowski provided a synopsis of a conceptual development. The development includes removing the existing school and replacing it with 20 assisted living units, 20 memory care units and 82 units of Page 6 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 8 Plan Commission Minutes 7 10/1/2019 6:00:00 PM independent senior living. The building will be two stories at the front of the building on Janesville Road and from the south the building will be three story based on the natural terrain of the site. Underground and surface parking will be provided. Waukesha County is amenable for the access drive on Janesville Road with a restriction that there is no connection do Durham Place. Density shows 80 units allowed within the RM zoning. Alderman Kubacki asked about the traffic on Durham Place with access not allowed on Janesville Road. Developer said they had a neighborhood meeting with residents. No negative comments from neighbors and will have less traffic than when it was a school. Additionally, from past communities they have found that initially residents drive, but the amount of driving curtails significantly within three years and they provide transportation. There are 87 underground parking stalls for 80 units. MISCELLANEOUS BUSINESS Nothing at this time. ADJOURNMENT Commissioner Jacques made a motion to adjourn. Alderman Kubacki seconded. Motion passed unanimously. Respectfully Submitted, Aaron Fahl Associate Planner Page 7 of 7 Approval of the minutes of the October 1, 2019 meeting. Packet Page 9 I06251,250312.5 FeetScale: Legend Affec ted Area Pro p erties within 300 ft M unic ip a l Bo unda ry Right-o f-Wa y Pa rc els Struc tures La ke Janesv i l l e R d . T e s s C o r n e r s D r . D u r h a m P l . Corne l l C i r . Cornell Dr. CITY OF MUSKEGO NOTICE OF PUBLIC HEARING PLEASE TAKE NO TICE tha t the Pla n Co m m issio n o f the City o f M uskego will ho ld a Pub lic Hea ring a t 6:00 PM , o r sho rtly therea fter, o n Tuesda y, No vem b er 5, 2019, a t M uskego City Ha ll, W182 S8200 Ra c ine Avenue, to c o nsider the fo llo wing: U p o n the p etitio n o f Presb yteria n Ho m es Wisc o nsin/Senio r Ho using Pa rtners sha ll the fo llo wing p ro p erty kno wn a s: Ta x Key No . 2168.961/ W147 S6800 Durha m Pl. (Fo rm er Tess Co rners Elem enta ry Sc ho o l) Be gra nted a Co nditio na l U se Perm it in a c c o rda nc e with the M uskego Z o ning O rdina nc e fo r the p urp o se o f a llo wing a senio r ho using c a m p us develo p m ent inc luding indep endent living units, a ssisted living units a nd m em o ry c a re units (under the c o de identific a tio n o f “Nursing ho m es, rest ho m es, a nd ho m es fo r a ll a ged, inc luding da y c a res”). The p etitio ner’s a p p lic a tio n is a va ila b le fo r p ub lic insp ec tio n a t the City o f M uskego Pla nning Divisio n. All interested p a rties will b e given a n o p p o rtunity to b e hea rd. Pla n Co m m issio n City o f M uskego Pub lish in the M uskego NO W Newsp a p er o n O c to b er 16, 2019 a nd O c to b er 23, 2019. Da ted this 9 th da y o f O c to b er, 2019. NO TICE IT IS PO SSIBLE THAT M EM BERS O F AND PO SSIBLY A QU O RU M O F M EM BERS O F O THER GO V ERNM ENTAL BO DIES O F THE M U NICIPALITY M AY BE IN ATTENDANCE AT THE ABO V E-STATED M EETING AND GATHER INFO RM ATIO N; NO ACTIO N WILL BE TAKEN BY ANY GO V ERNM ENTAL BO DY AT THE ABO V E-STATED M EETING O THER THAN THE GO V ERNM ENTAL BO DY SPECIFICALLY REFERRED TO ABO V E IN THIS NO TICE. NO TICE "Plea se no te tha t, up o n rea so na b le no tic e, effo rts will b e m a de to a c c o m m o da te the needs o f disa b led individua ls thro ugh a p p ro p ria te a ids a nd servic es. Fo r a dditio na l info rm a tio n o r to request this servic e, c o nta c t the Pla nning Divisio n a t City Ha ll, W182 S8200 Ra c ine Avenue, (262) 679-4136." Page 1 of 1 Public Hearing Packet Page 10 I06601,320330 FeetScale: L egen d Affected Area Pro perties within 300 ft Mun icipa l Bo un da ry Right-o f-Wa y Pa rcels Structures L a ke City of Muskego City of New BerlinCollege Ave. Commerce CenterParkway M o o r l a n d R d . CITY OF MUSKEGO NOTICE OF PUBLIC HEARING PL EASE T AKE N OT ICE tha t the Pla n n in g Co m m issio n o f the City o f Muskego will ho ld a Pub lic Hea rin g a t 5:30 PM, o r sho rtly therea fter, o n T uesda y, Ja n ua ry 8, 2019, a t Muskego City Ha ll, W182 S8200 Ra cin e Aven ue, to co n sider the fo llo win g: U po n the petitio n o f Green b ergFa rro w, o n b eha lf o f Jiffy L ub e, sha ll the fo llo win g a rea kn o wn a s: Pa rt o f T a x Key N o . 2169.999.011 / Co m m erce Cen ter Pa rkwa y Mo re specifica lly kn o wn a s, Pa rt o f L o t 2 o f Certified Survey Ma p N o . 11185, b ein g a divisio n o f la n ds in pa rt o f the N o rthea st ¼ o f the N o rthea st ¼ o f Sectio n 3, T o wn ship 5 N o rth, Ra n ge 20 Ea st, Wa ukesha Co un ty, Wisco n sin , b o un ded a n d describ ed a s fo llo ws: Co m m en cin g a t the So uthwest co rn er o f sa id L o t 2; then ce N o rthea sterly 150.06 feet a lo n g the Ea st lin e o f Mo o rla n d Ro a d (CT H O) a n d the a rc o f a curve who se cen ter lies to the Ea st, who se ra dius is 1535.42 feet, a n d who se cho rd b ea rs N o rth 09°48’52” West 150.00 feet to a po in t; then ce N o rth 82°02’45” Ea st 189.30 feet to a po in t; then ce So uth 49°48’52” Ea st 174.28 feet to a po in t o n the N o rthwesterly lin e o f Co m m erce Cen ter Pa rkwa y; then ce So uthwesterly 85.29 feet a lo n g sa id N o rthwesterly lin e a n d the a rc o f a curve who se cen ter lies to the So uthea st, who se ra dius is 260.00 feet, who se cho rd b ea rs So uth 40°01’58” West 87.87 feet to a po in t o n the N o rth lin e o f L o t 1 o f Certified Survey Ma p N o . 11185; then ce N o rth 59°41’35” West a lo n g sa id N o rth lin e 36.08 feet to a po in t; then ce So uth 88°45’40” West a lo n g sa id N o rth lin e 167.92 feet to a po in t; then ce So uth 77°23’09” West co n tin uin g a lo n g sa id N o rth lin e 40.49 feet to the po in t o f co m m en cem en t. Sa id la n ds co n ta in 40,275 squa re feet, o r 0.9246 a cres; Be gra n ted a Co n ditio n a l U se Perm it in a cco rda n ce with the Muskego Z o n in g Ordin an ce fo r the purpo se o f a llo win g a n a uto service fa cility o n sa id pro perty. T he petitio n er’s a pplica tio n is a va ila b le fo r pub lic in spectio n a t the City o f Muskego Pla n n in g Divisio n . All in terested pa rties will b e given a n o ppo rtun ity to b e hea rd. Pla n Co m m issio n City o f Muskego Pub lish in the Muskego N OW N ewspa per o n Decem b er 19, 2018 a n d Decem b er 26, 2018. Da ted this 10 th da y o f Decem b er, 2018. N OT ICE IT IS POSSIBL E T HAT MEMBERS OF AN D POSSIBL Y A QU ORU M OF MEMBERS OF OT HER GOVERN MEN T AL BODIES OF T HE MU N ICIPAL IT Y MAY BE IN AT T EN DAN CE AT T HE ABOVE-ST AT ED MEET IN G AN D GAT HER IN FORMAT ION ; N O ACT ION WIL L BE T AKEN BY AN Y GOVERN MEN T AL BODY AT T HE ABOVE-ST AT ED MEET IN G OT HER T HAN T HE GOVERN MEN T AL BODY SPECIFICAL L Y REFERRED T O ABOVE IN T HIS N OT ICE. N OT ICE "Plea se n o te tha t, upo n rea so n a b le n o tice, effo rts will b e m a de to a cco m m o da te the n eeds o f disa b led in dividua ls thro ugh a ppro pria te a ids a n d services. Fo r a dditio n a l in fo rm a tio n o r to request this service, co n ta ct the Pla n n in g Divisio n a t City Ha ll, W182 S8200 Ra cin e Aven ue, (262) 679-4136." Page 1 of 1 Public Hearing Packet Page 11 City of Muskego Plan Commission Supplement PC 064-2019 For the meeting of: November 5, 2019 REQUEST: Renewal of Outdoor Display/Sales for Pick ’n Save Tax Key No. 2199.999.065/ S74 W17005 Janesville Road SW ¼ of Section 10 PETITIONER:Tammy Koch, Roundy’s Supermarkets, Inc. INTRODUCED: November 5, 2019 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 064-2019 The petitioner is requesting to renew their previous approval allowing them to be allowed to display and sell christmas trees, wreaths, evergreen planters, pumpkins, flowers, and hanging baskets during the corresponding seasons. The products would continue to be displayed on the sidewalk by the store entry. The application states that no sales or display will occur in the parking lot and they state that they understand that the display must only contain natural materials. Pick ‘n Save received initial approval for outdoor display and sales under PC 063-2018 on December 5, 2017. Then they received an annual review approval on November 8, 2018 that required one further annual review in the Fall of 2019. DISCUSSION PC 064-2019 In general there are some other stores in Muskego that have requested similar approvals within the City in the past. In general, the City has not had issues with outdoor display/sales at retail locations as long as they first receive proper approvals and as long as they are done in a neat and orderly way. The resolution states the following conditions of approval to ensure the sales on this site meet the aesthetic standards the City has come to adopt with outdoor sales/display. 1. Any signage for the products must be kept to a minimum and well maintained at all times. 2. No banners or other larger signage is allowed without a temporary sign permit, which requires Planning Division review. 3. The sidewalk area in front of the store must remain safe and passible at all times for proper egress. 4. The area must be kept in a neat and clean order at all times. 5. Any complaints or observations of litter or unsightliness resulting from the proposed outdoor sales/display may result in Plan Commission re-review of this proposal at any time which could result in revocation of this approval OR further contingencies. Also, the resolution states that the allowed items for sale are meant to be for natural material (plants, flowers, trees, etc.) and not meant for packaged items (salt, fire wood, fertilizer, propane etc.) to ensure that the outdoor sales/display do not expand beyond what is being requested. Also, this approval does not specifically allow donations boxes on site, as items such as that would need separate Plan Commission approval. As part of the 2018 annual review, it was noted that if the display/sales proceed with no issues during the end of 2018 and through the first three-quarters of 2019, then further reviews may not be required after the November 2019 review. The City has not received any complaints regarding issues with any outdoor display/sales at this location. Therefore, staff is recommending that the annual reviews for the outdoor displays are no longer needed until such time that a complaint is received or violations to this outdoor sales/displays are found to be occurring Page 1 of 6 RESOLUTION PC 064-2019 Packet Page 12 onsite. STAFF RECOMMENDATION PC 064-2019 Approval of the outdoor storage/sales renewal with the contingencies noted above and in the resolution, most specifically with noting that this approval is valid until a complaint or violation occurs on site. At that time a re-review would be required if the store would like to continue outdoor storage/display. Page 2 of 6 RESOLUTION PC 064-2019 Packet Page 13 MUSKEGOthe City of Area of InterestI0330660 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 064-2019 Pick 'n SaveS74 W17005 Janesville Road JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 10/31/2019 Page 3 of 6 RESOLUTION PC 064-2019 Packet Page 14 RESOLUTION #P.C. 064-2019 APPROVAL OF RENEWAL OF OUTDOOR DISPLAY/SALES FOR PICK ‘N SAVE LOCATED IN THE SW ¼ OF SECTION 10 (S74 W17005 JANESVILLE RD / TAX KEY NO. 2199.999.065) WHEREAS, On December 5, 2017 the Plan Commission approved a Building, Site and Operation Plan amendment to allow outdoor display/sales of products through Resolution PC 063-2017, and WHEREAS, Said approval required a re-review in the Fall of 2018 and was approved via Resolution PC 056-2018, which then required an annual review in Fall of 2019, and WHEREAS, The applicant has now submitted for the required re-review, and WHEREAS, The request is to be allowed to display and sell christmas trees, wreaths, evergreen planters, pumpkins, flowers and hanging baskets during the corresponding seasons, and WHEREAS, The products are proposed to be displayed on the sidewalk by the store entry, and WHEREAS, No sales or display will occur in the parking lot, and WHEREAS, There was no issues found in 2019 relating to non-approved products being displayed/sold on this property. THEREFORE BE IT RESOLVED, That the Plan Commission re-approves the request from Pick ‘n Save located at S74 W17005 Janesville Road for the outdoor display and sale of seasonal products subject to the following conditions: 1. Any signage for the products must be kept to a minimum and well maintained at all times. 2. No banners or other larger signage is allowed without a temporary sign permit, which requires Planning Division review. 3. The sidewalk area in front of the store must remain safe and passible at all times for proper egress. 4. The area must be kept in a neat and clean order at all times. 5. Any complaints or observations of litter or unsightliness resulting from the proposed outdoor sales/display may result in Plan Commission re-review of this proposal at any time which could result in revocation of this approval OR further contingencies. 6. This approval is good until such time that a complaint is received or violations to this outdoor sales/displays are found to be occurring onsite. BE IT FURTHER RESOLVED, The allowed items for sale are meant to be for natural material (plants, flower, trees, etc.) and not meant for packaged items (salt, fire wood, fertilizer, propane, etc.). BE IT FURTHER RESOLVED, This approval does not specifically allow donations boxes on site, as items such as that would need separate Plan Commission approval. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: November 5, 2019 ATTEST: Adam Trzebiatowski AICP, Planning Manager Page 4 of 6 RESOLUTION PC 064-2019 Packet Page 15 Page 5 of 6 RESOLUTION PC 064-2019 Packet Page 16 Page 6 of 6 RESOLUTION PC 064-2019 Packet Page 17 City of Muskego Plan Commission Supplement PC 062-2019 For the meeting of: November 5, 2019 REQUEST: Recommendation to Council for a Rezoning from I-1 (Government and Institutional District) to PD (Planned Development District), Approval of a Building, Site and Operation Plan (BSO), and Approval of a Conditional Use Grant (CUG) Tax Key No. 2168.961 / W147 S6800 Durham Place SE ¼ of Section 2 PETITIONER: Presbyterian Homes Wisconsin/Senior Housing Partners INTRODUCED: November 5, 2019 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski AICP BACKGROUND PC 062-2019 The petitioner has submitted requests for rezoning, BSO and CUG for the old Tess Corners Elementary School property. The site will be rezoned from I-1 Government and Institutional District to PD Planned Development District, based on the RM-1 zoning district. The purpose of the rezoning request is to facilitate the development of a new senior housing community including 80 units of independent senior living, 20 units of memory care units and 20 units for assisted living units. The existing school will be completely removed to make way for the new development. PLAN CONSISTENCY PC 062-2019 Comprehensive Plan:Currently the 2020 Plan currently depicts the area for Government, Institutional, Transportation & Utility uses. Based on the proposed use and upon examining how similar past projects were reviewed, the current land use designation will remain, due to the continuing care idea and the assisted living and memory care portions of this facility. Zoning: The property is currently zoned I-1 Government, Institutional & Public Service District. For the proposed senior complex a Planned Development (PD) district is being requested due to the unit counts in building, the open space on site, the F.A.R. and the building height. The PD will have a base zoning of RM-1. The RM-1 allows 1 unit permit 5,000 SF of land. For the 9.22 acre lot this would then yield 80.3 or 80 units. A CUG is needed for the memory care and assisted living units as they fall under the code identification of “Nursing homes, rest homes, and homes for all aged, including day cares”. Park and Conservation Plan: No acquisitions or conservation priorities are noted in this area. The proposal is consistent with the Plan. Adopted 208 Sanitary Sewer Service Area: Public sanitary sewer is available in the area. The proposal is consistent with the Plan. Water Capacity Assessment Water currently is located in the area. All hydrants and water lines Page 1 of 39 RESOLUTION PC 062-2019 Packet Page 18 District:servicing said hydrants on site must me publicly dedicated and located within easements. The proposal is consistent with the Plan. Stormwater Management Plan: Stormwater management is required on this site and is currently shown conceptually with the pond on the south side of the site. Engineering review will be needed to ensure the facilities are sized properly for this full development and to ensure that existing drainage concerns on site are addressed. Special attention will need to be paid to trying to resolve any existing or new drainage concern as it relates to adjacent properties. DISCUSSION PC 062-2019 As stated above, Presbyterian Homes Wisconsin/Senior Housing Partners submitted plans for the redevelopment of this site that will include one single large senior living building that contain three separate types of living/care options. The site is located along Janesville Road and Durham Place. The three unit types will be senior independent living, assisted living, and memory care. Two ‘wings’ of the building that extend toward the south will be three stories in height for 80 units of independent living apartments. A two-story ‘wing’ of the building closer to Janesville Road will be used for 20 memory care units on the second floor and 20 assisted living care units on the first floor. This development will allow a tenant to transition from the independent living apartments to the assisted living facilities as they age and need more care. A Conditional Use Grant is needed to allow the assisted living and senior housing. The BSO is covering all details relating to the overall site and the architecture of all buildings on site. Rezoning Public Hearing: A Public Hearing for the rezoning was heard before the Common Council on October 22, 2019. There were two neighboring residents that spoke at the meeting. Their comments were similar and they brought up questions/concerns relating to drainage, lighting, noise and property values. Also two members of the Presbyterian Homes board and the design Engineer spoke at the meeting to talk about the features of this proposed complex and to try to ease some of the concerns brought up by the neighbors. Site Plan/Access: The site plan layout indicates a new access from Janesville Road as well as access to Durham Place. Waukesha County is allowing direct access to Janesville Road as long as there is no connection to Durham Place that can be used to cut through. Therefore, the access from Durham Drive will only be for emergency access, resident access to the underground parking, and 13 overflow parking spaces. The Janesville Road access is then intended to be used for visitors, deliveries and employees. Before Building Permits can be issued, formal approval from Waukesha County for access to Janesville Road needs to be submitted to the City. The parking area and driveways in the northern portion of the site adjacent to Janesville Road are shown with concrete curb and gutter as required by the City. The interior parking stalls are flanked by landscaping islands to clearly separate the driveway areas from the parking stalls. In the southern portion of the site, the parking area and the driveway to the underground parking is also shown with curb and gutter. Further east, the curb and gutter is not shown but replaced with fire access lanes and sidewalks/paths. The resolution states the entire site needs to contain concrete curb and gutter, with the exception of the “fire access lanes” provided east of the underground parking entry. If the “fire access lanes” east of the parking garage entry are used as typical driveways, rather than just for emergency purposes, then said “fire access lanes” will need to also contain curb and gutter. As for the location of the building, with the existing Tess Corners Elementary School building being removed, there will be a Town Center portion of the building with three separate ‘wings’ extending from the center. One wing extends towards Janesville Road, which will be two stories and be used for memory care and assisted living units. Two additional wings extend toward the rear of the property that will be used as the independent living units. These independent living wings will be three stories, however the Page 2 of 39 RESOLUTION PC 062-2019 Packet Page 19 roofline from the two story wing nearest Janesville Road carries through as the topography changes enables the applicant to construct livable units lower. A network of sidewalks are shown behind the buildings with looping walkways extending from a terrace immediately outside the rear of the building toward the stormwater pond. Sidewalks are also found along Janesville Road in front of the building with resident access to the City network of sidewalks. The site plan also shows a gazebo along the walking path adjacent to the pond. Other outdoor gathering spaces may include a large terrace directly behind the Town Center area at grade in addition to a terrace on the eastern side of the Town Center. Three separate common decks are illustrated outside of the Town Center, overlooking each of the terrace areas. Between Durham Place and the delivery entrance on the western side of the building there is a significant grade change indicating a retaining wall will be constructed. On any retaining walls greater than six feet in height, must include a fence, railing, or barrier on top. Parking: The main parking area is located in front of the building between the entrance to the building and Janesville Road. A total of 42 parking stalls are shown along with a driveway for deliveries. This surface parking area is intended for visitors and employees as resident parking is located indoor below the independent living wings where 87 spaces are identified for residents. Thirteen additional parking stalls are located south of the building adjacent to the resident drive access. The Zoning Code typically looks to have 2 enclosed stalls per unit for multi-family uses, along with additional guest parking. The Code does not address parking requirements for assisted living and memory care units since typically residents in these facilities are not driving, thus there is not a need for separate parking stalls. When the applicant met with the Plan Commission for a conceptual review in October, they addressed the number of parking stalls. The applicant stated that they have followed driving history of residents within their facilities and typically they start with a ratio of 1 stall per unit and within three years the amount of driving curtails significantly. The facility also provides transportation for residents, thereby reducing the need for additional parking. Applying the Zoning Code requirements, this site would need 160 enclosed stalls for residents living in the independent living portion of the building plus guest parking. This development is short of that by 73 enclosed parking stalls. In past developments, the City has typically addressed parking for senior housing with a ratio of one stall per unit with an additional 0.7 stalls per unit for surface parking. By applying the same requirement, 80 enclosed parking stalls and 56 surface parking stalls are required for employees and guests. This facility meets the parking requirements as applied to other senior housing developments. Architecture: The exterior of the new senior housing complex is designed as a mixture of grey stone and a combination of blue and grey tones of cement-board lap siding with a lighter color trim. Throughout much of the building the stone exterior covers the first floor with a few accent areas where the stone extends to the second floor. The total masonry calculation on all elevations provided is 51.3% for average masonry, although the calculation cannot be verified based on overlap of elevations and size differences between elevations. In general, the northern portion of the building, or two-story sections, mostly fall less than the 50% masonry ranging from an elevation with 10% masonry and an elevation with 65% masonry. The three story portions of the building, which generally include the independent living and the rear of the Town Center show an average of 55.3% masonry with a range from 48% to 66%. An average masonry for the entire complex as shown would then be 51.3%. The masonry calculations shown meet the desired limits of the City. Although most of the elevations show stone masonry across the entire first floor, the elevation between the memory care/assisted living Page 3 of 39 RESOLUTION PC 062-2019 Packet Page 20 wing and the independent living that stands out lacking masonry. This elevation is shown with 10% masonry and staff believes additional stone to cover the first floor will be consistent and compliment the remainder of the building. The Resolution is drafted to require additional masonry on the first floor to the same height as the remainder of the elevations. The resolution states that prior to building permits being issued, the overall percentage of masonry on the entire building must be provided and be at least 50 percent. The front entrance to the building provides multiple layers of ornamentation, multiple rooflines and a tower feature for the stairway inside as an accent feature enclosed with glass near the roofline. Much of the three-story portions of the building also include bump-outs, porches, and dormer rooflines providing a variation of depth and visual breaks. The senior housing complex is designed to be two stories on the northern portion of the property and three stories with underground parking on the southern portion of the property, but due to the topography of the site the ridge of the roof of the entire complex is consistent throughout. The height of the building on the north side facing Janesville Road has a height of about 27 feet (as measured per code from grade at the base of the building to the mid-point of the pitched roof) and the height on the south side of the building located along Durham Place is proposed at a height of about 37 feet (as measured per code from grade at the base of the building to the mid-point of the pitched roof) and the height to mid-point above the Durham Place roadway elevations is between 39 feet and 45 feet. Lighting: A photometric plan has been submitted along with specifications of the light fixtures to be used throughout the site. All lighting needs to meet the code requirements, including all fixtures being full cut- off and zero degree tilt. Any freestanding lights cannot have a concrete base that exceeds 6 inches above grade. Also, pole height will need to be reviewed by the City. A final photometric plan and final lighting details will be required before any building permits can be issued. Signage: There has not been any signage submitted as part of the CUG and BSO process. All signage will require separate sign permits if or when the sign design is finalized. Fire Department: The Fire Department needs to review the development plan before any permit can be issued. As such, the resolution states that the final site layout is subject to Fire Department review and approval. Refuse/Mechanicals: The garbage and recycling will be stored indoors without the need for any separate exterior dumpster enclosures. Per the applicant, the garbage and recycling will be brought outside on the day of pick-up through the set of delivery/pickup doors on the western side of the Town Center. The garbage and recycling cannot be left outdoors overnight and the Resolution has been drafted as such stating that all garbage, recycling, deliveries, equipment, etc. must be stored indoors and not left outside overnight. No specific details have been provided relating to any exterior mechanical units (HVAC, transformer, generator, etc.) either on the ground or the roof, other than basic locations of some ground mounted features near the delivery doors on the western side of the Town Center. Rooftop units have also not been identified, but will be located in recessed areas of the roof and must be screened from all view. Since there are not formal details provided relating to exterior/site/building mechanical/devices (HVAC units, transformers, etc.), full details will need to be provided relating to the location and size of all exterior mechanical (HVAC units, transformers, generators, etc.) and all such units will need to be fully screened from all surrounding views. All screening of exterior/site/building mechanical/devices (HVAC units, transformers, etc.) will need to be approved by the City before any building permits can be issued and the screening should be incorporated into the design building buildings and/or site where possible. Page 4 of 39 RESOLUTION PC 062-2019 Packet Page 21 Landscaping: Some basic landscape plans are included as part of the submittal. There are a mixture of trees, shrubs and perennials on portions of the site. The landscape plans are subject to formal review by the City Forester before building permits can be issued. There may be some some additional landscaping and/or modifications required. Utilities: The property will be serviced with municipal sewer and water. Full engineering review will need to occur as this project proceeds. All hydrants and water lines servicing said hydrants on site must me publicly dedicated and located within easements. Storm water management is proposed on site towards the southern side of the property. Preliminary concerns relate to stormwater on the eastern side of the building/property. Engineering review will be needed to ensure the facilities are sized properly for this full development. Special attention will need to be paid to trying to resolve any existing or new drainage concern as it relates to adjacent properties. Other: All BSO approvals are valid for two years. If all buildings are not started by that time, re-approvals will be required. If any phasing is going to occur as part of the development of this site, details of said phasing must be provided before any permits can be issued. The following are also part of the Plan Commission resolution: BE IT FURTHER RESOLVED, That no outdoor overnight storage/parking, other than daily driven vehicles, is allowed on the property (including but not limited to dumpsters, recycle bins, equipment, supplies, boats, trailers, campers, junk/wrecked vehicles, etc.). BE IT FURTHER RESOLVED, That all bollards must be colored to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any new handicap signs be placed permanently in the ground or mounted to the building. STAFF RECOMMENDATION PC 062-2019 Approval of Resolution PC 062-2019, subject to the discussion of the noted items above and recommendation to Common Council in favor or rezoning the property. Page 5 of 39 RESOLUTION PC 062-2019 Packet Page 22 MUSKEGOthe City of Area of InterestI0480960 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 062-2019 Presbyterian Homes Wisconsin/Senior Housing PartnersW147 S6800 Durham Place JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 10/31/2019 Page 6 of 39 RESOLUTION PC 062-2019 Packet Page 23 RESOLUTION #P.C.062-2019 RECOMMENDATION TO COUNCIL TO REZONE THE PROPERTY FROM I-1 GOVERNMENT AND INSTITUTIONAL DISTRICT TO A PLANNED DEVELOPMENT DISTRICT, APPROVAL OF A BUILDING, SITE AND OPERATION PLAN AND APPROVAL OF A CONDITIONAL USE GRANT FOR PRESBYTERIAN HOMES WISCONSIN/SENIOR HOUSING PARTNERS LOCATED IN THE SE ¼ OF SECTION 2 (W147 S6800 DURHAM PLACE / TAX KEY NO. 2168.961) WHEREAS, A petition was submitted by Presbyterian Homes Wisconsin/Senior Housing Partners to rezone property from I-1 Government and Institutional District to a Planned Development (PD) District for the property located in the SE ¼ of Section 2 (Tax Key No. 2168.961 / W147 S6800 Durham Place), and WHEREAS, Plans were submitted by Presbyterian Homes Wisconsin/Senior Housing Partners for a Building, Site and Operation Plan (BSO) and Conditional Use Grant (CUG) for the senior housing development, and WHEREAS, A Public Hearing for the rezoning was heard before the Common Council on October 22, 2019, and WHEREAS, A Public Hearing for the Conditional Use Grant (CUG) was heard before the Plan Commission on November 5, 2019, and WHEREAS, The submittal includes plans for a senior housing complex to include 80 independent living units, 20 memory care units, 20 assisted living units and a Town Center all located within one common building, and WHEREAS, Based on the total size of the development (9.22 acres), 80 independent living units are allowed under this PD zoning (with a base zoning of RM-1, which allows 5,000 SF of land per unit), and WHEREAS, The CUG is needed for the memory care and assisted living units as they fall under the code identification of “Nursing homes, rest homes, and homes for all aged, including day cares”, and WHEREAS, The 2020 Land Use designation of Institutional Uses will remain due to the makeup of this multi-facet senior living complex, and WHEREAS, There are two access points, one from Janesville Road and one from Durham Place that must remain disconnected pursuant to Waukesha County approval of access from Janesville Road, and WHEREAS, The northern driveway and parking areas will have vertical-face curb and gutter along with the southern parking area and driveway up to the underground parking entrance, and WHEREAS, Parking on the site is provided with underground parking (87 stalls) and two separate surface parking lots (55 stalls) which equates to 1.78 stalls per unit, and WHEREAS, The Zoning Code typically requires 2 enclosed stalls per unit plus additional visitor parking and this proposal does not currently meet the typical requirement, and WHEREAS, The applicant explained that in their other senior developments a ratio of one space per unit has been sufficient, and WHEREAS, The senior housing complex is designed to be two stories on the northern portion of the property and three stories with underground parking on the southern portion of the property, but due to the topography of the site the ridge of the roof of the entire complex is consistent throughout, and WHEREAS, The height of the building on the north side facing Janesville Road has a height of about 27 feet (as measured per code from grade at the base of the building to the mid-point of the pitched roof) Page 7 of 39 RESOLUTION PC 062-2019 Packet Page 24 and the height on the south side of the building located along Durham Place is proposed at a height of about 37 feet (as measured per code from grade at the base of the building to the mid-point of the pitched roof) and the height to mid-point above the Durham Place roadway elevations is between 39 feet and 45 feet, and WHEREAS, The exterior of the proposed building includes varying stone bays and bands, cement board siding in multiple colors, architectural reveal asphalt shingles, vinyl double glazed windows and wood framed decks with picket railings, and WHEREAS, The submitted renderings show the colors that are being proposed on the buildings and the color palette including blues and greys work will with the grey colored masonry, and WHEREAS, The total average masonry calculation on all provided elevations of the building is 51.3% (varying between 10% and 66%), and WHEREAS, The City’s design guides typically look for about 50% masonry, but the overall quality of the design and material usage is just as important, and WHEREAS, A photometric plan with lighting specifics has been submitted and the light levels meet the current code requirements, and WHEREAS, Trash and recycling storage will be indoors with containers moved outside only on pick-up days, and WHEREAS, No specific details have been provided relating to any mechanical (HVAC, transformer, etc.) units either on the ground or the roofs other than basic notes of some ground mounted features and recessed rooftop units, and WHEREAS, A Landscape Plan is included as part of the submittal and there is a mixture of trees, shrubs and perennials on portions of the site, and WHEREAS, The property will be serviced with municipal sewer and municipal water, and WHEREAS, Stormwater management is proposed on the southern portion of the site and engineering review will be needed to ensure the facilities are sized properly for this full development and to ensure that existing drainage concerns on site are addressed. THEREFORE BE IT RESOLVED, That the Plan Commission approves the Building, Site and Operation Plan and Conditional Use Grant for the senior housing project submitted by Presbyterian Homes Wisconsin/Senior Housing Partners located in the SE ¼ of Section 2 (W147 S6800 Durham Place / Tax Key No. 2168.961). BE IT FURTHER RESOLVED, The Plan Commission is providing a positive recommendation to the Common Council for rezoning the property from I-1 (Government and Institutional District) to PD (Planned Development District). BE IT FURTHER RESOLVED, Before Building Permits can be issued, formal approval from Waukesha County for access to Janesville Road needs to be submitted to the City. BE IT FURTHER RESOLVED, The landscape plans are subject to formal review by the City Forester before building permits can be issued and some additional landscaping and/or modifications will likely be required. BE IT FURTHER RESOLVED, Sign permits are required for any/all signage (temporary or permanent). Page 8 of 39 RESOLUTION PC 062-2019 Packet Page 25 BE IT FURTHER RESOLVED, A final photometric plan and final lighting/pole details will be required before any building permits can be issued. BE IT FURTHER RESOLVED, All lighting/poles needs to meet the code requirements, including, but not limited to, all fixtures being full cut-off and zero degree tilt, with lighting levels not exceeding 0.5 foot- candles at the lot lines. BE IT FURTHER RESOLVED, Any freestanding lights cannot have a concrete base that exceeds 6 inches above grade. BE IT FURTHER RESOLVED, Since there are not formal details provided relating to exterior/site/building/rooftop mechanical/devices (HVAC units, transformers, generators, etc.), full details will need to be provided relating to the location and size of all exterior mechanical (HVAC units, transformers, etc.) and all such units will need to be fully screened from all surrounding views. BE IT FURTHER RESOLVED, All screening of exterior/site/building/rooftop mechanical/devices (HVAC units, transformers, generator, etc. will need to be approved by the City before any building permits can be issued and the screening should be incorporated into the design building buildings and/or site where possible. BE IT FURTHER RESOLVED, That no outdoor overnight storage/parking, other than daily driven vehicles, is allowed on the property (including but not limited to dumpsters, recycle bins, equipment, supplies, boats, trailers, campers, junk/wrecked vehicles, etc.). BE IT FURTHER RESOLVED, That all bollards must be colored to match the colors of the principal structure. BE IT FURTHER RESOLVED, All parking stall sizes must meet the current code requirements of 10’ x 20’ per parking stall. BE IT FURTHER RESOLVED, The entire site needs to contain concrete curb and gutter, with the exception of the “fire access lanes” provided east of the underground parking entry. BE IT FURTHER RESOLVED, If the “fire access lanes” east of the parking garage entry are used as typical driveways, rather than just for emergency purposes, then said “fire access lanes” will need to also contain curb and gutter. BE IT FURTHER RESOLVED, That any new handicap signs be placed permanently in the ground or mounted to the building. BE IT FURTHER RESOLVED, Any retaining walls that exceed six (6) feet in height are required to have a fence or rail on the high side of them for safety. BE IT FURTHER RESOLVED, All hydrants and water lines servicing said hydrants on site must me publicly dedicated and located within easements. BE IT FURTHER RESOLVED, Full engineering/utility review of the site design and utilities will need to occur as this project proceeds. BE IT FURTHER RESOLVED, Special attention will need to be paid to trying to resolve any existing or new drainage concern as it relates to adjacent properties. BE IT FURTHER RESOLVED, The final site layout is subject to Fire Department review and approval. Page 9 of 39 RESOLUTION PC 062-2019 Packet Page 26 BE IT FURTHER RESOLVED, The exterior masonry on the eastern elevation between the memory care/assisted living units and the independent living units needs be increased to match the height of the adjacent elevation toward the north. BE IT FURTHER RESOLVED, Prior to building permits being issued, the overall percentage of masonry on the entire building must be provided and be at least 50 percent. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the City and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines for each day that a violation occurs, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: November 5, 2019 ATTEST: Adam Trzebiatowski, Planning Manager Page 10 of 39 RESOLUTION PC 062-2019 Packet Page 27 Page 11 of 39 RESOLUTION PC 062-2019 Packet Page 28 ENTRY SIDE VIEW 10/31/2019 TESS CORNERS SENIOR HOUSING DURHAM PL & JANESVILLE RD MUSKEGO, WIPRESBYTERIAN HOMES AND SERVICES Page 12 of 39 RESOLUTION PC 062-2019 Packet Page 29 VIEW FROM ENTRY DRIVE 10/21/2019 TESS CORNERS SENIOR HOUSING DURHAM PL & JANESVILLE RD MUSKEGO, WIPRESBYTERIAN HOMES AND SERVICES Page 13 of 39 RESOLUTION PC 062-2019 Packet Page 30 GRADE LEVEL COURTYARD VIEW 10/31/2019 TESS CORNERS SENIOR HOUSING DURHAM PL & JANESVILLE RD MUSKEGO, WIPRESBYTERIAN HOMES AND SERVICES Page 14 of 39 RESOLUTION PC 062-2019 Packet Page 31 OVERALL COURTYARD VIEW 10/31/2019 TESS CORNERS SENIOR HOUSING DURHAM PL & JANESVILLE RD MUSKEGO, WIPRESBYTERIAN HOMES AND SERVICES Page 15 of 39 RESOLUTION PC 062-2019 Packet Page 32 TERRACE MAIN ENTRANCE JANESVILLE ROAD POND PARKING LEVEL 0 (GARAGE) LEVEL 1 LEVEL 2 LEVEL 3 NEIGHBORING HOMES BERM SIGHTLINE FROM NEIGHBORING HOMES 1/64" = 1'-0" SITE SECTION 10/01/2019 MUSKEGO SENIOR HOUSING JANESVILLE ROAD, MUSKEGO, WI PRESBYTERIAN HOMES AND SERVICES   6(&7,21 9,(:)5206287+ :,7+$1':,7+28775((6 Page 16 of 39 RESOLUTION PC 062-2019 Packet Page 33 NEIGHBORING HOMES SIGHTLINE FROM NEIGHBORING HOMES TERRACE LEVEL 0 (GARAGE) LEVEL 1 LEVEL 2 LEVEL 3 1/64" = 1'-0" SITE SECTION 10/01/2019 MUSKEGO SENIOR HOUSING JANESVILLE ROAD, MUSKEGO, WI PRESBYTERIAN HOMES AND SERVICES   6(&7,21 9,(:)520($67 :,7+$1':,7+28775((6 Page 17 of 39 RESOLUTION PC 062-2019 Packet Page 34 MI D P O I N T O F R I D G E 37 ' - 0 " MIDPOINT OF RIDGE 27 ' - 0 " AT D E L I V E N T R A N C E 28 ' - 0 " 1/64" = 1'-0" SITE SECTION 10/01/2019 MUSKEGO SENIOR HOUSING JANESVILLE ROAD, MUSKEGO, WI PRESBYTERIAN HOMES AND SERVICES   6(&7,21 9,(:)520:(67 Page 18 of 39 RESOLUTION PC 062-2019 Packet Page 35 /HYHO   /HYHO   7UXVV%HDULQJ     0$7(5,$/5$7,2 6721( 6,',1* /HYHO   /HYHO   7UXVV%HDULQJ   0$7(5,$/5$7,2 6721( 6,',1* /HYHO   /HYHO   7UXVV%HDULQJ   0$7(5,$/5$7,2 6721( 6,',1* /HYHO   /HYHO   7UXVV%HDULQJ   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   7UXVV%HDULQJ   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   7UXVV%HDULQJ   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License #Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A3.1EXTERIOR ELEVATIONS 1905 Author Checker 03/19/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ 0$,1(175$1&(   $ $66,67('/,9,1*(/(9$7,21   $ $66,67('/,9,1*(/(9$7,21   $ $66,67('/,9,1*(/(9$7,21   $ $66,67('/,9,1*(/(9$7,21   $ $66,67('/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21 Page 19 of 39 RESOLUTION PC 062-2019 Packet Page 36 /HYHO   /HYHO   7UXVV%HDULQJ   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A3.2EXTERIOR ELEVATIONS 1905 Author Checker 03/19/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ $66,67('/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21 Page 20 of 39 RESOLUTION PC 062-2019 Packet Page 37 /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* /HYHO  /HYHO   /HYHO   7UXVV%HDULQJ     0$7(5,$/5$7,2 6721( 6,',1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A3.3EXTERIOR ELEVATIONS 1905 Author Checker 03/19/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ ,1'(3(1'(17/,9,1*(/(9$7,21   $ %$&.(175$1&( Page 21 of 39 RESOLUTION PC 062-2019 Packet Page 38 /HYHO  /HYHO   /HYHO   /HYHO   7UXVV%HDULQJ   )5267)7*   0$7(5,$/5$7,2 6721( 6,',1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A3.4EXTERIOR ELEVATIONS 1905 EJ DW 04/04/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ ,1'(3(1'(17/,9,1*(/(9$7,21 Page 22 of 39 RESOLUTION PC 062-2019 Packet Page 39 SHEET L200 LAWN LAWN LAWN LAWN LAWN LAWN LAWN MEADOW SEED MIX LAWN JANE S V I L L E R O A D DELIVERIES MAIN ENTRY PARKING GARAGE ENTRY POND TERRACE DU R H A M P L A C E PROPOSED BUILDING SIGN LAWN MEADOW SEED MIX LAWN SHEET NUMBER Br o o k f i e l d , W I | M i l w a u k e e , W I | A p p l e t o n , W I | M a d i s o n , W I | C e d a r b u r g , W I Mo u n t P l e a s a n t , W I | N a p e r v i l l e , I L | I r v i n e , C A 25 50 100 GRAPHIC SCALE 0 NORTH Know what's R MU S K E G O S E N I O R H O U S I N G JA N E S V I L L E R O A D , M U S K E G O , W I CO N C E P T U A L LA N D S C A P E P L A N PLANT SYMBOL KEY DECIDUOUS TREES ORNAMENTAL TREES EVERGREEN TREES EVERGREEN SHRUBS DECIDUOUS SHRUBS ORNAMENTAL GRASSES PERENNIALS EXISTING TREELINE TO REMAIN EXISTING TREES TO REMAIN EXISTING TREES TO BE REMOVED GENERAL LANDSCAPE NOTES - ALL DETAILS AND SPECIFICATIONS TO BE DETERMINED ON FINAL LANDSCAPE PLANS. - THIS LANDSCAPE PLAN HAS BEEN DESIGNED TO GENERALLY MEET THE VILLAGE OF LANNON LANDSCAPE REQUIREMENTS. FINAL QUANTITIES AND CALCULATIONS WILL BE PROVIDED ON FINAL LANDSCAPE PLAN SUBMITTAL. - SEPARATE LANDSCAPE PLANS WILL BE SUBMITTED FOR EACH PHASE OF THE DEVELOPMENT. - SITE AMENITIES INCLUDING BENCHES, TABLES/CHAIRS AND TRASH RECEPTACLES TO BE DETERMINED ON FINAL LANDSCAPE PLANS. - ALL TRANSFORMERS SHALL BE SCREENED TO THE GREATEST EXTENT POSSIBLE. SCREENING WILL BE DETERMINED ON FINAL LANDSCAPE PLANS. - CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TREE REMOVALS. - ALL PLANTINGS SHALL COMPLY WITH STANDARDS AS DESCRIBED IN AMERICAN STANDARD OF NURSERY STOCK - ANSI Z60.1 (LATEST VERSION) - MULCH: ALL PLANTING BEDS TO RECEIVE 3" DEEP LAYER OF SHREDDED HARDWOOD BARK MULCH. - TURF SEED: DURABLE, PREMIUM COMMERCIAL BLEND. - THE OWNER OF THE PREMISES IS RESPONSIBLE FOR THE WATERING, MAINTENANCE, REPAIR AND REPLACEMENT OF ALL LANDSCAPING, FENCES, AND OTHER LANDSCAPE ARCHITECTURAL FEATURES ON THE SITE. ALL PLANTING BEDS SHALL BE KEPT WEED FREE. - THE LANDSCAPE INSTALLER MUST CONTACT THE CITY FORESTER PRIOR TO PLANTING. -TREES SHALL BE PLANTED IN ACCORDANCE TO THE TREE PLANTING DIAGRAM. -THE LANDSCAPE INSTALLER MUST RECEIVE APPROVAL FROM THE CITY FORESTER FOR ANY SUBSTITUTIONS OR ALTERATIONS TO THE PLAN. -IT IS THE RESPONSIBILITY OF THE LANDSCAPE INSTALLER TO HAVE UNDERGROUND UTILITIES LOCATED BY DIGGERS HOTLINE PRIOR TO INSTALLATION WRITTEN CONSENT OF R.A. SMITH, INC. OR ALTERATIONS MADE TO THIS PLAN WITHOUT THE EXPRESSED FOR DAMAGES, LIABILITY OR COSTS RESULTING FROM CHANGES R.A. SMITH, INC. ASSUMES NO RESPONSIBILITY EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE THE LOCATIONS OF EXISTING UTILITY INSTALLATIONS AS SHOWN ON THIS PLAN ARE APPROXIMATE. THERE MAY BE OTHER UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. THE MUNICIPAL REVIEW PLAN NOT FOR CONSTRUCTION TREE PLANTING DIAGRAM - CITY OF MUSKEGO NOT TO SCALE TREE PLANTING DIAGRAM NOTES:Root flare must be visible at grade. Any adventitious or girdling roots are to bepruned off. Burlap, ropes, and wire must be cut away from at least the upper half of ball so outward root growth is not impeded. A wide "ring" of mulch(2" to 4") is to be placed around the tree, but no more than 1" in contact withthe trunk. If staked, strapping is to be removed after one complete growingseason. If tree cannot support itself,it must be staked. Stakesshould be driven in at a slight angle. Strapping should beof a wide (2") material that will not injure trunk. Mulch 2-4" deep.Do not pile against trunk. Dig a wide shallowplanting hole. 2-3 times ball diameter. Root flare must be at grade Identify depth of root flareDig hole no deeper thanbase of root ball to flare. Remove soil over root flare. Remove twine, burlap and wirefrom at least upper half ofburied portion of root ball 1 P-PL-TREE-DEC-06 Page 23 of 39 RESOLUTION PC 062-2019 Packet Page 40 $  $  $ $ $  $ $ $  $  $  $ PARKING UNEXCAVATED ELEVATOR STAIR STAIR SERVICES MECHANICAL ELEVATOR RESIDENT STORAGE STAIR GARAGE ENTRY 87 SPACES HC A P HC A P HC A P HC A P /HJHQGRI8VH &,5&8/$7,21 6(59,&( 3$5.,1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License #Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A1.0LEVEL 0 FLOOR PLAN 1905 EJ DW 03/08/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ /HYHO 1 0'10'20' 1 0'10'20'Page 24 of 39 RESOLUTION PC 062-2019 Packet Page 41 $  $  $ $ $  $ $ $  $ $  $  $  $ STAIR MECH STAIR MECH ELEVATOR TRASH RECEIVING ELECTRICAL SSTTOORRAAGGEE EELLEEVVAATTOORR MMEECCHH SSTTAAIIRR TERRACE STAIR DINING KITCHEN THEATER CLUB ROOM IL-2B IL-1D IL-1D IL-1D1 IL-1D1 IL-1D IL-2B IL-1D1 IL-1B IL-1B1 IL-2D IL-1B1 IL-1B IL-1D IL-2D IL-1B IL-2B IL-1D1 IL-1D1 IL-2B IL-1BIL-1D1 IL-2D IL-1D SERVICES BISTRO SEATING BISTRO UNEXCAVATED MECHANICAL $  $ /HJHQGRI8VH 72:1&(17(5 ,1'(3(1'(17 &,5&8/$7,21 6(59,&( ,1'(3(1'(17/,9,1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A1.1LEVEL 1 PLAN 1905 EJ DW 10.4.2019 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ /HYHO 1 0'10'20'Page 25 of 39 RESOLUTION PC 062-2019 Packet Page 42 $  $  $  $  $ $ $  $  $ $  $ $ $  $  $  $ STAIR MECH TRASH ELEVATOR MECH STAIR STAIR ELEVATOR STAIR MECH CLOSET IL-1B1 IL-1B IL-1D IL-2D IL-1B IL-2B IL-1D1 IL-1D IL-1D1 IL-2B IL-1BIL-1D1 IL-2D IL-1D IL-2B HEARTH DECK LIBRARY GUEST GUEST IL-2B IL-1B1 IL-2B IL-2D IL-1B1 IL-2B IL-1B IL-1D1 IL-1D1 IL-1D1 IL-1D IL-1D IL-1D OPEN TO BELOW HOME HEALTH PARLOUR ADMIN RECEPTION NURSE MECH ACTIVITIES ADMIN DINING AL-1B AL-1B AL-1B AL-1B AL-1B AL-1B AL-1B AL-1B AL-2B AL-2B AL-1D AL-1D AL-1D AL-1D AL-1D AL-1D AL-1D AL-1D LIVING ACTIVITY KITCHEN R E S T R O O M S SERVICES AL-S AL-S STAIR TERRACE PORCH $  /HJHQGRI8VH 72:1&(17(5 ,1'(3(1'(17 $66,67(' &,5&8/$7,21 6(59,&( ,1'(3(1'(17/,9,1* $66,67('/,9,1* I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A1.2LEVEL 2 PLAN 1905 EJ DW 03/19/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ /HYHO 1 0'10'20'Page 26 of 39 RESOLUTION PC 062-2019 Packet Page 43 $  $  $  $  $ $ $  $  $  $ $  $ $ $  $  $  $ CONFERENCE EMPLOYEES IL-1B1 IL-1B IL-1D IL-2D IL-1B IL-2B IL-1D1 IL-1D IL-1D1 IL-2B IL-1BIL-1D1 IL-2D IL-1D IL-2B IL-2B IL-1B1 IL-2B IL-2D IL-1B1 IL-2B IL-1B IL-1D1 IL-1D1 IL-1D1 IL-1D IL-1D IL-1D STAIR STAIR ELEVATOR STAIR ELEVATOR STAIR MECH TRASH MECH MECH MECH SERVICES MC-1B SITTING MC-1B MC-1B MC-S MC-S MC-S MC-SMC-S MC-S MC-S MC-S MC-S MC-S MC-S MC-S MC-1B MC-1B MC-1B MC-1B MC-1B KITCHEN NURSE NURSE CONF SERVICES R E S T R O O M S GATHERING FITNESS LOUNGE FITNESS COMMUNITY ROOM MC ENTRY SPA DINING LIVING ACTIVITY DECK DECK $  /HJHQGRI8VH 72:1&(17(5 ,1'(3(1'(17 0(025< &,5&8/$7,21 6(59,&( ,1'(3(1'(17/,9,1* 0(025<&$5( I hereby certify that this document was prepared by me or under my direct supervision and that I am a duly licensed architect under the laws of the State of Minnesota Typed or Printed Name License # Date PROJECT NUMBER DRAWN BY CHECKED BY ORIGINAL ISSUE: REVISIONS st. paul, minnesota 551041000 university ave. w. suite 130 612-252-4820 fax - 844-270-3946 A1.3LEVEL 3 PLAN 1905 EJ DW 03/19/19 TESS CORNERS SENIOR HOUSING DU R H A M P L & J A N E S V I L L E R D MU S K E G O , W I CUG SUBMITTAL SET 10.4.2019 TE S S C O R N E R S S E N I O R H O U S I N G No. Description Date   $ /HYHO 1 0'10'20'Page 27 of 39 RESOLUTION PC 062-2019 Packet Page 44 Presbyterian Homes Wisconsin Muskego Project Page 1 Presbyterian Homes Tess Corners Muskego Wisconsin Rezoning, CUG, Building, Site and Operation Plan Narrative Applicant: Presbyterian Homes Wisconsin, Inc. Senior Housing Partners (SHP) Project Name: Not named at this time Project Address: Former Tess Corners Elementary School Ownership: Presbyterian Homes Wisconsin, Inc. (PHW) the eastern Wisconsin affiliate of Presbyterian Homes and Services. PHW projects in the greater Milwaukee market: • Avalon Square: Waukesha, WI • Kirkland Crossings, Pewaukee, WI • Dickson Hollow, Menomonee Falls, WI • Fairway Knoll, Germantown, WI • Towner Crest, Oconomowoc, WI – opening early 2020 Presbyterian Homes & Services: Presbyterian Homes & Services (PHS), based in St. Paul, MN is a faith-based organization providing a broad array of high-quality housing choices, care and service options for older adults. In 2018, PHS generated $420.6M in revenues and held over $1.5B in assets. More than 6,500 employees and over 3,000 volunteers serve over 27,000 older adults through 46 PHS-affiliated senior living communities in Wisconsin, Minnesota and Iowa, and through Optage® the home and community-based services division of PHS. Established in 1955, PHS has earned the reputation as an innovative leader dedicated to promoting independence, vitality and well-being for those they serve. For a complete list and information about all of our PHW/PHS sites please visit www.preshomes.org. Senior Housing Partners: Senior Housing partners serves as the development arm of Presbyterian Homes & Services and development consultant to other not-for-profit sponsors of senior housing, assisted living and nursing homes. As a full-service organization, Senior Housing Partners (SHP) provides turn-key project development. From strategic planning and product positioning to site selection, zoning and regulatory compliance, SHP works through all the details. In addition, SHP’s marketing team is available to complete pre-leasing and fill of the project units once construction is complete. Formed in 1995, SHP has developed 74 projects and has been in the capital market for more than $3.1 billion of development. SHP services include developing new campuses and repositioning senior living communities across the country. Each project is designed to be highly competitive in the market place for years to come. For more information visit www.seniorhousingpartners.com and seniorlifestyledesign.com. PHS Mission and Objectives: Motto: Creating smiles in the eyes of the people we serve Mission: To enrich the lives and touch the hearts of older adults Vision: To provide more choices and opportunities for older adults to live well Project Objectives • Provide area senior residents with additional opportunities to continue living in the city of Muskego. • Build community identity and connectivity for residents in all housing types • Provide multiple options in living type, care level, healthy menus, dining venues, and activity choices. Page 28 of 39 RESOLUTION PC 062-2019 Packet Page 45 Presbyterian Homes Wisconsin Muskego Project Page 2 • Create inviting accessible outdoor spaces that maximize the beautiful landscape. • Bring nature indoors through thoughtful design. • Exercise good stewardship of entrusted resources and demonstrate operational integrity. Project Location and Land Use designation as depicted on the adopted Comprehensive Plan: Please see Appendix A for the legal description. The project site is the former Tess Corners Elementary School property, which is approximately 9.2 acres in size (excluding public right-of-way), located at the southeast corner of Janesville Road (CTH “L”) & Durham Place, TaxKey No. MSKC2168961. The Land Use designation for this property will remain Government/Institutional, with the property currently zoned I-1; this proposed senior community is a compatible use in the current Land Use designation. The site has approximately 30 – 38 feet of elevation change from the upper Janesville Road area to the lower field in the south portion of the site. The proposed redevelopment will integrate into the topography of the site, with the proposed building and parking being situated in the upper area where the school building, parking and play area are today, having proposed building elevations designed to step down with the changing topography. The main parking lot and delivery area will access Janesville Road (CTH “L”) with a new driveway at the Woodland Place intersection. Waukesha County has reviewed this access point and confirmed that the location is safe and acceptable and has recommended that the parking lot not connect to Durham Place (to avoid the potential for cut-through traffic). The underground resident parking garage and supplemental surface parking area will access Durham Place in the southwest area of the site. The project will provide storm water management for our site, which will also improve drainage for the adjacent downstream neighbors. The back yards of properties to the east will benefit from the increased greenspace and setbacks this project will provide. The runoff issues previously experienced from the playground area will be removed, with runoff from the proposed developed area designed to drain south to our storm water pond. The southern portion of the proposed development will be an aesthetically pleasing storm water pond that discharges at very low flow rates directly to the Durham Place ditch. An undulating berm between the pond and homes to the south/southeast provides visual assurance that runoff from the development and pond will only drain to Durham Place. The property is located in the Root River watershed, with the entire site tributary to Tess Corners Creek located 750’ – 1,450’ east of the site (near Tess Corners Drive). The storm water management plan will comply with Chapter 309 of the City code and MMSD requirements. Project Utilities and Capacity: The property has municipal sanitary sewer and water main available and accessible in Durham Place. The proposed development can connect via gravity sewer to the 8” diameter sanitary sewer in Durham Place. The 12” diameter water main in Durham Place has appropriate water capacity for the proposed redevelopment. Based on data available from the City’s Water Utility, water use from a single family home will average 6,000 to 7,000 gallons per month. Water use from an independently living unit, on the other hand, will average 1,000 to 2,000 gallons per month. Using the most conservative estimates, each independent unit will use approximately 1/3 of the capacity assigned to this land. The sanitary sewer design flows for the proposed redevelopment will be comparable to those calculated for the Tess Corners Elementary school at full operation, which is within the capacity of the 8” diameter Durham Place and Cornell Drive sewer system. The supporting Sewer Flow Analysis shows that a typical day sewer flow for the existing school is 6,300 gallons (0.01 cfs) versus the proposed senior community at a lesser 6,192 gallons (0.01 cfs). The capacity of an 8” diameter sewer pipe at minimum slope is 0.81 cfs; therefore, the proposed redevelopment contributes towards only 1.2% of the average day minimum capacity of the 8” sewer pipe (or 12% of capacity when evaluating the peak flow condition), which is acceptable. Page 29 of 39 RESOLUTION PC 062-2019 Packet Page 46 Presbyterian Homes Wisconsin Muskego Project Page 3 Development Summary The campus has a welcoming entrance boulevard leading to native landscapes with surface parking for residents and guests for easy access to the main entrance at the Town Center. Upon entering the Town Center, the views through the common area to the 2 story windows brings nature in and allows residents and guests views of the gathering spaces, landscaped gardens, pond, walking trails and mature trees that form the central outdoor common space. The outdoor feature areas will provide experiences with color, scents and water sounds which will be soothing to enjoy whether moving through our garden area or observing from a window. Prairie plantings will create seasonal changes and attract birds and butterflies that are interesting to observe. The proposed campus is a Mini-Continuum of Care, which offers multiple levels of care and housing options including independent living apartments, traditional assisted living and assisted living memory care units. The assisted living and memory care communities are intentionally designed as small neighborhoods so residents experience a home-like setting with living rooms and family space with staff nearby and involved. The variety in living options allows residents to stay within the campus and maintain connections with their friends and staff members as their care needs change. The multiple housing options create an added benefit and peace of mind for married couples, offering them the ability to stay together within the community with priority access to care should one need it. The mini-continuum campus approach creates a strong connected community where residents can age in place. See Site Plan Attachment. Project Components Town Center The Town Center consists of approximately 19,500 square feet of program space on three (3) levels. Following our Wellness motto “Freedom to live well”, the Town Center of the campus offers a variety of amenities that promote physical, intellectual, spiritual and emotional well-being. A controlled access entry lobby opens to resident activity areas with balcony views through to rear beautifully landscaped gathering areas and a large pond. Our restaurant style dining room offers many handcrafted healthy and delicious options to choose from in a more formal setting. A bistro venue with snacks, handcrafted sandwiches and homemade soups in a casual setting is another dining option for residents. Residents enjoy the use of a theatre complete with movie style seating and large screen and surround sound. The club room and library/learning center provide opportunities for social interaction as well as educational resources. The central Hearth and Fellowship Hall serve as gathering spaces for residents and hosts special campus wide events and programs as well as inter-denominational worship services for residents. The Wellness Center, with our own certified staff, offers state of the art cardio and weight equipment, group classes such as yoga, balance and mobility and stretching, as well as a full service beauty salon. Personal Training is available upon request. Administrative offices, conference rooms, two (2) guest suites, multiple elevators and stairways, a fully sprinkled building for maximum fire safety, and all back of house service and receiving spaces round out the abundant Town Center amenities. Site Data Total Area = 401,712 sf (9.22 ac) This excludes the right-of way. Lot Coverage – Impervious = 142,615 sf , 3.72 acres (35.5% of site) Building = 66,300 sf (16% of site) Parking, Pavement = 43,900 sf Sidewalk & Trail = 32,415 sf Non - Impervious = 257,004 (5.9 ac) = 64.4% of site Page 30 of 39 RESOLUTION PC 062-2019 Packet Page 47 Presbyterian Homes Wisconsin Muskego Project Page 4 Building Areas The total building area is 179,250 sf/401,712 sf (44.62% of site) for all floors excluding garage. The breakdown of the specific building components are as follows: Town Center 19,500 sf – included in totals below Garage 46,650 sf First Floor 46,650 sf Second Floor 66,300 sf Third Floor 66,300 sf Total Finished SF 179,250 sf Total Building SF 225,900 sf – includes garage Projected Market Demand for Muskego Presbyterian Homes Wisconsin conducted a Phase 1 Feasibility Report to forecast the potential need for independent living, assisted living and assisted living memory care in the Muskego market. This study showed a current demand in 2019 for 81 senior independent living apartments. By the year 2021, the demand increases to 96. Regarding assisted living, the current demand in 2019 is 47 units and levels out at 45 in 2021. Assisted living memory care shows a 2019 current demand for 43 units and drops to 32 units by 2021. Living Units Independent Living (IL) • The 80 Senior Apartments and separate entrance lobby are located in a three (3)- story wood-framed construction over one-story of underground structured parking. The building is designed to keep hallway length at a minimum with easy access to the elevators and Town Center amenities. Each apartment has high end finishes and includes a full kitchen with stainless steel appliances, washer & dryer, solid surface countertops (granite or comparable) and a balcony or patio. Additional resident storage and secured underground heated parking is available for a fee. Assisted Living (AL) and Memory Care (MC) The campus will offer CBRF assisted living and memory care options. For peace of mind, PHS home care staff is available 24/7 for all assisted living and memory care residents. Our full time Life Enrichment Director provides a myriad of activities throughout the day as well, and our onsite chefs create fresh, healthy meals daily with multiple menu offerings. • 20 units of CBRF assisted living are located on the first level of a two-story steel- framed construction. The assisted living community has a mix o f one (1) and two (2) bedroom units. A common area dining room, living room, activity room, outdoor garden patio and laundry in some units as well as a community laundry room with complimentary washers and dryers are located within the assisted living community. 2 meals are included daily as well as weekly linen change and housekeeping. • 20 memory care CBRF units are located on the second level of the 2 story steel- framed construction. The memory care has a mix of studio and one (1) bedroom units. A common area dining room, living room, activity room and outdoor patio are all located within the community. 3 meals are included daily as well as 3 loads of laundry per week, weekly linen change and housekeeping. Page 31 of 39 RESOLUTION PC 062-2019 Packet Page 48 Presbyterian Homes Wisconsin Muskego Project Page 5 Assisted Living Resident Safety and Security Daily “I’m ok Checks” are done at mealtime. In addition all residents have an emergency call pendant that is monitored by the homecare staff 24/7. Each pendant is equipped with a GPS monitoring system that alerts staff to the resident’s last known location within the building when the pendant button is pressed. Memory Care Resident Safety and Security Daily “rounding” of resident rooms is done every 2 hours. All doors entering to and exiting from the memory care community are secured by a key pad and/or electronic fob entry system that requires a code to enter and exit the building. All windows in resident rooms are secured. Should a door be propped or left open an alert will be sent to the monitoring nurse after 15 seconds. Due to the population of people we serve with memory loss, in lieu of the alarm sounding In the event of a fire, a strobe light will blink and all secured doors in memory care will unlock. Staff will follow emergency protocol that includes a designated staff person stationed at all unsecured doors. Projected Staffing The site is anticipating it will employ the equivalent of 34.4 full time employees in a variety of roles; site administration, chaplain, nurses, certified nursing attendants, cooks, servers, housekeepers and engineers as well as provide volunteer opportunities for those looking to give back to the Muskego community. Staff Hours and Training With the exception of the clinical homecare staff that are onsite 24 hours a day/7 days per week, all other PHS staff typically works between the hours of 6am and 8pm seven days per week depending on their position. In addition to all state and career required annual training and certifications (i.e. State required CBRF annual training), all staff are required to fulfill 18 hours of Relias continuing education annually. Staff also participates in Emergency Preparedness training through quarterly fire drills, semi-annual severe weather drills, missing resident, intruder and other safety education at the Stand Up meetings conducted every day at every shift change (3x per day). The safety committee meets quarterly and provides annual updates for training as well. For those staff that works with our memory care residents, an additional 6 hours of Dove Dementia Training and 1 hour of Relias training is required. Below is an anticipated maximum staffing per shift once the campus is fully occupied. Shift Times Number of Onsite Staff 6am-5pm 27 5pm-8pm 14 8pm-6am 5 PHS and Alcohol The community in Muskego will not hold a liquor license or sell alcohol on our premises. The Club Lounge in the Town Center is equipped with beverage lockers that residents can reserve and store any beverage of their choice. Residents are also permitted to bring their own Page 32 of 39 RESOLUTION PC 062-2019 Packet Page 49 Presbyterian Homes Wisconsin Muskego Project Page 6 beverage to dinner, however our staff does not serve it. Campus Security All exterior doors of the campus are secured at all times and require an electronic fob to gain entry. All residents will have a fob for building access. The main entry doors may remain open during normal business hours, however, in the event that the Operations Team deems the doors are to be locked, our receptionist will grant access through the door entry system. The main entry is equipped with a door entry system that provides residents the ability to grant access to their visitors by pressing an access number on their phone. Residents also have the front door video feed channel on their personal TVs so they can see who is calling to request access. All stairwells leading into the campus from the underground garage or exterior main level are secured with an interior door and require a fob for entry back into the building. All access points into the building are monitored by security cameras. Security cameras are also placed strategically throughout the entire campus. Parking/Deliveries and Staff Parking 42 surface parking stalls are located at the main entrance with access from Janesville Road. Intermittent FedEx and/or UPS deliveries and emergency responders will traditionally use the main entrance. Move-ins will occur in the delivery driveway and door located on the western side of the Town Center. This driveway will be clearly marked so as to avoid confusion. Regular deliveries to this part of the building would include: • garbage pick-up (garbage is stored within the building and pulled out by staff on pick up day) anticipated to be 2 times per week • Food delivery anticipated to be 2 times per week • Linen delivery anticipated to be 1 time per week • Supply delivery will be intermittent based on campus need All deliveries are anticipated to occur during normal business hours. With access from the west side of the site from Durham Road, an additional 87 parking stalls are located in the temperature controlled underground garage with an additional 13 surface parking stalls located at the southwest corner of the site. The total parking on the site is 142 stalls. Building Construction/Licensing The fully sprinkled building is to be constructed of three (3) stories of wood frame (Type V-A) construction over concrete garage (Type I-A). The assisted living wing is to be two stories of steel frame (Type II-A) construction. The different building uses will include Code Occupancy Groups R-2 for Independent Living, I-1 for Assisted Living and I-2 for Memory Care. The assisted living/memory care will be licensed as CBRF. Building Presentation With multiple stories and an underground garage that total 225,900 sf , the building is intentionally sited with the shortest and smallest wings closest to Janesville Road as a gentle transition to the single family homes nearby. The Assisted Living and Memory Care wing is two stories tall and located on the north east portion of the site. The Town Center, the center portion of the building, graduates to a three story height providing architectural interest as well as accommodating two story ceiling heights for large common spaces. The three-story independent Page 33 of 39 RESOLUTION PC 062-2019 Packet Page 50 Presbyterian Homes Wisconsin Muskego Project Page 7 living wings, intentionally located close to the center of the site away from the residential homes, are located on the southern portion of the site, with views of the large pond and garden areas. The community is surrounded by the mature trees on the east side of the property as well as a pond with large berms and evergreen trees, screening the homes to the south of the property, providing a low visual impact to the surrounding neighborhood. See Exterior Renderings Attachments. Emergency fire responders have access to the fully sprinkled building by designated fire access lanes that are maintained year round by site operations. Building Exterior Materials In keeping with the residential character of the neighborhood, the exterior building materials include: • Stone bays and bands • Cement Board Siding in multiple exposures and colors • Architectural Reveal Asphalt Shingles • Vinyl Double Glazed Windows with clear glazing • Wood framed decks with picket railings Site Landscape Design • Porte Cochere /Main front door at Town Center • Extensive planting design at the entry areas, site perimeter and at prominent architectural points along the building foundation. • Large windows bring natural light in and make views of nature plentiful. • Outdoor pathways with a pond and gardens are important elements of wellness. • AL outdoor patio with planters and furnishings, surrounded by plantings. • Meadow Mix along east property line provides a naturalized transition from the senior housing site to the existing tree line. • Service Entrance–isolate service activities through separate entry. • Along with the walking paths and pond area the landscape planting design will provide a natural feel for the residents to enjoy. Site Impact to Surrounding Community Traffic impact- It is worth noting that senior communities generate approximately 3.5 trips per day per household compared to single family homes which generate 9.6 trips per day per household. For cities looking to keep traffic impact to a minimum in developing residential areas, senior living communities are a preferred low impact option. Impact to schools- This development will have no negative impact on the Muskego School District as this will be a senior living facility. Impact to fire/police- The campus is equipped with an emergency call pendant system that is staffed and monitored 24/7 by PHS. Each resident is given a pendant to call for help that alerts campus staff to the resident location anywhere within the community. Statistically, 75% of residents who occupy a PHS community have lived within a 10 mile radius of the campus prior to moving in. Presbyterian Homes and Services staff will be the first responder to help residents when needed. These same residents would have been calling 911 if they needed help at their homes. Benefits to the city and residents of Muskego- Page 34 of 39 RESOLUTION PC 062-2019 Packet Page 51 Presbyterian Homes Wisconsin Muskego Project Page 8  Resident choice- With the addition of this PHW community, Muskego residents have more choices in living options. It also allows them to remain in the city where they have established personal, civic and community relationships. This will be a high-quality living community with a month to month rental agreement that DOES NOT require an entrance deposit. Residents who live within our community also keep their own physicians and specialists, an added benefit as well.  Neighborhood revitalization- As residents sell their home and move to Presbyterian Homes, real estate inventory expands, attracting new young families into the City of Muskego. This has a direct positive impact on the school district as well as the community at large.  New job creation- The site will employ the equivalent of 34.4 full time employees in a variety of roles; site administration, chaplain, nurses, certified nursing attendants, cooks, servers, housekeepers and engineers as well as provide volunteer opportunities for those looking to give back to the Oconomowoc community.  Low impact to neighborhood traffic- In addition to staff shift changes occurring at off peak hours. The average age of residents living within a Presbyterian Homes community is 85. Residents who are still driving tend to drive infrequently and during off peak hours. This project will have a low impact to traffic in the area. The campus will offer occasional van rides to area attractions, retail and clinic areas and seasonal trips that reduce overall traffic. Request for Rezoning to a PD with an RM-1 overlay Presbyterian Homes Wisconsin is requesting a PD planned development with an RM-1 overlay. The project is requesting an increase in building height and open area, and a reduction in the required floor area. The property has a total of 9.38 acres (408592.9 SF), and excluding the right of way is 9.22 acres (401,712 SF). Density We meet the allowable density as calculated at 5000 sf per unit. The allowable units are 80.34 units and Presbyterian Homes Wisconsin is constructing 80 units. Waiver Request: Parking The average age of residents living within a PHS community is 86. PHS Senior parking demand historically has been in the range of 1.2 parking stalls per independent living residential unit regardless of unit size and less than 10% of assisted living residents are still driving upon opening of the community. As the residents of the community age in place, they retain fewer and fewer cars and instead rely on PHS transportation, friends and family or public transportation for mobility services. Assuming the building is 100% occupied, fully staffed and at the peak hours of the day, of the 142 parking stalls on the campus the parking would be as follows: Description Units Stall Occupancy per unit Peak Day Total stalls Available in Peak Period Independent Living 80 80/142 Assisted Living 20 2/142 Staff 27 27/142 Total 127 109/142 33/142 Page 35 of 39 RESOLUTION PC 062-2019 Packet Page 52 Presbyterian Homes Wisconsin Muskego Project Page 9 We believe we have sufficient parking onsite to meet the demands of residents, staff and guests of the community. Building Height We are requesting an increase to the allowable height for a portion of the building. RM-1 zoning allows for a height of 30 feet as measured from grade at the building to the mid point of the pitched roof. Due to the varied topography and slope of the existing site and surrounding streets and lots, there are many different ways to view this. The entry floor elevation is proposed at 835.5’, the first floor at 824.5’, and the garage at 813.5’. The roof plane elevation will remain consistent across the building and a third story will be visible on the southern portion of the site as grade drops away. The underground parking garage level will be below grade at all locations except at the garage entry door. The two story portion of the building with no below grade garage will have an eave height of 19 feet and a roof mid point height of 27 feet. The three story portion of the building, with a below ground parking garage, will have an eave height above grade of 29 feet and a roof mid point height of 37 feet. From Janesville Road, the existing grade is approx. 836.5’ at the proposed entry to the site. On this north side with two stories and no underground garage, the roof mid point is 27 feet. At the building entry, with an elevation of 835.5’ and grade at the building at 835’, the building mid point roof is approx. 25.5 feet above the street. From Durham Place, existing grade varies from approx. 842’ at the cul de sac down to 815’ at our garage entry drive to the south. At the delivery entrance, the three story building emerges. The existing elevation on Durham is approx. 833’, the delivery drive is 824’ or 9 feet below the street level, the mid point roof will be approx. 28 feet above the street. At the closest point to Durham, grade on the street is approx. 822’, the first floor and grade is at 824’ or 2‘ above street level, the mid point roof will be approx. 39 feet above the street. Near the garage entrance, grade on the street is approx. 816’, the first floor and grade is at 824’ or 8‘ above street level, the mid point roof will be approx. 45 feet above the street. Open Space/Floor Area Open Space code is 4000 sf per unit. With 80 units and 64.6% of the site open at 259,485sf, we have Open Space of 3,243 sf/unit. Floor Area code is maximum 30%. With an overall area of 179,250 sf excluding garage and a site area of 401,712 sf, we have a Building Floor Area of 44.62% Presbyterian Homes Wisconsin is requesting a waiver for less open space and an increase in floor area. Our justification is as follows: Our communities are designed as a place that seniors can age in place. From a personal mobility standpoint, we intentionally design the campus with our residents in mind, creating ease of access to our indoor Town Center which hosts a myriad of activities for residents to enjoy without ever having to go outdoors. As aforementioned in this narrative, the Town Center is available to all residents and offers consistency in cultivating and supporting a vibrant “community” even when a resident moves within the continuum of care, however it does require more floor space than a typical residential apartment community. In lieu of large open green spaces, which the site does offer, Preshomes intentionally designs outdoor areas that are within a short walking distance to accommodate our aging population. Our residents can enjoy beautifully landscaped open spaces immediately adjacent to the community, Page 36 of 39 RESOLUTION PC 062-2019 Packet Page 53 Presbyterian Homes Wisconsin Muskego Project Page 10 providing residents easy access to the outdoors while still in close proximity to health care professionals who can provide support if needed. Summary of existing open space and floor area vs proposed: 1. Parking lot – pavement will be reduced by: Existing = 63,175 sf – Proposed = 43,620 sf = 19,555 sf (0.45 acres) pavement reduction 2. Building area will increase: Proposed = 66,300 sf - Existing = 31,211 sf = 35,089 sf of additional building area 3. Sidewalk and Trail area will be slightly reduced as compared to existing including the playground surface: Existing Sidewalk & Walkway = 12,973 sf + Existing Playground = 21,726 sf = Existing = 34,699 sf – Proposed = 32,307 sf = 2,392 sf less hard surface 4. TOTAL IMPERVIOUS AREA: Proposed = 142,227 sf - Existing = 129,085 sf = 13,142 sf (0.3 acres) of new impervious area with this redevelopment. a. The proposed project reduces parking lot/asphalt; the net impervious increase is associated with building rooftop. 5. The project will provide storm water management that greatly exceeds City, MMSD and WDNR minimums, significantly improving water quality and controlling peak discharge rates, to the benefit of the downstream neighbors. Development Team • Lisa Albain, Project Developer for Senior Housing Partners (SHP), a subsidiary of Presbyterian Homes and Services (PHS), will be leading the project development from planning and entitlements through construction and installation of furnishings, staff training start up and resident occupancy. Lisa was also the Project Developer for the Fairway Knoll Community in Germantown, WI adjacent to Blackstone Creek Golf Course and Towner Crest, currently under construction in Oconomowoc, WI. • Dawn Wieczorek, InSite Architects - Partner, Designer and Project Manager, specializing in Senior Housing and Affordable Housing will be leading the architectural team. Dawn has over 30 years in the industry and designed Dickson Hollow, Fairway Knoll and Towner Crest for Presbyterian Homes, as well as many other projects throughout the nation. • Josh Pudelko, TRIO Engineering - will provide the land surveying, site civil engineering, including grading and utility design, erosion control and storm water management planning, and construction staking. • Tom Mortensen, RA Smith Landscaping - Tom is the Assistant Director of Land Development Services. He and his team will provide the landscape architecture design for the project. • Senior Lifestyle Design (SLD), also a subsidiary of PHS, will provide interior design. • Heidi Roberts, Regional Director of Marketing for SHP, will be leading the marketing team from groundbreaking until the campus is 95% occupied. Page 37 of 39 RESOLUTION PC 062-2019 Packet Page 54 Presbyterian Homes Wisconsin Muskego Project Page 11 Development Team Contact Information Lisa Albain, Senior Housing Partners 3116 Fairview Ave. North Roseville, MN 55113 Office: 651.631.6316 lalbain@seniorpartners.com Dawn Wieczorek, InSite Architects 1000 University Avenue West, Suite 130 St Paul, Minnesota 55104 Office: 612.252.4824 Dawn@insitearchitect.com Josh Pudelko, Trio Engineering 4100 North Calhoun Rd Brookfield, WI 53005 Office: 262.790.1480 jpudelko@trioeng.com Heidi Roberts, Senior Housing Partners 3116 Fairview Ave. North Roseville, MN 55113 Office: 414.207.5913 hroberts@seniorpartners.com Tom Mortensen, RA Smith Landscaping 16745 W Bluemound Rd. Brookfield, WI 53005 Office: 262-317-3323 Tom.Mortensen@raSmith.com Senior Lifestyle Design 3116 Fairview Ave. North Roseville, MN 55113 Office: 651.631.6300 Thank you very much for your consideration of this important project. We look forward to partnering closely with the city on a successful redevelopment of this site and serving the residents of Muskego for years to come. Sincerely, Lisa Albain Project Developer, Senior Housing Partners Page 38 of 39 RESOLUTION PC 062-2019 Packet Page 55 Exhibit A Legal Description of Property located at Tess Corners Elementary, Muskego WI. Tax Key MSKC 2168961 Page 39 of 39 RESOLUTION PC 062-2019 Packet Page 56 City of Muskego Plan Commission Supplement PC 063-2019 For the meeting of: November 5, 2019 REQUEST: Approval of a Conditional Use Grant (CUG) and Building, Site, and Operation Plan (BSO) for Kwik Trip Tax Key No. 2162.999.002 / S63 W13510 Janesville Road NE ¼ of Section 1 PETITIONER: Kwik Trip, Inc. INTRODUCED: November 5, 2019 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 063-2019 A submittal was received from Kwik Trip for a BSO and CUG for a new gasoline station/convenience store/car wash located at the intersection of Janesville Road and College Avenue. This site currently contains a former bank, which is planned to be removed as part of this site redevelopment. CONSISTENCY WITH ADOPTED PLANS 063-2019 Comprehensive Plan: The 2020 Plan depicts the property as Commercial use. The petition is consistent with the Plan. Zoning: The property is zoned B-2, Local Service Center District. The use is permitted subject to CUG and BSO approval. Park and Conservation Plan: No acquisitions are proposed in this area. The proposal is consistent with the Plan. Street System Plan: All streets are dedicated to their ultimate widths. The proposal is consistent with the Plan. Adopted 208 Sanitary Sewer Service Area: Public sanitary sewer serves the property. The proposal is consistent with the Plan. Water Capacity Assessment District: The development is not currently served by municipal water, but since water is located less than 700 feet away, municipal water main will need to be extended to this site as part of its redevelopment. The cost of any water main extension are the responsibly of the developer/applicant. Also, any hydrants and water lines leading to hydrants will need to be public and located within easements. Stormwater Management Plan: Storm water management will be required on-site. The detailed review relating to stormwater will occur separately. The proposal is consistent with the Plan. General Design Guide The General Design Guide and the Historic Crossroads Design Guide govern this area. See comments below about building design. STAFF DISCUSSION PC 063-2019 Page 1 of 28 RESOLUTION PC 063-2019 Packet Page 57 The applicant is proposing to build a new 9,156 SF retail convenience store with an attached single-bay carwash and a separate fueling canopy with twelve separate pumps (24 total fueling stations). The proposed use is allowed with Plan Commission approval of a Building, Site and Operation (BSO) Plan and a Conditional Use Grant (CUG). The proposed hours of the business are 24 hours per day. The business will have between 28 and 35 employees with 2-8 employees on-site depending on the shift. Conditional Use Grant (CUG) A conditional use grant is required for any gasoline service station as per the requirements of the B-2 zoning district. Plan Commission will hold a public hearing on November 5, 2019 at the Plan Commission meeting to allow residents and/or business owners to voice any thoughts they may have about this project. Architecture This property is governed by the General Design Guide and the Historic Crossroads Design Guide. The proposed building is clad mostly with a red brick from grade to the bottom of the windows where a composite horizontal siding material stretches to the soffit of the building. The roof is proposed as a pitched hip roof with metal standing seam panels. The building also contains a gable accent roof feature with proposed shake-type siding. The storefront window frames and composite siding will be an almond color to match the soldier course of bricks just below the windows. The elevations include the following percentages of masonry: •West (Front) – 60% •East (Rear) – 54% •North – (College Avenue) - 49% •South (Janesville Road) – 49% •Total for Full Building – 53% Most elevations contain varying depths, materials, and door/window features. The overhead doors each contain at least two rows of windows, which is what the City typically likes to see at a minimum. The resolution states that the color of the overhead doors and any solid pedestrian doors needs to match the color of the building. One elevation of note is the eastern elevation that directly faces the intersection of College Avenue and Janesville Road. Kwik Trip has proposed an architectural bump-out on the east elevation with a dormer gable roof to accent this side of the building as this is a prominent visual feature entering the City from the east. The front entrance is proposed with brick column features with a masonry arch detail over the front door that matches the bump-out feature on the eastern elevation. The gas canopy has been designed to match the building with brick columns extending nine feet up the canopy supports to match the column features at the building entrance. The roof of the canopy will also match the building being the standing seam metal panels. The Historic Crossroads Design Guide generally discourages the use of the standing seam metal roofs, the Plan Commission is able to approve a metal roof. Staff does not see any concerns with a standing- seam metal room in the case. As such, the resolution is currently drafted stating that a standing-seam metal roof is allowed due to the durability and low maintenance of the product. Also, the color of the overhead doors and any solid pedestrian doors needs to match the color of the building. Site, Parking, and Access Access to the site is proposed directly to Janesville Road from this site and two cross-access entrances along Janesville Road and College Avenue via easements with the neighbor to the west. The plans indicate that the existing ingress/egress easement is to be vacated. The applicant is actively working with the western neighbor to complete new cross-access easements. The existing driveway onto College Avenue has been shown closed. The access points off the two County highways will need to be reviewed by the County to ensure no additional roadway/entry concerns are present. The site plan currently shows 27 parking stalls in addition to two handicap accessible stalls. This total does not include the 20 stalls associated with the gas pumps. Per the zoning code, one (1) space is needed for every 150 SF of customer floor area, which in this building is about 3,600 SF. That would suggest that 24 stalls are needed. Page 2 of 28 RESOLUTION PC 063-2019 Packet Page 58 The parking stalls as shown are differ in size based on their location. Six of the stalls are the standard 10’ x 20’; two spaces are 9’ x 20’; six are 9’6” x 20’; and the eleven spaces closest to College Avenue are 9’6” x 18’. All driveways appear to be at least 24 feet wide, which is required by code. Kwik Trip is also proposing an area adjacent to the parking stalls along College Avenue with two picnic tables for outdoor seating. The site plans currently shows curb and gutter on the site. Since there is a sidewalk provided in front of this business along Janesville Road, a pedestrian connection to this sidewalk should be provided. The car wash is located on the eastern side of the building. Consistent with the other recently approved car washes in the City, the doors must remain closed during the car wash cycle. If there is not enough space for the exit door to remain closed during the drying cycle, the door must be programmed to automatically close after a car has completed the drying cycle. Similarly, the entry door to the car wash must remain closed unless a vehicle is actively entering the car wash. The resolution states that the car wash operations within the proposed development must be limited to the hours of 7am to 10pm. Operations As is noted above, the proposed facility is requesting business operations to be allowed 24 hours per day. The resolution is draft to limit all deliveries (products, fuel, etc.) and trash pick-up to between 7:00 AM and 9:00 PM. This is to ensure these deliveries are not bothersome to neighbors to the north or south at unreasonable times of the day. Fire Department Approval The site plan is subject to Fire Department approvals at the time of building permits. Possible changes to the site plan may be required based upon the final Fire Department review. Dumpsters/Outdoor Storage A brick/lap siding dumpster enclosure is shown on the plans incorporated into the rear of the building. Access to the garbage enclosure would be near the entrance to the car wash with the gates constructed of a composite boards to match the building. Along the northern side of the building there is a narrow wall that will be constructed adjacent to the rear delivery doors. This area is commonly used to store additional bread racks and other similar type objects. The renderings show the interior of the wall being CMU block. This wall needs to have the interior clad with the same materials as on the outside and as the remainder of the building. Typically, ice, LP, salt, etc. stored outside is not allowed for on-site sales. Kwik Trip sells ice inside the building but they have a need for excess ice storage outdoor and as such have proposed two outside ice containers to the north side of the building. While the building consists of red brick on the lower portion of the building and an almond color lap siding, the ice containers is proposed as being white. The LP rack is proposed on the outside of the building on the west side (front). The cage would be painted a burgundy color to match the brick façade to compliment the building. If the Plan Commission were to approve the outdoor storage of LP and ice for Kwik Trip, staff recommends that the ice coolers be painted a burgundy color similar to the proposed LP racks to blend in more with the building. Kwik Trip is also proposing placing softener salt under the gas canopy between the support columns. The site plan shows salt under the canopy on the three inner gas pump islands between the supports. Salt is also shown on both ends of each of the five gas pump islands, but Kwik Trip states they would be open to only having salt between the supports on only the three inner gas pump islands. Staff is amenable to allowing salt in the inner three gas pump islands with a restriction that the salt remains is placed on an elevated curbed surface and maintained within a confined space. No additional outdoor storage or display of products/material, of any type, would be allowed under this approval (i.e. firewood, etc.). Landscaping A landscape plan has been provided that shows various landscaping throughout the site. The final landscape plan must be submitted for formal review before building permits can be issued. Per the Historic Crossroads Design Guide there needs to be a 15-foot landscape buffer abutting Janesville Road with additional landscaping in this area. Due to the location of the building and the needed parking, staff recommends that the 15-foot landscape buffer be allowed to be reduced to ten feet with more dense Page 3 of 28 RESOLUTION PC 063-2019 Packet Page 59 landscaping being added. The final landscape plan must include additional plantings around any transformers and/or wall mounted mechanical equipment. All landscaping must be located completely on private property and not within the right-of-way. The City Forester will conduct a formal plan review before building permits can be issued. Signage Some signage details have been provided at this time. Formal signage review will occur via separate sign permits as the project proceeds. In general, Kwik Trip wall signs are proposed on the front and sides of the building along with two freestanding monument signs. Smaller non-illuminated informational signs are also shown on the building. Smaller illuminated signs are shown on one of the longer sides of the canopy with an illuminated band along the length of all four sides of the canopy. The total wall signage allowances are based on the typical code requirements. For the B-2 District, 5% of the wall area is allowed on each façade. Separate sign permits will be required before any signage (temporary or permanent) can be installed including both building and freestanding signs. The monument signs proposed include the Kwik Trip logo, gas prices and an electronic message center. The resolution states that the monument sign should contain a stone base to match the building materials. Lighting A photometric plan has been included along with a schedule of proposed lighting fixtures. The photometric plan indicates that the lighting will all be building and pole mounted. The photometric plan shows the lighting levels to be 0.5 foot-candles or less at the lot lines, as required. All lighting must be zero degree tilt and full cut-off. As proposed the light poles will have a concrete base 6 inches above grade and the lights will be 14 feet in height meeting the City requirements. Sewer, Water and Stormwater The development will be served by municipal sanitary sewer. The development is not currently served by municipal water, but the applicant/developer will need to extend the municipal water main to this site as part of its redevelopment. The cost of any water main extensions are the responsibility of the developer/applicant. Currently, no stormwater management facilities exist on this site. As part of the re-development of this site, stormwater management is being accounted for with an on-site pond. Further engineering review will be needed with the re-development of this site. Other The resolution requires that an annual review be placed on this property for the first year the business is in operation to ensure there are no issues. If no problems are found, the annual review could be reconsidered by the Plan Commission. The following are also part of the Plan Commission resolution: BE IT FURTHER RESOLVED, That any bollards, railings, ladders, etc. must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any new handicap signs be permanently mounted in the ground or mounted to the building so they are not moveable. BE IT FURTHER RESOLVED, That all roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and should be approved by the Planning Division before the issuance of building permits. STAFF RECOMMENDATION PC 063-2019 Approval of Resolution PC 063-2019 – Subject to the items noted in the resolution as conditions of approval. Page 4 of 28 RESOLUTION PC 063-2019 Packet Page 60 MUSKEGOthe City of Area of InterestI0160320 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 063-2019 Kwik Trip, Inc.S63 W13510 Janesville Road JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 10/31/2019 Page 5 of 28 RESOLUTION PC 063-2019 Packet Page 61 RESOLUTION #P.C. 063-2019 APPROVAL OF A BUILDING, SITE, AND OPERATION PLAN AND CONDITIONAL USE GRANT FOR KWIK TRIP LOCATED IN THE NW ¼ OF SECTION 1 (TAX KEY NO. 2162.999.002 / S63 W13510 JANESVILLE ROAD - COLLEGE AVENUE) WHEREAS, A submittal was received from Kwik Trip for a new gas station/convenience store/car wash located at Janesville Road and College Avenue (Tax Key No. 2162.999.002 / S63 W13510 Janesville Road), and WHEREAS, The property is zoned B-2 Local Service Center District and that district allows gas stations via a Conditional Use Grant (CUG), and WHEREAS, A Public Hearing for the Conditional Use Grant (CUG) was heard before the Plan Commission on November 5, 2019 and WHEREAS, The 2020 Comprehensive Plan shows this property for commercial uses and the proposal is consistent with the plan, and WHEREAS, This property currently contains a building that was formerly used as a bank and will be removed as part this project, and WHEREAS, The proposal is to build a new convenience store/gas station totaling about 9,156 square feet with a separate canopy area to cover 12 multi-product fuel dispensers (24 total fueling stations), and WHEREAS, Hours of the business are proposed as 24 hours per day, and WHEREAS, The business will have a total of 28-35 employees with between two and eight of those being on-site at a time, and WHEREAS, This property is governed by the General Design Guide and the Historic Crossroads Design Guide, and WHEREAS, The proposed building is clad with a brick up to the windows and then a composite horizontal lap siding to the soffit on all four elevations, along with brick columns and an arch feature above the entry, as well as on the bump-out on the east elevation, and WHEREAS, The building has windows shown on three of the elevations and a dormer on three elevations with a gable front to be clad with shake-style siding, and WHEREAS, The building contains a standing-seam metal hip roof, with rooftop mechanical units set within the recessed are of the roof to be screened from all four sides of the building, and WHEREAS, The gas canopy design will match the building with a standing-seam metal hip roof and brick columns extending nine-feet from grade on all canopy support columns, and WHEREAS, The Historic Crossroad Design Guide generally discourages standing-seam metal roofs, but they can be allowable subject to Plan Commission review and approval, and WHEREAS, The garbage enclosure is attached to the rear of the building and enclosed with a brick wall matching the brick on the store with composite board doors to screen the garbage canisters, and WHEREAS, The existing cross-access easement near Janesville Road for connection to the site to the west will be vacated, and Page 6 of 28 RESOLUTION PC 063-2019 Packet Page 62 WHEREAS, Kwik Trip is actively working with the western neighbor to form an agreement/easement for cross-access between the two sites, and WHEREAS, The site plan currently shows 27 parking stalls on-site with 20 additional parking locations by the pumps and based on the code requirement at least 24 stall are required, and WHEREAS, All parking stalls are shown to vary in size pending the location on-site; six of the stalls are the standard 10’ x 20’; two spaces are 9’ x 20’; six are 9’6” x 20’; and the eleven spaces closest to College Avenue are 9’6” x 18’, and WHEREAS, Access to the site is proposed via the existing driveway along Janesville Road and two cross access easements with the site to the west, and WHEREAS, Waukesha County has all control over the Janesville Road and College Avenue access points since those are county highways, and WHEREAS, There is an area adjacent to the parking stalls along College Avenue proposed for two picnic tables for outdoor seating. WHEREAS, A landscape plan has been provided that shows various landscaping throughout the site, and WHEREAS, A photometric plan has been included along with specs of proposed lighting fixtures, and WHEREAS, The photometric plan indicates that the lighting will all be building mounted, soffit mounted, and pole mounted, and WHEREAS, The photometric plan shows that the lighting levels do not exceed 0.5 foot-candles at the lot lines, and WHEREAS, Signage has been proposed as follows: a Kwik Trip wall sign is proposed on each of the three gable features facing, one facing each east, south and west; one sign on the gas canopy facing west; and two freestanding monument signs one on each College Avenue and Janesville Road, and WHEREAS, The development will be served by municipal sewer, and WHEREAS, The development is not currently served by municipal water, but since water is located less than 700 feet away, preliminary discussions have indicated that the municipal water main will need to be extended to this site as part of its redevelopment, and WHEREAS, Stormwater management facilities will be located east of the convenience store/car wash building on-site, and WHEREAS, The site plans currently show concrete curb and gutter on the site. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site and Operation Plan and a Conditional Use Grant for Kwik Trip located at Janesville Road and College Avenue (Tax Key No. 2162.999.002 / S63 W13510 Janesville Road) BE IT FURTHER RESOLVED, All deliveries (products, fuel, etc.) and trash pick-up hours are limited to between 7:00 AM and 9:00 PM. BE IT FURTHER RESOLVED, The access points off of Janesville Road and College Avenue will need to be reviewed by the County. Page 7 of 28 RESOLUTION PC 063-2019 Packet Page 63 BE IT FURTHER RESOLVED, Prior to building permit being issued, the cross-access easements with the property to the west must be recorded and submitted to the City. BE IT FURTHER RESOLVED, Since there is a sidewalk provided in front of this business along Janesville Road, a pedestrian connection to this sidewalk will need to be provided. BE IT FURTHER RESOLVED, Due to residential neighbors to the north and south, the car wash operations within the proposed development must be limited to the hours of 7am to 10pm and the the entry and exit doors must remain completely closed, except for when a vehicle is actively entering or leaving the car wash. BE IT FURTHER RESOLVED, The color of the overhead doors and any solid pedestrian doors needs to match the color of the building. BE IT FURTHER RESOLVED, The public water main will need to be expended as part this site redevelopment. BE IT FURTHER RESOLVED, The cost of any water main extensions are the responsibly of the developer/applicant. BE IT FURTHER RESOLVED, The wall being constructed on the north side of the building to store racks, or other equipment needs to have the interior clad with the same materials as on the outside and as the remainder of the building. BE IT FURTHER RESOLVED, A standing-seam metal roof is allowed due to the durability and low maintenance of the product. BE IT FURTHER RESOLVED, A separate sign permit will be required before any signage (temporary or permanent) can be installed and this includes any signage on the building or freestanding. BE IT FURTHER RESOLVED, Outdoor storage/sales of LP and ice are limited to the containers and locations as proposed on the plans (two ice and one LP) with the exterior of all to be painted a burgundy color to match the building. BE IT FURTHER RESOLVED, Outdoor merchandise sales of salt is limited to the inner three gas pump islands in between the pumps only (not on the end caps) and must be raised on a curbed surface and maintained at all times in a confined area. BE IT FURTHER RESOLVED, No additional outdoor storage or display of products is allowed at any time on site. BE IT FURTHER RESOLVED, All lighting must be zero degree tilt and full cut-off and the concrete bases for any pole lights cannot exceed 6 inches in height above grade. BE IT FURTHER RESOLVED, The height of any light poles cannot exceed the greater of either 15 feet or the average eve height of the building. BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals before Building Permits can be issued and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, The final landscape plan must be submitted for formal review before building permits can be issued and changes/additions to the plan may be required. Page 8 of 28 RESOLUTION PC 063-2019 Packet Page 64 BE IT FURTHER RESOLVED, The 15-foot landscape buffer, per the Historic Crossroads Design Guide, can be reduced to ten feet with additional plantings. BE IT FURTHER RESOLVED, All landscaping must be located completed on private property and not within the right-of-way. BE IT FURTHER RESOLVED, Formal approvals from the Engineering Division will be required before the issuance of any permits as it relates to overall site design. BE IT FURTHER RESOLVED, That any bollards, railings, ladders, etc. must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any new handicap signs be permanently mounted in the ground or mounted to the building so they are not moveable. BE IT FURTHER RESOLVED, That all roof top, wall mounted and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and must be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, An annual review will occur on this property for the first year after the building has been in operation and if no problems are found the annual review could be reconsidered by the Plan Commission. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Denied: Deferred: Introduced: November 5, 2019 ATTEST: Adam Trzebiatowski, Planning Manager Page 9 of 28 RESOLUTION PC 063-2019 Packet Page 65 Page 10 of 28 RESOLUTION PC 063-2019 Packet Page 66 Page 11 of 28 RESOLUTION PC 063-2019 Packet Page 67 Page 12 of 28 RESOLUTION PC 063-2019 Packet Page 68 Page 13 of 28 RESOLUTION PC 063-2019 Packet Page 69 MU S K E G O , W I S C O N S I N S6 3 W 1 3 5 1 0 J A N E S V I L L E R O A D CO N V E N I E N C E S T O R E # 1 0 8 0 FAX (608) 781-8960 PH. (608) 781-8988 LA CROSSE, WI 54602-2107 1626 OAK STREET P.O. BOX 2107 KWIK TRIP, Inc. S. ANDERSON / L. OLSON 119.0620.30 OCTOBER 4, 2019 NOTED DRAWN BY SCALE PROJ. NO. DATE SHEET DESCRIPTIONDATE# 5010 VOGES ROADMADISON, WISCONSIN 53718608-838-0444 SP 1.1 SI T E P L A N - L A Y O U T TOLL FREE 1-800-242-8511 CALL DIGGERS HOTLINE ADA PARKING 2 STALLS WITH LOADING ZONE STANDARD PARKING: 27 STALLS TOTAL SITE AREA: 92,425 SF / 2.12 ACRES EXISTING IMPERVIOUS: 32,312 SF (TO BE REMOVED) BUILDING AREA: 9,207 SF (10.0%) PAVED AREA: 50,486 SF (54.6%) ZONING DISTRICT: B - 2 LOCAL SERVICE CENTER DISTRICT CANOPY AREA: 4,800 SF (5.2%) CONVENIENCE STORE 20'-0" CANOPY 15'-6" TOTAL PERVIOUS: 30,411 SF (32.9%) (LOT COVERAGE) ELECTRICITY - WE ENERGIES - 414-221-2345 NATURAL GAS - WE ENERGIES - 414-221-2345 PHONE - AT & T - 800-660-3000 CABLE - SPECTRUM COMMUNICATIONS - 800-581-0081 SANITARY SEWER - CITY OF MUSKEGO - 262-679-4128 WATER SERVICE - CITY OF MUSKEGO - 262-679-5621 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITIES ON AND ADJACENT TO THE SITE PRIOR TO THE START OF THE PROJECT. RADII ARE FROM FACE OF CURB DIMENSIONS ARE FROM FACE OF CURB W. JANESVILLE ROAD WILL ACT AS THE FIRE LANE ACCESS TO THE BUILDING. PER CODE, TOTAL PARKING STALLS REQUIRES TWO HANDICAP PARKING STALLS MUST BE PROVIDED. TWO HANDICAP PARKING STALLS ARE SHOWN TOTAL DISTURBED AREA: 84,120 SF / 1.93 ACRES FRONT: 40' REAR: 40' SIDE: 10' TRUCK PARKING 1 LOADING ZONE STALL 10' P A V E M E N T S E T B A C K 40' B U I L D I N G S E T B A C K 3' P A V E M E N T S E T B A C K 10' B U I L D I N G S E T B A C K 30' SEWER AND WATER EASEMENT 3' P A V E M E N T S E T B A C K 10 ' B U I L D I N G S E T B A C K 10' PAVEMENT SETBACK 40' BUILDING SETBACK 30' NON-EXCLUSIVE INGRESS/EGRESS EASEMENT TO BE VACATED 10' TEMPORARY LIMITED EASEM E N T SIDEWALK / PICNIC AREA: 2,321 SF (2.5%) TOTAL IMPERVIOUS: 62,014 SF (67.1%) (LOT COVERAGE) Page 14 of 28 RESOLUTION PC 063-2019 Packet Page 70 MU S K E G O , W I S C O N S I N S6 3 W 1 3 5 1 0 J A N E S V I L L E R O A D CO N V E N I E N C E S T O R E # 1 0 8 0 FAX (608) 781-8960 PH. (608) 781-8988 LA CROSSE, WI 54602-2107 1626 OAK STREET P.O. BOX 2107 KWIK TRIP, Inc. S. ANDERSON / L. OLSON 119.0620.30 OCTOBER 4, 2019 NOTED DRAWN BY SCALE PROJ. NO. DATE SHEET DESCRIPTIONDATE# 5010 VOGES ROADMADISON, WISCONSIN 53718608-838-0444 SP 1.2 SI T E P L A N - K E Y N O T E TOLL FREE 1-800-242-8511 CALL DIGGERS HOTLINE SITE PLAN KEYNOTES 1. LANDSCAPE AREA. SEE SHEET L1. ALL GREEN SPACE THAT DOES NOT RECEIVE EROSION MAT SHALL HAVE SOD APPLIED. - 17,283 SQ.FT. 2. OFF-STREET PARKING STALLS STRIPING - 4" WIDE STALL LINES, USE HIGH VISIBILITY YELLOW PAINT. SPACES PROVIDED (6) 10'-0" x 20'-0" GENERAL PARKING (2) 9'-0" x 20'-0" GENERAL PARKING (6) 9'-6" x 20'-0" GENERAL PARKING (11) 9'-6" x 18'-0" GENERAL PARKING (1) 23'-0" x 87'-0" LOADING ZONE 3. (2) A.D.A. ACCESSIBLE PARKING SPACE WITH LOADING ZONE. PROVIDE APPROPRIATE STRIPING AND PAVEMENT MARKINGS. 4. 4" WIDE, HIGH VISIBILITY, PAVEMENT STRIPING, LANE MARKINGS AND TEXT. COLOR: YELLOW PAINT SHALL BE SHERWIN WILLIAMS SETFAST PREMIUM ALKYD ZONE MARKING PAINT 5. 40'-0" x 120'-0" DISPENSER ISLAND CANOPY. VERIFY SIZE, PLACEMENT, COLUMN AND FOOTING SIZE WITH CANOPY AND STRUCTURAL PLANS. CANOPY GRAPHICS PER OWNER. 6. 3'-6" x 6'-0" CONCRETE ISLANDS W/ 6" EXPOSURE WITH FUEL DISPENSERS. DISPENSER PER OWNER. 7. 36" HT BOLLARD, SEE DETAILS 8. UNDERGROUND FUEL STORAGE TANKS PER OWNER. PROVIDE PIPING AND VENTING PER OWNER'S SPECIFICATIONS. 9. EXTERNAL TRASH ENCLOSURE TO MATCH BUILDING. SEE ARCHITECTURAL DETAILS. 10. KWIK TRIP TRADEMARK SIGN (VERIFY LOCATION WITH SIGN PERMIT) 11. BRICK SCREENING WALLS, SEE ARCHITECTURAL PLANS FOR DETAILS. 12. 30" HT., 6" DIA. CONCRETE FILLED PIPE BOLLARD SEE DETAIL ON SHEET SP4.0. 13. HC PVC BOLLARD SLEEVE PER OWNER. VAN ACCESS SIGNAGE AT 48" HT. STALL PARKING AT 60" HT, SEE DETAIL ON SHEET SP2.2. 14. FREE AIR COMPRESSOR. PROVIDE SIGNAGE PER OWNER 15. OUTDOOR MERCHANDISE AREA, TYPICAL 16. 6" DEPTH (MIN.) CONCRETE SLAB-ON-GRADE WITH #3 REBAR 3' O.C. CONCRETE SEALER: TK-26UV - 41,843 SQ.FT. 17. 8" DEPTH (MIN.) CONCRETE SLAB-ON-GRADE WITH #4 REBAR 3' O.C. CONCRETE SEALER: TK-26UV - 4,994 SQ.FT. 18. CONCRETE CURB AND GUTTER PER DETAIL ON SHEET SP4.0. 19. REJECT CONCRETE CURB AND GUTTER PER DETAIL ON SHEET SP 4.0 20. 6" INTEGRAL CONCRETE CURB/ WALK. SEE DETAILS ON SP4.0. CONCRETE SEALER: TK-26UV - 2,365 SQ.FT. 21. PICNIC TABLE PER OWNER. PROVIDE 1 HC ACCESS TABLE SPACE. PROVIDE TRASH CONTAINER PER OWNER. 22. VACUUM STATION 23. PROPOSED LIGHT POLE LOCATION, TYP. SEE LIGHTING PLAN FOR DETAILS 24. 4" THICK CONCRETE PAD FOR PICNIC TABLES 25. BIKE RACK WITH 5' CLEARANCE. BIKE RACKS WILL BE SARIS CITY RACK SKU2406 4-BIKE FREE STANDING/FLANGE MOUNT MODEL IN COLOR RED. 26. 36"x48" ICE OUTDOOR STORAGE 27. 26"x84" LP OUTDOOR STORAGE 28. ANY DAMAGED PAVEMENT ON COUNTY HIGHWAY L (W. JANESVILLE RD.) SHALL BE REPAIRED TO THE SATISFACTION OF THE CITY OF MUSKEGO. 29. ADD SHOULDER THAT MATCHES EXISTING SHOULDER DEPTH AT EXISTING DRIVEWAY LOCATION 30. ADD TRUNCATED DOMES AND CURB TAPERS AT EXISTING ASPHALT PATH 31. BOULDER RETAINING WALL 2 3 3 17 4 13 5 5 6 6 7 7 8 15 14 20 16 1 18 26 1 1 1 1 1 1 2 2 2 2 2 2 4 4 4 17 17 17 9 11 11 12 12 12 15 15 16 16 16 16 16 16 16 16 18 18 18 18 18 181919 19 19 19 12 20 20 20 21 22 23 23 23 23 23 23 24 25 27 10 28 29 30 31 18 10 Page 15 of 28 RESOLUTION PC 063-2019 Packet Page 71 W. JAN E S V I L L E R O A D ( C . T . H . " L " ) C1 ARC=310.97' RAD=2,919.78' CH. BRG.=N62°29'50" CH. L.=310.82' Δ=06°06'08" Δ=51 1739 JANE S V I L L E R O A D U N L 20K P R E M SPLIT 2 0 K E 8 5 12K D S L 2 20K U N L 8 8 R E J E C T R E J E C T R E J E C T R E J E C T E U G G G G G 1 1 1 1 1 2 2 2 4 4 5 5 6 6 3 3-JW 3-PM 3-JP 41-PS 10-PO 3-JW3-RA 4-PN 3-NS3-RT 8-JP3-RT 3-JP 5-PS 5-JW 5-PS 3-JP 3-AA 3-RB 3-AA 6-JP 5-JP 1-QR 5-EA 6-JW 1-GT 11-PD 1-QR 1-GT 6-JW5-EA 1-QR 1-GB 3-VP 3-VP 2-AA3-EA 9-PD 3-JW 9-PD3-JW LIMIT OF WORK LIMIT OF WORK 4-JW3-CP 3-CP 3-NS 8-JW 14-PD 3-CP 3-CP 4-JP5-BA 3-MP 4-JW 4-JW 12-PD4-JP 1-PM 4-JW 5-RA 6-CP 13-PD 5 1 3 VISION TRIANGLE BY DA T E | 1" = Sh e e t Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m CH K D TE C H EN G R MM - D D - Y Y Y Y AS S H O W N 11 9 . 0 6 2 0 . 0 3 L1 . 1 119.0620.03 L1.1 MU S K E G O K W I K T R I P LA N D S C A P E P L A N MU S K E G O , W I TT N - R R W - S S FEET 0 20 SOD (17,283 SF), REFER TO CONSTRUCTION NOTES FOR TYPE LANDSCAPE LEGEND SHRUB BED WITH HARDWOOD MULCH (42 CY DOES NOT INCLUDE STAND-ALONG TREES OUTSIDE SHRUB BED AREAS), REFER TO CONSTRUCTION NOTES FOR TYPE SPADE CUT EDGER AT 4" DEPTH (837 LF) DECIDUOUS CANOPY TREE LARGE DECIDUOUS ORNAMENTAL TREE DECIDUOUS SHRUBS EVERGREEN EVERGREEN SHRUBS ORNAMENTAL GRASSES 1$7,9(6(('0,; 6) LIMIT OF WORK &2%%/( &< 5()(572&216758&7,21127(6)257<3( LANDSCAPE BOULDERS (8 TOTAL) PLANTING PLAN CONSTRUCTION NOTES 1. SOD SHALL BE TFKB PROVIDED BY PAUL'S TURF AND TREE NURSERY SOD PRODUCTS (608.655.3600) 5050 MIX OF TALL FESCUE AND KENTUCKY BLUEGRASS OR APPROVED EQUAL 2. WINONA RIVER ROCK 1-1/2" RIVER ROCK MULCH PROVIDED BY MILESTONE MATERIALS OR APPROVED EQUAL. SUBMIT SAMPLE FOR APPROVAL. 3. 36"-48" AND LARGER BOULDERS PROVIDED BY MILESTONE MATERIALS OR APPROVED EQUAL. SUBMIT PHOTO SAMPLE FOR APPROVAL. 4. PROVIDE 3" DEPTH SHREDDED HARDWOOD MULCH AROUND ALL STAND-ALONE TREES TO A MIN. 3-FOOT PERIMETER, AND IN ALL AREAS NOTED ON PLANS OVER GEOTEXTILE WEED CONTROL FABRIC. NO WEED CONTROL FABRIC IS REQUIRED IN GROUNDCOVER OR PERENNIAL AREAS. MULCHED LANDSCAPE BEDS SHALL HAVE A SPADED VERTICAL EDGE WHEN PERIMETER IS NOT CONCRETE CURB. 5. MULCHED LANDSCAPE BEDS SHALL HAVE A SPADED VERTICAL EDGE AT 4" DEPTH WHEN PERIMETER IS NOT CONCRETE SIDEWALK OR CURB. 6. PRAIRIE SEED MIX #50001 BY PRAIRIE NURSERY (1-800-476-9453) OR APPROVED EQUAL. 7. REFER TO CONSTRUCTION SEQUENCE FOR NOTES REGARDING SITE RESTORATION PLANT SCHEDULE COMMON NAME CANOPY TREES GB AUTUMN GOLD GINKGO QR GT SKYLINE HONEYLOCUST RB HERITAGE RIVER BIRCH EVERGREEN TREES AA AMERICAN ARBORVITAE PN AUSTRIAN PINE NS NORWAY SPRUCE PY SCOTCH PINE ORNAMENTAL TREES MP PRAIRIFIRE CRABAPPLE PC JACK FLOWERING PEAR 30 AMUR CHOCKCHERRY DECIDUOUS SHRUBS 2'-4' SPREAD PO GOLDFINGER POTENTILLA SB GLOW GIRL SPIREA 5'-7' SPREAD CP ROCK COTONEASTER FM SHOW OFF FORSYTHIA 7' + SPREAD AG EA RA FRAGRANT SUMAC VP BLACKHAW VIBURNUM RT RED TWIG DOGWOOD EVERGREEN SHRUBS 2'-4' SPREAD JN 5'-7' SPREAD JP ANDORRA JUNIPER JW BLUE RUG JUNIPER 7' + SPREAD PP DWARF MUGO PINE RC ORNAMENTAL GRASSES BA PS SHENANDOAH SWITCH GRASS PD PRAIRIE DROPSEED PLANTING PLAN Page 16 of 28 RESOLUTION PC 063-2019 Packet Page 72 Page 17 of 28 RESOLUTION PC 063-2019 Packet Page 73 Page 18 of 28 RESOLUTION PC 063-2019 Packet Page 74 This drawing for representation purposes only. Please refer to sign plan for actual sign locations. Page 19 of 28 RESOLUTION PC 063-2019 Packet Page 75 Page 20 of 28 RESOLUTION PC 063-2019 Packet Page 76 Page 21 of 28 RESOLUTION PC 063-2019 Packet Page 77 Page 22 of 28 RESOLUTION PC 063-2019 Packet Page 78 Page 23 of 28 RESOLUTION PC 063-2019 Packet Page 79 Page 24 of 28 RESOLUTION PC 063-2019 Packet Page 80 Page 25 of 28 RESOLUTION PC 063-2019 Packet Page 81 Page 26 of 28 RESOLUTION PC 063-2019 Packet Page 82 City of Muskego Adam Trzebiatowski W182 S8200 Racine Ave Muskego, WI 53150 October 10th, 2019 BSO Application and CUG Application Submittals Mr. Trzebiatowski, This letter is intended to accompany our submittal for our application to the City of Muskego for the requested BSO and CUG Applications for our proposed project located at the NW Corner of W. Janesville Rd and W. College Ave. We are proposing constructing a new Retail Convenience Store facility. Kwik Trip, Inc. is proposing the construction of a 9156 S.F. building structure with attached 1-Bay Carwash and an attached dumpster enclosure and separate Fueling Canopy. I have included two hard copies and digital format via email for each of the two submittals. If additional hard copies are needed please let me know and I will submit them right away. I have verified that the fee was BSO App Fee $300.00, CUG Fee $600.00, and Developer’s Deposit Fee of $3000.00. I included one check for total of $3900.00. The proposed method of operation for this development will be consistent with that for our existing convenience stores within the area. The requested hours of operation will be 24 hours for all uses. The type of products that will be sold will be similar to that of our existing stores: gasoline, in line diesel, E-85, groceries, bakery and dairy, hot and cold food and beverages, tobacco products, lotto, convenience store merchandise, ice, and propane. The outside merchandising of products is being requested next to the store (ice and propane) and softener salt merchandising under the gas canopy. Please see site plans attached for exact locations. The proposed store is projected to have between 28-35 full and part time employees, with 2-8 on staff at any given time. We have met with the city staff multiple times and have had them review our submittal documents prior to this submittal so that we could provide you with the most complete submittal possible. Here is a summary of the submittal in accordance with the neighborhood design guide. We are requesting some minimal outside merchandising. We have placed two ice merchandising storage coolers on the north side of our building. These are located partially behind a brick enclosure wall towards the front of the store to help screen them from the public view. The coolers are used for back stock and customers don’t have access to them for purchase. The cooler located inside the store is used for customers. We use the outside coolers to keep our other coolers stocked when there is a large demand for ice. We also have our LP Cage located on the outside of our building on the west face of our building. With this being a flammable product, we aren’t allowed to keep this within the building or in an enclosure due to the product. We do paint our metal cages a burgundy color to match the brick façade in which it sits in front of, so it complements the building. The last item we are requesting to merchandise and store outside is our softener salt. We show this being stored under our gas canopy in between the two support columns of each row of gas pumps and potentially at the end of each row of pumps as shown on the site plans attached. It is an option to merchandise only between the canopy columns to help keep these items hidden better from Page 27 of 28 RESOLUTION PC 063-2019 Packet Page 83 view from the streets. We keep this area nice and clean and the product is kept up and organized by our retail staff. These items are paid for inside the store and then placed in customers vehicles. Our standard prototype building consists of a full brick façade with EIFS/Stucco accents and a standing seam metal roof. We have integrated our fascia almond color from the building to match the almond color of our Canopy fascia as well. We complement the building and canopy with our red franchise colors that tie in well with our Kwik Trip logo at both locations. We pride ourselves on owning all our locations and we build our buildings with maintenance free and durable materials so that our buildings remain clean and last a long time. We place all our mechanical units on our roof which has a mono-pitched roof around the perimeter with a flat roof that provides a screen for all equipment from view. We have integrated our carwash as attached to the main building to help consolidate our building footprint and creates a nice safe traffic flow within the parking area of our site. We have also integrated our dumpster enclosure within our building footprint as well. This allows us to provide a full brick façade with composite boards on our gate to match the building and keep it from being a remote enclosure within the site. We have reviewed the neighborhood design guide and have realized that several of our prototype materials do not fall within the guidelines of this design guide. We are proposing to reduce the full brick façade to our window sill height and provide a prefinished composite siding above the brick up to our soffit line. We have also provided composite siding shakes in all our gable features which replace the EIFS/Stucco product that doesn’t meet the design guide. Our composite siding will be almond in color to accent both the building and canopy fascia and are trimming all windows and doors with a composite trim piece that is similar in color to our soldier course brick accents. Our gable design features and pitched roof allow us to fall within the colonial architecture consistent within this neighborhood. The change to the composite siding materials have allowed us to accent the building a bit more than standard and then also have provided nice brick accents at the main entry of our building with brick columns as well as a gable and brick column design feature at the rear of our store. We realize that the rear of the store facing east is really at the gateway into the city and want this façade to compliment the rest of our building. We have provided our normal aluminum windows with transoms with a few accent windows in the gable feature of the rear as well to tie this façade in with the other building facades. The design of the rear of the building also promotes four-sided architecture which is also mentioned in the design guide. The gas canopy was also a focus of ours to tie it in with the building both design and colors to meet the design guide. We have implemented a pitched roof with standing seam metal roof that matches our building design. We acknowledge that metal roofs are discouraged in the design guide, but we have provided all required earth tone colors and want a low maintenance product and feel this is one item we would like to keep within our building design. We have also dressed up our fuel canopy columns with 9’ high brick piers with an accented soldier course to tie them into the building brick design. This site is located on a corner lot, so we have emphasized and located signage and landscaping accordingly. We are requesting two monuments signs. One sign will be located on the W. Janesville Rd frontage and the other along W. College Ave. We have located these signs outside of the required vision triangles at their locations. We have also located the approximate transformer location and we are showing all sides be screened with plantings other than where the access panel will be located. This area will have landscaping setback on that side but allow access. Included in this submittal is our signage plan. We acknowledge that this may not be part of the approval process and will have a final review at Sign Application Submittal but wanted to discuss a few of these items. We are requesting signage in our colonial style gables on three sides of our building. On our canopy we have our signature Kwik Trip red band. We feel this is our tie in to match the red facia on our building so that our structures carry the same color schemes. We have removed our Kwik Trip signage on three of our canopy sides and are proposing it on one of the long sides of the canopy. Without the red stripe on our canopy we really feel that it doesn’t tie in with the main building as well and looks out of place with the other structures on site. We have been expanding our building layout and design and our footprint is much larger than previous years building. We have really expanded our retail sales floor area as well as the kitchen. We are offering many more food options and also are now adding fried chicken to our menu. We have expanded from a convenience store to a hot food destination as well as a small market to get the daily or weekly groceries needed as well. The total estimated project costs are $2,000,000. Kwik Trip would be happy to provide any additional information or answer any questions or concerns you may have with our submission. Please feel free to call me with any questions. Sincerely, Jeff Osgood – Development Manager - Store Engineering - Kwik Trip, Inc. 608-793-5547 - josgood@kwiktrip.com 1626 Oak St | P.O. Box 2107 | La Crosse, WI 54602 Page 28 of 28 RESOLUTION PC 063-2019 Packet Page 84 City of Muskego Plan Commission Supplement PC 065-2019 For the meeting of: November 5, 2019 REQUEST: Approval of a Final Plat – Waters of Lake Denoon Crowbar Drive (east of Lake Denoon) / Tax Key No. 2283.999 SW & SE ¼ of Section 31 PETITIONER: John Jewell INTRODUCED: November 5, 2019 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 065-2019 The petitioner has submitted the Final Plat for the Waters of Lake Denoon subdivision. The rezoning for this subdivision was granted by the Common Council under Ordinance #1416 on May 15, 2018 for a Conservation Planned Development District (CPD) zoning. The preliminary plat was approved by the Plan Commission on June 5, 2018 under Resolution PC 032-2018 and the Common Council on June 26, 2018 under Resolution #053-2018. PLAN CONSISTENCY PC 065-2019 Comprehensive Plan: The 2020 Plan depicts the properties for rural density residential development (densities of < .49 units per acre). Excluding the three bonus lots for a Conservation Subdivision the density is .42 units per acre. The proposal is consistent with the plan. Zoning: The property was rezoned to a Conservation Planned Development District (CPD). The proposed lots range in size between 22,806 SF and 44,310 SF. The proposal is consistent with the plan. Park and Conservation Plan: The Parks and Conservation Plan identify portions of this lot adjacent to the lake as high conservation priority. These areas contain wetlands which are located within an outlot. Additionally, the applicant has identified Outlot 3, in the northeast corner of this development, to be dedicated to the City for park purposes. Street System Plan: Right-of-way is proposed to be dedicated as part of the development. The length of the roadway exceeds the recommended limit of 1,320 feet for a road with a permanently closed end. The Plan Commission granted a waiver during the Preliminary Plat approval to allow the road to exceed the 1,320 feet limit for roads with a permanently closed end. Stormwater Management Plan: Stormwater is shown to be accommodated within the outlots in the development. Adopted 208 Sanitary Sewer Service Area: The lots will be serviced by municipal sanitary sewer that will be extended to this development solely at the developer’s expense. The plat is consistent with the Plan. Water Capacity Assessment The lots will be serviced by private water wells. The plat is consistent with the Page 1 of 5 RESOLUTION PC 065-2019 Packet Page 85 District:Plan. STAFF DISCUSSION PC 065-2019 As mentioned above, the Preliminary Plat for this development was approved for 16 single-family lots and 2 outlots. As the plans for this development progressed, one of the single-family bonus lots was eliminated thereby reducing the total number of lots from 16 to 15 single-family lots. Additionally, a third outlot was created in the northeast corner of the property, adjacent to Denoon Park, that will be dedicated to the City for park purposes. The Parks and Conservation Committee recommended approval for receiving the land dedication and waiving the per lot Park Land Dedication fee when the lots are developed. Pursuant to the rezoning to Conservation Planned Development District, a minimum of 50% of the property must be preserved for open space. The Final Plat indicates 53% of the overall development is in the outlots to be preserved in addition to the outlot to be dedicated to the City. Additionally, as part of the preliminary plat review an open space management plan is to be recorded to outline the perpetual maintenance of the restored prairie grasses and open lands within the subdivision. The 15 lots were created including three bonus lots. Excluding the bonus lots, the density is .42 units/acre which is well within the “Rural Density Residential” development density in the City’s Comprehensive Plan of < .49 units per acre. The preliminary plat allowed lots as low as 20,000 SF in area with a minimum average width of 100 feet. There are technical corrections/updates that exist and the Resolution is drafted to allow approval subject to these technical corrections being addressed before the final plat can be recorded. Resolution states the following: BE IT FURTHER RESOLVED, All subdivision improvements must be finalized and accepted by the City before Final Plat recording can be allowed. BE IT FURTHER RESOLVED, All technical corrections identified by City staff, Waukesha County and the State of Wisconsin must be addressed before Final Plat recording can be allowed. STAFF RECOMMENDATION PC 065-2019 Approval of Resolution #PC 065-2019 Page 2 of 5 RESOLUTION PC 065-2019 Packet Page 86 MUSKEGOthe City of Area of InterestI05801,160 Feet Agenda Item(s) Properties Zoning Districts Right-of-Way Hydrography Supplemental MapRESOLUTION #PC 065-2019 John JewellCrowbar Drive (East of Lake Denoon) JANESVIL L E LOO M I S R D RA C I N E A V DU R H A M WOOD S CO L L E G E Prepared by City of Muskego Planning Department Date: 11/1/2019 Page 3 of 5 RESOLUTION PC 065-2019 Packet Page 87 RESOLUTION #P.C. 065-2019 APPROVAL OF A FINAL PLAT FOR THE WATERS OF LAKE DENOON LOCATED IN THE SW & SE ¼ of SECTION 31 (TAX KEY NO. 2283.999 / CROWBAR DRIVE) WHEREAS, A Final Plat was submitted by John Jewell for the Waters of Lake Denoon Subdivision located in the SW & SE ¼ of Section 31, and WHEREAS, The rezoning for this development was granted by the Common Council under Ordinance #1416 on May 15, 2018 for a Conservation Planned Development District (CPD) zoning, and WHEREAS, The preliminary plat was approved by the Plan Commission on June 5, 2018 under Resolution PC 032-2018 and the Common Council on June 26, 2018 under Resolution #053-2018, and WHEREAS, This final plat includes 15 lots and 3 outlots, and WHEREAS, The CPD - Planned Development District for this plat allows lot sizes as low as 20,000 SF in area and minimum average widths of at least 100 feet, and WHEREAS, The 2020 Comprehensive Plan has the area as Rural Density Residential and the proposed overall density meets this requirement under the Conservation Planned Development zoning previously approved, and WHEREAS, As part of the recording of the Final Plat, Outlot 3 will be dedicated to the City of Muskego for park extension purposes, and WHEREAS, The development will be serviced by City sewer and private water wells. THEREFORE BE IT RESOLVED, That the Plan Commission recommends approval to the Common Council of a Final Plat for the Waters of Lake Denoon, located in the SW & SE ¼ of Section 31, subject to resolution of technical discrepancies as identified by the City Planning Department and City Engineers, and payment of all applicable fees of the Land Division Ordinance and outstanding assessments if applicable. BE IT FURTHER RESOLVED, That all wetlands on private lots or close to borders of private lots or roadways need to be lined with split rail fences. BE IT FURTHER RESOLVED, All subdivision improvements must be finalized and accepted by the City before Final Plat recording can be allowed. BE IT FURTHER RESOLVED, All technical corrections identified by City staff, Waukesha County and the State of Wisconsin must be addressed before Final Plat recording can be allowed. BE IT FURTHER RESOLVED, That a digital file of this Plat shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: November 5, 2019 ATTEST: Adam Trzebiatowski, Planning Manager Page 4 of 5 RESOLUTION PC 065-2019 Packet Page 88 FI L E N A M E : S : \ P R O J E C T S \ S 8 7 1 7 \ D W G \ S 8 7 1 7 F I N A L P L A T . D W G 36 36 31 31 31 -- 31 SE COR. OF THE SW (1/4) OF SEC. 31, T 5 N, R20E. FOUND CONC. MON. W/ BRASS CAP NW COR. OF THE SW (1/4) OF SEC. 31, T 5 N, R20E. FOUND CAST IRON MON. W/ CITY OF MUSKEGO BRASS CAP OWNER / DEVELOPER: COMMUNITY HOLDINGS, LLC ATTN: JOHN JEWELL S75 W17237 JANESVILLE ROAD MUSKEGO, WI 53150-9304 SURVEYOR: JAHNKE AND JAHNKE ASSOCIATES, LLC ATTN: PAUL J. JENSWOLD, PE JOHN R. STIGLER, PLS 711 W. MORELAND BLVD WAUKESHA, WI 53188 ATTN: (262) 542-5797 EMAIL: PJenswold@JahnkeAndJahnke.com INSTRUMENT DRAFTED BY JOHN R. STIGLER SHEET NO. 1 OF 3 SHEETS SURVEYOR NOTE: ALL DISTANCES HAVE BEEN MEASURED TO THE NEAREST TWO HUNDREDTH OF A FOOT AND COMPUTED TO THE NEAREST HUNDREDTH OF A FOOT. ANGLES HAVE BEEN MEASURED TO THE NEAREST THREE SECONDS AND COMPUTED TO THE NEAREST SECOND. LEGEND: - INDICATES IRON PIPE 18" LONG BY 2" NOMINAL DIAMETER PIPE WHICH HAS AN OUTSIDE DIAMTER OF 2.375" - 3.65 LBS. PER LINEAL FOOT. ALL OTHER LOT CORNERS MARKED BY IRON PIPE 18" LONG BY 1" NOMINAL DIAMETER PIPE WHICH HAS AN OUTSIDE DIAMETER OF 1.315" - 1.13 LBS. PER LINEAL FOOT. REFERENCE BEARING: THE EAST LINE OF THE SW 14 OF SECTION 31, T 5 N, R20E WAS USED AS THE REFERENCE BEARING AND HAS A BEARING OF N 02°40'38" W BASED ON THE WISCONSIN STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) There are no objections to this plat with respect to Secs. 236.15, 236.16, 236.20 and 236.21(1) and (2), Wis. Stats. as provided by s. 236.12, Wis. Stats. Certified __________________, 2019 Department of AdministrationVICINITY MAP SCALE: 1" = 2000' SEC. 31, T 5 N, R 20 E 31 LAKE DENOON CR O W B A R D R I V E DATED this 17th DAY of September, 2019 REVISED this -----th DAY of ----------, 2019 THE WATERS OF LAKE DENOON ALL THAT PART OF THE NE 1/4 OF THE SW 1/4 AND THE NW 1/4 OF THE SE 1/4 OF SECTION 31, TOWN 5 NORTH, RANGE 20 EAST, CITY OF MUSKEGO, WAUKESHA COUNTY, WISCONSIN TOTAL SITE AREA:SITE ZONING:LAKE DENOON WATER ELEV. INFO: 1,243,450 S.F. CPD OHWM = 780.9 28.5457 AC. 100 YR = 781.2 ( FEMA 11/5/2014 ) WATER ELEV 4/6/18 = 780.9 VISION CORNER: The height of all plantings, berms, fences, signs, or other structures within the easement is limited to 24 inches above the elevation of the center of the intersection. No access to any roadway shall be permitted within the vision corner easement. RACINE COUNTY LINE NE COR. OF THE SW (1/4) OF SEC. 31, T 5 N, R20E. FOUND CONC. MON. W/ SEWRPC BRASS CAP S 2 ° 4 0 ' 3 8 " E 2 1 0 7 . 7 9 ' SE W R P C S 2 ° 4 0 ' 3 8 " E 2 6 6 2 . 7 2 ' ( M E A S . 2 6 6 2 . 8 8 ' ) EA S T L I N E O F T H E S . W . ( 1 / 4 ) O F S E C . 3 1 , T 5 N , R 2 0 E DR A F T Page 5 of 5 RESOLUTION PC 065-2019 Packet Page 89