Loading...
Public Works Committee Packet - 1/15/2018CITY OF MUSKEGO PUBLIC WORKS COMMITTEE AGENDA January 15, 2018 5:00 PM Aldermen’s Room – Upper Level of City Hall, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF MINUTES HELD NOVEMBER 20, 2017 STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: 1. Moorland Road Reconstruction 2. Middle School Water Main Project (Hi View Drive) 3. Waukesha Water 4. Little Muskego Lake Drawdown 5. Muskego-Norway School District Broadband Network Project UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: 1. Approval of Pellmann Farm Sanitary Sewer and Water Main Plans NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, PLEASE CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT AT (262) 679-4145. Unapproved CITY OF MUSKEGO PUBLIC WORKS COMMITTEE MINUTES November 20, 2017 5:00 PM Aldermen’s Room – Upper Level of City Hall, W182 S8200 Racine Avenue CALL TO ORDER Alderman Madden called the meeting to order at 5:00 PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Alderman Madden, Alderman Borgman, Alderman Engelhardt and Scott Kroeger, Director of Public Works and Development. Also Present: Patrick and Patricia Krupinski STATEMENT OF PUBLIC NOTICE The meeting was posted in accordance with open meeting laws. APPROVAL OF MINUTES HELD OCTOBER 16, 2017 Alderman Borgman made a motion to approve the minutes of October 16, 2017, Alderman Engelhardt seconded. Motion Passed 3 in favor. STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: Moorland Road Reconstruction Project is on track with utility work continuing. Bid to take place in December, with construction to begin in April or May 2018. Middle School Water Main Project (Hi View Drive) A total of 12 bids were received with the lowest being approximately $470,000. This was almost half of the estimated project cost. The bid will go to Council on December 12th, 2017, for approval. Two letters were mailed to residents today. One went to those on Hi View Drive asking if they did/did not want to hookup to the lateral. A second letter went out explaining the WCA (Water Capacity Assessment). Waukesha Water No longer coming through Oak Creek, directly from Milwaukee. Only one return pipe will be routed through Muskego. Little Muskego Lake Drawdown Little Muskego is currently down about 65 inches. All pumps have been removed. The siphons and draw down pipe remain in place and run 24/7 to maintain the water level as much as possible. The Lake District, at their cost, is pumping water from the Hillview area to the center of the Lake to expose more of the lake bed in that affected area. The City has applied for a DNR dredging permit to clean up two launch areas (Hillview and Pleasant View) and one public access point (Shore Lane). The debris removed from the Lake will be taken to the Landfill for disposal. No work planned for Idle Isle. The only remaining concern is the animal waste, especially in the beach area. Muskego-Norway School District Broadband Network Project The first order of business was to get approval and a ROW (right-of-way) permit for the area near the new Middle School. The plan is one area at a time throughout the City of Muskego, along with obtaining approvals and ROW permits from adjacent municipalities. Target completion date is May 2018. UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: Martin/Lentini Vision Corner Alderman Borgman gave some background information leading up to the first six months of 2017 and all the complaints he received. In June he started talking to both the homeowners and the City to come up with an agreed upon compromise. The homeowners will need to trim back/remove their bushes in the 30' x 30' vision triangle. The City has agreed to paint a 12" Stop bar for added safety, along with relocating a Stop sign and a No Parking sign. Alderman Borgman made a motion to approve the Martin/Lentini Vision Corner compromise between the homeowners and the City, Alderman Engelhardt seconded. Motion Passed 3 in favor. NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT Alderman Engelhardt made a motion to adjourn at 5:34 PM, Alderman Borgman seconded. Motion Passed 3 in favor. Respectfully Submitted, Wendy Fredlund, Transcribing Secretary CITY OF MUSKEGO Staff Report to Public Works Committee To: Public Work Committee From: Scott Kroeger, PE, PLS, Public Works and Development Director Subject: Pellmann Farm – Water Main and Sanitary Sewer Date: January 15, 2018 The City of Muskego has reviewed the Pellmann Farm Water Main and Sanitary Sewer plans. The water main and sanitary sewer utilities will be dedicated to the City of Muskego upon completion and acceptance of the project. The City of Muskego has reviewed the plans and given approval for these plans to move forward contingent upon all City of Muskego staff comments being addressed. Recommendation for Action by the Committee: Approve the water main and sanitary sewer design plans for Pellmann Farm, contingent upon all City of Muskego staff comments being addressed. ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 SA N I T A R Y S E W E R P L A N & P R O F I L E 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 81" = 4 0 ' SANITARY SEWER PLAN & PROFILE PER CITY COMMENTS 3 1" = 40'0 80'1" = 40'0 80' 1" = 40'0 0 1" = 4' 1" = 40'0 0 1" = 4' 15" STORM OVER 8" SANITARY 15" STM B/PIPE= 7775.36 8" SAN T/PIPE= 771.29 1 CROSSINGS 36" STORM OVER 8" SANITARY 36" STM B/PIPE= 774.39 8" SAN T/PIPE= 772.07 2 15" STORM OVER 8" SANITARY 15" STM B/PIPE= 778.16 8" SAN T/PIPE= 772.17 3 CONTRACTOR SHALL COORDINATE WITH CITY OF MUSKEGO FOR ALL SANITARY SEWER CONSTRUCTION INSPECTION PROPOSED SANITARY SEWER NEEDS TO BE CONSTRUCTED PER CITY OF MUSKEGO STANDARDS. 18" STORM OVER 8" SANITARY 18" STM B/PIPE= 777.84 8" SAN T/PIPE= 774.17 4 15" STORM OVER 8" SANITARY 15" STM B/PIPE= 778.33 8" SAN T/PIPE= 775.77 5 ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 SA N I T A R Y S E W E R P L A N & P R O F I L E 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 91" = 4 0 ' SANITARY SEWER PLAN & PROFILE PER CITY COMMENTS 3 1" = 40'0 80' 1" = 40'0 0 1" = 4' 15" STORM OVER 8" SANITARY 15" STM B/PIPE= 778.33 8" SAN T/PIPE= 775.77 5 CROSSINGSCONTRACTOR SHALL COORDINATE WITH CITY OF MUSKEGO FOR ALL SANITARY SEWER CONSTRUCTION INSPECTION PROPOSED SANITARY SEWER NEEDS TO BE CONSTRUCTED PER CITY OF MUSKEGO STANDARDS. 12" STORM OVER 8" SANITARY 12" STM B/PIPE= 779.07 8" SAN T/PIPE= 776.38 6 ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 WA T E R M A I N P L A N & P R O F I L E 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 101" = 4 0 ' WATER MAIN PLAN & PROFILE PER CITY COMMENTS 3 1" = 40'0 80'1" = 40'0 80' 1" = 40'0 0 1" = 4' 1" = 40'0 0 1" = 4' 12" STORM OVER 8" WATER 12" STM B/PIPE= 775.62 8" WM T/PIPE= 773.74 1 CROSSINGS 36" STORM OVER 8" WATER 36" STM B/PIPE= 774.50 8" WM T/PIPE= 773.00 2 36" STORM OVER 8" WATER 36" STM B/PIPE= 776.57 8" WM T/PIPE= 775.07 3 CONTRACTOR SHALL COORDINATE WITH CITY OF MUSKEGO FOR ALL WATER MAIN CONSTRUCTION INSPECTION CONTRACTOR SHALL INSTALL RESTRAINED JOINTS ON ALL FITTINGS (SEE CONSTRUCTION DETAILS FOR CALCS) ALL WATER MAIN, VALVES AND HYDRANTS TO BE CONSTRUCTED TO CITY OF MUSKEGO STANDARDS DUCTILE IRON FITTINGS & VALVES TO BE POLY WRAPPED PER CITY OF MUSKEGO STANDARDS ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 WA T E R M A I N P L A N A N D P R O F I L E 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 111" = 4 0 ' WATER PLAN PLAN & PROFILE PER CITY COMMENTS 3 1" = 40'0 80' 1" = 40'0 0 1" = 4' CONTRACTOR SHALL COORDINATE WITH CITY OF MUSKEGO FOR ALL WATER MAIN CONSTRUCTION INSPECTION CONTRACTOR SHALL INSTALL RESTRAINED JOINTS ON ALL FITTINGS (SEE CONSTRUCTION DETAILS FOR CALCS) ALL WATER MAIN, VALVES AND HYDRANTS TO BE CONSTRUCTED TO CITY OF MUSKEGO STANDARDS 8" WATER OVER 36" EX. SANITARY 8" WM B/PIPE= 779.53 36" EX. SAN T/PIPE= 760.32 4 CROSSINGS DUCTILE IRON FITTINGS & VALVES TO BE POLY WRAPPED PER CITY OF MUSKEGO STANDARDS ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 WA T E R M A I N P L A N & P R O F I L E 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 121" = 4 0 ' WATER MAIN PLAN & PROFILE PER CITY COMMENTS 3 1" = 40'0 0 1" = 4' KURTZE LANE 12" EX. STORM OVER 8" WATER 12" EX. STM B/PIPE= 775.07 8" WM T/PIPE= 771.92 5 CROSSINGS 24" STORM OVER 8" WATER 24" STM B/PIPE= 773.70 8" WM T/PIPE= 771.09 6 1" = 40'0 80' CONTRACTOR SHALL COORDINATE WITH CITY OF MUSKEGO FOR ALL WATER MAIN CONSTRUCTION INSPECTION CONTRACTOR SHALL INSTALL RESTRAINED JOINTS ON ALL FITTINGS (SEE CONSTRUCTION DETAILS FOR CALCS) ALL WATER MAIN, VALVES AND HYDRANTS TO BE CONSTRUCTED TO CITY OF MUSKEGO STANDARDS DUCTILE IRON FITTINGS & VALVES TO BE POLY WRAPPED PER CITY OF MUSKEGO STANDARDS ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 CO N S T R U C T I O N D E T A I L S 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 16 NT S CONSTRUCTION DETAILS PER CITY COMMENTS 3 FLOW TRENCH DETAIL 2 NOTE: ADDITIONAL POST DEPTH OR TIE BACKS MAY BE REQUIRED IN UNSTABLE SOILS NOTES: 1.ALL SILT FENCE MATERIALS AND INSTALLATION SHALL BE IN CONFORMANCE WITH WI DNR TECHNICAL STANDARD 1056. 2.GEOTEXTILE FABRIC SHALL MEET THE REQUIREMENTS OF MATERIAL SPECIFICATION 592 GEOTEXTILE TABLE 1 OR 2, CLASS I WITH EQUIVALENT OPENING SIZE OF AT LEAST 30 FOR NONWOVEN AND 50 FOR WOVEN. 3.SILT FENCE SHALL BE ANCHORED BY SPREADING AT LEAST 8-INCHES OF FABRIC IN A 4-INCH WIDE AND 6-INCH DEEP TRENCH OR 6-INCH DEEP V-TRENCH ON THE UPSLOPE SIDE OF THE FENCE. TRENCHES SHALL NOT BE EXCAVATED WIDER OR DEEPER THAN NECESSARY FOR PROPER INSTALLATION. 4.FOLD MATERIAL TO FIT TRENCH AND BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL. 5.WOOD POSTS SHALL BE A MINIMUM SIZE OF 1.125-INCHES x 1.125-INCHES OF DRIED OAK OR HICKORY. 6.SILT FENCE TO EXTEND ABOVE THE TOP OF PIPE, WHERE APPLICABLE. 7.POST SPACING SHALL BE SELECTED BASED ON GEOTEXTILE FABRIC (8-FEET FOR WOVEN AND 3-FEET FOR NON-WOVEN). WOOD POSTS LENGTH 3' - 4' 20" MIN. DEPTH IN GROUND BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL GEOTEXTILE FABRIC ONLY SILT FENCE SHALL BE STAPLED, USING AT LEAST 0.5-INCH STAPLES, TO THE UPSLOPE SIDE OF THE POSTS IN AT LEAST 3 PLACES NYLON CORD SEAM 1 2 GEOTEXTILE FABRIC FLOW DIRECTION EXPRESS FABRIC SILT FENCE 1 #100-C 07-31-14 INLET PROTECTION #105 06-20-14 INSTALLATION NOTES: 1.DO NOT INSTALL INLET PROTECTION TYPE "D" IN INLETS SHALLOWER THAN 30 INCHES, MEASURED FROM THE BOTTOM OF THE INLET TO THE TOP OF THE GRATE. 2.TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3 INCHES OF THE GRATE. 3.THE INSTALLED BAG SHALL HAVE A MINIMUM SIDE CLEARANCE, BETWEEN THE INLET WALLS AND THE BAG, MEASURED AT THE BOTTOM OF THE OVERFLOW HOLES, OF 3 INCHES. WHERE NECESSARY THE CONTRACTOR SHALL CINCH THE BAG, USING PLASTIC ZIP TIES, TO ACHIEVE THE 3 INCHES CLEARANCE. THE TIES SHALL BE PLACED AT A MAXIMUM OF 4 INCHES FROM THE BOTTOM OF THE BAG. NOTES: 1.INLET PROTECTION DEVICES SHALL BE MAINTAINED OR REPLACED AT THE DIRECTION OF THE ENGINEER. 2.MANUFACTURED ALTERNATIVES APPROVED AND LISTED ON THE WisDOT EROSION CONTROL PRODUCT ACCEPTABILITY LIST MAY BE SUBSTITUTED. 3.WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARE SHALL BE TAKEN SO THAT THE SEDIMENT TRAPPED ON THE GEOTEXTILE FABRIC DOES NOT FALL INTO THE INLET. ANY MATERIAL FALLING INTO THE INLET SHALL BE REMOVED IMMEDIATELY. 1 FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10 INCHES AROUND THE PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL. 2 FLAP POCKETS SHALL BE LARGE ENOUGH TO ACCEPT WOOD 2 INCH X 4 INCH. INLET SPECIFICATIONS AS PER PLAN, DIMENSION LENGTH AND WIDTH TO MATCH GEOTEXTILE FABRIC, TYPE "FF" FLAP POCKET USE REBAR OR STEEL ROD FOR REMOVAL OR FOR INLETS WITH CAST CURB BOX USE WOOD 2"x4", EXTEND 10" BEYOND GRATE WIDTH ON BOTH SIDES, LENGTH VARIES. SECURE TO GRATE WITH WIRE OR PLASTIC TIES. FRONT, BACK, AND BOTTOM TO BE MADE FROM SINGLE PIECE OF FABRIC. MINIMUM DOUBLE STITCHED SEAMS ALL AROUND SIDE PIECES AND ON FLAP POCKETS. 2 1 2 4" x 6" OVAL HOLE SHALL BE HEAT CUT INTO ALL FOUR SIDE PANELS #107-WI 10-02-12 CONSTRUCTION ENTRANCE NOTES: 1.ALL TRACKING PAD MATERIALS AND INSTALLATION SHALL BE IN CONFORMANCE WITH WI DNR TECHNICAL STANDARD 1057. 2.TRACKING PADS SHALL BE INSTALLED PRIOR TO ANY TRAFFIC LEAVING THE SITE. CONTRACTOR SHALL VERIFY LOCATION WITH OWNER. 3.THE AGGREGATE FOR TRACKING PADS SHALL BE 3 TO 6 INCH CLEAR OR WASHED STONE. ALL MATERIALS TO BE RETAINED ON A 3-INCH SIEVE 4.THE AGGREGATE SHALL BE PLACED IN A LAYER AT LEAST 12-INCHES THICK. ON SITES WHERE SATURATED CONDITIONS ARE EXPECTED DURING THE LIFE OF THE PAD, THE PAD SHALL BE UNDERLAIN WITH GEOTEXTILE FABRIC WHICH MEETS MATERIAL SPECIFICATION 592 GEOTEXTILE, TABLE 1 OR 2, CLASS I, II OR IV, TO PREVENT MIGRATION OF UNDERLYING SOILS INTO THE STONE LAYER. 5.THE TRACKING PAD SHALL BE THE FULL WIDTH OF THE EGRESS POINT. MINIMUM WIDTH IS 14 FEET FOR ONE-WAY TRAFFIC AND 20 FEET FOR TWO-WAY TRAFFIC, WITH AN ADDITIONAL INCREASE OF 4 FEET FOR TRAILER TRAFFIC. THE TRACKING PAD SHALL BE A MINIMUM 50-FEET LONG. 6.ANY SEDIMENT TRACKED ONTO A PUBLIC OR PRIVATE ROAD SHOULD BE REMOVED BY STREET CLEANING, NOT FLUSHING, AT THE END OF EACH WORKING DAY. 7.TRACKING PADS SHALL, AT A MINIMUM, BE INSPECTED WEEKLY AND WITHIN 24-HOURS AFTER EVERY PRECIPITATION EVENT THAT PRODUCES 0.5-INCHES OF RAIN OR MORE DURING A 24-HOUR PERIOD. 8.THE TRACKING PAD PERFORMANCE SHALL BE MAINTAINED BY SCRAPING OR TOP-DRESSING WITH ADDITIONAL AGGREGATE. AGGREGATE OVER GEOTEXTILE FABRIC 20.0'10.0'20.0' EXISTING PAVEMENTPROFILE VIEW3'' TO 6'' WASHED OR CLEAR STONE RIP RAP AT END SECTIONS #124 12/26/12 PLAN VIEW END VIEW L*= 3 TIMES PIPE DIAMETER (TYP.) OR 10 FOOT MIN. OR AS DIRECTED BY THE ENGINEER 5 1 5 1 SIDE VIEW RIPRAP RIPRAP RIPRAP L* 1/2 END SECTION LENGTH NOTES: 1.RIP RAP AND GEOTEXTILE FABRIC SHALL MEET REQUIREMENTS FOR STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION. COVER EXPOSED END SECTION WITH RIPRAP JOINT RESTRAINTS "TIE BOLTS" REQ'D FOR LAST THREE JOINTS (2 BOLTS 3(5-2,17#0,1ƒ6(3$5$7,21 ANCHOR WITH SOIL OR STAPLES GEOTEXTILE SEPARATION FABRIC PREFABRICATED BAR GRATE PLAN VIEW LIMITS OF RIP RAP (SEE END VIEW) GEOTEXTILE FABRIC STORM SEWER MANHOLE #301 04/26/13 NOTES: 1.CLEAN UNDERSIDE OF ADJUSTING RING OR CAST IRON FRAME AND SET IN PLACE. 2.TUCK POINT MORTAR INTO ANNULAR CRACK AND BACKPLASTERED INSIDE AND OUTSIDE OF ALL JOINTS. 3.THE FLAT TOP MAY BE USED IN LIEU OF THE TAPERED TOP WHEN FIELD CONDITIONS PROHIBIT THE USE OF A FLAT TAPERED TOP. 4.MANHOLE CONSTRUCTION TO MEET REQUIREMENTS OF ASTM C478. 5.ECCENTRIC CONE SECTION OF MANHOLE TO BE SET OUTSIDE OF VEHICULAR WHEEL PATH NEAR ȭ OF ROADWAY. 6.ALL STORM MANHOLES TO BE CONSTRUCTED TO CITY STANDARDS (SWS 3.5.0 & 8.39.0). NEENAH FOUNDRY R-2471D OPEN GRATE, PER CITY STANDARDS 4'' ADJUSTMENT RING SIDE BY SIDE JOINT (TYP) CONCRETE DECK MAY BE SUBSTITUTED FOR CONE SECTION FOR SHALLOW STORM SEWERS. SIDE BY SIDE JOINT (TYP)2 STRIPS OF 1'' E-Z-STIK BETWEEN ALL MANHOLE SECTIONS TOP OF BENCH FLOW LINE STORM SEWER PIPE MINIMUM 4.0' INSIDE DIAMETER 2.0' 0.42' MIN. PRECAST WALLS 6" MINIMUM STONE BEDDING 2' x 3' INLET #306 06/04/14 NOTES: 1.EASY STICK, RUBBER GASKET OR APPROVED EQUIVALENT SHALL BE PLACED AT ALL JOINTS BETWEEN ADJUSTING RINGS FOR STORM CATCH BASINS. 2.THE FLAT TOP MAY BE USED IN LIEU OF THE TAPERED TOP WHEN FIELD CONDITIONS PROHIBIT USE OF A TAPERED TOP. 3.ALL CURB CATCH BASINS SHALL HAVE NO SUMP. 4.ALL CATCH BASINS TO BE CONSTRUCTED TO CITY STANDARDS (SWS 3.5.0 & 8.39.0) INSTALL STEPS @ 16'' O.C. WHEN STRUCTURE IS OVER 5 FEET DEEP. (ALIGN WITH OPENING) SEE PLAN FOR SEWER SIZE AND INVERT ELEV. GRADE 5" PRECAST CONC. WALLS REINF'D CONCRETE FOUNDATION W/ #5 RE-BAR @ 12'' EA. WAY. 3.0' SANITARY MANHOLE #400 10-10-12 FLOW 7" 2.0' 4.0' DIA 5" MIN.5" 2.0' 14"5" MIN.5" 4" (TYP) ALL AROUND CAST IRON FRAME AND COVER NEENAH R-1661 (NON-MODERNIZED) PER CITY STANDARDS PRECAST CONCRETE ADJUSTING ADJUSTING RINGS TYPE A MANHOLE TYPE C MANHOLE (REINFORCED CONC. TOP SLAB DESIGNED FOR ANTICIPATED TRUCKING LOADING.) FLEXIBLE GASKETED MANHOLE COUPLINGS PRECAST INTO STRUCTURE FOR ALL PIPE PENERATIONS FOR SANITARY STRUCTURES. (SEE SPECIFICATIONS).CONCRETE BASE CAST INTEGRAL WITH LOWEST BARREL SECTION 6" SAND CUSHION OR AGG. BASE CLASS SI CONC. GROUTED BENCH MANHOLE STEPS NEENAH R-1981-1 NOTES: 1.1" EZ STIKE BETWEEN ALL ADJUSTMENT RINGS, BETWEEN TOP ADJUSTMENT RINGS AND FRAME. USE INTERNAL ADAPTOR SEAL RING, ALL JOINTS MUST BE BACKPLASTERED INSIDE AND OUT. 2.THE FLAT TOP MAYBE USED IN LIEU OF THE TAPERED TOP WHEN FIELD CONDITIONS PROHIBIT THE USE OF A TAPERED TOP. 3.STRUCTURE TO BE 4' -0" DIA UNLESS OTHERWISE INDICATED ON THE PLANS. 4.ALL SANITARY SEWER MANHOLES TO BE CONSTRUCTED TO CITY STANDARDS. 2" R 1 2 3 2 STRIPS OF 1" EZ STIK BETWEEN ALL MANHOLE SECTIONS RUBBER BOOT BUTTE JOINT SIDE BY SIDE JOINT THE EZ STIK JOINT SHALL BE MANUALLY COMPRESSED TO SETTING THE NEXT CASTING, ADJUSTING RING OR MANHOLE SECTION FOR ALL DRIVEWAYS ONLY PERPENDICULAR HYDRANT BRANCHES SHALL BE ,167$//(':,7+[7(($1'12ƒ$1&+25(/%2: ‹ C O P Y R I G H T 2 0 1 6REVISIONSSHEET PE G J O B N o . PE G P M ST A R T D A T E SC A L E PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP ww w . p i n n a c l e - e n g r . c o m WISCONSIN OFFICE: 15850 W. BLUEMOUND ROAD BROOKFIELD, WI 53005 (262) 754-8888 ENGINEERING I NATURAL RESOURCES I SURVEYING PLAN I DESIGN I DELIVER CHICAGO I MILWAUKEE : NATIONWIDE w w w .p i n n a c l e -e n g r .c o m MUSKEGO, WI THE GLEN AT PELLMANN FARM 57 0 . 0 0 AE K 10 / 2 1 / 1 6 17 CO N S T R U C T I O N D E T A I L S 1 PER CITY COMMENTS 01/23/17 2 04/11/17 07/06/17PER CITY COMMENTS 17 NT S CONSTRUCTION DETAILS PER CITY COMMENTS 3 4:14:1 100-YEAR SPILLWAY ELEV. NW = 780.5 TOP OF BERM ELEV.= 781.00 20' WIDE TOP OF BERM ELEV. = 781.00 100-YEAR SPILLWAY ELEV.= 780.5 TOE OF SLOPE OUTSIDE OF POND INSIDE OF POND NOTES: 1.EXTEND MATTING 2' BELOW THE ELEVATION OF THE EMERGENCY SPILLWAY ON THE INSIDE OF THE POND. 2.EXTEND MATTING TO TOE OF SLOPE ON THE OUTSIDE OF THE POND. 3.MATTING SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. EMERGENCY SPILLWAY 2. 0 ' PERMANENT TURF REINFORCEMENT MATTING (CLASS III, TYPE C) PERMANENT TURF REINFORCEMENT MATTING (CLASS III, TYPE C) #200 4/25/13 100 YR HWL = 780.1 HWL = HIGH WATER LEVEL NWL = NORMAL WATER LEVEL TOP OF BERM 10' WIDE SAFETY SHELF EMERGENCY SPILLWAY ELEV. = 780.5 NWL = 774.0 WET POND CROSS SECTION POND BOTTOM ELEV. = 769.0 TOP OF CLAY LINER = 776.0 10' WIDE SAFETY SHELF OUTLET STRUCTURE - SEE DETAIL 8' TURF MAT COMPACTED CLAY TOPSOIL LINEAR (2FT MIN)DISCHARGE TO EXISTING STORM SEWER TURF REINFORCEMENT MAT TO EXTEND TO 2' PAST THE TOE OF SLOPE NOTES: 1.ALL CONSTRUCTION SHALL MEET THE SPECIFICATIONS OF WNDR WET DETENTION BASIN TECHNICAL STANDARDS 1001. 2.ALL WORK TO BE CONDUCTED IN CONFORMANCE WITH THE STORM WATER MANAGEMENT PLAN FOR THE PROJECT SITE AS APPROVED BY THE REGULATORY ENGINEER OF RECORD. 3.HDPE PIPING & INSTALLATION WITHIN THE BASIN SHALL BE IN ACCORDANCE WITH ASSTHO M-294 TYPE "S" WITH WATER TIGHT JOINTS. 4.CLAY LINEAR SHALL BE A MINIMUM OF 2 FEET THICK. CLAY SHALL BE &203$&7('$7“237,0$/02,6785(&217(1772 MODIFIED PROCTOR. 5.FOR CONSTRUCTED EMBANKMENTS WHERE THE PERMANENT POOL IS PONDED 3 FEET OR MORE AGAINST THE EMBANKMENT. THERE SHALL BE A CORE TRENCH OR KEYWAY ALONG THE CENTERLINE OF THE EMBANKMENT UP TO THE PERMANENT POOL ELEVATION. THE CORE TRENCH OR KEYWAY SWALE SHALL BE A MINIMUM OF 2 FEET DEEP AND 8 FEET WIDE WITH SIDE SLOPE OF 1:1 OR FLATTER. 6.CONTRACTOR SHALL POSITION ANTI-SEEP COLLAR SUCH THAT THE COLLARS ARE COMPLETELY CONTAINED WITHIN THE EMBANKMENT. 7.CONTRACTOR SHALL FIT STANDPIPES WITH REMOVABLE CONSTRUCTION ORIFICE PLATE OVER THE PERMANENT DEWATERING ORIFICE. THE CONSTRUCTION ORIFICE SHALL REMAIN IN PLACE UNTIL 70% VEGETATION IS ESTABLISHED OVER THE CONTRIBUTING AREA OF THE POND. 8. IMMEDIATELY INSTALL FILTER FABRIC OVER ALL OUTLETS TO PREVENT SEDIMENT DEPOSITION IN THE PIPING. (REMOVE FOLLOWING AREA STABILIZATION). 9.TURF REINFORCEMENT MATTING SHALL BE INSTALLED IN ACCORDANCE WITH WDNR TECH STANDARD 1052. PERMANENT POND OUTLET DETAIL STANDARD 36"Wx36"Lx36"H CATCH BASIN BOTTOM. 36"x44" GALVANIZED HEAVY DURTY BAR GRATING USE McNICHOLS GHB-100 OR EQUIVALENT 2" STEEL "L" BRACKET - BOLT TO SIDES. BOLT GRATING TO BRACKET. MAKE REMOVABLE FOR CLEANING BRACKET SECTION TOP VIEW 24"x44" GALVANIZED HEAVY DUTY BAR GRATING USE McNICHOLS GHB-100 OR EQUIVALENT TOP OF CONC 775.3 12" IE 773.9 2" STEEL "L" BRACKET - BOLT TO SIDES. BOLT GRATING TO BRACKET. MAKE REMOVABLE FOR CLEANING OUTLET PROFILE TOP OF CONC 774.0 STANDARD 36"Wx36"Lx36"H CATCH BASIN BOTTOM. CUT BOX AS SHOWN. 10' - 12" RCP @ 0.5% BOT 773.0 BOLT AND SEAL 12" SQUARE x 1/8" THICK ALUMINUM PLATE AND DRILL 2" HOLE AT INVERT 774.0 NORMAL WATER 774.0 24" 36" 36" DIA CONCRETE MANHOLE 36" DIA REMOVABLE BAR GRATE - #5 BAR 6" OC EACH DIRECTION 12" IE 773.85 PROPOSED GRADE EXISTING 24" PIPE = 773.6 TOP OF CONC 777.6 CONSTRUCT NEW 48" DIA MANHOLE - SEE STANDARD MANHOLE DETAIL 24" IE 773.85 24" IE 773.6 83' - 24" RCP @ 0.3% {Lr}{Lr} RE S T R A I N E D LE N G T H TEES: THE MINIMUM ATTACHED LENGTH OF PIPE (Lr) TO EXTEND IN EACH DIRECTION ALONG THE RUN OF THE TEE SHALL BE A SOLID PIPE WITHOUT JOINTS, FITTINGS, ETC. THE LENGTH OF THE RESTRAINED BRANCH SHALL BE DERIVED FROM THE FOLLOWING TABLE. RUNRUN BR A N C H {Lr}{Lr} HORIZONTAL/VERTICAL BENDS: THE MINIMUM RESTRAINED LENGTH OF PIPE (Lr) TO EXTEND IN BOTH DIRECTIONS FROM THE BEND SHALL BE DERIVED FROM THE FOLLOWING TABLE. {Lr} DEAD ENDS: THE MINIMUM LENGTH OF PIPE (Lr) TO BE RESTRAINED ON A DEAD END SHALL BE DERIVED FROM THE FOLLOWING TABLE. ALL VALVES SHALL BE CONSIDERED DEAD ENDS IN BOTH DIRECTIONS. NOTES: 1.THE LENGTHS OF RESTRAINED OR CONTINUOUS PIPE CALLED OUT IN THE FOLLOWING TABLES ARE FOR INSTALLATION OF MECHANICALLY RESTRAINED FITTINGS AND ARE CALCULATED BASED ON THE FOLLOWING PARAMETERS: A) ALL 6" & 8" PIPE MATERIAL IS PVC AWWA C-151 DR 18. B) THE SOIL TYPE IS "CL" AS DEFINED BY THE UNIFIED SOIL CLASSIFICATIONS, ASTM STANDARD 2487. C) THE TEST PRESSURE OF THE WATER SYSTEM IS EIGHTY POUNDS PER SQUARE INCH (150 PSI). D) THE TRENCH IS TYPE 5, AS PER ANSI/AWWA C150/A21.5, TRENCH CONDITIONS. E) THE DEPTH OF COVER IS SIX FEET (6'). F) THE SAFETY FACTOR SHALL BE 1.5. 2. IF THE FIELD CONDITIONS RESULT IN DIFFERENCES FROM WHAT IS ONE THE PLAN, THE CONTRACTOR SHALL NOTIFY THE CITY OF MUSKEGO AND THE DEVELOPERS DESIGN ENGINEER WILL BE REQUIRED TO PROVIDE THE CITY WITH AN UPDATED JOINT RESTRAINT LENGTH PRIOR TO COMMENCING WORK. WATERMAIN JOINT RESTRAINT LENGTHS MINIMUM ATTACHED LENGTH OF PIPE (Lr) TEE SIZE 0'1'2'4'6'8'10'12'14'16' 18'+ LENGTH OF RESTRAINED BRANCH 8"x6"38'29'20'1'1'1'1'1'1'1'1' DEAD END MINIMUM SIZE RESTRAINED LENGTH 6"38' 8"50' PIPE SIZE 11 1 4ƒƒ22 1 2ƒ HORIZONTAL BEND 11 1 4ƒ HORIZONTAL BEND 22 1 2ƒ HORIZONTAL BEND ƒƒ HORIZONTAL BEND ƒ VERTICAL BEND 8" 6" 2' VERTICAL BEND VERTICAL BEND VERTICAL BEND 2' 6' 6' 3' 3' 12' 9' 7' 7' 25' 18' 15' 12' - -