PLAN COMMISSION Packet - 9/3/2019CITY OF MUSKEGO
PLAN COMMISSION AGENDA
09/03/2019
6:00 PM
Muskego City Hall, Council Chambers, W182
S8200 Racine Avenue
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
STATEMENT OF PUBLIC NOTICE
APPROVAL OF THE MINUTES
Approval of the minutes of the August 6, 2019 meeting.
CONSENT BUSINESS
Resolution PC 052-2019 Approval of an Accessory Structure for Ryan Beeck located at
W149 S8275 Harvest Court / Tax Key No. 2214.996.023.
Resolution PC 055-2019 Approval of a two-lot Certified Survey Map for Michael Michalski
located at S70 W20279 Adrian Drive / Tax Key No. 2179.994.011.
NEW BUSINESS FOR CONSIDERATION
PC 051-2019 Conceptual Plat for discussion of a 38-Lot residential subdivision located at
the northwest corner of Priegel Drive and Durham Drive / Tax Key No. 2211.998.
Resolution PC 053-2019 Approval of the sale of Christmas Trees and related items at the
property located at the W189 S8747 Racine Avenue; Muskego Center - Piggly Wiggly
Parking Lot / Tax Key No. 2192.973
Resolution PC 054-2019 Approval of a Building, Site and Operations Plan Amendment for
JP Morgan Chase located at S69 W15612 Janesville Road / Tax Key No. 2172.998.
MISCELLANEOUS BUSINESS
ADJOURNMENT
NOTICE
IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF
THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION
WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL
BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE.
Packet Page 1
Plan Commission Agenda 2
9/3/2019 6:00:00 PM
ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136.
Packet Page 2
UNAPPROVED
CITY OF MUSKEGO
PLAN COMMISSION MINUTES
08/06/2019
6:00 PM
Muskego City Hall, Council Chambers, W182
S8200 Racine Avenue
CALL TO ORDER
Mayor Chiaverotti Called the meeting to order at 6:00 PM.
PLEDGE OF ALLEGIANCE
Those present recited the Pledge of Allegiance.
ROLL CALL
Present: Mayor Chiaverotti, Alderman Kubacki, Commissioners Graf, Oliver, Jacques,
Bartlett and Planner Trzebiatowski
Absent: Commissioner Buckmaster
STATEMENT OF PUBLIC NOTICE
The meeting was noticed in accordance with the open meeting laws.
APPROVAL OF THE MINUTES
Approval of the minutes of the June 4, 2019 meeting.
Commissioner Jacques made a motion to approve the minutes of the June 4, 2019 meeting.
Commissioner Bartlett seconded. Motion passed unanimously.
CONSENT BUSINESS
Resolution PC 042-2019 Approval of a Two-Lot Extraterritorial Certified Survey Map for the
Jensen property located in the Town of Waterford.
Resolution PC 045-2019 Approval of a Three Lot Certified Survey Map for the Miles
property located along Parker Drive and Racine Avenue / Tax Key No. 2273.990.
Resolution PC 046-2019 Approval of a Four Lot Certified Survey Map for a portion of the
Miles property located along Parker Drive and Racine Avenue / Tax Key No. 2273.990.
Resolution PC 048-2019 Approval of a Building, Site and Operation Plan for Steve Stack
Northfield Green (Lot 13) on Princeton Court / Tax Key No. 2172.023.
Commissioner Jacques made a motion to approve the Consent Business. Alderman
Kubacki seconded. Motion passed unanimously.
Page 1 of 4
Approval of the minutes of the August 6, 2019 meeting.
Packet Page 3
Plan Commission Agenda 2
8/6/2019 6:00:00 PM
NEW BUSINESS FOR CONSIDERATION
Resolution PC 041-2019 Recommendation to Common Council to Rezone a property from
B-4 Highway Business District to M-1 Light Industrial District for PJ's Trucking LLC. located
at W125 S9791 North Cape Road/ Tax Key No 2257.979.
Mr. Trzebiatowski explained the rezoning from B-4 to M-1. A public hearing was held in
front of the Common Council on July 23rd. The rezoning includes a change in the
Comprehensive Plan from commercial uses to industrial. The proposal would be for future
business of storage of trucks and trailers and material storage. At the public hearing five
people spoke against the request with two in favor of the rezoning change. Concerns were
related to traffic, commercial versus industrial uses, proximity near residential areas and
potential noise. Comments in favor included use is already there, trucks back in during the
day, professional drivers are hired, owners looking to screen the new business. A previous
discussion was brought up regarding rezoning for a specific use or using a Conditional Use
Grant. Discussion with city attorney confirmed that conditional zoning for a specific use is
not something the City should be allowing.
Alderman Kubacki asked what other uses are permitted in M-1. Mr. Trzebiatowski explained
more of light industrial or business park uses.
Commissioner Graf asked for zoning on the other three corners of the intersection. Mr.
Trzebiatowski explained they are zoned B-4.
Commissioner Jacques made a motion to approve Resolution PC 041-2019. Alderman
Kubacki seconded. Motion passed 4-1. Commissioner Bartlett opposed.
Resolution PC 043-2019 Recommendation to Common Council to Rezone a portion of a
property from A-1 Agricultural District to B-4 Highway Business District for All Star Rental
LLC. located on Loomis Drive & Muskego Dam Road / Partial Tax Key No. 2295.999.010.
Mr. Trzebiatowski explained the rezoning from A-1 to B-4. A similar request was approved
previously but for a smaller piece of the property. The new request is for the same use and
same zoning, but just a larger area. A public hearing was held in front of the Common
Council on July 23rd. No concerns were raised at the public hearing. An email was sent to
Mr. Trzebiatowski with no concerns about the use, but just want to be sure that the applicant
utilize sufficient screening from neighboring properties when developed.
Commissioner Jacques made a motion to approve Resolution PC 043-2019. Alderman
Kubacki seconded. Motion passed unanimously.
Resolution PC 044-2019 Recommendation to Common Council to Rezone a property and
a portion of a second property from A-1 Agricultural District to B-4 Highway Business District
for Bryon Hrin located on Loomis Drive and Loomis Road / Part of Tax Key Nos.
2295.999.010 (partial) and 2295.996.005.
Mr. Trzebiatowski explained the rezoning from A-1 to B-4. Discussed use for now is mini
storage units. A public hearing was held in front of the Common Council on July 23rd. No
concerns were raised at the public hearing. Building, Site and Operation Plan approval is
necessary moving forward.
Page 2 of 4
Approval of the minutes of the August 6, 2019 meeting.
Packet Page 4
Plan Commission Agenda 3
8/6/2019 6:00:00 PM
Alderman Kubacki asked about the access to this property. Mr. Trzebiatowski explained
there will be a frontage road from Muskego Dam Road across the All-Star Rental property
that will be the main access. There is an access onto STH 36, but future discussions with
the state will be necessary for the access onto STH 36.
Commissioner Bartlett made a motion to approve Resolution PC 044-2019. Alderman
Kubacki seconded. Motion passed unanimously.
Resolution PC 047-2019 Approval of a Building, Site and Operation Plan for The Naber
Group located at S107 W16311 Loomis Road / Tax Key No. 2296.996.
Mr. Trzebiatowski explained the BSO amendment application. The business includes
exterior construction, landscaping, snow removal and similar uses. Wants to use the
existing building for storage of materials and equipment. An area to the south of the building
will be an enclosed wood fenced area for outdoor storage of trailers, trucks and equipment.
One item of note is drums of questionable materials. One requirement included is to
properly dispose of these drums. Staff is also asking that an annual review in Fall 2020 to
ensure site is properly maintained.
Commissioner Bartlett raised concerns about the fence and wanted to know the specs. Mr.
Trzebiatowski explained that the fence has been described as a wood privacy fence and
staff will be reviewing this during permitting time.
Commissioner Jacques made a motion to approve Resolution PC 047-2019. Commissioner
Bartlett seconded. Motion passed unanimously.
Resolution PC 049-2019 Approval of a Building, Site and Operation Plan for Alliance
Construction & Design Inc located at S73 W16555 West Janesville Road / Tax Key No.
2198.978
Mr. Trzebiatowski explained the BSO amendment application. The proposal includes
discontinuing the car wash use for all bays except the eastern bay that will continue. A
laundromat and two additional tenant spaces are included. Proposal will be adding masonry
with glass doors and reusing existing masonry. Screening of mechanicals is included in the
resolution. The traffic flow for the site will remain. The existing fence will be replaced with a
new vinyl privacy fence. The site plan does not include concrete curb and gutter. Because
the developer is replacing the hard surface on the entire site, vertical face curb and gutter is
included in the resolution. Future signage and lighting will be addressed per city standards
during permitting. The Plan Commission typically does not address hours of operation for
indoor uses, however with the car wash doors being open and dryer fans operable near a
residential use, the Plan Commission may want to discuss hours of operation, which has
been included in the resolution.
Commissioner Graf mentioned that the site could become very congested if there are
multiple cars waiting in line for the car wash.
Commissioner Bartlett asked about the access to the site with existing egress and proximity
to Janesville Road. Nothing will be changing regarding the access to the site.
Commissioner Jacques made a motion to approve Resolution PC 049-2019. Commissioner
Bartlett seconded. Motion passed unanimously.
Page 3 of 4
Approval of the minutes of the August 6, 2019 meeting.
Packet Page 5
Plan Commission Agenda 4
8/6/2019 6:00:00 PM
Resolution PC 050-2019 Approval of a Building, Site and Operation Plan Amendment for
an Accessory Structure at the Stoney Creek Lutherans Inc for Elderly located at S69
W14142 Tess Corners Drive / Tax Key No. 2168.977.
Mr. Trzebiatowski explained the BSO amendment application for an accessory building that
requires Plan Commission approval. Regarding the metal roof, staff would like to be sure
that recommendation is not solely because the manufacture makes that as there are many
manufacturers, but because it fits within existing site and has very limited view.
Alderman Kubacki made a motion to approve Resolution PC 050-2019. Commissioner
Jacques seconded. Motion passed unanimously.
MISCELLANEOUS BUSINESS
Nothing at this time.
ADJOURNMENT
Commissioner Jacques made a motion to adjourn. Alderman Kubacki seconded. Motion
passed unanimously.
Respectfully Submitted,
Aaron Fahl
Associate Planner
Page 4 of 4
Approval of the minutes of the August 6, 2019 meeting.
Packet Page 6
City of Muskego
Plan Commission Supplement PC 052-2019
For the meeting of: September 3, 2019
REQUEST: Accessory Structure
Tax Key No. 2214.996.023 / W149 S8275 Harvest Court
NW ¼ of Section 14
PETITIONER: Ryan Beeck
INTRODUCED: September 3, 2019
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 052-2019
The petitioner proposes to construct a 30’ x 60’ accessory structure (totaling 1,800 square feet) on his 2-acre lot.
The applicant is proposing an accessory structure that would have the materials of the future residence
match/similar the materials of the future accessory structure. The intent is to construct the home and accessory
structure concurrently. The applicant would like to finish the house with white siding and trim but the accessory
structure to be a typical ‘barn red’ color with white trim. Since the colors of the proposed accessory structure do not
match the proposed home Plan Commission approvals are required. Plans are attached for your review.
Plan Commission may waive the architectural requirements for accessory structures when any of the following are
met:
1. The structure is screened from view,
2. The principal structure is composed of materials, colors, or styles that are inappropriate in their applications
to an accessory structure,
3. The Plan Commission finds other circumstances to be present which would result in no undue harm to the
property or its surroundings,
4. When the area is found not to be predominately residential.
Plan Commission may approve the materials as submitted, or require modifications prior to release of building
permits.
PLAN CONSISTENCY PC 052-2019
Comprehensive Plan:The 2020 Plan depicts the area for low density residential land use. The
proposal for this residential outbuilding is consistent with the Plan.
Zoning:
The property is zoned RS-2 Suburban Residence District. Accessory structures
totaling up to 1,928 square feet are permitted on the subject property. The
proposal measures 1,800 square feet. The proposal meets the bulk requirements
of the Zoning Code.
STAFF DISCUSSION PC 052-2019
The architectural requirements state that the accessory structure should have similar materials and colors as the
principal residence. Planning Commission approval is being sought due to this concern.
The petitioner is proposing a LP siding and steel/dimensional shingles on the roof of both structures. The
architectural features including the trim, corners, fascia and soffits will match the house. The house is proposed to
be white with white trim and the accessory structure would be ‘barn red’ siding with white trim. Since the roof is Page 1 of 12
Resolution PC 052-2019
Packet Page 7
noted as being dimensional shingle or metal, either option can be allowable if the roof on the home contains both
shingles and metal.
The accessory structure would be located closer to the road than the house. The two different colors are to mimic a
farmhouse style of construction. The building is shown is includes details such as the shed dormer roofs over the
front windows in addition to doors and windows to match the house.
The proposed height of the building is approximately 15 feet to the midpoint, which is within the allowable height
based on the size of the lot.
The Resolution states the following items:
BE IT FURTHER RESOLVED, That the building and lot cannot be used for the operations of any business activities
or for business storage.
BE IT FURTHER RESOLVED, That the floor of the entire building must be concrete or asphalt, unless a specific
portion is only to be used by animals.
BE IT FURTHER RESOLVED, The depth of the over hangs on all sides of the building must at least be equal to
those on the main home.
BE IT FURTHER RESOLVED, The accessory structure cannot be started before the home, but it can be started
with construction of the new home, subject to the term of the written agreement with the City.
STAFF RECOMMENDATION PC 052-2019
Approval of Resolution #PC 052-2019, finding that there will be no undue harm to the surrounding
properties, the farmhouse architecture and ‘theme’ to the property and due to the structure having
materials matching/similar the home.
Page 2 of 12
Resolution PC 052-2019
Packet Page 8
MUSKEGOthe City of
Area of InterestI05501,100
Feet
Agenda Item(s)
Properties
Zoning Districts
Right-of-Way
Hydrography
Supplemental MapRESOLUTION #PC 052-2019
Ryan BeeckW149 S8275 Harvest Court
JANESVIL
L
E
LOO
M
I
S
R
D
RA
C
I
N
E
A
V
DU
R
H
A
M
WOOD
S
CO
L
L
E
G
E
Prepared by City of Muskego Planning Department Date: 8/27/2019
Page 3 of 12
Resolution PC 052-2019
Packet Page 9
RESOLUTION #P.C. 052-2019
APPROVAL OF AN ACCESSORY STRUCTURE
FOR THE BEECK PROPERTY LOCATED IN THE NW ¼ OF SECTION 14
(TAX KEY NO. 2214.996.023 / W149 S8275 HARVEST COURT)
WHEREAS, A site plan and building drawings were submitted to construct a 30’ x 60’ accessory structure (totaling 1,800
square feet) on the Beeck property located at W149 S8275 Harvest Court (Tax Key No. 2214.996.023), and
WHEREAS, The property is zoned RS-2 – Suburban Residence District, and said structure is a permitted accessory use, and
WHEREAS, The proposal does not meet the Plan Commission’s standards for administrative approval of residential accessory
structures as the house is proposed as being white and accessory structure proposed as ‘barn red’, and
WHEREAS, A home residence and accessory structure will be constructed concurrently, and
WHEREAS, The proposed square footage of 1,800 square feet is within the total allowable square footage for accessory
structures on this property, which meets the bulk requirements of the Zoning Code, and
WHEREAS, The accessory structure will be used for personal storage only, and
WHEREAS, The proposed height is approximately 15 feet, as measured by code, which is within the allowed height given the
lot area, and
WHEREAS, The structure is proposed to be sided with LP siding and steel/dimensional shingles to match the house and the
architectural features including the trim, corners, fascia and soffits will match the house, and
THEREFORE BE IT RESOLVED, The Plan Commission approves of a 1,800 square foot accessory structure with a ‘barn red’
siding for the Beeck property located at W149 S8275 Harvest Court (Tax Key No. 2214.996.023).
BE IT FURTHER RESOLVED, That the building and lot cannot be used for the operations of any business activities or for
business storage.
BE IT FURTHER RESOLVED, The floor of the entire building must be concrete or asphalt, unless a specific portion is only to
be used by animals.
BE IT FURTHER RESOLVED, The depth of the overhangs on all sides of the building must at least be equal to those on the
main home.
BE IT FURTHER RESOLVED, The accessory structure cannot be started before the home, but it can be started with
construction of the new home, subject to the term of the written agreement with the City.
BE IT FURTHER RESOLVED, Since the roof is noted as being dimensional shingle or metal, either option can be allowable if
the roof on the home contains both shingles and metal.
BE IT FURTHER RESOLVED, That the Plan Commission approves of the accessory structure due to no undue harm to the
surrounding properties, the farmhouse architecture and ‘theme’ to the property and due to the structure having materials
matching the home.
BE IT FURTHER RESOLVED, That failure to comply with the terms of this resolution and the approved site plans shall result
in the issuance of fines of $100 per day per violation, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred:
Introduced: September 3, 2019
ATTEST: Adam Trzebiatowski, Planning Manager
Page 4 of 12
Resolution PC 052-2019
Packet Page 10
Page 5 of 12
Resolution PC 052-2019
Packet Page 11
Page 6 of 12
Resolution PC 052-2019
Packet Page 12
Page 7 of 12
Resolution PC 052-2019
Packet Page 13
Page 8 of 12
Resolution PC 052-2019
Packet Page 14
Page 9 of 12
Resolution PC 052-2019
Packet Page 15
Page 10 of 12
Resolution PC 052-2019
Packet Page 16
Page 11 of 12
Resolution PC 052-2019
Packet Page 17
Page 12 of 12
Resolution PC 052-2019
Packet Page 18
City of Muskego
Plan Commission Supplement PC 055-2019
For the meeting of: September 3, 2019
REQUEST: Two (2) Lot Land Division – Certified Survey Map
S70 W20279 Adrian Drive / Tax Key No. 2179.994.011
SW ¼ of Section 5
PETITIONER: Michael Michalski
INTRODUCED: September 3, 2019
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 055-2019
The petitioner is proposing to divide one lot into two lots by Certified Survey Map (CSM). The proposed
lots are 2.0 acres and 10.68 acres in size. The property is located at the end of Adrian Drive.
PLAN CONSISTENCY PC 055-2019
Comprehensive Plan: The 2020 Plan depicts the area for medium density residential uses (1 –
2.99 units/acre). The proposal is consistent with the Plan.
Zoning: The property is zoned RS-1 – Suburban Residence District. This zoning
requires minimum lot sizes of 30,000 SF and an average lot width of
120’. All lots are also required to have at least 80 feet of frontage on a
dedicated right-of-way.
Parks and Conservation Plan:The 2017-2021 Plan depicts an area of medium conservation priority on
the south portion of this property. As such, said areas will need further
review/discussion to determine what type of preservation, if any, is
needed in this area.
Street System Plan: The proposal is consistent with the Plan. A 30’ Access Easement is
being provided over Lot 1 for the benefit of Lot 2. Also, it was previously
determined by the Public Works Committee that the additional
unimproved right-of-way did not need to be improved at this time to limit
the impact of this division/development to the surrounding neighbors.
Adopted 208 Sanitary Sewer
Service Area:
Both lots will be served by municipal sanitary sewer. The developer is
required to install the two required sewer laterals. The proposal is
consistent with the Plan.
Water Capacity Assessment
District:
The lots will be served by private water wells. The proposal is consistent
with the Plan.
Stormwater Management
Plan:
Stormwater management and grading will need to be reviewed further at
the time of permitting.
Page 1 of 5
Resolution PC 055-2019
Packet Page 19
DISCUSSION PC 055-2019
Upon initial review of the CSM, the bulk requirements of the code appear to be met. A technical review
has been completed with minor corrections/additions needed prior to the CSM can be signed by the City
and recorded.
Staff recommends approval subject to meeting all items noted above and all technical corrections
received from the Engineering Division. The Resolution is drafted accordingly.
STAFF RECOMMENDATION PC 055-2019
Approval of Resolution PC 055-2019
Page 2 of 5
Resolution PC 055-2019
Packet Page 20
MUSKEGOthe City of
Area of InterestI0430860
Feet
Agenda Item(s)
Properties
Zoning Districts
Right-of-Way
Hydrography
Supplemental MapRESOLUTION #PC 055-2019
Michael MichalskiS70 W20279 Adrian Drive
JANESVIL
L
E
LOO
M
I
S
R
D
RA
C
I
N
E
A
V
DU
R
H
A
M
WOOD
S
CO
L
L
E
G
E
Prepared by City of Muskego Planning Department Date: 8/28/2019
Page 3 of 5
Resolution PC 055-2019
Packet Page 21
RESOLUTION #P.C. 055-2019
APPROVAL OF A TWO LOT CERTIFIED SURVEY MAP FOR THE MICHALSKI PROPERTY
LOCATED AT S70 W20279 ADRIAN DRIVE / TAX KEY NO. 2179.994.011
WHEREAS, A Certified Survey Map (CSM) was submitted by Michael Michalski for a two (2) lot land
division located on S70 W20279 Adrian Drive / Tax Key No. 2179.994.011, and
WHEREAS, The proposed lots are 2.0 acres and 10.68 acres in size, and
WHEREAS, The property is zoned RS-1 – Suburban Residence District and requires minimum lot sizes of
30,000 SF with a minimum average width of 120 feet per lot, when serviced my municipal sanitary sewer,
and
WHEREAS, The 2020 Comprehensive Plan depicts the area for medium density residential uses (1 – 2.99
units/acre) and the proposal is consistent with the plan, and
WHEREAS, Both lots will be served by municipal sanitary sewer, and
WHEREAS, Lot 1 has direct access from Adrian Drive while Lot 2 will have access via an easement over
Lot 1 from Adrian Drive.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted
by Michael Michalski for a two (2) lot land division located at S70 W20279 Adrian Drive / Tax Key No.
2179.994.011, subject to technical corrections as identified by the City Engineers, and payment of all
applicable fees and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, The Parks and Conservation Plan identifies medium priority conservation
areas on site and said areas will need further review/discussion to determine what type of preservation, if
any, is needed in these areas.
BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the
Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with
Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred:
Introduced: September 3, 2019
ATTEST: Adam Trzebiatowski AICP, Planning Manager
Page 4 of 5
Resolution PC 055-2019
Packet Page 22
Page 5 of 5
Resolution PC 055-2019
Packet Page 23
City of Muskego
Plan Commission Conceptual Discussion - PC 051-2019
For the meeting of: September 3, 2019
REQUEST: Conceptual Discussion for the Proposed Residential Subdivision
Durham Drive & Priegel Drive / Part of Tax Key Nos. 2211.998 and 2211.996.002
SW ¼ & SE ¼ of Section 13
PETITIONER: Homes by Towne / Towne Realty, Inc.
INTRODUCED: September 3, 2019
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 051-2019
The petitioner has submitted for a conceptual discussion relating to a proposed future development as
outlined further below.
The petitioner is requesting conceptual approval and discussion to get comments from the Planning
Commission regarding the proposal. The petitioner will be present at the meeting to further explain the
conceptual land division and to answer any questions.
No formal approval or denial will be given at this meeting and no guarantees can be made. This
conceptual discussion is intended to solicit comments, suggestions, and ideas. If the petitioner would like
to take the next steps and eventually apply for a land division the comments received at this meeting
must be addressed as part of the formal submittal.
PLAN CONSISTENCY PC 051-2019
Comprehensive Plan: The 2020 Plan depicts the area for Low Density Residential uses (.5 -
.99 units/acre) with an option to incorporate the City’s Conservation
Subdivision ordinances if possible. The current proposed concept is just
under 1 unit/acre density. Details of the density calculation are
discussed further below.
Zoning: The property is currently zoned RC-2 Residential Country Residence
District and SW Shoreland Wetland District. The proposal discusses
requesting a future zoning change to a Planned Development District.
DISCUSSION PC 051-2019
Per the submittal attached the petitioner, Homes by Towne, is looking for feedback for a new 38-lot
single-family development concept plan that they are looking to possibly develop on an area northwest of
the intersection of Priegel Drive and Durham Drive. This is located just north of Aster Hills Estates, which
Page 1 of 8
PC 051-2019
Packet Page 24
was also developed by Towne Realty.
History
There was a previous rezoning request submitted for this property by Towne Realty in 2006. That
concept proposal included 49 lots over 47.7 acres. Said lots were proposed with a minimum lot size of
18,000 SF and an average width of 100 feet. The density proposed equated to 1.03 units/acre. The
2010 Comprehensive Plan, which was in place at that time would have had to be changed to medium
density residential to facilitate this proposal. At that time there was a formal public hearing held and there
were numerous concerns raised by residents in the area. The Plan Commission recommended denial of
the proposal. Based on that, the developer withdrew their request before the Common Council acted on
the rezoning request.
New Proposal
At this time, Homes by Towne has re-developed a new conceptual plan showing that they are now
looking into developing approximately 38.1 acres of land for 38 new single family lots. The new proposal
is intended to utilize the existing Comprehensive Plan land use designation (Low Density Residential) and
with a future rezoning to a Planned Development (PD) District, to be able to utilize the overall density of
the development, while preserving open space on the western portion of the development. A base zoning
district has not been formally noted by the applicant in their submittal, but based on the lot sizes and
width, a base zoning of RS-2 seems appropriate. That is the same base zoning that the PD district for
Aster Hills utilized. The lots proposed in the new concept are at least 5,000 SF each larger than those
proposed on the 2006 concept.
This conceptual plan for the proposed subdivision is identified as containing 38.1 acres total. As is noted
above, the 2020 Comprehensive Plan identifies this property as Low Density Residential uses, which
allows densities between 0.5 - 0.99 units/acre. This new proposal breaks down to having 0.997
units/acre. Since that is not under 0.990 units/acre, staff suggests that the total lot/development size
should be increased to 38.4 acres as that would truly not exceed 0.990 units/acre, with an overall density
of 0.989 units/acre. This is something that the Plan Commission may want to discuss and will need to be
a possible talking point for any formal future rezoning request.
The remaining 30 acres (+/-) between this conceptual plan and Big Muskego Lake will be split from the
parent lots. This remaining land will remain owned by the May family and remain undeveloped at this
time. It appears that the remaining 30 acres to the west of the proposed development is largely identified
as a wetland complex abutting Big Muskego Lake. These wetlands have been identified in the Park and
Rec plan as High Conservation Priority Area and should be protected through conservation planning
techniques.
Access through the proposed development would include a looped drive that intersects with both Durham
Drive and Priegel Drive along with three short cul-de-sacs. Even though this subdivision is almost an
extension of the Aster Hills Subdivision, one difference to note is that this conceptual plan is to have
standard width roads, unlike the slightly narrower roads of Aster Hills. Three of the lots closest to the
intersection of Durham Drive and Priegel Drive would have access directly to Priegel Drive in the same
way that the four lots immediately west access Priegel Drive.
Homes by Towne is proposing extending municipal services to the new development. The plan would be
to connect to sanitary sewer at the lift station on Durham Drive. Water connections would be on both
Durham Drive and Priegel Drive looping the system through the development. These connections would
be reviewed by Engineering and Utilities upon the concept plan being further developed and submitted in
the future.
One additional items worth noting is that there is FEMA mapped Floodplain on the western portion of this
development. The developer needs to make sure the exact floodplain boundary is field verified, not just
interpolated from a map, to make sure that it is not impacted and/or follows all City, State and Federal
floodplain regulations.
Page 2 of 8
PC 051-2019
Packet Page 25
DIRECTION PC 051-2019
The Plan Commission will need to review the concept map and narrative to see how they feel this may fit
within the plans for this portion of the City. The applicant is looking for any feedback and/or comments for
the submittal proposal. This review does not grant any approvals/denials, but is intended to provide
feedback to the developer.
Page 3 of 8
PC 051-2019
Packet Page 26
MUSKEGOthe City of
Area of InterestI01,000 2,000
Feet
Agenda Item(s)
Properties
Zoning Districts
Right-of-Way
Hydrography
Supplemental MapPC 051-2019
Homes by TowneNW corner of Durham Drive and Priegel Drive
JANESVIL
L
E
LOO
M
I
S
R
D
RA
C
I
N
E
A
V
DU
R
H
A
M
WOOD
S
CO
L
L
E
G
E
Prepared by City of Muskego Planning Department Date: 8/26/2019
Page 4 of 8
PC 051-2019
Packet Page 27
Page 5 of 8
PC 051-2019
Packet Page 28
Page 6 of 8
PC 051-2019
Packet Page 29
D
U
R
H
A
M
D
R
I
V
E
PRIEGEL DRIVE
MA
Y
P
R
O
P
E
R
T
Y
CI
T
Y
O
F
M
U
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
38
L
O
T
C
O
N
C
E
P
T
SI
T
E
P
L
A
N
SHEET NUMBER
Br
o
o
k
f
i
e
l
d
,
W
I
|
Mi
l
w
a
u
k
e
e
,
W
I
|
A
p
p
l
e
t
o
n
,
W
I
|
M
a
d
i
s
o
n
,
W
I
|
C
e
d
a
r
b
u
r
g
,
W
I
Mo
u
n
t
P
l
e
a
s
a
n
t
,
W
I
|
N
a
p
e
r
v
i
l
l
e
,
I
L
|
I
r
v
i
n
e
,
C
A
N
( IN FEET )
GRAPHIC SCALE
0 2001005050
P:
\
3
0
5
0
6
8
6
\
3
0
5
0
6
8
6
.
0
1
\
D
w
g
\
S
h
e
e
t
s
\
3
0
5
0
6
8
6
.
0
1
-
C
S
P
.
d
w
g
,
P
l
a
n
S
h
e
e
t
3
6
x
2
4
,
8
/
7
/
2
0
1
9
1
1
:
3
1
:
3
9
A
M
,
d
j
m
Page 7 of 8
PC 051-2019
Packet Page 30
D
U
R
H
A
M
D
R
I
V
E
BI
G
M
U
S
K
E
G
O
L
A
K
E
PRIEGEL DRIVE
SHEET OF
PROPERTY EXHIBIT
MAY PROPERTY
11
PROPOSED DIVISION CONCEPT
PROJECT NO. 162866 AUGUST 6, 2019
S:
\
5
1
6
2
8
6
6
\
d
w
g
\
S
X
1
1
1
D
.
d
w
g
,
M
o
d
e
l
,
8
/
6
/
2
0
1
9
5
:
2
2
:
2
4
P
M
,
j
p
c
Page 8 of 8
PC 051-2019
Packet Page 31
City of Muskego
Plan Commission Supplement PC 053-2019
For the meeting of: September 3, 2019
REQUEST: Approval of the Temporary Sale of Christmas Trees at the Piggly Wiggly Property
W189 S8747 Racine Avenue / Tax Key No. 2192.973
SE ¼ of Section 8
PETITIONER: Scott Dickmann
INTRODUCED: September 3, 2019
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 053-2019
Petitioner proposes to operate a temporary Christmas tree stand in the Piggly Wiggly parking lot. An area of 20’ x
190’ will be fenced off with snow fencing with a tent on the eastern end for display area. The applicant is seeking
approval to sell Christmas trees, tree bags, tree stands, ornaments and decorations. Signage has been indicated
as a 3’ x 8’ temporary banner that will be attached to the tented area. Operations are proposed from November 6,
2019 to December 23, 2019 from 9:00 am to 8:00 pm. Permission has been received from the property owner to
use the site and the restroom facilities.
DISCUSSION PC 053-2019
The proposal is consistent with operations of other vendors in Muskego and for this site. The only difference with
this proposal is that instead the sales operations will be in late fall and winter selling Christmas goods rather than
plants and flowers or fireworks in the spring and early summer.
A transient merchant license must be obtained from the City Clerk’s Office.
STAFF RECOMMENDATION PC 053-2019
Approval of Resolution #PC 053-2019
Page 1 of 10
Resolution PC 053-2019
Packet Page 32
MUSKEGOthe City of
Area of InterestI0360720
Feet
Agenda Item(s)
Properties
Zoning Districts
Right-of-Way
Hydrography
Supplemental MapRESOLUTION #PC 053-2019
Scott DickmanW189 S7847 Racine Avenue
JANESVIL
L
E
LOO
M
I
S
R
D
RA
C
I
N
E
A
V
DU
R
H
A
M
WOOD
S
CO
L
L
E
G
E
Prepared by City of Muskego Planning Department Date: 8/27/2019
Page 2 of 10
Resolution PC 053-2019
Packet Page 33
RESOLUTION #P.C. 053-2019
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT TO
ALLOW TEMPORARY SALES OF CHRISTMAS TREES FOR SCOTT DICKMANN AT THE
PROPERTY LOCATED AT W189 S7847 RACINE AVENUE
(MUSKEGO CENTER-PIGGLY WIGGLY PARKING LOT / TAX KEY NO. 2192.973)
WHEREAS, A request for the temporary sale of Christmas Trees, tree bags, tree stands, ornaments and
decorations has been submitted by Scott Dickmann of Shear Magic, Inc. to locate in the parking lot of
the Muskego Centre / Piggly Wiggly Store at W189 S8747 Racine Avenue, and
WHEREAS, The petitioner is proposing to erect a temporary tent with a row of parking cordoned off with
snow fencing located at the southeast corner of the parking lot near the southern entry, being generally
between the shopping center and McDonald's, and
WHEREAS, The proposed dates of operation will be from November 6, 2019 to no later than December
23, 2019, and the hours of operation will be daily from 9am to 8pm, and
WHEREAS, The fencing will be 20’ x 190’ and will not inhibit the two way vehicle traffic aisle, and
WHEREAS, Signage has been indicated as one 3’ x 8’ temporary banner attached to the temporary
tent, and
WHEREAS, A site plan has been filed for staff review and proof of sanitary facilities accommodations
has been provided, and
WHEREAS, An electrical permit and inspection will be required through the Building Inspection Division
for any electricity hookups, and
WHEREAS, A Transient Merchant License will be required to be obtained from the City Clerks Office.
THEREFORE BE IT RESOLVED, That the Plan Commission approves the request for temporary sales
of Christmas trees, tree bags, tree stands, ornaments and decorations in the Piggly Wiggly parking lot
for Scott Dickmann of Shear Magic Inc. subject to the following conditions:
1. Dates of operation approved from November 6, 2019 to December 23, 2019, and
2. Hours of operation permitted only from 9 am to 8 pm, and
3. A letter of approval from the property owner has been submitted to the Planning Division
approving rental space for the Mr. Dickmann, and
4. Applicable electrical permits / licensing must be obtained from the Building Inspection Division
prior to any site work on the property, if applicable, and
5. Petitioner to obtain a Transient Merchants License from the Clerk-Treasurer’s Office.
BE IT FURTHER RESOLVED, The drive aisle for traffic must remain at an open width of 24 feet.
BE IT FURTHER RESOLVED, No items other Christmas trees and associated accessories (i.e. tree
bags, tree stands, ornaments and decorations, etc.) are allowed to be sold as part of these sales.
BE IT FURTHER RESOLVED, No sales/displays can occur outside of the enclosed fenced area.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred:
Introduced: September 3, 2019
ATTEST: Adam Trzebiatowski, Planning Manager
Page 3 of 10
Resolution PC 053-2019
Packet Page 34
Page 4 of 10
Resolution PC 053-2019
Packet Page 35
Page 5 of 10
Resolution PC 053-2019
Packet Page 36
Page 6 of 10
Resolution PC 053-2019
Packet Page 37
Page 7 of 10
Resolution PC 053-2019
Packet Page 38
Page 8 of 10
Resolution PC 053-2019
Packet Page 39
Page 9 of 10
Resolution PC 053-2019
Packet Page 40
Page 10 of 10
Resolution PC 053-2019
Packet Page 41
City of Muskego
Plan Commission Supplement PC 054-2019
For the meeting of: September 3, 2019
REQUEST: Building, Site and Operation Plan Amendment for Chase Bank
Tax Key No. 2172.998 / S69 W15612 Janesville Road
SE ¼ of Section 3
PETITIONER: David Stangle, The Architects Partnership, Ltd.
INTRODUCED: September 3, 2019
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 054-2019
Chase Bank is seeking a Building, Site and Operation (BSO) Plan amendment in order to move forward
with exterior modifications on the site. The modifications being sought include approval to remove and
replace the existing parking lot asphalt and replace the garbage enclosure. The slope of the existing ADA
parking stalls will be modified to comply with current ADA requirements in addition to the replacement of
the concrete walk leading from the ADA parking stalls to the bank entrance. Additionally, along Janesville
Road on both sides of the ingress/egress the existing asphalt extends into the right-of-way. The applicant
is looking to remove that asphalt and return the areas back to lawn.
CONSISTENCY WITH ADOPTED PLANS 054-2019
Comprehensive Plan: The 2020 Plan depicts the property as Business Park uses. This proposal is
consistent with the plan.
Zoning: The property is zoned BP-1 – Business and Office Park Support District and
the proposed amendments are consistent with the code.
STAFF DISCUSSION PC 054-2019
As noted above, the applicant is seeking to remove and replace the asphalt parking surface including
slight changes to conform to current ADA standards. The site does not currently contain curb and gutter
and the submitted plans do not propose adding curb and gutter to the site. The plan does shows parking
stops within each parking stall. When sites in urban/developed areas of Muskego, especially along
commercial corridors, are redeveloped, fully repaved and/or significantly modified, the City will look to
consider the installation of concrete curb and gutter. Given the extensive nature of this project, including
full paving replacement, concrete curb and gutter need to be provided around the exterior perimeter of the
site.
Additionally, along Janesville Road on both sides of the ingress/egress the existing asphalt extends into
the right-of-way. The applicant is looking to remove that asphalt and restore with sod. Typically
commercial parking areas are required to be set back from the right-of-way three (3) feet. However,
along Janesville Road the Plan Commission has generally allowed businesses to have their parking area
up to the property line when the former parking was up to or past the right-of-way line. In this instance,
the applicant is acknowledging that the parking area must remain on their property and not extend into
the right-of-way.
Page 1 of 9
Resolution PC 054-2019
Packet Page 42
A new handicap sign is proposed near the entrance to the bank with a concrete bollard extending from
the ground four (4) feet in height. As identified, the bollard will be painted a blue color per Chase
guidelines. Staff would like to be sure that the bollard color complements the colors of the building. If
there is no other matching blue on the building, a new color must be selected by the applicant.
Lastly, a new garbage enclosure is proposed on the site in roughly the same location, which is behind the
bank on the eastern side of the lot. The new enclosure will be a metal frame structure with six (6) foot
cedar planks to screen the dumpster within the enclosure. Although no finish color is identified, the colors
selected for the garbage enclosure must compliment the building.
As part of the BSO Amendment process, now would be the time to address any other glaring issues on
the site that require attention. It has been noted that there are two (2) newer light fixtures that have been
mounted to the roof of the building. These fixtures do not meet he city standards all lighting is to be full
cut-off with zero degree tilt and must be modified or removed. Due to this issue, a lighting plan with light
fixture details must be submitted for approval from the Planning Division. All lighting must meet city
standards, including that pole light concrete bases be no more than six (6) inches above grade and all
lighting to be full cut-off with zero degree tilt and fit the safety and architectural purposes of the structure.
STAFF RECOMMENDATION PC 054-2019
Approval of Resolution PC 054-2019
Page 2 of 9
Resolution PC 054-2019
Packet Page 43
MUSKEGOthe City of
Area of InterestI0230460
Feet
Agenda Item(s)
Properties
Zoning Districts
Right-of-Way
Hydrography
Supplemental MapRESOLUTION #PC 054-2019
Chase BankS69 W15612 Janesville Road
JANESVIL
L
E
LOO
M
I
S
R
D
RA
C
I
N
E
A
V
DU
R
H
A
M
WOOD
S
CO
L
L
E
G
E
Prepared by City of Muskego Planning Department Date: 8/28/2019
Page 3 of 9
Resolution PC 054-2019
Packet Page 44
RESOLUTION #P.C. 054-2019
APPROVAL OF A BUILDING, SITE AND OPERATION PLAN AMENDMENT FOR
CHASE BANK LOCATED IN THE SE ¼ OF SECTION 3
(TAX KEY NO. 2172.998 / S69 W15612 JANESVILLE ROAD)
WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment
for Chase Bank located at S69 W15612 Janesville Road / Tax Key No. 2172.998, and
WHEREAS, The petitioner is proposing to remove and replace the existing parking lot asphalt
and replace the garbage enclosure, and
WHEREAS, The slope of the existing ADA parking stalls will be modified to comply with current
ADA requirements in addition to the replacement of the concrete walk leading from the ADA
parking stalls to the bank entrance, and
WHEREAS, Typically commercial parking areas are required to be set back from the right-of-way
three (3) feet. However, along Janesville Road the Plan Commission has generally allowed
businesses to have their parking area up to the property line, if there are stiuations where former
paving was in or up to the right-of-way line, and
WHEREAS, The petitioner is proposing to remove the asphalt that extends into the right-of-way
and return the areas back to lawn, and
WHEREAS, None of the site currently contains curbing, and
WHEREAS, A new handicap sign is proposed near the entrance to the bank with a concrete
bollard extending from the ground four (4) feet in height, and
WHEREAS, A dumpster enclosure is proposed in the northeast corner of the site and the
enclosure is to be screened with a cedar plank fence, and
WHEREAS, No new site bollards, lighting or signage have been proposed at this time, and
WHEREAS, The existing light fixtures that have been mounted to the roof of the building do not
meet the city standards that all lighting must be full cut-off with zero degree tilt, as the lights shine
onto Janesville Road and the light source is directly visible.
THEREFORE BE IT RESOLVED, The Plan Commission approves of an amended Building, Site
and Operation Plan for Chase Bank at S69 W15612 Janesville Road / Tax Key No. 2172.998.
BE IT FURTHER RESOLVED, For the proposed work, proper permits are required to be issued
prior to any work commencing, including a Zoning Permit, Building Permit, Electrical Permit
and/or possible Land Disturbance Permit.
BE IT FURTHER RESOLVED, An exterior lighting plan, for all existing and proposed lighting, is
required and will need approvals, before any site work can occur, from the Planning Division to
ensure that all exterior lighting meets the code requirements.
BE IT FURTHER RESOLVED, Since the entire site is being repaved, the exterior perimeter of the
site will need to contain concrete curb and gutter and said plans must be submitted before any
permits can be issued.
BE IT FURTHER RESOLVED, Any handicap sigs, no parking signs or other information signage
must be mounted in the ground or on the building and cannot be on a moveable base.
BE IT FURTHER RESOLVED, Any bollards protecting the building, parking signs or other site
features must be painted a color to match the building.
BE IT FURTHER RESOLVED, All driveway and parking surfaces must be located within the lot
lines and the owner is responsible for knowing where the lot lines are.
BE IT FURTHER RESOLVED, The gate of the dumpster enclosure must be constructed out of
the same material as the fencing, which must compliment the color of the building.Page 4 of 9
Resolution PC 054-2019
Packet Page 45
BE IT FURTHER RESOLVED, A copy of said plans must be kept on file and that all aspects of
this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, Failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted:
Denied:
Deferred:
Introduced: September 3, 2019
ATTEST: Adam Trzebiatowski, Planning Manager
Page 5 of 9
Resolution PC 054-2019
Packet Page 46
TEL 847.478.9700L FAXFF 847.478.9701X
Page 6 of 9
Resolution PC 054-2019
Packet Page 47
1
S6
2
S6
CONCRETE PAD - REFER
TO SITE PLAN
EQ.EQ.
9'-0"
5'-6"
1'-0"1'-0"
1'-0"
PI
T
CH
1
/4"
PE
R
F
T
.
STL. ANGLE AS REQD.
FOR CASTER MOUNTING
4" GALVANIZED STEEL
POSTS, TYP.
12" DIAM. CONCRETE
PIER - HOLD T/ PIER 3"
BELOW PAVING
ALL EXPOSED STEEL COMPONENTS SHALL BE
HOT-DIPPED GALVANIZED, PRIMED WITH
SELF-ETCHING PRIMER, AND PAINTED BLACK.
6'
-0"
6'-
0"
3'-
6"
L 2" x 2" x 3/8" STEEL ANGLE GATE
FRAME - PRIME AND PAINT
5/4x6 DOG-EARED SMOOTH CEDAR
GATE BOARDS BOLTED W/ (2) 1/4"
STN. STEEL CARRIAGE BOLTS AT
EACH HORIZONTAL FRAME MEMBER
BARREL HINGE WELDED TO STEEL
POST AND BOLTED TO GATE FRAME
2'
-0"
4'
-
0
"
4'
0
"
3'
-
0
"
3'
0
"
GATE HARDWARE- REFER TO
DOOR HARDWARE SCHEDULE
T/CONCRETE PAD
CONCRETE PAD - REFER
TO SITE PLAN
9'-0"5'-6"
PROVIDE STN. STEEL TUBE
EMBEDDED IN CONCRETE
TO RECEIVE CANE BOLT
FROM GATE. ENSURE GATE
OPENS A FULL 90°, TYP.
BOTH GATES.
1/2" COMPRESSIBLE FILLER
BETWEEN CONCRETE AND
ASPHALT, TYP.
CASTER ON
BOTH GATES
PROVIDE 1/4" STN. STEEL
PLATE, 12"x6", EMBEDDED IN
CONCRETE WITH ANCHORS
SO T/ PLATE IS FLUSH WITH
T/CONCRETE. DRILL HOLES
THROUGH PLATE AND
CONCRETE TO RECEIVE
BOTH CANE BOLTS.
CONTROL JOINT
RELOCATE EXISTING
WHEEL STOP - ANCHOR
INTO NEW CONCRETE.
CONCRETE PIER
HARDWARE SCHEDULE
GROUP COMPONENT MFR.MODEL FINISH NOTES
14
TRASH ENCLOSUREGATE
BARREL HINGES (1 PAIR PER LEAF)GUARDIAN 1000-LB. CAPACITY PER PAIR, PRIMED STEEL2135.100 PAINT TO MATCH ADJ. FINISH
LATCH STANLEY 621513 GALVANIZED STEEL OR EQUAL
PULL (1 PER LEAF)CROWN BOLT 62309 GALVANIZED STEEL OR EQUAL
CANE BOLT (1 PER LEAF)STANLEY 532531 GALVANIZED STEEL BY PANEL SYSTEM MANUFACTURER
SPRING-LOADED CASTERS (1 PER LEAF)ABBEY TRADING 081-368-1 GALVANIZED STEEL OR EQUAL
BOLTS AND MISC. HARDWARE ------STAINLESS STEEL
1
S6
2
S6
TEL 847.478.9700L FAXFF 847.478.9701X
Page 7 of 9
Resolution PC 054-2019
Packet Page 48
Page 8 of 9
Resolution PC 054-2019
Packet Page 49
TEL 847.478.9700 FAX 847.478.9701
Page 9 of 9
Resolution PC 054-2019
Packet Page 50