Loading...
Public Works Committee Packet - 3/20/2017 CITY OF MUSKEGO PUBLIC WORKS COMMITTEE AGENDA March 20, 2017 5:00 PM Aldermen’s Room – Upper Level of City Hall, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF MINUTES HELD February 20, 2017. STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: 1. Moorland Road Reconstruction 2. 2017 Road Program 3. Racine Avenue and Martin Drive Recreation Paths UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: 1. Authorization to Prepare 18th Amendment for Area Wide Water Capacity Assessment (WCA) for Water Services Under Wisconsin Statute 66.0703 and Levying Water Capacity Special Assessments Against Benefited Property. 2. Approval to Change April BOPW Meeting to April 24th, 2017 at 5:00PM. NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136. Unapproved CITY OF MUSKEGO PUBLIC WORKS COMMITTEE MINUTES February 20, 2017 5:00 PM Aldermen’s Room – Upper Level of City Hall, W182 S8200 Racine Avenue CALL TO ORDER Alderman Eileen Madden called the meeting to order at 5:02PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Alderman Eileen Madden, Alderman Robert Wolfe, Mayor Kathy Chiaverotti, City Engineer Mike Paulos, Utilities Superintendent Scott Kloskowski, City Attorney Jeff Warchol Not Present: Alderman Kevin Kubacki, Alderman Thomas Kapusta Guests: Matthew Wolfert of Bray Architects STATEMENT OF PUBLIC NOTICE The meeting was noticed in accordance with the open meeting laws. APPROVAL OF MINUTES HELD January 23, 2017. Alderman Wolfe made a motion to approve the MINUTES HELD January 23, 2017. Alderman Madden seconded. Motion Passed 2 in favor. STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: Moorland Road Reconstruction 2017 Road Program UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: Discussion based upon committees request for clarification of Figure 5 relating to costs on water study for the proposed middle school prepared by Ruekert & Miekle for the Muskego Norway School District City Engineer Mike Paulos clarified the entire project cost from Durham Drive to the school, around the school, to Tudor Oaks to be about $1.2 Million which includes construction cost, engineering design, permitting and administration. DISCUSSION No formal action may be taken on any of the following: Request for Approval to Pursue a Private Well for New Middle School by the Muskego Norway School District The Muskego-Norway School District requested a discussion regarding the pursual of a well for the New Middle School. Concerns were voiced by Committee Members about private wells drying up in the area, the presence of radium and fire safety. Bray Architects recapped their submittal entitled "Muskego-Norway School Board New Middle School". In the City Engineer's opinion, the initial cost of the well, along with the additional cost of maintaining the well are low estimates, especially if it is necessary to treat for radium. Cost is not a factor for municipal water service approval. The City has requested detailed cost analysis of the well system from the School District but to date no such report has been submitted. Included in the discussion was City Ordinance:28.05(4)(f) The City Engineer confirmed municipal water service is available for this site and believes municipal water is the most reliable, best long term and cost effective solution for the Middle School. Water Utility/Public Utility Discussion - Private Entity Not Contained within City Budget - New Users Contributions and Recapture Agreements Mayor Chiaverotti discussed the possibility of a recapture agreement. NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT Alderman Wolfe made a motion to ADJOURN at 6:11PM. Alderman Madden seconded. Motion Passed 2 in favor. City of Muskego 2017 Road Improvement Project Project No. 2016-0920 Bids Received Thursday, March 9, 2017 Bidders Bid Bond Addendum 1 Total of all Base Bid No. 1 bid prices (Items 1 - 9) Payne & Dolan 5% Yes $373,859.20* Stark Pavement 5% Yes $388,425.50* Engineer's Estimate $473,898.24 *Note: Total project costs will include base bid No.1 and city selected mandatory alternate bids. Mandatory Alternate Bid Cost not included in cost above. City of Muskego- 2017 Road Improvement Program Bid Tabulation NO. ITEM DESCRIPTION (BID NO. 1) UNIT ESTIMATED QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL 1 Mill 2"S.Y. 12,150 $0.90 $10,935.00 $1.42 $17,253.00 2 2" Roadway Asphalt Surface Course (5LT 58-28 S, 9.5 mm)TON 1,410 $58.05 $81,850.50 $53.00 $74,730.00 3 Remove & Replace Concrete Curb and Gutter L.F. 330 $38.00 $12,540.00 $58.00 $19,140.00 Subtotal of Items 1 through 3 $105,325.50 $111,123.00 4 Mill 4"S.Y. 14,220 $1.30 $18,486.00 $1.61 $22,894.20 5 Pulverize, Shape, and Grade S.Y. 14,220 $0.75 $10,665.00 $1.25 $17,775.00 6 2.5" Roadway Asphalt Binder Course (3LT 58-28 S, 19 mm)TON 2,080 $55.00 $114,400.00 $47.85 $99,528.00 7 2" Roadway Asphalt Surface Course (5LT 58-28 S, 9.5 mm)TON 1,660 $56.50 $93,790.00 $54.35 $90,221.00 8 Driveway Transition S.Y. 500 $35.00 $17,500.00 $25.00 $12,500.00 Subtotal of Items 4 through 8 $254,841.00 $242,918.20 9 Concrete Pad S.Y. 367 $77.00 $28,259.00 $54.00 $19,818.00 Subtotal of Item 9 $28,259.00 $19,818.00 TOTAL OF ALL ESTIMATED BASE BID NO. 1 PRICES - 1-9 $388,425.50 $373,859.20 NO. ITEM DESCRIPTION (MANDATORY ALTERNATE BIDS) UNIT ESTIMATED QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL 10 Mill 4"S.Y. 15,030 1.30$ $19,539.00 1.82$ $27,354.60 11 Pulverize, Shape, and Grade S.Y. 15,030 0.75$ $11,272.50 1.35$ $20,290.50 12 2.5" Roadway Asphalt Binder Course (3LT 58-28 S, 19 mm)TON 2,180 55.00$ $119,900.00 47.50$ $103,550.00 13 2" Roadway Asphalt Surface Course (5LT 58-28 S, 9.5 mm)TON 1,750 58.25$ $101,937.50 54.45$ $95,287.50 14 Driveway Transition S.Y. 400 35.00$ $14,000.00 25.00$ $10,000.00 Subtotal of Items 10 through 14 $266,649.00 $256,482.60 15 Pavement Removal S.Y. 55 19.55$ $1,075.25 17.00$ $935.00 16 Mill 3"S.Y. 216 6.00$ $1,296.00 6.50$ $1,404.00 17 3" Asphalt Surface Course 5LT 58- 28 S, 9.5 mm)TON 40 125.00$ $5,000.00 77.00$ $3,080.00 Subtotal of Items 15 through 17 $7,371.25 $5,419.00 18 Asphalt Pathway Construction S.Y. 125 45.00$ $5,625.00 39.00$ $4,875.00 Subtotal itme of 18 $5,625.00 $4,875.00 19 Asphalt Pathway Construction S.Y. 50 60.00$ $3,000.00 54.00$ $2,700.00 Subtotal of Item 19 $3,000.00 $2,700.00 20 Asphalt Basketball Court Pavement S.Y. 455 42.50$ $19,337.50 28.50$ $12,967.50 21 Basketball Court Striping L.F. 450 2.10$ $945.00 1.00$ $450.00 Subtotal of Items 20 through 21 $20,282.50 $13,417.50 22 Aspalt Pathway Construction S.Y. 550 37.00$ $20,350.00 30.90$ $16,995.00 Subtotal of Item 22 $20,350.00 $16,995.00 23 Mill 3"S.Y. 260 6.25$ $1,625.00 8.00$ $2,080.00 24 3" Asphalt Surface Course (5 LT 58-28 S, 9.5 mm)TON 45 125.00$ $5,625.00 76.40$ $3,438.00 Subtotal of Items 23 through 24 $7,250.00 $5,518.00 25 Asphalt Basketball Court Pavement S.Y. 455 42.50$ $19,337.50 28.50$ $12,967.50 26 Basketball Court Striping L.F. 450 2.10$ $945.00 1.00$ $450.00 Subtotal of Items 25 through 26 $20,282.50 $13,417.50 27 Asphalt Basketball Court Pavement S.Y. 455 36.15$ $16,448.25 28.50$ $12,967.50 28 Basketball Court Striping L.F. 450 2.10$ $945.00 1.00$ $450.00 Subtotal of Items 27 through 28 $17,393.25 $13,417.50 29 Mill 3"S.Y. 240 5.50$ $1,320.00 9.00$ $2,160.00 30 3" Asphalt Surface Course (5 LT 58-28 S, 9.5 mm)TON 45 71.50$ $3,217.50 78.00$ $3,510.00 Subtotal of Items 29 through 30 $4,537.50 $5,670.00 31 Mill 2"S.Y. 550 4.35$ $2,392.50 4.00$ $2,200.00 32 2" Asphalt Surface Course (5LT 58- 28 S, 9.5 mm)TON 175 65.95$ $11,541.25 57.00$ $9,975.00 33 Common Excavation CY 375 26.50$ $9,937.50 23.00$ $8,625.00 34 3/4" Crushed Limestone T.B.TON 235 17.00$ $3,995.00 16.00$ $3,760.00 35 1-1/4" Crushed Limestone T.B.TON 235 17.00$ $3,995.00 16.00$ $3,760.00 36 4" Asphalt Binder Course (3LT 58- 28 S, 19.00 mm)TON 225 62.50$ $14,062.50 51.00$ $11,475.00 37 Pavement Striping L.F. 950 5.00$ $4,750.00 0.50$ $475.00 Subtotal of Items 31 through 37 $50,673.75 $40,270.00 38 Existing Tennis and Basketball Court Restoration S.Y. 1,220 14.00$ $17,080.00 19.00$ $23,180.00 Subtotal of Item 38 $17,080.00 $23,180.00 39 Mill 2" S.Y. 1,680 1.90$ $3,192.00 1.80$ $3,024.00 40 2" Roadway Asphalt Surface Course (5 LT 58-28 S, 9.5 mm)TON 195 66.50$ $12,967.50 58.75$ $11,456.25 41 Remove and Replace Concrete Curb and Gutter L.F. 100 44.50$ $4,450.00 58.00$ $5,800.00 Subtotal of Items 39 through 41 $20,609.50 $20,280.25 42 Mill 2"S.Y. 3,150 1.75$ $5,512.50 1.55$ $4,882.50 43 2" Roadway Asphalt Surface Course (5 LT 58-28 S, 9.5 mm)TON 365 58.50$ $21,352.50 55.00$ $20,075.00 44 Remove and Replace Concrete Curb and Gutter L.F. 100 44.50$ $4,450.00 58.00$ $5,800.00 Subtotal of Items 42 through 44 $31,315.00 $30,757.50 45 Mill 2"S.Y. 13,025 0.75$ $9,768.75 1.52$ $19,798.00 46 2" Roadway Asphalt Surface Course (5 LT 58-28 S, 9.5 mm)TON 1,510 55.00$ $83,050.00 52.00$ $78,520.00 47 Remove and Replace Concrete Curb and Gutter L.F. 400 38.00$ $15,200.00 58.00$ $23,200.00 Subtotal of Items 45 through 47 $108,018.75 $121,518.00 TOTAL OF ALL ESTIMATED MANDATORY ALTERNATE BIDS PRICES - 10-47 $600,438.00 $573,917.85 TOTAL OF ALL ESTIMATED PRICES $988,863.50 $947,777.05 NO.ITEM DESCRIPTION (ADDITIONS AND DELETIONS)UNIT MAXIMUM UNITS UNIT PRICE TOTAL UNIT PRICE TOTAL 1 Silt Fence l.F. 3000 3.00$ $9,000.00 1.50$ $4,500.00 2 Erosion Bales EACH 8.00$ $0.00 7.00$ $0.00 3 Erosion Mat S.Y. 10.00$ $0.00 1.50$ $0.00 4 Unclassified Excavation C.Y. 900 40.00$ $36,000.00 25.00$ $22,500.00 5 3" Breaker Stone TON 1000 20.00$ $20,000.00 20.00$ $20,000.00 6 3/4" Crushed Limestone TON 750 18.00$ $13,500.00 18.00$ $13,500.00 7 1-1/4" Crushed Limestone TON 1000 18.00$ $18,000.00 18.00$ $18,000.00 Subtotal of Items 1 through 7 $96,500.00 $78,500.00 Stark Pavement Corp.Payne & Dolan, Inc. 1 of 1 2/11/2016 81 3 . 3 5 81 3 . 8 4 81 4 . 0 0 81 3 . 5 5 81 3 . 0 7 81 1 . 7 0 81 1 . 4 2 81 1 . 1 6 80 9 . 5 9 80 7 . 9 1 80 7 . 0 0 80 5 . 9 4 80 5 . 1 8 80 4 . 1 5 80 3 . 5 2 80 4 . 0 0 80 4 . 4 4 80 3 . 3 4 MUSKEGO TRAIL_990 - 010101_TI - 010101_TI CITY OF MUSKEGO PLAN OF PROPOSED IMPROVEMENT X:\ML\2016\20160990\CAD\SITE\DWG\00\010101_TI.DWG 3/1/2017 1:30 PM ADLER, JORDAN CTH Y (RACINE AVENUE) RECREATIONAL TRAIL CARDINAL DRIVE TO WOODS ROAD 2015-0990 WAUKESHA COUNTY N/A ---- GENERAL NOTES WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE FO FO FO FOFOFOFOFOFOFOFO FO G G G G G G G G G G G S A N S A N S A NTTTT TTT TTTT TTT W W W W W W W W W W W W M H WV TELEPH O N E XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX X X 11+00 12+00 13+00 EX. R/W 787.64 787.64 787.64 787.64 787.64 786.64 787.42787.39787.35787.35787.27 787.43 EXISTING 60"X72" CORRUGATED METAL CULVERT PIPE I.E=772.36 EXISTING 60"X72" CORRUGATED METAL CULVERT PIPE I.E=772.81 BOTTOM OF WALL (TOP OF LEVELING PAD) EXISTING GROUND AT FACE OF WALL PROPOSED TOP OF WALL STA. 12+25 STA. 12+19 STA. 12+13 STA. 12+70 STA. 11+12 STA. 11+79 STA. 11+64 STA. 11+39 787.64 782.64 781.31 779.97 778.64 779.97 781.97 783.30 780 775 785 790 770 780 775 785 790 770 3:1 WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE LOOKING EAST WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE 3" ASPHALT SIDEWALK 8" BASE AGGREGATE DENSE 1 1 4 -INCH 3:1 MAX 3:1 MAX 3:1 M A X 3:1 M A X 8'2'2' 0.5'0.5' SILT FENCE NTS WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE TILE POST GUY POST POST WELL POST 10+00 11+00 12+00 13+00 14+00 FO FO FO FO FO FO FO FO FO FO G G G G G GGGGG O H SA N SANSAN T T T T T T T T T T T T T T T T TW W WWWWWWWW GUY WVWV M H WVWVWV 10+00 11+00 12+00 13+00 14+00 XXXXXXXX XXXX XXXX XXXX XXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W (787.04) (786.96) 786.24 785 . 4 8 78 5 . 2 7 787.36 787.42 787.39 787.35 787.35 787.27 787.25 786.66 786.40 786.63 787.12 786.12 785 . 3 6 78 6 . 1 1 787.33 787.27 787.24 787.21 787.21 787.15 787.06 786.56 786.28 786.51 787.00 786.99 787.06 786.91 786.84 786.76 786.69 786.54 786.80 787.66 787.92 787.89 786.68 787.54 787.80 787.77 WETLAND BOUNDARY (TYP.) CTH Y (RACINE AVENUE) 36D R A A SLOPE INTERCEPT (TYP.) A (787.14) (787.13)(787.10)(787.05)(787.07)(787.07)(787.06) SAWCUT AND MATCH EXISTING 58.6' LT SAWCUT AND MATCH EXISTING 0' LT (787.14) A A PAV 1 F A 3/4-INCH BASE AGGREGATE M A T C H L I N E S T A . 1 4 + 0 0 PLOT SCALE : 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE PLAN DETAILS LEGEND A C 30D 36D CD R 3" ASPHALT OVER 8" BASE AGGREGATE CONCRETE SIDEWALK 5-INCH CONCRETE CURB & GUTTER 30-INCH TYPE D CONCRETE CURB & GUTTER 6-INCH SLOPED 36-INCH TYPE D CONCRETE DRIVEWAY 6-INCH OVER 6" BASE AGGREGATE MODULAR BLOCK RETAINING WALL 1 4" ASPHALT OVER 12" BASE AGGREGATE F 5' CHAIN LINK FENCE PAV POST TILE POST TILE POST GUY 14+00 15+00 16+00 17+00 18+00 19+00 E E FO FO FO FO FO FO FO FO FO FO FO G GGG G G G G GG T T T T T T T T T T T T T T TT T T T T T T T T T T T W W W WW WW WW W W W GUY WVWVWV WVWV 14+00 15+00 16+00 17+00 18+00 19+00 XXXXXXXXXXXX XXXX XXXX XXXX XXXX XXXXXXXXXXXXXXXX EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W 786.80 787.66 787.92 787.89 788.05 787.86 788.01 788.54 789.02 789.47 789.81 789.38 789.69 789.73 789.87 789.70 789.87 789.69 789.63 789.42 789.45 789.61 786.68 787.54 787.80 787.77 787.93 787.73 787.89 788.42 788.81 789.34 789.68 789.24 789.56 789.62 789.7 1 789.59 789.57 789.51 789.30 789.33 789.49 A CTH Y (RACINE AVENUE) A A CD 789.75 SAWCUT AND MATCH EXISTING 0' LT SAWCUT AND MATCH EXISTING 0' LT SLOPE INTERCEPT (TYP.) A A 787.46 787.27 786.97 MA T C H L I N E S T A . 1 4 + 0 0 MA T C H L I N E S T A . 1 9 + 0 0 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE PLAN DETAILS LEGEND A C 30D 36D CD R 3" ASPHALT OVER 8" BASE AGGREGATE CONCRETE SIDEWALK 5-INCH CONCRETE CURB & GUTTER 30-INCH TYPE D CONCRETE CURB & GUTTER 6-INCH SLOPED 36-INCH TYPE D CONCRETE DRIVEWAY 6-INCH OVER 6" BASE AGGREGATE MODULAR BLOCK RETAINING WALL 4" ASPHALT OVER 12" BASE AGGREGATE F 5' CHAIN LINK FENCE PAV1 19+00 20+00 21+00 22+00 23+00 FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T WWWWW W W W W W WVWVWV 19+00 20+00 21+00 22+00 23+00 EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W 789.69 789.63 789.42 789.45 789.61 789.59 789.55 789.3 9 789.1 3 790.25 790.19 790.13 790.07 789.92790.21790.05789.88790.03 789.95 789.88 789.57 789.51 789.30 789.33 789.49 789.47 789.43 789.2 5 789.76 789.82 789.89 790.13 790.07790.09789.93789.76 790.01 789.95 789.79 CTH Y (RACINE AVENUE) A A C 30D 30D C A RELOCATE STOP SIGN SLOPE INTERC E P T ( T Y P . ) SLOPE INTERCEPT (TYP.) SLOPE INTERCEPT (TYP.) 789.01 789.85 789.73 MA T C H L I N E S T A . 1 9 + 0 0 MA T C H L I N E S T A . 2 3 + 5 0 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE PLAN DETAILS LEGEND A C 30D 36D CD R 3" ASPHALT OVER 8" BASE AGGREGATE CONCRETE SIDEWALK 5-INCH CONCRETE CURB & GUTTER 30-INCH TYPE D CONCRETE CURB & GUTTER 6-INCH SLOPED 36-INCH TYPE D CONCRETE DRIVEWAY 6-INCH OVER 6" BASE AGGREGATE MODULAR BLOCK RETAINING WALL 4" ASPHALT OVER 12" BASE AGGREGATE F 5' CHAIN LINK FENCE PAV1 23+00 24+00 25+00 26+00 27+00 28+00 FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T WWWWWWW W W W W WVWVWV 23+00 24+00 25+00 26+00 27+00 28+00 EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W EX.R/W 790.19 790.13 790.07 789.92 789.63 790.14 790. 5 8 790.91 790.83 791.08 791.47 791.39 791.35 791.50 791.72 791.53 790.07 790.01 789.95 789.79 789.51 790.02 790. 4 6 790.79 790.71 790.96 791.35 791.27 791.23 791.38 791.60 791.41 CTH Y (RACINE AVENUE) CTH Y (RACINE AVENUE) 30D C C C A 30D A SLOPE INTERCEPT (TYP.) SLOPE INTERCEPT (TYP.) SLOPE INTE R C E P T ( T Y P . ) 790.89 790.77 790.66 790.62 79 0 . 4 6 79 0 . 3 4 MA T C H L I N E S T A . 2 3 + 5 0 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE MA T C H L I N E S T A . 2 8 + 0 0 PLAN DETAILS LEGEND A C 30D 36D CD R 3" ASPHALT OVER 8" BASE AGGREGATE CONCRETE SIDEWALK 5-INCH CONCRETE CURB & GUTTER 30-INCH TYPE D CONCRETE CURB & GUTTER 6-INCH SLOPED 36-INCH TYPE D CONCRETE DRIVEWAY 6-INCH OVER 6" BASE AGGREGATE MODULAR BLOCK RETAINING WALL 4" ASPHALT OVER 12" BASE AGGREGATE F 5' CHAIN LINK FENCE PAV1 POSTGUYGUY GUY POLE 28+00 29+00 30+00 30+53 EE FO FO FO FO FO SAN SAN T T T T TTTTT T W WWW MH MH GUYGUY GUY POLE MH WV MH WV28+00 29+00 30+00 30+53 EX.R/W EX.R/W EX.R/W EX.R/W 791.47 791.39 791.35 791.50 791.72 791.53 791.94 792.11 792.39 791.88 791.25 790.86 791.35 791.27 791.23 791.38 791.60 791.41 791.82 791.99 792.27 791.76 791.13 790.74 CTH Y (RACINE AVENUE) A SLOPE INTERCEPT (TYP.) SLOPE INTERCEPT (TYP.) W O O D S R O A D C 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE MA T C H L I N E S T A . 2 8 + 0 0 PLAN DETAILS LEGEND A C 30D 36D CD R 3" ASPHALT OVER 8" BASE AGGREGATE CONCRETE SIDEWALK 5-INCH CONCRETE CURB & GUTTER 30-INCH TYPE D CONCRETE CURB & GUTTER 6-INCH SLOPED 36-INCH TYPE D CONCRETE DRIVEWAY 6-INCH OVER 6" BASE AGGREGATE MODULAR BLOCK RETAINING WALL 4" ASPHALT OVER 12" BASE AGGREGATE F 5' CHAIN LINK FENCE PAV1 TILE POST POST POST WELL POST 10+00 11+00 12+00 13+00 14+00 FO FO FO FO FO FO FO FO FO FO G G G G G GGGGG O H SA N SANSAN T T T T T T T T T T T T T T T T TW W WWWWWWWWWVWV M H WVWVWV XXXXXXXX XXXX XXXX XXXX XXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX INLET 2X2 NEENAH CAS T I N G R - 2 5 0 8 - B STA. 14+20, 1 7 . 6 ' R T RIM EL.= 785 . 3 4 PR 12" W I.E.= 7 8 3 . 3 4 19"X25" CMCP AEW STA. 11+22, 13.8' LT PR 19"X25" S I.E.= 782.1 19"X25" CMCP AEW STA. 11+22, 9.2' LT PR 19"X25" S I.E.= 782.1 CTH Y (RACINE AVENUE) INLET 2X2 NEENAH CASTING R-3508-B STA. 13+00, 14.7' RT RIM EL.= 785.39 PR 12" W I.E.= 783.31 18" CONCRETE APRON ENDWALL STA. 12+23, 15' LT I.E.= 780.5 MH 4FT NEENAH CASTING R-1550-A STA. 13+00, 9' RT RIM EL.= 786.25 PR 12" E I.E.= 783.28 PR 18" S IE = 782.44 PR 18" N IE = 782.54 12 10 11 13 CONECT DRA I N T I L E T O 1 8 " S T O R M SEWER WITH 4 " P V C P I P E M A T C H L I N E S T A . 1 4 + 0 1 780.5 79' - 18" SSPRC @ 2.46% 786.25 782.54782.44 221' - 18" SSPRC @ 0.5% 11 10 PLOT SCALE : 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE EROSION CONTROL AND STORM SEWER SILT FENCE LEGEND EROSION MAT CLASS I, TYPE B CULVERT PIPE DITCH CHECK INLET PROTECTION TEMPORARY DITCH CHECK 790 780 785 775 790 780 785 775 POST TILE POST TILE POST 14+00 15+00 16+00 17+00 18+00 19+00 E E FO FO FO FO FO FO FO FO FO FO FO G GGG G G G G GG T T T T T T T T T T T T T T TT T T T T T T T T T T T W W W WW WW W W W W W WVWVWV WVWV XXXXXXXXXXXX XXXX XXXX XXXX XXXX XXXXXXXXXXXXXXXX INLET 2X2 NEENAH CASTING R-2508-B STA. 14+20, 17.6' RT RIM EL.= 785.34 PR 12" W I.E.= 783.34 18" CONCRETE APRON ENDWALL STA. 17+71, 26.3' RT PR 18" SE I.E.= 786.50CTH Y (RACINE AVENUE) INLET 2X2 NEENAH CASTING R-3508-B STA. 15+21, 18.0' RT RIM EL.= 785.93 PR 12" W I.E.= 783.93 INLET 2X2 NEENAH CASTING R-1550-A STA. 15+21, 9' RT RIM EL.= 787.59 PR 12" E I.E.= 783.89 PR 18" S = 783.64 PR 18" N = 783.74 MH 4FT NEENAH C A S T I N G R - 1 5 5 0 - A STA. 13+0 0 , 9 ' R T RIM EL.= 7 8 6 . 2 5 PR 12" E I. E . = 7 8 3 . 2 8 PR 18" S I E = 7 8 2 . 4 4 PR 18" N I E = 7 8 2 . 5 4 11 13 14 15 16 CONECT DRAIN TILE TO 18" STORM SEWER WITH 4" PVC PIPE MA T C H L I N E S T A . 1 4 + 0 1 MA T C H L I N E S T A . 1 8 + 9 8 256'- 18" SSPRC @ 1.14% 787.59 786.50 221' - 18" SSPRC @ 0.5% 783.74783.64 14 16 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE EROSION CONTROL AND STORM SEWER 790 780 785 775 790 780 785 775 SILT FENCE LEGEND EROSION MAT CLASS I, TYPE B CULVERT PIPE DITCH CHECK INLET PROTECTION TEMPORARY DITCH CHECK 19+00 20+00 21+00 22+00 23+00 FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T WWWWW W W W W W WVWVWV CTH Y (RACINE AVENUE) 28' - 12" CMCP WITH APRON ENDWALLS SW I.E. = 787.46 NE I.E. = 786.58 MA T C H L I N E S T A . 1 8 + 9 8 MA T C H L I N E S T A . 2 3 + 4 8 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE EROSION CONTROL AND STORM SEWER SILT FENCE LEGEND EROSION MAT CLASS I, TYPE B CULVERT PIPE DITCH CHECK INLET PROTECTION TEMPORARY DITCH CHECK 23+00 24+00 25+00 26+00 27+00 28+00 FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T WWWWWWW W W W W WVWVWV CTH Y (RACINE AVENUE) CTH Y (RACINE AVENUE) 28' - 12" CMCP WITH APRON ENDWALLS N I.E. = 788.50 S I.E. = 788.11 MA T C H L I N E S T A . 2 3 + 4 8 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE MA T C H L I N E S T A . 2 8 + 0 0 EROSION CONTROL AND STORM SEWER SILT FENCE LEGEND EROSION MAT CLASS I, TYPE B CULVERT PIPE DITCH CHECK INLET PROTECTION TEMPORARY DITCH CHECK POST 28+00 29+00 30+00 30+53 EE FO FO FO FO FO SAN SAN T T T T TTTTT T W WWW MH MH GUY POLE MH WV MH WV CTH Y (RACINE AVENUE) W O O D S R O A D 1 IN:40 FT WOODS ROAD TO 2016-0990 www.graef-usa.com CONSULTANTS: DRAWN BY: APPROVED BY: PROJECT NUMBER: PROJECT TITLE: ISSUE: PROJECT INFORMATION: SHEET TITLE: SHEET NUMBER: DATE: CHECKED BY: SCALE: 3/1/2017 JLA DJR One Honey Creek Corporate Center 125 South 84th Street, Suite 401 Milwaukee, WI 53214-1470 414 / 259 1500 414 / 259 0037 fax MUSKEGO TRAIL CARDINAL DRIVE MA T C H L I N E S T A . 2 8 + 0 0 EROSION CONTROL AND STORM SEWER SILT FENCE LEGEND EROSION MAT CLASS I, TYPE B CULVERT PIPE DITCH CHECK INLET PROTECTION TEMPORARY DITCH CHECK 10+50 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS SAN WAT 11+00 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS WAT 11+50 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT EX RW EX RW EX RW 785.25 -3.20 7 8 4 . 7 8 8.00 784.90 0.00 784.44 1 3 . 3 5 784.44 1 3 . 3 5 4.0:1 1.5%4.0: 1 786.56 1 9 . 5 3 787.48 0.50 787.48 0.50786.25 -4.58 783.96 -14.03 3.9%1.4% 4.1:1 786.36 14.00 786.52 1 8 . 0 0 785.36 10.00 786.77 1.00 786.65 9.00 4.0%1.5%0.0% EX RW EX RW EX RW 10+00 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 FO GAS SAN WAT 786.34 8. 0 0 786.46 0. 0 0 787.12 -2.00 787.60 -3.92 787.60 -3.92 1.0% 4.0: 1 WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:44 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090201_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 12+00 770 780 790 770 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TELWAT EX RW 11+94 770 780 790 770 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TELWAT EX RW 786.32 14.00 786.48 1 8 . 0 0 7 8 5 . 3 2 1 0 . 0 0 786.73 1.00 786.61 9. 0 0 4.0%1.5%0.0% 786.33 14.00 786.49 1 8 . 0 0 785.33 10.00 786.73 1.00 786.61 9. 0 0 4.0%1.5%0.0% EX RW EX RW 12+41 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 8.8% EXISTING CMP EXISTING CMP 786.41 -10.03 786.60 -22.55 786.48 0.00 786.20 -7 . 0 3 1.5%4.0% PR 18" SS WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:44 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090202_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 12+50 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20 R/L FO GAS TEL WAT 13+00 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 13+50 780 790 780 790 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOGAS TEL WAT EX RW EX RW EX RW 786.67 0. 0 0 7 8 6 . 1 6 17.12 785.16 13.02 786.52 1 0 . 2 7 786.48 25.283.9:1 3.9:1 1.6%3.9%1.4%3.9% 7 8 4 . 7 4 -8.94 7 8 4 . 7 4 -8.94 7 8 5 . 7 0 8.00 785.82 0.00 785.12 1 4 . 2 9 785.12 1 4 . 2 9 4.0:1 4.0:1 1.5%4.0: 1 786.42 -5.12 786.42 -5.12 786.42 8.00 786.54 0.00 785.59 15.32 785.59 15.32 4.0:1 1.5%4.0: 1 EX RW EX RW EX RW 13+69 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOGAS TEL WAT 786.79 6.00 7 8 6 . 9 1 -2.00 786.27 2 0 . 4 5 786.79 6.00 1.5%3.6%1.9% PR 18" SS PR 18" SS PR 18" SS PR 18" SS WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:44 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090203_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 14+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 14+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT EX RW EX RW 7 8 6 . 1 0 8.00 786.22 0.00 786.48 1 0 . 0 0 1.5% 4.0: 1 787.22 8.00 787.34 0.00 785.56 18.17 785.56 18.17 1.5% 4.0: 1 EX RW EX RW 14+87 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 787.92 6. 0 0 788.04 -2.00 786.90 3 1 . 3 9 787.92 6. 0 0 1.5%4.0% PR 18" SS PR 18" SS PR 18" SS WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090204_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 15+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 15+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 16+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT EX RW EX RW EX RW 787.35 8. 0 0 787.47 0.00 786.99 12.99 1.5%4.0: 1 787.31 8.00 7 8 7 . 4 3 0.00 787.69 10.00 1.5% 4.0: 1 788.43 6.00 788.55 -2.00 787.39 30.92 788.43 6.00 1.5%4.2% EX RW EX RW EX RW 786.02 1 6 . 6 9 PR 18" SS PR 18" SS PR 18" SS WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090205_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 16+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOGAS TEL WAT 17+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOGAS TEL WAT EX RW EX RW 789.11 8.00 789.23 0.00 789.49 10.00 789.49 10.00 1.5% 4.0: 1 7 8 8 . 9 9 8.00 789.11 0.00 787.26 1 8 . 4 6 787.26 1 8 . 4 6 1.5% 4.0: 1 EX RW EX RW 7 8 7 . 4 3 1 8 . 2 6 PR 18" SS PR 18" SS WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090206_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 17+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO GAS TEL WAT 18+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT EX RW EX RW 7 8 9 . 1 7 7.99 789.29 -0 . 0 1 786.97 2 0 . 3 1 786.97 2 0 . 3 1 1.5% 4.0: 1 789.47 10.81 789.47 10.81 789.94 -2.03 789.94 -2.03 789.17 8.00 4.0: 14.0:1 1.5% EX RW EX RW PR 18" SS WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090207_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 18+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT 19+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT EX RW EX RW 789.71 -2.00 7 8 9 . 7 6 -2 . 1 7 7 8 9 . 7 6 -2 . 1 7 788.93 8. 0 0 789.05 0.00 789.03 11.61 789.03 11.61 4.0: 1 1.5%4.0: 1 789.53 -2.00 789.61 -2.34 789.61 -2.34 788.75 8.00 788.87 0.00 788.85 11.58 788.85 11.58 4.0: 1 1.5%4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090208_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 19+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT 20+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT EX RW EX RW 789.67 -2.00 789.80 -2 . 4 9 789.80 -2 . 4 9 788.89 8. 0 0 789.01 0.00 789.07 11.31 789.07 11.31 4.0: 1 1.5%4.0: 1 789.47 -2.00 7 8 9 . 5 9 -2.49 7 8 9 . 5 9 -2.49 7 8 8 . 6 9 8. 0 0 788.81 0. 0 0 788.51 12.74 788.51 12.74 4.0: 1 1.5%4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090209_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 21+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT 21+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOTEL WAT 22+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOTEL WAT EX RW EX RW EX RW 789.45 -3.76 789.45 -3.76 789.11 8.00 789.23 0. 0 0 789.55 10.25 789.55 10.25 4.0:1 1.5%4.0: 1 788.91 -6.52 788.91 -6.52 789.26 8.00 789.38 0.00 7 8 7 . 6 9 1 8 . 2 7 7 8 7 . 6 9 1 8 . 2 7 4.0:1 1.5% 4.0: 1 789.96 -2 . 0 0 789.96 - 2 . 0 2 789.96 - 2 . 0 2 7 8 9 . 1 8 8.00 789.30 0.00 788.23 15.79 788.23 15.79 4.0: 1 1.5% 4.0: 1 EX RW EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090211_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 22+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOTEL WAT 23+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOTEL WAT EX RW EX RW 790.29 -2.00 790.33 -2.19 790.33 -2.19 789.51 8.00 789.63 0.00 789.21 13.18 789.21 13.18 4.0: 1 1.5%4.0: 1 790.27 -2.00 790.28 -2.07 790.28 -2.07 789.49 8. 0 0 789.61 0.00 789.52 1 1 . 8 5 789.52 1 1 . 8 5 4.0: 1 1.5%4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090212_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 23+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FOTELWAT 24+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT EX RW EX RW 790.11 -2.14 790.11 -2.14 789.37 8. 0 0 789.49 0.00 7 8 9 . 6 3 1 0 . 9 2 7 8 9 . 6 3 1 0 . 9 2 4.0:1 1.5%4.0: 1 789.70 - 2 . 0 8 789.70 - 2 . 0 8 788.94 8. 0 0 7 8 9 . 0 6 0.00 7 8 9 . 3 5 10.34 7 8 9 . 3 5 10.34 4.0:1 1.5%4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090213_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 24+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT 25+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT 25+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT EX RW EX RW EX RW 789.29 -7.00 789.29 -7.00 789.76 8.00 7 8 9 . 8 8 0. 0 0 789.37 13.56 789.37 13.56 4.0:1 1.5%4.0: 1 790.25 8. 0 0 790.13 0. 0 0 7 9 0 . 5 0 -3.14 7 9 0 . 5 0 -3.14 1.5%4.0:1 790.40 8. 0 0 790.28 0. 0 0 790.94 -2.00 791.08 -2.56 791.08 -2.56 1.5%4.0: 1 EX RW EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090214_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 26+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT 27+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TELWAT EX RW EX RW 790.88 -2 . 4 3 790.88 -2 . 4 3 790.21 8.00 790.33 0. 0 0 790.04 12.69 791.24 17.48 791.24 17.48 4.0:1 1.5%4.0: 14.0:1 791.16 -2 . 0 0 791.17 -2.03 791.17 -2.03 790.38 8.00 790.50 0. 0 0 788.97 1 7 . 6 7 788.97 1 7 . 6 7 4.0: 1 1.5% 4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090216_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 27+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT 28+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT EX RW EX RW 791.47 -2.00 791.48 -2 . 0 5 791.48 -2 . 0 5 790.69 8. 0 0 790.81 0.00 7 8 9 . 0 9 18.41 7 8 9 . 0 9 18.41 4.0: 1 1.5% 4.0: 1 791.56 -2.06 791.56 -2.06 790.80 8.00 790.92 0. 0 0 790.16 1 4 . 5 5 790.16 1 4 . 5 5 4.0:1 1.5%4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:45 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090217_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 28+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL WAT 29+00 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL EX RW EX RW 791.61 -2.00 791.61 -2.00 790.83 8. 0 0 7 9 0 . 9 5 0. 0 0 7 9 1 . 2 6 1 0 . 2 9 7 9 1 . 2 6 1 0 . 2 9 4.0:1 1.5%4.0: 1 792.17 -2 . 0 8 792.17 -2 . 0 8 791.41 8. 0 0 791.53 0.00 791.76 10.60 791.76 10.60 4.0:1 1.5%4.0: 1 EX RW EX RW WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:46 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090218_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. 29+50 780 790 800 780 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL EX RW791.96 - 2 . 0 0 792.24 -3.12 792.24 -3.12 7 9 1 . 1 8 8.00 791.30 0.00 7 8 9 . 9 6 16.88 7 8 9 . 9 6 16.88 4.0: 1 1.5% 4.0: 1EX RW 30+00 790 800 790 800 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150 R/L FO TEL 790.16 8.00 790.28 0.00 790.94 -2.00 790.96 -2.09 790.96 -2.09 1.5%4.0: 1 4.0:1 WISDOT/CADDS SHEET 49 EHWY:COUNTY: X:\ML\2016\20160990\CAD\SITE\DWG\00\090201_XS.DWGFILE NAME :3/1/2017 1:46 PMPLOT DATE :PLOT BY :ADLER, JORDAN 9 PROJECT NO: PLOT NAME : 9 CROSS SECTIONS:SHEET PLOT SCALE : 2016-0990 CTH Y (RACINE AVE)WAUKESHA MUSKEGO TRAIL CROSS SECTIONS 10 FT 20 FT LAYOUT NAME - 090219_xs 1 IN:20 FT HORZ. / 1 IN:10 FT VERT. March 7, 2017 RE: Racine Avenue Recreation Trail Dear Resident/Property Owner: The City of Muskego is planning to construct an of f-road recreation trail on the west side of Racine Ave. (CTH Y) from Woods Road to the existing trail at the Woodland Creek Subdivision. The purpose of this project is to help improve roadway safety by building a recreation trail for users to safely traverse along Racine Avenue and to link to other recreation trails. The work will include the paving of an eight-foot wide paved recreation trail, storm sewer and the installation/reconstruction of some ditches to improve/maintain drainage along the roadway. Construction is currently planned for the summer of 2017 with completion in the fall of 2017. I have enclosed a copy of the preliminary design plan sheet/s of the area in front of your property. Please review these plans and feel free to contact me directly with any questions, comments or concerns you may have. Please do not hesitate to contact me directly at (262) 679-4156 or via email to dflamini@cityofmuskego.org. Thank you, City of Muskego Daniel Flamini, R.L.S. Lead Engineering Technician cc: Mike Paulos, City Engineer ENGINEERING DIVISION W182 S8200 Racine Avenue Muskego, Wisconsin 53150 (262) 679-4145 FAX (262) 679-5614 EA G LES W AY H AWKS TRL SCHAEFERDR COUNTRYVIEWCT N O R T H V I E W D R H O LZ D R NORTH CAPE RD ACKER DR BLUE HERONLN D U R H A M D R HI VI EW DR PROPOSED18th AMENDEDWCA DISTRICT MAP Proposed WCA Amendment 18 Existing WCA District Property I05001,000 Feet Prepared by City of Muskego Planning Department 3/10/2018 AREA OF INTEREST C I T Y o f F R A N K L I N EXHIBIT "B" Page 1 of 2 EXHIBIT “A” March 10th, 2017 Eighteenth Amended Legal Description for the Water Capacity Assessment (WCA) District All that part of Northeast ¼, Southeast ¼, and the Northwest ¼, of Section 13, Town 5 North, Range 20 East, in the City of Muskego, Waukesha County, Wisconsin, bounded and described as follows: Commencing at the Northeast corner of the Northeast ¼ of Section 13; thence Southerly along the East line of the said Northeast ¼ a distance of 25.00 feet to the South right-of- way line of the Wisconsin Electric and Power Company, said point also being the point of beginning; thence Westerly along said right-of-way line, 2662 feet more or less to the West line of said Northeast ¼; thence Continuing Westerly along said right -of-way, 1,330 feet more or less to the West line of the East ½ of the Northwest ¼ of said Section 13; thence Southerly along said West line 993 feet more or less to the Northwest corner of Parcel 1 Certified Survey Map No. 8915; thence continuing Southerly along said West line 802.11 feet; thence Easterly 270.00 feet; thence Southerly 357.99 feet, to the North right-of-way line of Hi View Drive; thence continuing Southerly 60 feet more or less to the South right-of-way line of said Drive; thence Easterly along said right-of-way line 155 feet more or less to the Northwest corner of lands identified by Tax-key No. 2210- 988; thence Southeasterly along the West line of said lands 490.67 feet to the South line of the Northwest ¼ of said Section 13; thence Easterly along said South line 631.17 feet to the Northwest corner of the Southeast ¼ of said Section 13; thence Easterly along the North line of said Southeast ¼, said line also being the South line of Highview Acres, an Unrecorded Plat, 1676.53 feet; thence Southerly 167.00 feet, to the North line of Lot 2, Certified Survey Map No. 10870; thence Westerly along said North line 143.89 feet, to the West line of said Lot 2; thence Southerly along said West line and the West line of Lot 1 of said Certified Survey Map 628.00 feet, to the South right-of-way line of Schaefer Road; thence Southeasterly 122.27 feet along said South line and along the arc of a curve whose center is to the Southwest, with a radius of 190.00 feet, with a chord length of 120.17 feet; thence Southeasterly 199.49 feet along said South line and along the arc of a curve whose center is to the Northeast, with a radius of 310.00 feet, with a chord length of 196.06 feet; thence Easterly along said South line 133.36 feet to a Southwesterly right of way line of North Cape Road (C.T.H. “OO”); thence Southeasterly along said Southwest line 171.44 feet, to a Westerly right of way line of North Cape Road (C.T.H. “OO”); thence Southerly along said Westerly line 492.67 feet, to a point on the Northerly right of way line of the North Cape Road (C.T.H. “OO”); thence Easterly along said right of way line 17 feet more or less to the Westerly right of way line of North Cape Road (C.T.H. “OO”); thence Southerly along said Westerly right- of-way line 591 feet more or less to the extended South line of North Cape Farms a subdivision located in the City of Muskego; thence Easterly along said Southerly line 543 feet more or less to a Southeasterly line of said North Cape Farms Subdivision, said point also being the southeast corner of Lot 7 in said Subdivision; thence Northeasterly along Page 2 of 2 said Southeasterly line 321.00 fee to the Southeast corner of said Subdivision, said point also located on the East line of the Southeast ¼ of Section 13; thence Northerly along said East line 1,948 feet more or less to the Southeast corner of the Northeast ¼ of said Section 13; thence Northerly along the East line of the Northeast ¼ of said Section 13 a distance of 2,634.07 feet to the point of beginning. (See Attached Map) Daniel Flamini, PLS #2486