Loading...
Public Works Committee Packet- 11/21/2016 CITY OF MUSKEGO PUBLIC WORKS COMMITTEE AGENDA November 21, 2016 5:00 PM Aldermen’s Room – Upper Level of City Hall, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF MINUTES HELD November 10, 2016. STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: 1. North Cape Road Recreational Trail (Racine Avenue to Windover Drive) 2. Moorland Road Reconstruction 3. Oakridge Glen Subdivision 4. Edgewater Heights Subdivision 5. Woods Road Emergency Culvert Replacement UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: 1. Review of Public Information Meeting Materials for Moorland Road by Kapur 2. Review Request by the Village of Big Bend to Explore the Feasibility of the City of Muskego to Supply Water to the Village 3. Review Request for Municipal Water for New Middle School by Muskego-Norway School District 4. Review Request for Public Improvements to be Required as part of the Potential Land Division of MSK2208-997-001 NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136. Unapproved CITY OF MUSKEGO PUBLIC WORKS COMMITTEE MINUTES November 10, 2016 8:30 AM Aldermen’s Room – Upper Level of City Hall, W182 S8200 Racine Avenue CALL TO ORDER Alderman Kevin Kubacki called the meeting to order at 8:30 AM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Alderman Kevin Kubacki, Alderman Eileen Madden Not Present: Alderman Tom Kapusta Guests: City Engineer Mike Paulos, Mayor Kathy Chiaverotti STATEMENT OF PUBLIC NOTICE The meeting was noticed in accordance with the open meeting laws. APPROVAL OF MINUTES HELD October 17, 2016. Alderman Madden made a motion to approve the MINUTES HELD October 17, 2016. Alderman Kubacki seconded. Motion Passed 2 in favor. STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: *Resolution 001-2016 -- Resolution Authorizing The Retaining Of DF Tomasini For Emergency Repair Of Culvert Replacement On Woods Road Near Sandy Beach Drive Alderman Madden made a motion to approve *Resolution 001-2016 -- Resolution Authorizing The Retaining Of DF Tomasini For Emergency Repair Of Culvert Replacement On Woods Road Near Sandy Beach Drive. Alderman Kubacki seconded. Motion Passed 2 in favor. Mike Paulos suggested moving forward with the emergency repair to the culvert on Woods Road bypassing public bidding due to the urgency of the matter. NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT Alderman Kubacki made a motion to ADJOURN at 8:37 AM. Alderman Madden seconded. Motion Passed 2 in favor. Page 1 of 1 CITY OF MUSKEGO Staff Report to Public Works Committee To: Public Works Committee From: Michael N. Paulos, P.E., Director of Public Works/City Engineer Subject: Review Public Information Meeting Exhibits Date: November 15, 2016 Kapur and Associates, Inc. along with Single Source, Inc and Engineering staff will be hosting the second Public Information Meeting for Moorland Road Reconstruction Project on December 12th from 5:00- 7:00 pm in the Muskego Room at City Hall. The following attached exhibits will be shared with the Public and Staff and the Consultants will be on hand to answer questions. Recommendation for Action by Committee: Review the exhibits to be shared with the Public at the second Public Information Meeting. IP IP MH IP IP IP T IL E WV WV MH IP IP IP P O S T MPMP MH WV IP IPW V IP WV IP V L V W V G U Y IP MH V L V MP G U Y V L V P O S T MP WV WV WV WV WV W V MH W V IP IP IP W V P O S T G U Y P O L E MP MB MP IP MH WV WV V L V IP W V W V MP IP MP IP MH IP WV MH G V IP WV MH MP WV G U Y WV SIGN IP IP WVWV MP IP MB P O S T V L V G V MH WV P O S T MB IP W V W V S I G NWV WV G U Y IP WV MH W V MH MH MP WV IP WV WV MH P O S T MP IP W V MP IP IP IP W V IP G U Y IP V L V IP IP MB IP V L V MHMH MB W V IP G U Y MH IP MH IP P O S T G U Y IP IP MH V L V MB V L V MB MB IP V L V G U Y G U Y MH WV WV WV WV WV MP V L V W V V L V MP MB MP G U Y S IG N WV IP WV MH W V IP MP IP IP IP G U Y IP IP MH IP P O S T P O S T IP MH IP MH MH 1 1 12 1 1 1212 254 256 258 260 262 2 6 4 2 6 6 250 1 2 8 5 8 6 0 132 134 136 138 140 142 144 146 148 150 154 156 158 160 162 1 6 4 1 6 6 1 6 8 4 6 4 2 2 4 3 2 34 1 2 1 4 4 2 5 8 6 0 154 156 158 160 162 1 6 4 1 6 6 1 6 8 5 8 6 0 7 8 8 .0 788.0 788.0 7 8 8 .0 7 8 8 .0 7 8 8 .0 7 8 8 .0 7 8 6 .0 786.0 7 8 6 .0 7 8 4 .0 784.0 7 8 2 .0 782.0 7 8 8. 0 7 8 8 .0 W O O D S R O A D MOORLAND ROAD DURHAM DRIVE C A N D L E W O O D L A N E DURHAM COURT D U R H A M P L A C E W O O D S R O A D M O O R L A N D R O A D P IL G R IM D R IV E E A S Y S T R E E T M c S H A N E D R IV E DURHAM DR IVE SCALE, FEET 0 50 100 LINDA L RANN WILLIAM C &FRASIER KEVIN J & LISA A ALLAN W & AMY M ATKINSON K LAWLIS MICHAEL TRUST STOIBER PATRICIA A ALBERTA M BITTER KENNETH M & ENGELMANN SHARON L ALLAN A PASCUTTI CZERNIAK JAMES & DEBRA TRUST RITA WANTA AMBROSE & REHORST DANIEL & NANCY D A VID A & S A N D R A S B E L L K N O P IC K M IC H A E L & K A R E N MALINOWSKI MICHAEL & ANN MEDENBLIK RUSSEL J & ANGELA A PROHASKA DEBORAH METZELFELD MICHAEL & DAWN POPOUTSIS NICKOLAS & PAULA FUJINAKA MICHAEL & WENDY MARTIN SHERYL KREGELKA ROGER & WENDY PIZUR MARK & KAREN THOMAS P & PAMELA A EVANS BOYD W SCOTT & SHERRY L PATTEE RYAN & KELLEY DEVROY DAVID L & DEBRA K REVOCABLE TRUST BELL SR RUSSELL E BATCHELOR CHARLES J & MICHELLE M PIEKARSKI DENNIS A & MARY BE BARTZ GLORIA SORENSEN ROBERT A & SUSAN R L HETZNECKER M SCHREIBER & HART MARGARET A DREW W & TODD A CRISP JR BARBARA L LICHMAN RICKY A & WETLAND BOUNDARY WETLAND BOUNDARY SLOPE INTERCEPT (TYP) SLOPE INTERCEPT (TYP) BUCKMASTER C/O CHRISTOPHER HOMEOWNERS ROSEWOOD ESTATES ANNE M FOGLIA VINCENT A & BRATISHKO TATYANA OLEG V & ALCANTARA GUSTAVO RAMIREZ & ADRIANA HOMEOWNERS ASSOCIATION CANDLEWOOD CREEK NO BUILD P R O P O S E D P O N D L O C A T IO N SAVE TREES LEGEND TREE REMOVAL P R O P O S E D P O N D L O C A T IO N JOSEPH E MEYER VOGL & VICKIE LEE IP WV IPWVWV WV MPMP MH WV MP WV MP WV IP WV IP WV WV IP WV WV MP WV WVWV WV WV WVWV WV IP WV WVWV MH SIGN WV MH MH MH WV S IG N IP PO ST WV WV WV V LV IP MH V LV V LV MH W VWV WV MH IP WV MH V LV V LV S IGN C H IS MH V LV WV MH V LV V LV V LV WV MH WV MH V LV PO ST MH WV WV MH MH WV PO ST V LV MH MH MH S IG N V LV CH IS V LV V LV WV V LV MH WV IP S IGN V LV MH V LV WV PO ST WV WV ON LY W V MH PO ST WV IP MH MH IP MH MH C H IS IP IP IP WV IP SIGN MH IP 386 388 390 3 9 2 3 9 4 396 398 264 266 7 2 6 8 164 16 6 168 170 172 174 176 178 180 182 1 8 4 1 8 6 188 190 19 2 1 9 4 196 198 200 7 2 6 8 6 8 7 6 7 8 8 0 8 2 8 4 8 6 164 16 6 168 170 172 174 176 178 180 182 1 8 4 1 8 6 188 190 19 2 1 9 4 196 198 200 788.0 78 8.0 788.0 788.0 786.0 788.0 SA N D A L W O O D D R IV E S A N D A L W O O D D R IVE P R IN C E T O N D R IV E M O O R LA N D R O A D R O SE W O O D D RI V E J A N E S V IL L E R O A D MO O R LA N D R O A D MO O R LA N D R O A D J A N E S V IL L E R O A D P R IN C E T O N D R IV E ROSEWOOD DRIVE W E S T C O T D RI V E MOORLAND ROAD SCALE, FEET 0 50 100 GUSTAVO ALCANTARA ADRIANA RAMIREZ & JOHNSON ERIC J & PATRICIA A VIDMAR BRENDA B HUMMEL HENRY J & BARBARA A HOMEOWNERS ESTATES ROSEWOOD ROBERTS JUDITH A RAYMOND R & ADDENDUM 1 2ND AMENDMENT CANDLEWOOD VILLAGE ADDENDUM 1 2ND AMENDMENT CANDLEWOOD VILLAGE ADDENDUM 1 2ND AMENDMENT CANDLEWOOD VILLAGE ILSLEY BANK MARSHALL & M & I PROPERTIES LLC JETZ MUSKEGO MUSKEGO CITY OF DAWN M PIERSON JUDE M & BLOCK JENNIER A AARON E & WETLAND BOUNDARY WETLAND BOUNDARY WETLAND BOUNDARY WETLAND BOUNDARY SLOPE INTERCEPT (TYP) SLOPE INTERCEPT (TYP) TATYANA BRATISHKO OLEG V & MILL & OVERLAY MOORLAND PARK HOMEOWNERS ASSOCIATION CANDLEWOOD CREEK LEGEND TREE REMOVAL PR O PO SED PO N D LO C A TIO N PLANTING TO REMAIN EXISTING SIGN AND ONLY 42"x48" R3-5R STA 193+35, 50'LT S-XX-XXX OVERHEAD SIGN SUPPORT CITY OF MUSKEGO, WAUKESHA COUNTY WOODS ROAD TO JANESVILLE ROAD MOORLAND ROAD PROJECT ID 2723-00-01 CITY OF MUSKEGO, WAUKESHA COUNTY WOODS ROAD TO JANESVILLE ROAD MOORLAND ROAD PROJECT ID 2723-00-01 Page 1 of 1 CITY OF MUSKEGO Staff Report to Public Works Committee To: Public Works Committee From: Michael N. Paulos, P.E., Director of Public Works/City Engineer Subject: Review Request by the Village of Big Bend to Explore the Feasibility of Muskego Supplying Municipal Water to the Village Date: November 17, 2016 The Village of Big Bend is requesting approval from the City of Muskego to work with Staff and explore the option for the City of Muskego to supply municipal water to the Village of Big Bend. The Village of Big Bend is considering various options to bring municipal water within the Village to spur development. Recommendation for Action by Committee: Recommend that the City of Muskego staff work with the Village of Big Bend to determine the feasibility of supplying the Village of Big Bend with municipal water. Also recommend that any costs associated to the Village of Big Bend’s request shall be at the Village of Big Bend’s expense. Page 1 of 1 CITY OF MUSKEGO Staff Report to Public Works Committee To: Public Works Committee From: Michael N. Paulos, P.E., Director of Public Works/City Engineer Subject: Review Request by Muskego-Norway school District for New Middle School Date: November 15, 2016 The Muskego Norway School District is requesting approval for a municipal water connection for the proposed new Middle School located at W124 S8009 North Cape Road, just south of the Muskego recreational Trail and Tudor Oaks Senior Living Community. The proposed connection point is the existing 8-inch, dead end water main at Tudor Oaks Senior Living Community. A duplex booster station and separate fire pump are being considered for the school. Recommendation for Action by Committee: Recommend that the proposed water main be connected to the municipal water system at Tudor Oaks Senior Living Community as proposed as well as extending the proposed water main south and tie into the existing water distribution system thereby creating a truly looped system to greatly increase system pressure, supply and fire protection reliability. The water main loop connection concept was discussed with the development team in April with possible routes to consider. Wednesday | November 9, 2016 City of Muskego, Public Works Committee W182 S8200 Racine Avenue Muskego, WI 53150 Re: Muskego-Norway School District Request for Municipal Water for New Middle School Dear Public Works Committee: The Muskego-Norway School District is requesting approval from the City of Muskego’s Public Works Committee to provide a municipal water connection for the proposed New Middle School project that was approved by public referendum on April 5, 2016. The New Middle School site is located at W124 S8009 North Cape Road in Muskego, just south of the Muskego Recreational Trail and Tudor Oaks Senior Living Community. The proposed route for the new water service is to connect to the existing 8 inch water main at Tudor Oaks Senior Living Community at a single point with a new 8 inch water main running south across the Muskego Recreational Trail to the New Middle School site. An 8 inch water main loop would then be created around the New Middle School building. Please reference the attached overall site plan of the New Middle School, sheet C1.2, which shows the proposed route. The Muskego-Norway School District has been in contact with Tudor Oaks Senior Living Community regarding the easement needed to make this proposed water service connection possible and will continue to coordinate with them on the route should this proposal be approved. Several options for providing water to the New Middle School have been studied, including through meetings with the City of Muskego. In addition to the immediate impact on the New Middle School project, both the City’s long term plan and the School District’s long term plan were taken into consideration. Additional information is available upon request. The City of Muskego provided preliminary estimates for the water capacity to the New Middle School based on the proposed connection and route outlined above. The estimated available fire flow is approximately 1,500 GPM, and the estimated pressure is approximately 20 PSI. Muermann Engineering has provided Muskego-Norway School District with estimates of the water demand for the New Middle School. The peak load is estimated to be approximately 197 GPM with an anticipated service load of 118 GPM. However, the estimated 20 PSI water pressure is too low, so a duplex booster pump is being proposed to increase the pressure for the domestic water demand. A separate fire pump is also being proposed to increase the pressure for the fire protection system. Muermann Engineering estimates, based on preliminary calculations, that the 1,500 GPM fire flow may be sufficient for the New Middle School; however, if this proposal is approved additional engineering will be done to confirm that is the case, which the School District will coordinate with the City of Muskego. Thank you for your time and consideration of this proposal to provide municipal water for the Muskego-Norway School District’s New Middle School. Sincerely, Muskego-Norway School District Jeremiah Johnson, SHRM-CP, CSRM Director of Operations | Safety Coordinator | Muskego-Norway School District Enclosure: New Middle School Site Plan cc: Kathy Chiaverotti, Mayor, City of Muskego Scott Kloskowski, Utilities Superintendent, City of Muskego Jeff Muenkel, Director of Community Development, City of Muskego Mike Paulos, Graef Rick Petfalski, School Board President, Muskego-Norway School District Matt Wolfert, President, Bray Architects 1 Heather Owen From:Heather Owen Sent:Thursday, November 17, 2016 2:04 PM To:Heather Owen Subject:FW: Permitting Attachments:Sanitary Asbuilt.pdf; ATT00001.htm; Water Extension Options.pdf; ATT00002.htm From: David Simpson [mailto:dsimpson@cityofmuskego.org] Sent: Wednesday, April 13, 2016 12:43 PM To: Joe.Schmidt@cgschmidt.com; jeremiah.johnson@muskegonorway.org Cc: julie.kelly@muskegonorway.org; kelly.thompson@muskegonorway.org; Jeffrey Muenkel; mhacker@brayarch.com; Dan.Duerrwaechter@cgschmidt.com; Scott Kloskowski Subject: RE: Permitting Hi Joe- I have attached the sanitary asbuilt as well as a sketch of the two routes we think would be most viable for the water main loop connection. You may also want to start reaching out to Franklin to begin discussions on what their driveway entrance requirements will be. Thanks, Dave David Simpson, P.E. Director of Public Works/City Engineer City of Muskego Direct (262) 679-5686   This message originates from David Simpson.  It contains information that may be confidential or privileged and is intended only for the individual named above.  It is prohibited for anyone to  disclose, copy, distribute or use the contents of this message without permission, except as allowed by Wisconsin Public Records Laws.  If this message is sent to a quorum of a governmental  body, my intent is the same as though it were sent by regular mail and further distribution is prohibited.  All personal messages express views solely of the sender, which are not attributed to  the municipality I represent, and may not be copied or distributed without this disclaimer. From: Joe.Schmidt@cgschmidt.com [mailto:Joe.Schmidt@cgschmidt.com] Sent: Thursday, April 07, 2016 9:48 PM To: David Simpson; jeremiah.johnson@muskegonorway.org Cc: julie.kelly@muskegonorway.org; kelly.thompson@muskegonorway.org; Jeffrey Muenkel; mhacker@brayarch.com; Dan.Duerrwaechter@cgschmidt.com Subject: RE: Permitting Dave,    Thank you for all the information.  I look forward to our upcoming discussions.   If there is information from your GIS system to begin looking at the building service utilities that you can share that  would be very helpful for our team.     Joseph Schmidt, PE  Preconstruction Manager  CG SCHMIDT INC.  11777 West Lake Park Drive  Milwaukee, WI 53224  Direct: (414) 577‐1147  Fax: (414) 577‐1155  Cell Phone (414) 758‐7333  2 Creating Exceptional Facilities that Improve the Lives of Others   From: David Simpson [mailto:DSimpson@cityofmuskego.org] Sent: Thursday, April 07, 2016 8:04 AM To: Jeremiah Johnson Cc: Julie Kelly; Kelly Thompson; Schmidt, Joe; Jeffrey Muenkel Subject: RE: Permitting Jeremiah- We are always willing to meet and discuss project requirements so feel free to let us know when you are ready to meet. I would imagine the biggest topic from the Engineering end of things will be how to get water service to the new school as well as access issues. I am sure there will be other questions relating to storm water management as well. Thanks, Dave David Simpson, P.E. Director of Public Works/City Engineer City of Muskego Direct (262) 679-5686   This message originates from David Simpson.  It contains information that may be confidential or privileged and is intended only for the individual named above.  It is prohibited for anyone to  disclose, copy, distribute or use the contents of this message without permission, except as allowed by Wisconsin Public Records Laws.  If this message is sent to a quorum of a governmental  body, my intent is the same as though it were sent by regular mail and further distribution is prohibited.  All personal messages express views solely of the sender, which are not attributed to  the municipality I represent, and may not be copied or distributed without this disclaimer. From: David Simpson Sent: Wednesday, April 06, 2016 3:47 PM To: 'Jeremiah Johnson' Cc: Julie Kelly; Kelly Thompson; joe.schmidt; Jeffrey Muenkel Subject: RE: Permitting Jeremiah- Jeff Muenkel is in charge of Building Inspection so I will let him answer your questions. I have copied him on this email. I will be involved with your approval process from the Engineering side of things and Jeff will handle all Planning and Building items. I am sure we can assist in any way you might need when working through the approval processes. Thanks, Dave David Simpson, P.E. Director of Public Works/City Engineer City of Muskego Direct (262) 679-5686   This message originates from David Simpson.  It contains information that may be confidential or privileged and is intended only for the individual named above.  It is prohibited for anyone to  disclose, copy, distribute or use the contents of this message without permission, except as allowed by Wisconsin Public Records Laws.  If this message is sent to a quorum of a governmental  body, my intent is the same as though it were sent by regular mail and further distribution is prohibited.  All personal messages express views solely of the sender, which are not attributed to  the municipality I represent, and may not be copied or distributed without this disclaimer. From: Jeremiah Johnson [mailto:jeremiah.johnson@muskegonorway.org] Sent: Wednesday, April 06, 2016 3:33 PM To: David Simpson Cc: Julie Kelly; Kelly Thompson; joe.schmidt Subject: Permitting Hi Dave- I understand this will need a greater level of discussion, but we have begun to map out our building plans and wondered if we could work out an arrangement for permitting costs. Some have noted that the City has worked on a time and material basis for permitting during past District projects? Is that something we could come 3 around in the coming month? Looking forward to all of the work will we be doing with you in the coming year! -- Jeremiah Johnson SHRM-CP, CSRM Buildings & Grounds Supervisor | Safety Coordinator | Muskego-Norway School District | 262.971.1807 Page 1 of 1 CITY OF MUSKEGO Staff Report to Public Works Committee To: Public Works Committee From: Michael N. Paulos, P.E., Director of Public Works/City Engineer Subject: Review Request for Review of Water Main to be Required as Part of a Potential Land Division of MSKC2208-997-001 Date: November 15, 2016 The attached was received from David Simpson in reference to a potential land division on the east side of Nursery Court. Mr. Simpson is asking that the Committee not require water main to be installed on Nursery Court as part of a potential land division. Mr. Simpson makes reference to the loss of a tree line for the water main installation, costs, and that the original developer for Nursery Subdivision was not required to install water main. Water main is available along McShane Drive. The same request was made at the August 11, 2016 Public Works Committee meeting by the Neumann Companies. Staff recommended and the motion was passed that public improvements be required of a potential land division of MSKC2208-997-001. Recommendation for Action by Committee: Require water main extension be required for any land division of MSKC2208-997- 001 as the Public Works Committee passed on August 11, 2016 for the same parcel. David & Elizabeth Simpson 3155 Cherry Hill Drive Brookfield, WI 53005 Page 1 of 2    November 4, 2016 City of Muskego Attn: Public Works Committee W182 S8200 Racine Avenue Muskego, WI 53150 RE: Land Division of S76 W12677 McShane Drive - Water Main Requirements Dear Public Works Committee Members, At a previous Public Works Committee meeting a request was made by a developer to consider the scope of water main improvements for a potential land division of S76 W12677 McShane Drive. At that meeting the Committee was only able to consider the facts provided by the Developer to them at that time, and the decision was made to require water main improvements on Nursery Court. Since that meeting I have acquired this property and am beginning the process of looking into a potential land division. I am writing to request a reconsideration of the previous decision based on new information and ask that no water main improvements be required to be installed on Nursery Court. The following are factors that I would like the Committee to consider when determining the required water main improvements: 1. There is an existing quality tree line along the edge of the roadway that would have to be completely removed in order to install the water main. The existing residents on the west side of Nursery Court most certainly enjoy the nice screening that these trees provide and would not be pleased if they had to be removed. The pictures below show the existing trees looking north from McShane and looking south from the cul-de-sac. I believe development should occur in a fashion that allows the least amount of disruption to the existing environment and neighborhoods. If a land division occurs without installing water main the only disruption to this tree line would be for small driveway openings. David & Elizabeth Simpson 3155 Cherry Hill Drive Brookfield, WI 53005 Page 2 of 2    2. The attached concept land division shows the most feasible land division option. In this scenario, it would be possible to keep the existing home that is currently served by an active safe well and the corner lot could be served by the existing water main in McShane Drive. In this scenario, it would mean that the entire water main would only be serving two new lots. The attached cost estimate shows that the estimated cost to install water main for this project would be $96,500. This cost does not include engineering, permitting, or City costs, which could easily cost upwards of $25,000. This would leave the total benefit to each potential lot over $60,000/lot. This is an extremely high cost that would preclude this potential development from occurring. 3. The original Developer of the Nursery Subdivision was not required to install water main and that was a larger development with a total of 6 lots. Requiring water main at this time of this development would not be equitable. 4. This development is feasible if the water main improvements are not required. If this development does occur, the existing one sided roadway will become a traditional dual loaded roadway. This is important to the City because the current one sided roadway is very expensive to maintain compared to a traditional roadway with dual sided tax base. The additional value to the City’s levy if a four lot land division occurs and new homes are constructed (assuming a home similar to Belle Chasse at $325K in improvement value and a lot value of $75K) could easily be an additional $1,200,000, which equates to an annual tax bill collection of over $20,000. This value could be even higher if the exiting home’s value is improved by remodeling or replacement. I look forward to discussing this issue with the Committee and am available to answer any questions you or staff may have in advance. Thank you, David Simpson