COMMITTEE OF THE WHOLE Packet - 8/18/2016
CITY OF MUSKEGO
COMMITTEE OF THE WHOLE AGENDA
August 18, 2016
6:00 PM
City Hall, W182 S8200 Racine Avenue
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
STATEMENT OF PUBLIC NOTICE
APPROVAL OF AGENDA
APPROVAL OF MINUTES - July 26, 2016
NEW BUSINESS - Capital Projects Fund Budgets
1.) Facility Projects Update
2.) Community Development
3.) Engineering/DPW/Utilities
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
ADJOURNMENT
Possible reconvening of the Committee of the Whole immediately following Common Council
Meeting of the same date to continue work on agenda items
NOTICE
IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF
THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION
WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL
BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE.
ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS
SERVICE, MUSKEGO CITY HALL, (262) 679-4100.
Unapproved
CITY OF MUSKEGO
COMMITTEE OF THE WHOLE MINUTES
July 26, 2016
6:00 PM
City Hall, W182 S8200 Racine Avenue
CALL TO ORDER
Mayor Chiaverotti called the meeting to order at 6:15 pm.
PLEDGE OF ALLEGIANCE
ROLL CALL
Present Alderman Wolfe, Borgman, Kapusta, Engelhardt, Kubacki, Madden and Mayor
Chiaverotti. Alderman Hammel was absent. Also present Deputy Clerk Blenski, Attorney
Warchol, Director Muenkel, Director Simpson, John Sabinash and District 1 Resident
(Hawthorne Road).
STATEMENT OF PUBLIC NOTICE
Deputy Clerk Blenski stated the meeting was properly noticed.
APPROVAL OF AGENDA
APPROVAL OF MINUTES - July 12, 2016
Alderman Madden motioned to approve July 12, 2016 minutes. Alderman Wolfe seconded
motion.
NEW BUSINESS
1.) Zoning Code Review - Accessory Structures in Front Yards
2.) Update and Discussion of Facilities Project
1.) Zoning Code Review - Accessory Structures in Front Yards
Director Muenkel opened the follow-up discussion regarding Accessory Structures Zoning
Code. Aldermen discussed what they observed in their districts and ordinance compliance.
District 1 Resident spoke in regards to her complaint and asked the committee to make
changes to the ordinance.
Mayor asked for the general consensus. The consensus was 4/2, to leave the ordinance as is
due to the number of existing structures and the diverse property types.
2.) Update and Discussion of Facilities Project
John Sabinash gave an update of the 7-21-16 bids received, Absolute Construction was the
low bidder. All bids exceed the project budget. Zimmerman will analyze all the bid amounts
and will be prepared to make a recommendation in about 2 weeks.
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
ADJOURNMENT
Possible reconvening of the Committee of the Whole immediately following Common Council
Meeting of the same date to continue work on agenda items
Alderman Kubacki motioned to adjourn. Alderman Engelhardt seconded motion. Meeting
adjourned at 7:02 pm.
PROPOSED
5-YEAR CAPITAL PLAN
2017 - 2021
Prepared by
City of Muskego
Finance & Administration Department
Thursday, August 18, 2016
W182 S8200 Racine Avenue, Muskego, WI 53150-0749
Waukesha County, Wisconsin
(262) 679-4100
Table of Contents
5-Year Capital Improvements Program
2017 – 2021
I
2017 Capital Expenditure Summary ......................................................... 1
Summary of All Projects .......................................................................... 2
Detailed 5-Year Project Description ......................................................... 3
Building Maintenance ................................................................................. 5
– Facilities Planning – City Hall ..................................................... 5
Information Technology ............................................................................. 6
– MS Office Upgrade ..................................................................... 6
– Unitrends Backup ....................................................................... 7
– Switch Replacement ................................................................... 8
– Microsoft Exchange Upgrade ..................................................... 9
– Email Archiving ........................................................................... 10
– Multi-Function Print Device Replacements ................................ 11
– Body Cam Storage ..................................................................... 12
– Firewall Replacement ................................................................. 13
Police .......................................................................................................... 14
– Facility ...................................................................................... 14
– Drone ........................................................................................ 15
– Officer Body Camera ................................................................ 16
– FX Training Equipment ............................................................. 17
– Rifle Plate & Carrier ................................................................. 18
– Taser Replacement .................................................................. 19
– Detective Vehicle ..................................................................... 20
– Boat Replacement .................................................................... 21
– Auto License Plate Reader ...................................................... 22
– Support Vehicle ........................................................................ 23
– Tactical Vehicle ........................................................................ 24
Table of Contents
5-Year Capital Improvements Program
2017 – 2021
II
TC Volunteer Fire Department ................................................................. 25
– Various Equipment & Vehicles ................................................. 25
Library ........................................................................................................ 26
– Children’s Area Redesign ......................................................... 26
– Carpeting .................................................................................. 27
– HVAC System ........................................................................... 28
– Meeting Room Technology ....................................................... 29
– Public Furniture ........................................................................ 30
– Staff Workstations .................................................................... 31
– Young Adult Area Redesign ..................................................... 32
– RFID ......................................................................................... 33
– Service Desks Redesign .......................................................... 34
Recreation .................................................................................................. 35
– Software ................................................................................... 35
Public Works – Engineering Division ...................................................... 36
– Moorland Reconstruction .......................................................... 36
– Hillendale Drive Phase I ........................................................... 37
– Hillendale Drive Phase II .......................................................... 38
– Baylane Drive Reconstruction .................................................. 39
Public Works Division ............................................................................... 40
– City Garage Maintenance/Addition (70%) ................................ 41
– Gas Pump ................................................................................ 42
– Motor Grader ............................................................................ 43
– Pickup Truck ............................................................................ 44
– Concrete Mixer ......................................................................... 45
– Asphalt Roller ........................................................................... 46
Table of Contents
5-Year Capital Improvements Program
2017 – 2021
III
Public Works Division (continued)
– Tri Deck Mower ........................................................................ 47
– Out Front Mower ...................................................................... 48
– Salt Shed Roof ......................................................................... 49
– Pavement Striper ..................................................................... 50
– Roadside Mower ...................................................................... 51
– Back Hoe .................................................................................. 52
– Front End Loader ..................................................................... 53
– Skid Loader .............................................................................. 54
Water Utility ............................................................................................... 55
– City Garage Maintenance/Addition (15%) ................................. 55
– Truck (50%) ............................................................................... 56
– Gas Pump (15%) ....................................................................... 57
– SCADA Maintenance (50%) ...................................................... 58
– Meters ....................................................................................... 59
– Water Tower Painting ................................................................ 60
– Relay Water Laterals ................................................................. 61
– Water Tower Cleaning & Inspections ........................................ 62
– Filling Station ............................................................................. 63
– Relay Water Mains .................................................................... 64
– Hillendale Booster Station ......................................................... 65
Sewer Utility ..................................................................................... 66
– City Garage Maintenance/Addition (15%) ................................ 66
– Truck (50%) .............................................................................. 67
– Gas Pump (15%)I ..................................................................... 68
– SCADA Maintenance (50%) ..................................................... 69
Table of Contents
5-Year Capital Improvements Program
2017 – 2021
IV
Sewer Utility (continued)
– Lift Station Upgrades ................................................................ 70
– Private Property I & I ................................................................ 71
– Camera ..................................................................................... 72
Special Revenue Funds .................................................................. 73
– Conservation Truck .................................................................. 73
– Park Dedication/Improvements ................................................ 74
CAPITAL CAPITAL PARK WORKING
PROJECT DEPARTMENT EXPENDITURE BORROWING DEDICATION CONSERVATION CAPITAL TOTAL
FUNDING (Landfill)(Utilities)
FACILITY - CITY HALL NEW BUILDING/REMODEL BUILDING MAINTENANCE $0 $4,635,311 $4,635,311
MS OFFICE UPGRADE INFORMATION TECHNOLOGY $53,500 $53,500
UNITRENDS BACKUP INFORMATION TECHNOLOGY $38,000 $38,000
SWITCH REPLACEMENTS INFORMATION TECHNOLOGY $20,070 $20,070
MICROSOFT EXCHANGE UPGRADE INFORMATION TECHNOLOGY $13,100 $13,100
EMAIL ARCHIVING INFORMATION TECHNOLOGY $4,000 $4,000
MULTI-FUNCTION PRINTING DEVICES INFORMATION TECHNOLOGY $25,000 $25,000
FACILITY - NEW PD BUILDING/REMODEL POLICE $412,842 $132,004 $544,846
DRONE POLICE $7,491 $7,491
OFFICER BODY WORN CAMERAS POLICE $40,500 $40,500
FX TRAINING EQUIPMENT POLICE $11,500 $11,500
RIFLE PLATE & CARRIER POLICE $12,600 $12,600
TASER REPLACEMENT POLICE $16,700 $16,700
TCVFD EQUIPMENT (Council approval 9/8/15)TC VOLUNTEER FIRE DEPT $105,000 $105,000
CHILDREN'S AREA REDESIGN LIBRARY $61,500 $61,500
CARPETING LIBRARY $20,000 $20,000
HVAC SYSTEM CONTROLS LIBRARY $45,000 $45,000
MEETING ROOM TECHNOLOGY LIBRARY $6,800 $6,800
PUBLIC FURNITURE LIBRARY $8,000 $8,000
STAFF WORKSTATIONS LIBRARY $3,750 $3,750
SOFTWARE RECREATION $8,500 $8,500
MOORLAND RECONSTRUCTION DPW-ENGINEERING $120,000 $120,000
HILLENDALE DRIVE RECONSTRUCTION PHASE I DPW-ENGINEERING $150,000 $150,000
MOTOR GRADER DPW $175,000 $175,000
PICKUP TRUCK DPW $55,000 $55,000
CONCRETE MIXER DPW $26,000 $26,000
CITY GARAGE MAINTENANCE/ADDITION DPW & UTILITIES $107,283 $2,686,675 $499,568 $3,293,526
GAS PUMP REPLACEMENT DPW & UTILITIES $28,000 $12,000 $40,000
TRUCK WATER & SEWER UTILITY $32,000 $32,000
SCADA MAINTENANCE WATER & SEWER UTILITY $10,000 $10,000
METERS WATER UTILITY $50,000 $50,000
WATER TOWER PAINTING WATER UTILITY $350,000 $350,000
LIFT STATION UPGRADES SEWER UTILITY $50,000 $50,000
PRIVATE PROPERTY I & I (MMSD Reimbursement) SEWER UTILITY $250,000 $250,000
TRUCK CONSERVATION $30,000 $30,000
PARKS PROJECTS PARK DEDICATION/IMPROVE $1,023,536 $1,023,536
TOTAL CAPITAL PORJECTS $1,575,136 $7,453,990 $1,023,536 $30,000 $1,253,568 $11,336,230
(Debt Issuance)
CITY OF MUSKEGO - 2017 BUDGET
CAPITAL EXPENDITURE SUMMARY
(Landfill)(Landfill)
Page 1
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
2017 - 2021 Totals
A. PROJECT IDENTIFICATION
1. Project Name:Summary of All Projects
2. Department:All Departments
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 2,453,511 733,511 508,000 672,000 226,000 314,000
Vehicle Replacement 3,000,000 117,000 424,000 721,000 1,628,000 110,000
Arch/Engineering 1,392,645 1,042,645 255,000 0 65,000 30,000
Land/ROW/Site Prep 945,000 535,000 210,000 200,000 0 0
Construction 25,910,522 7,244,614 8,496,495 6,414,413 2,345,000 1,410,000
Other 2,789,549 1,663,461 498,120 627,968 0 0
TOTAL 36,491,226 11,336,230 10,391,615 8,635,381 4,264,000 1,864,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.881,000 427,000 67,000 148,000 169,000 70,000
601 Sewer Working Cap.980,568 576,568 167,000 78,000 79,000 80,000
410 Capital Expenditure 000000
401 GO Borrowing 22,961,418 6,954,422 7,044,615 5,462,381 3,500,000 0
Water Borrowing 1,879,568 499,568 0 0 0 1,380,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
210 Landfill 7,765,136 1,605,136 2,863,000 2,697,000 266,000 334,000
202 Park Dedication &670,000 670,000 0000
203 Park Improvements 353,536 353,536 0000
216 Storm Water 000000
503 Library Funds 000000
601 Other Funding - MMSD 1,000,000 250,000 250,000 250,000 250,000 0
TOTAL 36,491,226 11,336,230 10,391,615 8,635,381 4,264,000 1,864,000
Check Total (0) (0) 0 (0) 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 000000
2. Materials 000000
3. Total Cost 000000
4. Offsetting Rev or Savings 000000
5. Net impact 000000
Page 2
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION 2017 - 2021
Page Totals 2017 2018 2019 2020 2021
General Government
Building Maintenance
Facilities Planning - City Hall 5 7,827,831 4,635,311 3,192,520 - - -
Total 7,827,831 4,635,311 3,192,520 - - -
Information Technology
MS Office Upgrade 6 53,500 53,500 - - - -
Unitrends Backup 7 38,000 38,000 - - - -
Switch Replacement 8 20,070 20,070 - - - -
Microsoft Exchange Upgrade 9 13,100 13,100 - - - -
Email Archiving 10 4,000 4,000 - - - -
Multi-Function Print Device Replacements 11 40,000 25,000 - - 15,000 -
Body Cam Storage 12 15,000 - 15,000 - - -
Firewall Replacement 13 26,000 - - - 26,000 -
Total 209,670 153,670 15,000 - 41,000 -
Total General Government 8,037,501 4,788,981 3,207,520 - 41,000 -
Public Safety
Police Department
Facility 14 6,989,322 544,846 3,852,095 2,592,381 - -
Drone 15 7,491 7,491 - - - -
Officer Body Camera 16 40,500 40,500 - - - -
FX Training Equipment 17 11,500 11,500 - - - -
Rifle Plate & Carrier 18 12,600 12,600 - - - -
Taser Replacement 19 16,700 16,700 - - - -
Detective Vehicle 20 35,000 - 35,000 - - -
Boat Replacement 21 20,000 - 20,000 - - -
Auto License Plate Reader 22 20,000 - - 20,000 - -
Support Vehicle 23 30,000 - - - 30,000 -
Tactical Vehicle 24 30,000 - - - - 30,000
Total 7,213,113 633,637 3,907,095 2,612,381 30,000 30,000
TC Volunteer Fire Department
Various Equipment & Vehicles 25-26 3,124,000 105,000 375,000 1,122,000 1,522,000 -
Total Public Safety 10,337,113 738,637 4,282,095 3,734,381 1,552,000 30,000
Recreation & Education
Library
Children's Area Redesign 27 102,500 61,500 41,000 - - -
Carpeting 28 60,000 20,000 20,000 20,000 - -
HVAC System 29 45,000 45,000 - - - -
Meeting Room Technology 30 6,800 6,800 - - - -
Public Furniture 31 44,000 8,000 12,000 - 8,000 16,000
Staff Workstations 32 3,750 3,750 - - - -
Young Adult Area Redesign 33 20,000 - - 20,000 - -
RFID 34 90,000 - - - 90,000 -
Service Desks Redesign 35 23,000 - - - 15,000 8,000
Total 395,050 145,050 73,000 40,000 113,000 24,000
Recreation
Software 36 8,500 8,500 - - - -
Total Recreation & Education 403,550 153,550 73,000 40,000 113,000 24,000
Page 3
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION 2017 - 2021
Page Totals 2017 2018 2019 2020 2021
Public Works
PW-Engineering
Moorland Reconstruction 37 1,720,000 120,000 1,600,000 - - -
Hillendale Drive Phase I 38 2,150,000 150,000 200,000 1,800,000 - -
Hillendale Drive Phase II 39 2,375,000 - 175,000 200,000 2,000,000 -
Baylane Drive Reconstruction 40 2,340,000 - 90,000 2,250,000 - -
Total 8,585,000 270,000 2,065,000 4,250,000 2,000,000 -
Department of Public Works (DPW)
Facilities - Garage 41 2,294,390 2,294,390 - - - -
Gas Pump 42 28,000 28,000 - - - -
Motor Grader 43 175,000 175,000 - - - -
Pickup Truck 44 245,000 55,000 55,000 35,000 60,000 40,000
Concrete Mixer 45 26,000 26,000 - - - -
Asphalt Roller 46 75,000 - 75,000 - - -
Tri Deck Mower 47 40,000 - 40,000 - - -
Outfront Mower 48 30,000 - 30,000 - - -
Salt Shed Roof 49 30,000 - 30,000 - - -
Pavement Striper 50 25,000 - 25,000 - - -
Roadside Mower 51 25,000 - 25,000 - - -
Back Hoe 52 100,000 - - 100,000 - -
Front End Loander 53 175,000 - - - - 175,000
Skid Loader 54 65,000 - - - - 65,000
Total 3,333,390 2,578,390 280,000 135,000 60,000 280,000
Total Public Works 11,918,390 2,848,390 2,345,000 4,385,000 2,060,000 280,000
Total General Fund 30,696,554 8,529,558 9,907,615 8,159,381 3,766,000 334,000
Utilities
Water Utility
City Garage Maint/Add (DPW & Utilities) 55 499,568 499,568 - - - -
Truck 56 90,000 16,000 17,000 18,000 19,000 20,000
Gas Pump 57 6,000 6,000 - - - -
SCADA Maintenance 58 10,000 5,000 - 5,000 - -
Meters 59 250,000 50,000 50,000 50,000 50,000 50,000
Water Tower - Painting 60 730,000 350,000 - - - 380,000
Relay Water Laterals 61 75,000 - - 75,000 - -
Water Tower Cleaning & Inspections 62 25,000 - - - 25,000 -
Filling Station 63 35,000 - - - 35,000 -
Relay Water Mains 64 640,000 - - - 40,000 600,000
Hillendale Booster Station 65 400,000 - - - - 400,000
Total 2,760,568 926,568 67,000 148,000 169,000 1,450,000
Sewer Utility
City Garage Maint/Add (DPW & Utilities) 66 499,568 499,568 - - - -
Truck 67 90,000 16,000 17,000 18,000 19,000 20,000
Gas Pump 68 6,000 6,000 - - - -
SCADA Maintenance 69 10,000 5,000 - 5,000 - -
Lift Station Upgrades 70 275,000 50,000 50,000 55,000 60,000 60,000
Private Property I & I 71 1,000,000 250,000 250,000 250,000 250,000 -
Camera 72 100,000 - 100,000 - - -
Total 1,980,568 826,568 417,000 328,000 329,000 80,000
Total Utilities 4,741,137 1,753,137 484,000 476,000 498,000 1,530,000
Special Revenue Funds
Conservation Truck 73 30,000 30,000 - - - -
Park Dedication 74-75 1,023,536 1,023,536 - - - -
Total 1,053,536 1,053,536 - - - -
GRAND TOTAL 36,491,226 11,336,230 10,391,615 8,635,381 4,264,000 1,864,000
Page 4
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Facilities Planning
2. Department:Building Maintenance
3. Description:Various studies have been provided by Zimmerman Architectural Studies Inc. Committee
discussions lean towards maintaining a Police/City Hall campus whether at the current or a new
location. Project time period spans over 3 years with an estimated cost for all projects
combined in excess of $18,000,000. (Summary provided in 2015)
Note: $219,930.30 Expended YTD
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 108,711 108,711 0000
Land/ROW/Site Prep 455,000 455,000 0000
Construction 6,786,000 4,071,600 2,714,400 0 0 0
Testing 000000
Other 478,120 0 478,120 0 0 0
TOTAL 7,827,831 4,635,311 3,192,520 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 7,827,831 4,635,311 3,192,520 0 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 7,827,831 4,635,311 3,192,520 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
401.08.90.09.6550
Page 5
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Upgrade MS Office
2. Department:Information Technology
3. Description:Email upgrade warrants the Office suite get updated as well. The user experience would be
hard if there were 2 different versions.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 53,500 53,500 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 53,500 53,500 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 53,500 53,500 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 53,500 53,500 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.14.6520
Page 6
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Unitrends Backup
2. Department:Information Technology
3. Description:We are currently outgrowing our space and only have 2 weeks of retention.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 38,000 38,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 38,000 38,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 38,000 38,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 38,000 38,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.90.14.6521
Page 7
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Switch Replacements
2. Department:Information Technology
3. Description:Replace all non POE HP procurve switches at all city facilities.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 20,070 20,070 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 20,070 20,070 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 20,070 20,070 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 20,070 20,070 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.14.6513
Page 8
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Microsoft Exchange Upgrade
2. Department:Information Technology
3. Description:Email system upgrade to Exchange 2016.
Current email server is 9 years old and clients are 7 years old.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 13,100 13,100 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 13,100 13,100 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 13,100 13,100 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 13,100 13,100 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.14.6520
Page 9
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Email Archiving
2. Department:Information Technology
3. Description:Replace existing email archiving appliance.
This appliance hit end of life last year. We need a newer appliance to remain in compliance.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 4,000 4,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 4,000 4,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 4,000 4,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 4,000 4,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.14.6518
Page 10
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Multi-Function Printing Device Replacements
2. Department:Information Technology
3. Description:Finance & Admin - 2017
Library & Recreation - 2020
PW - 2022
Police & CDD - 2025
Court - 2017
Atty/Mayor's Office - 2017
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 40,000 25,000 0 0 15,000 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 40,000 25,000 0 0 15,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 40,000 25,000 0 0 15,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 40,000 25,000 0 0 15,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.14.6503
Page 11
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Additional Storage for PD Body Cams
2. Department:Information Technology
3. Description:Based on needs of agency, we may need to increase some storage for their body cameras.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 15,000 0 15,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 15,000 0 15,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 15,000 0 15,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 15,000 0 15,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.90.14.6522
Page 12
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Firewall Replacement
2. Department:Information Technology
3. Description:Replacement of existing Positron LL100 911 call processing equipment.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 26,000 0 0 0 26,000 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 26,000 0 0 0 26,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 26,000 0 0 0 26,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 26,000 0 0 0 26,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 00
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.90.14.6512
Page 13
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Police Facility
2. Department:Police Department
3. Description:Construction of new Police facility to replace existing building.
Note: $101,533.07 Expended YTD
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 544,846 544,846 0000
Land/ROW/Site Prep 000000
Construction 5,836,508 0 3,852,095 1,984,413 0 0
Testing 000000
Other 607,968 0 0 607,968 0 0
TOTAL 6,989,322 544,846 3,852,095 2,592,381 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 6,576,480 132,004 3,852,095 2,592,381 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 412,842 412,842 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,989,322 544,846 3,852,095 2,592,381 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2007
Revised Date:
401.08.91.20.6550
Page 14
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Drone
2. Department:Police/City Use
3. Description:Add drone for all department use
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 7,491 7,491 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 7,491 7,491 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 7,491 7,491 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 7,491 7,491 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6519
Page 15
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Body Worn Cameras
2. Department:Police Department
3. Description:Purchase of 30 body worn cameras to outfit patrol officers. Price includes cameras, mounts,
chargers, software licensing and support, programming, and configuration
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 40,500 40,500 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 40,500 40,500 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 40,500 40,500 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 40,500 40,500 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6512
Page 16
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:FX Training Equipment
2. Department:Police Department
3. Description:Purchase of FX training equipment to replace old and worn officer training equipment which
allows for realistic, scenario based training.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 11,500 11,500 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 11,500 11,500 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 11,500 11,500 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 11,500 11,500 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6520
Page 17
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Rifle Plate & Carrier
2. Department:Police Department
3. Description:Ballistic Rifle Plate & Carrier to be deployed in 12 squad cars and for the 3 School Resource
Officers. These carriers will fit over the officers' existing body armor and provide protection
against rifle rounds. These carriers will replace 15 year old ballistic vests in squads that are out
of date and not rated to stop rifle rounds.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 12,60012,6000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 12,60012,6000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 12,60012,6000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 12,60012,6000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6521
Page 18
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Taser Replacement
2. Department:Police Department
3. Description:Replace outdated Tasers
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 16,700 16,700 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 16,700 16,700 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 16,700 16,700 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 16,700 16,700 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/21/2014
Revised Date:
Revised Date:
410.08.91.20.6510
Page 19
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Detecitve Vechile
2. Department:Police Department
3. Description:Replace unmarked vehicle used by detectives.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 35,000035,000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 35,000035,000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 35,000035,000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 35,000035,000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6517
Page 20
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Water Patrol Boat Replacement
2. Department:Police Department
3. Description:Replace 15 year old boat which is used to patrol lakes within the City of Muskego.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 20,000 0 20,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 20,000 0 20,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 20,000 0 20,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 20,000 0 20,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6513
Page 21
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Automatic License Plate Reader
2. Department:Police Department
3. Description:Purchase additional ALPR to be mounted on squad car
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 20,000 0 0 20,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 20,000 0 0 20,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 20,000 0 0 20,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 20,000 0 0 20,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6522
Page 22
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Support Vehicle
2. Department:Police Department
3. Description:Purchase vehicle to be used for undercover activities and evidence transportation
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 30,00000030,0000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 30,00000030,0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 30,00000030,0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 30,00000030,0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
DETAILED PROJECT DESCRIPTION
410.08.91.20.6517
Page 23
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Tactical Vehicle
2. Department:Police Department
3. Description:Replace approximately 15 year old tactical vehicle used for tactical situations and transport
of prisoners.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 30,000000030,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 30,000000030,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 30,000000030,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 30,000000030,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6517
Page 24
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Equipment/Vehicle
2. Department:Tess Corners Volunteer Fire Department
3. Description:Detail provided on following page.
Per Resolution #093-2015, the 2017 - 2018 Capital expenditures have been approved as part
of the TCVFD Agreement.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 674,000 105,000 75,000 472,000 22,000 0
Vehicle Replacement 2,450,000 0 300,000 650,000 1,500,000 0
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 3,124,000 105,000 375,000 1,122,000 1,522,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 2,570,000 0 0 1,070,000 1,500,000 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 554,000 105,000 375,000 52,000 22,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 3,124,000 105,000 375,000 1,122,000 1,522,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:
401.08.91.21.6504
Page 25
CITY OF MUSKEGO, WISCONSIN
TESS CORNERS VOLUNTEER FIRE DEPARTMENT
DETAILED PROJECT LISTING
PROJECT
NAME DESCRIPTION ACCOUNT # TOTAL 2017 2018 2019 2020 2021
Pagers Replacement for Fire Pagers 410.08.91.21.6503 35,000 7,000 7,000 7,000 7,000 7,000
Fire Hose Replacement of Fire Hose (25 sets)410.08.91.21.6509 25,000 5,000 5,000 5,000 5,000 5,000
Fire Helmets Replacement of Fire Helmets that expire over a 3-year period (2016-2019)410.08.91.21.6510 16,000 8,000 8,000
Fire Gear Replacement of Fire Gear (current gear expires over a 3-year period beginning in 2016 410.08.91.21.6511 90,000 45,000 45,000
Stabilizing Struts Purchase stabilizing struts to be used in motor vehicle accidents.410.08.91.21.6512 20,000 10,000 10,000
TNT Hydraulic Tools Replacement of Hdraulic Amkus Tools to TNT Tools for extrication purposes.410.08.91.21.6513 80,000 40,000 40,000
Tanker Replacement of current tankers over a 2-year period. Current tankers were purchased in 1984.410.08.91.21.6514 300,000 300,000
Air Packs Replacements of breathing apparatuses for fire personnel. Current apparatus expires in 2019.410.08.91.21.6515 420,000 420,000
Pumper Replacement of Fire Pumper. Current Pumper was purchased in 1996.410.08.91.21.6516 650,000 650,000
Aerial Ladder Replacement (1473) Replace unit 1473 with a new aerial ladder. Current Ladder was purchased in 1995.410.08.91.21.6517 1,500,000 1,500,000 0
TOTAL EXPENDITURES 3,136,000 105,000 375,000 1,122,000 1,522,000 12,000
GO Borrowing 000000
Landfill Funds 3,124,000 105,000 375,000 1,122,000 1,522,000 0
Reserve Funds 000000
Other Source 000000
TOTAL FUNDING SOURCE 3,124,000 105,000 375,000 1,122,000 1,522,000 0
AMOUNT
EXPENDITURE SCHEDULE
FUNDING SOURCE
Page 26
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Children's Area Redesign
2. Department:Library
3. Description:Furniture: 6 lounge chairs, 2 tables with 4 chairs, 2 curved groupins, 2 ottomans, paint.
Entry: Signage, curved shelves, walls, tunnel, specialty lighting, acrylic panels, new signage,
relocate existing shelves, and design fee.
Carpeting costs for project is included in carpeting capital request.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 102,500 61,500 41,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 102,500 61,500 41,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 102,500 61,500 41,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 102,500 61,500 41,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6508
DETAILED PROJECT DESCRIPTION
Page 27
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Carpeting
2. Department:Library
3. Description:The current Library building opened over 15 years ago, and the carpeting throughout the
building will be reaching the end of its expected life. Rather than replace the carpeting
throughout the building in a single year, the Library is planning to replace different segments
over the course of a few years. In 2016, the carpeting in the children's area will be replaced
as part of a redesign.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 60,000 20,000 20,000 20,000 0 0
TOTAL 60,000 20,000 20,000 20,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 60,000 20,000 20,000 20,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 60,000 20,000 20,000 20,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6507
Page 28
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:HVAC System Controls
2. Department:Library
3. Description:The Library's current HVAC system controls date to the opening of the current building in 2000
and is at the end of its useful life. The existing controls run on a Windows 2000 based PC and
will be replaced with an Internet based system that allows City maintenace to control the system
remotely as well as perform remote diagnostics. The new system will also allow for more
precise control and efficient use.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 45,00045,0000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 45,00045,0000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 45,00045,0000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 45,00045,0000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6509
Page 29
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Meeting Room Technology Improvements
2. Department:Library
3. Description:Presentation equipment for meeting rooms 1, 2, 3, and 4.
Meeting rooms 1 and 2 would get a wall mounted television. Meeting room 3 would get a wall
mounted television and speaker bar. Meeting room 4 would get a ceiling mounted projector,
screen, and speakers.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 6,800 6,800 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 6,800 6,800 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 6,800 6,800 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,800 6,800 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:
410.08.90.71.6510
Page 30
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Public Furniture
2. Department:Library
3. Description:2017: Replace 8 soft chairs in the Reading Area. The current chairs are over 16 years old and
require frequent repairs.
2018: 8 soft chairs, 4 end tables, 2 work tables, and lamps to replace furniture in the Great Room
2020: 4 soft chairs for Fiction Area, 4 soft chairs for Media Room
2021: Replace all public meeting room chairs (188).
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 44,000 8,000 12,000 0 8,000 16,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 44,000 8,000 12,000 0 8,000 16,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 44,000 8,000 12,000 0 8,000 16,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 44,000 8,000 12,000 0 8,000 16,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6511
Page 31
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Staff Workstations
2. Department:Library
3. Description:2017: Replace 15 staff workstation chairs. Current chairs are all at least 16 years old.
2018: Install cubicle furniture in 5 staff cubicles that currently have stand alone desks, which
do not provide an efficient workspace. Ideally the cubicle furniture could be repurposed from
City Hall.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 3,750 3,750 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 3,750 3,750 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 3,750 3,750 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 3,750 3,750 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6512
Page 32
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Young Adult Area redesign
2. Department:Library
3. Description:Update the Young Adult Area with functional spaces to accommodate individual and group use:
Furniture, shelving, and a computer bar
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 20,000 0 0 20,000 0 0
Vehicle Replacement 000000
Stormwater 000000
F Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 20,000 0 0 20,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 20,000 0 0 20,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 20,000 0 0 20,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 00
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6513
Page 33
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:RFID
2. Department:Library
3. Description:Upgrading the Library to a Radio Frequency Identification System
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 90,000 0 0 0 90,000 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 90,000 0 0 0 90,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 90,000 0 0 0 90,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 90,000 0 0 0 90,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6514
Page 34
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Service Desks Redesign
2. Department:Library
3. Description:2020: Redesign Circulation Desk Area
2021: Redesign Reference Desk
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 23,000 0 0 0 15,000 8,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 23,000 0 0 0 15,000 8,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 23,000 0 0 0 15,000 8,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Library Funds 000000
Other Source 000000
TOTAL 23,000 0 0 0 15,000 8,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6515
Page 35
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No.
A. PROJECT IDENTIFICATION
1. Project Name:Recreation Software
2. Department:Parks & Recreation
3. Description:Current registration & facility software (Class/Active) will no longer be supported after 2017.
Transition to eCity is extremely cost effective as compared to updating the current software.
The new software will allow City residents to pay multiple invoices as well as register for recreation
programs. Recommendation is to implement the new software in the fall of 2016 to allow
sufficient time for preparation of the winter/spring session programs and eliminate the $8,000+
current Class/Active annual maintenance fee.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 00000 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 00000 0
Land/ROW/Site Prep 00000 0
Construction 00000 0
Testing 00000 0
Other 8,5008,500000 0
TOTAL 8,5008,500000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.00000 0
601 Sewer Working Cap.00000 0
410 Trnsfr w/in CPF 00000 0
401 GO Borrowing 00000 0
Water Borrowing 00000 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 8,5008,500000 0
202 Park Ded. Funds 00000 0
Forfeiture Funds 00000 0
Stormwater Funds 00000 0
Other Source 00000 0
TOTAL 8,5008,500000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.72.6501
Page 36
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Moorland Reconstruction
2. Department:DPW- Engineering
3. Description:Design and reconstruction of Moorland Road from Janesville to McShane and the intersection
of Woods Road and Moorland Road will be converted to a roundabout. A grant has been
secured for $2.68M and the remaining portion of the project is to be City funded, which is
in the budget.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 40,00040,0000000
Land/ROW/Site Prep 80,00080,0000000
Construction 1,600,000 0 1,600,000000
Testing 000000
Other Contingency 000000
TOTAL 1,720,000 120,000 1,600,000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 1,720,000 120,000 1,600,000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source-TIF 000000
TOTAL 1,720,000 120,000 1,600,000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2012
Revised Date:7/20/2016
410.08.91.19.6303
Page 37
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Drive Reconstruction
2. Department:DPW-Engineering
3. Description:Reconstruct Hillendale Drive from Racine Avenue to College Avenue including an off road
multi-use pathway. This would be a full reconstruction with right-of-way acquisition.
Total project length is approximately 1.2 miles.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 150,000 150,0000000
Land/ROW/Site Prep 200,000 0 200,000000
Construction 1,800,000 0 0 1,800,000 0 0
Testing 000000
Other 000000
TOTAL 2,150,000 150,000 200,000 1,800,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 1,800,000 0 0 1,800,000 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 350,000 150,000 200,000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,150,000 150,000 200,000 1,800,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2016
410.08.91.19.6507
Page 38
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Drive Reconstruction Phase II
2. Department:DPW-Engineering
3. Description:Reconstruct Hillendale Drive from Janesville Road to Racine Avenue including an off road
multiuse pathway for a portion. This would be a full reconstruction with right-of-way acquisition
Total project length is approximately 1.7 miles.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 175,000 0 175,000000
Land/ROW/Site Prep 200,000 0 0 200,000 0 0
Construction 2,000,0000002,000,000 0
Testing 000000
Other 000000
TOTAL 2,375,000 0 175,000 200,000 2,000,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 2,000,0000002,000,000 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 375,000 0 175,000 200,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source - TIF 000000
TOTAL 2,375,000 0 175,000 200,000 2,000,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2016
Page 39
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Baylane Drive Reconstruction
2. Department:DPW-Engineering
3. Description:Reconstruct Baylane Drive from Janesville Road to Woods Road and add pedestrian
facilities.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 80,000 0 80,000 0 0 0
Land/ROW/Site Prep 10,000 0 10,000 0 0 0
Construction 2,250,000 0 0 2,250,000 0 0
Testing 000000
Other 000000
TOTAL 2,340,000 0 90,000 2,250,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 2,340,000 0 90,000 2,250,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,340,000 0 90,000 2,250,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2016
410.08.91.19.6504
Page 40
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage Maintenance/Addition
2. Department:Public Works
3. Description:Replace Existing Roof & HVAC = $1,075,000 (split 50/50 DPW/Utilities).
Build Cold Storage Building = $905,000 (split 50/50 DPW/Utilities).
Mechanics Area Addition Plus extra area = $2,580,000 (split 70/30 DPW/Utilities).
Locker Room = $405,000 (split 50/50 DPW/Utilities)
Break Room = $203,000 (split 50/50 DPW/Utilities)
All in Project Cost Including Economy of Scale Reductions = $4,670,000
City Portion = $2,851,000 Utilitiy Portion = $1,819,000
Note: Expended YTD = $36,928 Design & $1,096,017 Building Purchase
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 107,283 107,2830000
Land/ROW/Site Prep 000000
Construction 1,759,110 1,759,1100000
Testing 000000
Other Contingency 427,997 427,9970000
TOTAL 2,294,390 2,294,3900000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 2,187,107 2,187,1070000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 107,283 107,2830000
202 Park Ded. Funds 000000
215 Conservation Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,294,390 2,294,3900000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
401.08.93.51.6550
Page 41
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Gas Pump Replacement
2. Department:Public Works
3. Description:Replace existing gas pumps and software (current pumps and software are 20 years old)
These are shared by all City vehicles as well as utilities vehicles so a cost share is proposed
70% City and 30% Utilities with a total cost of $40,000
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 28,00028,0000000
Testing 000000
Other 000000
TOTAL 28,00028,0000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 28,00028,0000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 28,00028,0000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
410.08.93.51.6519
Page 42
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Motor Grader
2. Department:Public Works
3. Description:Replace 1983 Motor Grader, which is primarily used for topsoil work and gravel shouldering
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 175,000 175,0000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 175,000 175,0000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 175,000 175,0000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 175,000 175,0000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.93.51.6520
DETAILED PROJECT DESCRIPTION
Page 43
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Pickup Truck Replacement
2. Department:Highway
3. Description:2017 - 1 Ton Pickup with dumpbed and Plow
2018 - 1 Ton Pickup with dumpbed and Plow
2019 - 1/2 Ton Pickup
2020 - 1 Ton Pickup with dumpbed and Plow
2021 - 1/2 Ton Pickup
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 245,000 55,000 55,000 35,000 60,000 40,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 245,000 55,000 55,000 35,000 60,000 40,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 245,000 55,000 55,000 35,000 60,000 40,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 245,000 55,000 55,000 35,000 60,000 40,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2016
410.08.93.51.6507
Page 44
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Concrete Mixer
2. Department:Public Works
3. Description:Replace existing concrete trailer with a trailer mounter mixer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 26,000 26,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 26,000 26,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 26,000 26,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 26,000 26,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
410.08.93.51.6521
Page 45
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Asphalt Roller
2. Department:Public Works
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 75,000 0 75,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 75,000 0 75,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 75,000 0 75,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 75,000 0 75,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
410.08.93.51.6522
Page 46
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Replace Tri-Deck Mower
2. Department:Public Works
3. Description:Replace Existing Tri-Deck mower used for mowing parks.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 40,000040,000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 40,000040,000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 40,000040,000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 40,000040,000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2015
410.08.93.51.6523
Page 47
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Replace Outfront Mower
2. Department:Public Works
3. Description:Replace existing outfront mower used for mowing parks.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 30,000 0 30,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 30,000 0 30,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 30,000 0 30,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 30,000 0 30,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2012
Revised Date:7/18/2014
410.08.93.51.6524
Page 48
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Salt Shed Roof
2. Department:Public Works
3. Description:Replace existing asphalt shingle roof on large salt shed
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 30,000 0 30,000 0 0 0
Testing 000000
Other Contingency 000000
TOTAL 30,000 0 30,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 30,000 0 30,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 30,000 0 30,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
410.08.93.51.6503
Page 49
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Pavement Striper
2. Department:Public Works
3. Description:Replace existing pavement striping equipment
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 25,000025,000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 25,000025,000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 25,000025,000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
402 Other Source 000000
TOTAL 25,000025,000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2015
410.08.93.51.6525
Page 50
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A.PROJECT IDENTIFICATION
1. Project Name:Replace Roadside Mower
2. Department:Public Works
3. Description:Replace Existing Tractor used for roadside mowing.
B.EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 25,000025,000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 25,000025,000000
C.FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 25,000025,000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 25,000025,000000
D.ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E.DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2015
410.08.93.51.6510
Page 51
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Back Hoe
2. Department:Public Works
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 100,000 0 0 100,000 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 100,000 0 0 100,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 100,000 0 0 100,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 100,000 0 0 100,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/1/2007
Revised Date:7/20/2015
410.08.93.51.6526
Page 52
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Frond End Loader
2. Department:Public Works
3. Description:Replace existing front end loader.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 175,000 0000175,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 175,000 0000175,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 175,000 0000175,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 175,000 0000175,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2015
410.08.93.51.6514
Page 53
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Skid Loader w/ Bucket
2. Department:Public Works
3. Description:Replace existing Skid Loader
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 65,000000065,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 65,000000065,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 65,000000065,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 65,000000065,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.93.51.6516
Page 54
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage
2. Department:Water Utility
3. Description:Refer to City Garage Memo
Total of $150,000 for achitechture for Utilities split 50/50 Water/Sewer
Total of $1,669,000 for construction for Utilities split 50/50 Water/Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 00000 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 30,90230,902000 0
Land/ROW/Site Prep 00000 0
Construction 376,952 376,952000 0
Testing 00000 0
Other 91,71491,714000 0
TOTAL 499,568 499,568000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.00000 0
601 Sewer Working Cap.00000 0
410 Trnsfr w/in CPF 00000 0
401 GO Borrowing 00000 0
Water Borrowing 499,568 499,568000 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 00000 0
202 Park Ded. Funds 00000 0
Forfeiture Funds 00000 0
Stormwater Funds 00000 0
Other Source 00000 0
TOTAL 499,568 499,568000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
605.00.00.00.1975
Page 55
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Truck
2. Department:Water Utility
3. Description:2017 - Pickup Truck $32,000 split 50/50 Wtr/Swr
2018 - Pickup Truck $34,000 split 50/50 Wtr/Swr
2019 - Pickup Truck $36,000 split 50/50 Wtr/Swr
2020 - Pickup Truck $38,000 split 50/50 Wtr/Swr
2021 - Pickup Truck $40,000 split 50/50 Wtr/Swr
2024 - Confined Space Truck every 15 years split 50/50 Wtr/Swr
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 90,000 16,000 17,000 18,000 19,000 20,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other - 25% DPW 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.90,000 16,000 17,000 18,000 19,000 20,000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/18/2014
605.00.00.00.1962
Page 56
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Gas Pump Replacement
2. Department:Water Utility
3. Description:Replace existing gas pumps and software (current pumps and software are 20 years old)
Replace all four existing doors and openers.
These are shared by all City vehicles as well as Utilities vehicles so a cost share is proposed
70% City and 30% Utilities with a total cost of $40,000
50/50 split between water and sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 6,0006,0000000
Testing 000000
Other 000000
TOTAL 6,0006,0000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.6,0006,0000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,0006,0000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1975
Page 57
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:SCADA Maintenance
2. Department:Water Utility
3. Description:2017 - Replace reporting software package, $10,000 split 50/50 with Sewer
2019 - Replace SCADA computers, $10,000 split 50/50 with Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 10,000 5,000 0 5,000 0 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 00000 0
Land/ROW/Site Prep 00000 0
Construction 00000 0
Testing 00000 0
Other 00000 0
TOTAL 10,000 5,000 0 5,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.10,000 5,000 0 5,000 0 0
601 Sewer Working Cap.00000 0
401 Trnsfr w/in CPF 00000 0
GO Borrowing 00000 0
Water Borrowing 00000 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 00000 0
202 Park Ded. Funds 00000 0
Forfeiture Funds 00000 0
Stormwater Funds 00000 0
Other Source 00000 0
TOTAL 10,000 5,000 0 5,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1926
Page 58
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Meters
2. Department:Water Utility
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 250,000 50,000 50,000 50,000 50,000 50,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 250,000 50,000 50,000 50,000 50,000 50,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.250,000 50,000 50,000 50,000 50,000 50,000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 250,000 50,000 50,000 50,000 50,000 50,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/18/2014
605.00.00.00.1953
Page 59
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
Struct Impr
A. PROJECT IDENTIFICATION
1. Project Name:Water Tower - Painting
2. Department:Water Utility
3. Description:Paint Water Towers
Approximately every 15 years.
2017 - Mercury Drive Tower
2021 - Hillendale Drive Tower
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 60,00030,00000030,000
Land/ROW/Site Prep 000000
Construction 670,000 320,000 0 0 350,000
Testing 000000
Other 000000
TOTAL 730,000 350,000000380,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.350,000 350,0000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 380,0000000380,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 730,000 350,000000380,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.54.06.50.5702 or Exp
605.00.00.00.1941
Page 60
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Relay Water Laterals
2. Department:Water Utility
3. Description:Replace failing water laterals in Weatherwood Courts subdivision. They appear to be failing
because of a chemical reaction between the soil and copper pipe.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 75,000 0 0 75,000 0 0
Testing 000000
Other 000000
TOTAL 75,000 0 0 75,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.75,000 0 0 75,000 0 0
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 75,000 0 0 75,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1951
Page 61
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
Struct Impr
A. PROJECT IDENTIFICATION
1. Project Name:Water Tower Cleaning & Inspections
2. Department:Water Utility
3. Description:Done every 5 years for Hillendale Drive, Mercury Drive and Commerce Drive last done in 2015
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 25,00000025,0000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 25,00000025,0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.25,00000025,0000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 25,00000025,0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.54.06.50.5702 or Exp
605.00.00.00.1941
Page 62
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Construct Water Filling Station
2. Department:Water Utility
3. Description:Construct a meter station that would allow accurate tracking of all water sold to contractors
that currently connect at a hydrant near the City Garage.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 35,00000035,0000
Testing 000000
Other 000000
TOTAL 35,00000035,0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.35,00000035,0000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 35,00000035,0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1975
Page 63
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Relay Water Mains
2. Department:Water Utility
3. Description:Replace aging water mains in older areas that are beginning to show signs of age. They would
likeyly be assessed to the adjacent owners but a portion would be paid by the Utility and we
would still have to budget for it as we allow a repayment plan. This plan will be more refined as
areas of concern are identified more.
Areas of concern include Lake Lore, Lake Brittany, Guersey Meadows, and Kristin Downs.
Begin a replacement program in 2020 and continue a phased program from there out.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 40,00000040,0000
Land/ROW/Site Prep 000000
Construction 600,0000000600,000
Testing 000000
Other - Bldg Repair 000000
TOTAL 640,00000040,000600,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.40,00000040,0000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 600,0000000600,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 640,00000040,000600,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1951
Page 64
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Booster Station
2. Department:Water Utility
3. Description:Will boost zone along Hillendale and Racine. Thus far, residents in this area have not shown
interest in connection.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 400,0000000400,000
Testing 000000
Other 000000
TOTAL 400,0000000400,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 400,0000000400,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 400,0000000400,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.00.00.00.1964
Page 65
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage
2. Department:Sewer Utility
3. Description:Refer to City Garage Memo
Total of $150,000 for architecture for Utilities split 50/50 Water/Sewer
Total of $1,669,000 for construction for Utilities split 50/50 Water/Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 30,90230,9020000
Land/ROW/Site Prep 000000
Construction 376,952 376,9520000
Testing 000000
Other 91,71491,7140000
TOTAL 499,568 499,5680000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.499,568 499,5680000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 499,568 499,5680000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
601.00.00.00.1903
Page 66
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Truck
2. Department:Sewer Utility
3. Description:2017 - P/U Truck $32,000 split 50/50 Wtr/Swr
2018 - P/U Truck $34,000 split 50/50 Wtr/Swr
2019 - P/U Truck $36,000 split 50/50 Wtr/Swr
2020 - P/U Truck $38,000 split 50/50 Wtr/Swr
2021 - P/U Truck $40,000 split 50/50 Wtr/Swr
2024 - Confined Space Truck every 15 years split 50/50 Wtr/Swr
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 90,000 16,000 17,000 18,000 19,000 20,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other - 25% DPW 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.90,000 16,000 17,000 18,000 19,000 20,000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/25/2013
601.00.00.00.1922
Page 67
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Gas Pump Replacement
2. Department:Sewer Utility
3. Description:Replace existing gas pumps and software (current pumps and software are 20 years old)
Replace all four existing doors and openers.
These are shared by all City vehicles as well as Utilities vehicles so a cost share is proposed
70% City and 30% Utilities with a total cost of $40,000
50/50 split between water and sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 6,0006,0000000
Testing 000000
Other 000000
TOTAL 6,0006,0000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.6,0006,0000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,0006,0000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
601.00.00.00.1903
Page 68
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:SCADA Maintenance
2. Department:Sewer Utility
3. Description:2017 - Replace reporting software package, $10,000 split 50/50 with Water
2019 - Replace SCADA computers, $10,000 split 50/50 with Water
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 10,000 5,000 0 5,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 10,000 5,000 0 5,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.10,000 5,000 0 5,000 0 0
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 10,000 5,000 0 5,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
601.00.00.00.1925
Page 69
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Lift Station Upgrades
2. Department:Sewer Utlilty
3. Description:2017 - Replace pump 2 and 3 at McShane Lift Station
2018 - Replace VFDs and controls at Loomis Drive Lift Station
2019 - Replace VFDs and controls at Woods Road Lift Station
2020 - Replace VFDs at McShane Lift Station
2021 - Replace pumps at Woods Road Lift Station
2022 & 2023 - Add a phase with VFD at Sobek Lift Station and Kurtze Lane
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 275,000 50,000 50,000 55,000 60,000 60,000
Testing 000000
Other 000000
TOTAL 275,000 50,000 50,000 55,000 60,000 60,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.275,000 50,000 50,000 55,000 60,000 60,000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 275,000 50,000 50,000 55,000 60,000 60,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/25/2013
601.00.00.00.1924
Page 70
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Private Property I & I
2. Department:Water Utility
3. Description:Will be reimbused by the MMSD
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 1,000,000 250,000 250,000 250,000 250,000 0
Testing 000000
Other 000000
TOTAL 1,000,000 250,000 250,000 250,000 250,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 1,000,000 250,000 250,000 250,000 250,000 0
TOTAL 1,000,000 250,000 250,000 250,000 250,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
601.00.00.00.1950
Page 71
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Camera
2. Department:Sewer Utility
3. Description:Replace existing camera that televises sewer lines.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 100,000 0 100,000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other-Bldg. Repair 000000
TOTAL 100,000 0 100,000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.100,000 0 100,000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 100,000 0 100,000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
601.00.00.00.1923
Page 72
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Conservation Truck
2. Department:Conservation
3. Description:Purchase extended cab pickup truck. Current is 2003 F-150 with multiple issues.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 30,00030,0000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 30,00030,0000000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 30,00030,0000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
216 Stormwater Funds 000000
Other Source 000000
TOTAL 30,00030,0000000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
215.06.00.00.6008
Page 73
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Parks Projects
2. Department:Park Dedication
3. Description:~Listing of projects recommended from Parks/Conservation Committee & Finance Committee.
~Recommended use of Park Dedication Fees for partial payment of projects.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 1,023,536 1,023,5360000
TOTAL 1,023,536 1,023,5360000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Dedication &670,000 670,0000000
203 Park Improvement 353,536 353,5360000
Stormwater Funds 000000
Other Source 000000
TOTAL 1,023,536 1,023,5360000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/6/2012
Revised Date:
202 & 203.08.94.74.XXXX
Page 74
CITY OF MUSKEGO, WISCONSIN
PARK DEDICATION SPECIAL REVENUE PROGRAM FUND
DETAILED PROJECT LISTING
PROJECT
NAME DESCRIPTION ACCOUNT # TOTAL 2017 2018 2019 2020 2021
202 & 203.08.94.74.
Sand Hill Park Improvements Open Air Pavilion ($80k), Playground Equipment ($188k), Synthetic Surface ($53,036),6501 353,536 353,536 0 0 0 0
Plantings ($7.5k), Electrical ($15k), Signage/Tables/Benches ($10k) (P&R Committee Rec)
Future Trails Janesville Road - Jimmy's Carwash to InPro (~650') construction (P&R Committee Rec)6573 95,000 95,000 0 0 0 0
Martin Drive - Janesille to Atonement Church area (~650') construction (P&R Committee Rec) 55,000 55,000
Racine Ave - Woodland Creek Sub to Woods Road (2000') construction (FC rec on 7/26 to move design) 225,000 225,000
Lannon Road - Parkland Towne Center to Martin Drive design (consultant driven; P&R Committee Rec) 60,000 60,000
Denoon Park Disc Golf (P&R Committee Rec)6571 25,000 25,000
Veterans, Idle Isle, Lion's, Manchester Hill, Landscaping / Shading Project (P&R Committee Rec)6576,6579,6581,6578 15,000 15,000
Moorland, Park Arthur & Schmidt 6586,6530,6582
Sandy Beach Drive Recreational Trail Bridge - Replace a failing WE Energies bridge with a pedestrian bridge or 6579 150,000 150,000 0 0 0 0
box culvert. Reflects preliminary estimate and will be reviewing
options at a future PW meeting. WE Energies will remove the
bridge completely if not replaced by City. ($25k=architectural)
Park Arthur Baseball infield Maintenance - Add additional infield mix to three fields including grading and installation 6530 15,000 15,000 0 0 0 0
of turfaface material. Approximately 45 tons of material per field @ $5k/field.
MAA will fund 50% of cost.
Idle Isle Pay Station - Install two stations that will accept credit card or cash payments for parking and boat launch 6579 30,000 30,000 0 0 0 0
fees and will allow for continual collection vs. only when staff are present. 0 0 0
000000
000000
TOTAL EXPENDITURES 1,023,536 1,023,536 0 0 0 0
GO Borrowing 000000
Park Dedication (Landfill Funds)662,500 662,500 0 0 0 0
Park Improvements (Subdivider Fees)353,536 353,536 0 0 0 0
Other Source - Sports Organizations 0 7,500 0 0 0 0
TOTAL FUNDING SOURCE 1,016,036 1,023,536 0 0 0 0
EXPENDITURE SCHEDULE
FUNDING SOURCE
AMOUNT
Page 75
PROPOSED
5-YEAR CAPITAL PLAN
2017 - 2021
Prepared by
City of Muskego
Finance & Administration Department
Thursday, August 18, 2016
W182 S8200 Racine Avenue, Muskego, WI 53150-0749
Waukesha County, Wisconsin
(262) 679-4100
CAPITAL CAPITAL PARK WORKING
PROJECT DEPARTMENT EXPENDITURE BORROWING DEDICATION CONSERVATION CAPITAL TOTAL
FUNDING (Landfill)(Utilities)
FACILITY - CITY HALL NEW BUILDING/REMODEL BUILDING MAINTENANCE $0 $4,635,311 $4,635,311
MS OFFICE UPGRADE INFORMATION TECHNOLOGY $53,500 $53,500
UNITRENDS BACKUP INFORMATION TECHNOLOGY $38,000 $38,000
SWITCH REPLACEMENTS INFORMATION TECHNOLOGY $20,070 $20,070
MICROSOFT EXCHANGE UPGRADE INFORMATION TECHNOLOGY $13,100 $13,100
EMAIL ARCHIVING INFORMATION TECHNOLOGY $4,000 $4,000
MULTI-FUNCTION PRINTING DEVICES INFORMATION TECHNOLOGY $25,000 $25,000
FACILITY - NEW PD BUILDING/REMODEL POLICE $412,842 $132,004 $544,846
DRONE POLICE $7,491 $7,491
OFFICER BODY WORN CAMERAS POLICE $40,500 $40,500
FX TRAINING EQUIPMENT POLICE $11,500 $11,500
RIFLE PLATE & CARRIER POLICE $12,600 $12,600
TASER REPLACEMENT POLICE $16,700 $16,700
TCVFD EQUIPMENT (Council approval 9/8/15)TC VOLUNTEER FIRE DEPT $105,000 $105,000
CHILDREN'S AREA REDESIGN LIBRARY $61,500 $61,500
CARPETING LIBRARY $20,000 $20,000
HVAC SYSTEM CONTROLS LIBRARY $45,000 $45,000
MEETING ROOM TECHNOLOGY LIBRARY $6,800 $6,800
PUBLIC FURNITURE LIBRARY $8,000 $8,000
STAFF WORKSTATIONS LIBRARY $3,750 $3,750
SOFTWARE RECREATION $8,500 $8,500
MOORLAND RECONSTRUCTION DPW-ENGINEERING $120,000 $120,000
HILLENDALE DRIVE RECONSTRUCTION PHASE I DPW-ENGINEERING $150,000 $150,000
MOTOR GRADER DPW $175,000 $175,000
PICKUP TRUCK DPW $55,000 $55,000
CONCRETE MIXER DPW $26,000 $26,000
CITY GARAGE MAINTENANCE/ADDITION DPW & UTILITIES $107,283 $2,686,675 $499,568 $3,293,526
GAS PUMP REPLACEMENT DPW & UTILITIES $28,000 $12,000 $40,000
TRUCK WATER & SEWER UTILITY $32,000 $32,000
SCADA MAINTENANCE WATER & SEWER UTILITY $10,000 $10,000
METERS WATER UTILITY $50,000 $50,000
WATER TOWER PAINTING WATER UTILITY $350,000 $350,000
LIFT STATION UPGRADES SEWER UTILITY $50,000 $50,000
PRIVATE PROPERTY I & I (MMSD Reimbursement) SEWER UTILITY $250,000 $250,000
TRUCK CONSERVATION $30,000 $30,000
PARKS PROJECTS PARK DEDICATION/IMPROVE $1,023,536 $1,023,536
TOTAL CAPITAL PORJECTS $1,575,136 $7,453,990 $1,023,536 $30,000 $1,253,568 $11,336,230
(Debt Issuance)
CITY OF MUSKEGO - 2017 BUDGET
CAPITAL EXPENDITURE SUMMARY
(Landfill)(Landfill)
Page 1
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
2017 - 2021 Totals
A. PROJECT IDENTIFICATION
1. Project Name:Summary of All Projects
2. Department:All Departments
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 2,453,511 733,511 508,000 672,000 226,000 314,000
Vehicle Replacement 3,000,000 117,000 424,000 721,000 1,628,000 110,000
Arch/Engineering 1,392,645 1,042,645 255,000 0 65,000 30,000
Land/ROW/Site Prep 945,000 535,000 210,000 200,000 0 0
Construction 25,910,522 7,244,614 8,496,495 6,414,413 2,345,000 1,410,000
Other 2,789,549 1,663,461 498,120 627,968 0 0
TOTAL 36,491,226 11,336,230 10,391,615 8,635,381 4,264,000 1,864,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.881,000 427,000 67,000 148,000 169,000 70,000
601 Sewer Working Cap.980,568 576,568 167,000 78,000 79,000 80,000
410 Capital Expenditure 000000
401 GO Borrowing 26,811,418 6,954,422 8,644,615 7,712,381 3,500,000 0
Water Borrowing 1,879,568 499,568 0 0 0 1,380,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
210 Landfill 3,915,136 1,605,136 1,263,000 447,000 266,000 334,000
202 Park Dedication &662,500 662,500 0000
203 Park Improvements 353,536 353,536 0000
216 Storm Water 000000
503 Library Funds 000000
601 Other Funding - MMSD 1,007,500 257,500 250,000 250,000 250,000 0
TOTAL 36,491,226 11,336,230 10,391,615 8,635,381 4,264,000 1,864,000
Check Total (0) (0) 0 (0) 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 000000
2. Materials 000000
3. Total Cost 000000
4. Offsetting Rev or Savings 000000
5. Net impact 000000
Page 2
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION 2017 - 2021
Totals 2017 2018 2019 2020 2021
General Government
Building Maintenance
Facilities Planning - City Hall 7,827,831 4,635,311 3,192,520 - - -
Total 7,827,831 4,635,311 3,192,520 - - -
Information Technology
MS Office Upgrade 53,500 53,500 - - - -
Unitrends Backup 38,000 38,000 - - - -
Switch Replacement 20,070 20,070 - - - -
Microsoft Exchange Upgrade 13,100 13,100 - - - -
Email Archiving 4,000 4,000 - - - -
Multi-Function Print Device Replacements 40,000 25,000 - - 15,000 -
Body Cam Storage 15,000 - 15,000 - - -
Firewall Replacement 26,000 - - - 26,000 -
Total 209,670 153,670 15,000 - 41,000 -
Total General Government 8,037,501 4,788,981 3,207,520 - 41,000 -
Public Safety
Police Department
Facility 6,989,322 544,846 3,852,095 2,592,381 - -
Drone 7,491 7,491 - - - -
Officer Body Camera 40,500 40,500 - - - -
FX Training Equipment 11,500 11,500 - - - -
Rifle Plate & Carrier 12,600 12,600 - - - -
Taser Replacement 16,700 16,700 - - - -
Detective Vehicle 35,000 - 35,000 - - -
Boat Replacement 20,000 - 20,000 - - -
Auto License Plate Reader 20,000 - - 20,000 - -
Support Vehicle 30,000 - - - 30,000 -
Tactical Vehicle 30,000 - - - - 30,000
Total 7,213,113 633,637 3,907,095 2,612,381 30,000 30,000
TC Volunteer Fire Department
Various Equipment & Vehicles 3,124,000 105,000 375,000 1,122,000 1,522,000 -
Total Public Safety 10,337,113 738,637 4,282,095 3,734,381 1,552,000 30,000
Recreation & Education
Library
Children's Area Redesign 102,500 61,500 41,000 - - -
Carpeting 60,000 20,000 20,000 20,000 - -
HVAC System 45,000 45,000 - - - -
Meeting Room Technology 6,800 6,800 - - - -
Public Furniture 44,000 8,000 12,000 - 8,000 16,000
Staff Workstations 3,750 3,750 - - - -
Young Adult Area Redesign 20,000 - - 20,000 - -
RFID 90,000 - - - 90,000 -
Service Desks Redesign 23,000 - - - 15,000 8,000
Total 395,050 145,050 73,000 40,000 113,000 24,000
Recreation
Software 8,500 8,500 - - - -
Total Recreation & Education 403,550 153,550 73,000 40,000 113,000 24,000
Page 3
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION 2017 - 2021
Totals 2017 2018 2019 2020 2021
Public Works
PW-Engineering
Moorland Reconstruction 1,720,000 120,000 1,600,000 - - -
Hillendale Drive Phase I 2,150,000 150,000 200,000 1,800,000 - -
Hillendale Drive Phase II 2,375,000 - 175,000 200,000 2,000,000 -
Baylane Drive Reconstruction 2,340,000 - 90,000 2,250,000 - -
Total 8,585,000 270,000 2,065,000 4,250,000 2,000,000 -
Department of Public Works (DPW)
Facilities - Garage 2,294,390 2,294,390 - - - -
Gas Pump 28,000 28,000 - - - -
Motor Grader 175,000 175,000 - - - -
Pickup Truck 245,000 55,000 55,000 35,000 60,000 40,000
Concrete Mixer 26,000 26,000 - - - -
Asphalt Roller 75,000 - 75,000 - - -
Tri Deck Mower 40,000 - 40,000 - - -
Outfront Mower 30,000 - 30,000 - - -
Salt Shed Roof 30,000 - 30,000 - - -
Pavement Striper 25,000 - 25,000 - - -
Roadside Mower 25,000 - 25,000 - - -
Back Hoe 100,000 - - 100,000 - -
Front End Loander 175,000 - - - - 175,000
Skid Loader 65,000 - - - - 65,000
Total 3,333,390 2,578,390 280,000 135,000 60,000 280,000
Total Public Works 11,918,390 2,848,390 2,345,000 4,385,000 2,060,000 280,000
Total General Fund 30,696,554 8,529,558 9,907,615 8,159,381 3,766,000 334,000
Utilities
Water Utility
City Garage Maint/Add (DPW & Utilities)499,568 499,568 - - - -
Truck 90,000 16,000 17,000 18,000 19,000 20,000
Gas Pump 6,000 6,000 - - - -
SCADA Maintenance 10,000 5,000 - 5,000 - -
Meters 250,000 50,000 50,000 50,000 50,000 50,000
Water Tower - Painting 730,000 350,000 - - - 380,000
Relay Water Laterals 75,000 - - 75,000 - -
Water Tower Cleaning & Inspections 25,000 - - - 25,000 -
Filling Station 35,000 - - - 35,000 -
Relay Water Mains 640,000 - - - 40,000 600,000
Hillendale Booster Station 400,000 - - - - 400,000
Total 2,760,568 926,568 67,000 148,000 169,000 1,450,000
Sewer Utility
City Garage Maint/Add (DPW & Utilities)499,568 499,568 - - - -
Truck 90,000 16,000 17,000 18,000 19,000 20,000
Gas Pump 6,000 6,000 - - - -
SCADA Maintenance 10,000 5,000 - 5,000 - -
Lift Station Upgrades 275,000 50,000 50,000 55,000 60,000 60,000
Private Property I & I 1,000,000 250,000 250,000 250,000 250,000 -
Camera 100,000 - 100,000 - - -
Total 1,980,568 826,568 417,000 328,000 329,000 80,000
Total Utilities 4,741,137 1,753,137 484,000 476,000 498,000 1,530,000
Conservation Truck 30,000 30,000 - - - -
Park Dedication 1,023,536 1,023,536 - - - -
Total 1,053,536 1,053,536 - - - -
GRAND TOTAL 36,491,226 11,336,230 10,391,615 8,635,381 4,264,000 1,864,000
Special Revenue Funds
Page 4
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Facilities Planning
2. Department:Building Maintenance
3. Description:Various studies have been provided by Zimmerman Architectural Studies Inc. Committee
discussions lean towards maintaining a Police/City Hall campus whether at the current or a new
location. Project time period spans over 3 years with an estimated cost for all projects
combined in excess of $18,000,000. (Summary provided in 2015)
Note: $219,930.30 Expended YTD
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 108,711 108,711 0000
Land/ROW/Site Prep 455,000 455,000 0000
Construction 6,786,000 4,071,600 2,714,400 0 0 0
Testing 000000
Other 478,120 0 478,120 0 0 0
TOTAL 7,827,831 4,635,311 3,192,520 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 7,827,831 4,635,311 3,192,520 0 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 7,827,831 4,635,311 3,192,520 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
401.08.90.09.6550
Page 5
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Police Facility
2. Department:Police Department
3. Description:Construction of new Police facility to replace existing building.
Note: $101,533.07 Expended YTD
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 544,846 544,846 0000
Land/ROW/Site Prep 000000
Construction 5,836,508 0 3,852,095 1,984,413 0 0
Testing 000000
Other 607,968 0 0 607,968 0 0
TOTAL 6,989,322 544,846 3,852,095 2,592,381 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 6,576,480 132,004 3,852,095 2,592,381 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 412,842 412,842 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,989,322 544,846 3,852,095 2,592,381 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2007
Revised Date:
401.08.91.20.6550
Page 6
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage Maintenance/Addition
2. Department:Public Works
3. Description:Replace Existing Roof & HVAC = $1,075,000 (split 50/50 DPW/Utilities).
Build Cold Storage Building = $905,000 (split 50/50 DPW/Utilities).
Mechanics Area Addition Plus extra area = $2,580,000 (split 70/30 DPW/Utilities).
Locker Room = $405,000 (split 50/50 DPW/Utilities)
Break Room = $203,000 (split 50/50 DPW/Utilities)
All in Project Cost Including Economy of Scale Reductions = $4,670,000
City Portion = $2,851,000 Utilitiy Portion = $1,819,000
Note: Expended YTD = $36,928 Design & $1,096,017 Building Purchase
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 107,283 107,283 0000
Land/ROW/Site Prep 000000
Construction 1,759,110 1,759,110 0000
Testing 000000
Other Contingency 427,997 427,997 0000
TOTAL 2,294,390 2,294,390 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 2,187,107 2,187,107 0000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 107,283 107,283 0000
202 Park Ded. Funds 000000
215 Conservation Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,294,390 2,294,390 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
401.08.93.51.6550
Page 7
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage
2. Department:Water Utility
3. Description:Refer to City Garage Memo
Total of $150,000 for achitechture for Utilities split 50/50 Water/Sewer
Total of $1,669,000 for construction for Utilities split 50/50 Water/Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 00000 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 30,902 30,902 0 0 0 0
Land/ROW/Site Prep 00000 0
Construction 376,952 376,952 0 0 0 0
Testing 00000 0
Other 91,714 91,714 0 0 0 0
TOTAL 499,568 499,568 0 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.00000 0
601 Sewer Working Cap.00000 0
410 Trnsfr w/in CPF 00000 0
401 GO Borrowing 00000 0
Water Borrowing 499,568 499,568 0 0 0 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 00000 0
202 Park Ded. Funds 00000 0
Forfeiture Funds 00000 0
Stormwater Funds 00000 0
Other Source 00000 0
TOTAL 499,568 499,568 0 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
605.00.00.00.1975
Page 8
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage
2. Department:Sewer Utility
3. Description:Refer to City Garage Memo
Total of $150,000 for architecture for Utilities split 50/50 Water/Sewer
Total of $1,669,000 for construction for Utilities split 50/50 Water/Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 30,902 30,902 0000
Land/ROW/Site Prep 000000
Construction 376,952 376,952 0000
Testing 000000
Other 91,714 91,714 0000
TOTAL 499,568 499,568 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.499,568 499,568 0000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 499,568 499,568 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
601.00.00.00.1903
Page 9
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Moorland Reconstruction
2. Department:DPW- Engineering
3. Description:Design and reconstruction of Moorland Road from Janesville to McShane and the intersection
of Woods Road and Moorland Road will be converted to a roundabout. A grant has been
secured for $2.68M and the remaining portion of the project is to be City funded, which is
in the budget.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 40,000 40,000 0000
Land/ROW/Site Prep 80,000 80,000 0000
Construction 1,600,000 0 1,600,000 0 0 0
Testing 000000
Other Contingency 000000
TOTAL 1,720,000 120,000 1,600,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 1,600,000 0 1,600,000 0 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 120,000 120,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source-TIF 000000
TOTAL 1,720,000 120,000 1,600,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2012
Revised Date:7/20/2016
410.08.91.19.6303
Page 10
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Drive Reconstruction
2. Department:DPW-Engineering
3. Description:Reconstruct Hillendale Drive from Racine Avenue to College Avenue including an off road
multi-use pathway. This would be a full reconstruction with right-of-way acquisition.
Total project length is approximately 1.2 miles.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 150,000 150,000 0000
Land/ROW/Site Prep 200,000 0 200,000 0 0 0
Construction 1,800,000 0 0 1,800,000 0 0
Testing 000000
Other 000000
TOTAL 2,150,000 150,000 200,000 1,800,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 1,800,000 0 0 1,800,000 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 350,000 150,000 200,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,150,000 150,000 200,000 1,800,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2016
410.08.91.19.6507
Page 11
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Drive Reconstruction Phase II
2. Department:DPW-Engineering
3. Description:Reconstruct Hillendale Drive from Janesville Road to Racine Avenue including an off road
multiuse pathway for a portion. This would be a full reconstruction with right-of-way acquisition
Total project length is approximately 1.7 miles.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 175,000 0 175,000 0 0 0
Land/ROW/Site Prep 200,000 0 0 200,000 0 0
Construction 2,000,000 0 0 0 2,000,000 0
Testing 000000
Other 000000
TOTAL 2,375,000 0 175,000 200,000 2,000,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 2,000,000 0 0 0 2,000,000 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 375,000 0 175,000 200,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source - TIF 000000
TOTAL 2,375,000 0 175,000 200,000 2,000,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2016
Page 12
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Gas Pump Replacement
2. Department:Public Works
3. Description:Replace existing gas pumps and software (current pumps and software are 20 years old)
These are shared by all City vehicles as well as utilities vehicles so a cost share is proposed
70% City and 30% Utilities with a total cost of $40,000
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 28,000 28,000 0000
Testing 000000
Other 000000
TOTAL 28,000 28,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 28,000 28,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 28,000 28,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
410.08.93.51.6519
Page 13
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Gas Pump Replacement
2. Department:Water Utility
3. Description:Replace existing gas pumps and software (current pumps and software are 20 years old)
Replace all four existing doors and openers.
These are shared by all City vehicles as well as Utilities vehicles so a cost share is proposed
70% City and 30% Utilities with a total cost of $40,000
50/50 split between water and sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 6,000 6,000 0000
Testing 000000
Other 000000
TOTAL 6,000 6,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.6,000 6,000 0000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,000 6,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1975
Page 14
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Gas Pump Replacement
2. Department:Sewer Utility
3. Description:Replace existing gas pumps and software (current pumps and software are 20 years old)
Replace all four existing doors and openers.
These are shared by all City vehicles as well as Utilities vehicles so a cost share is proposed
70% City and 30% Utilities with a total cost of $40,000
50/50 split between water and sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 6,000 6,000 0000
Testing 000000
Other 000000
TOTAL 6,000 6,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.6,000 6,000 0000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,000 6,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
601.00.00.00.1903
Page 15
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Motor Grader
2. Department:Public Works
3. Description:Replace 1983 Motor Grader, which is primarily used for topsoil work and gravel shouldering
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 175,000 175,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 175,000 175,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 175,000 175,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 175,000 175,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.93.51.6520
DETAILED PROJECT DESCRIPTION
Page 16
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Pickup Truck Replacement
2. Department:Highway
3. Description:2017 - 1 Ton Pickup with dumpbed and Plow
2018 - 1 Ton Pickup with dumpbed and Plow
2019 - 1/2 Ton Pickup
2020 - 1 Ton Pickup with dumpbed and Plow
2021 - 1/2 Ton Pickup
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 245,000 55,000 55,000 35,000 60,000 40,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 245,000 55,000 55,000 35,000 60,000 40,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 245,000 55,000 55,000 35,000 60,000 40,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 245,000 55,000 55,000 35,000 60,000 40,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2016
410.08.93.51.6507
Page 17
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Concrete Mixer
2. Department:Public Works
3. Description:Replace existing concrete trailer with a trailer mounter mixer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 26,000 26,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 26,000 26,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 26,000 26,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 26,000 26,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
410.08.93.51.6521
Page 18
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Truck
2. Department:Water Utility
3. Description:2017 - Pickup Truck $32,000 split 50/50 Wtr/Swr
2018 - Pickup Truck $34,000 split 50/50 Wtr/Swr
2019 - Pickup Truck $36,000 split 50/50 Wtr/Swr
2020 - Pickup Truck $38,000 split 50/50 Wtr/Swr
2021 - Pickup Truck $40,000 split 50/50 Wtr/Swr
2024 - Confined Space Truck every 15 years split 50/50 Wtr/Swr
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 90,000 16,000 17,000 18,000 19,000 20,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other - 25% DPW 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.90,000 16,000 17,000 18,000 19,000 20,000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/18/2014
605.00.00.00.1962
Page 19
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Truck
2. Department:Sewer Utility
3. Description:2017 - P/U Truck $32,000 split 50/50 Wtr/Swr
2018 - P/U Truck $34,000 split 50/50 Wtr/Swr
2019 - P/U Truck $36,000 split 50/50 Wtr/Swr
2020 - P/U Truck $38,000 split 50/50 Wtr/Swr
2021 - P/U Truck $40,000 split 50/50 Wtr/Swr
2024 - Confined Space Truck every 15 years split 50/50 Wtr/Swr
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 90,000 16,000 17,000 18,000 19,000 20,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other - 25% DPW 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.90,000 16,000 17,000 18,000 19,000 20,000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 90,000 16,000 17,000 18,000 19,000 20,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/25/2013
601.00.00.00.1922
Page 20
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:SCADA Maintenance
2. Department:Water Utility
3. Description:2017 - Replace reporting software package, $10,000 split 50/50 with Sewer
2019 - Replace SCADA computers, $10,000 split 50/50 with Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 10,000 5,000 0 5,000 0 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 00000 0
Land/ROW/Site Prep 00000 0
Construction 00000 0
Testing 00000 0
Other 00000 0
TOTAL 10,000 5,000 0 5,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.10,000 5,000 0 5,000 0 0
601 Sewer Working Cap.00000 0
401 Trnsfr w/in CPF 00000 0
GO Borrowing 00000 0
Water Borrowing 00000 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 00000 0
202 Park Ded. Funds 00000 0
Forfeiture Funds 00000 0
Stormwater Funds 00000 0
Other Source 00000 0
TOTAL 10,000 5,000 0 5,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
605.00.00.00.1926
Page 21
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:SCADA Maintenance
2. Department:Sewer Utility
3. Description:2017 - Replace reporting software package, $10,000 split 50/50 with Water
2019 - Replace SCADA computers, $10,000 split 50/50 with Water
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 10,000 5,000 0 5,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 10,000 5,000 0 5,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.10,000 5,000 0 5,000 0 0
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 10,000 5,000 0 5,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2016
Revised Date:
601.00.00.00.1925
Page 22
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Meters
2. Department:Water Utility
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 250,000 50,000 50,000 50,000 50,000 50,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 250,000 50,000 50,000 50,000 50,000 50,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.250,000 50,000 50,000 50,000 50,000 50,000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 250,000 50,000 50,000 50,000 50,000 50,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/18/2014
605.00.00.00.1953
Page 23
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
Struct Impr
A. PROJECT IDENTIFICATION
1. Project Name:Water Tower - Painting
2. Department:Water Utility
3. Description:Paint Water Towers
Approximately every 15 years.
2017 - Mercury Drive Tower
2021 - Hillendale Drive Tower
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 60,000 30,000 0 0 0 30,000
Land/ROW/Site Prep 000000
Construction 670,000 320,000 0 0 350,000
Testing 000000
Other 000000
TOTAL 730,000 350,000 0 0 0 380,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.350,000 350,000 0000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 380,000 0000380,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 730,000 350,000 0 0 0 380,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.54.06.50.5702 or Exp
605.00.00.00.1941
Page 24
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Lift Station Upgrades
2. Department:Sewer Utlilty
3. Description:2017 - Replace pump 2 and 3 at McShane Lift Station
2018 - Replace VFDs and controls at Loomis Drive Lift Station
2019 - Replace VFDs and controls at Woods Road Lift Station
2020 - Replace VFDs at McShane Lift Station
2021 - Replace pumps at Woods Road Lift Station
2022 & 2023 - Add a phase with VFD at Sobek Lift Station and Kurtze Lane
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 275,000 50,000 50,000 55,000 60,000 60,000
Testing 000000
Other 000000
TOTAL 275,000 50,000 50,000 55,000 60,000 60,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.275,000 50,000 50,000 55,000 60,000 60,000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 275,000 50,000 50,000 55,000 60,000 60,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/25/2013
601.00.00.00.1924
Page 25
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Private Property I & I
2. Department:Water Utility
3. Description:Will be reimbused by the MMSD
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 1,000,000 250,000 250,000 250,000 250,000 0
Testing 000000
Other 000000
TOTAL 1,000,000 250,000 250,000 250,000 250,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 1,000,000 250,000 250,000 250,000 250,000 0
TOTAL 1,000,000 250,000 250,000 250,000 250,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
601.00.00.00.1950
Page 26
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Parks Projects
2. Department:Park Dedication
3. Description:~Listing of projects recommended from Parks/Conservation Committee & Finance Committee.
~Recommended use of Park Dedication Fees for partial payment of projects.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2017 2018 2019 2020 2021
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 1,023,536 1,023,536 0000
TOTAL 1,023,536 1,023,536 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Dedication &662,500 662,500 0000
203 Park Improvement 353,536 353,536 0000
Stormwater Funds 000000
Other Source 7,500 7,500 0000
TOTAL 1,023,536 1,023,536 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel
2. Materials
3. Total Cost
4. Offsetting Rev or Savings
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/6/2012
Revised Date:
202 & 203.08.94.74.XXXX
Page 27
CITY OF MUSKEGO, WISCONSIN
PARK DEDICATION SPECIAL REVENUE PROGRAM FUND
DETAILED PROJECT LISTING
PROJECT
NAME DESCRIPTION ACCOUNT # TOTAL 2017 2018 2019 2020 2021
202 & 203.08.94.74.
Sand Hill Park Improvements Open Air Pavilion ($80k), Playground Equipment ($188k), Synthetic Surface ($53,036),6501 353,536 353,536 0 0 0 0
Plantings ($7.5k), Electrical ($15k), Signage/Tables/Benches ($10k) (P&R Committee Rec)
Future Trails Janesville Road - Jimmy's Carwash to InPro (~650') construction (P&R Committee Rec)6573 95,000 95,000 0 0 0 0
Martin Drive - Janesille to Atonement Church area (~650') construction (P&R Committee Rec) 55,000 55,000
Racine Ave - Woodland Creek Sub to Woods Road (2000') construction (FC rec on 7/26 to move design) 225,000 225,000
Lannon Road - Parkland Towne Center to Martin Drive design (consultant driven; P&R Committee Rec) 60,000 60,000
Denoon Park Disc Golf (P&R Committee Rec)6571 25,000 25,000
Veterans, Idle Isle, Lion's, Manchester Hill, Landscaping / Shading Project (P&R Committee Rec)6576,6579,6581,6578 15,000 15,000
Moorland, Park Arthur & Schmidt 6586,6530,6582
Sandy Beach Drive Recreational Trail Bridge - Replace a failing WE Energies bridge with a pedestrian bridge or 6579 150,000 150,000 0 0 0 0
box culvert. Reflects preliminary estimate and will be reviewing
options at a future PW meeting. WE Energies will remove the
bridge completely if not replaced by City. ($25k=architectural)
Park Arthur Baseball infield Maintenance - Add additional infield mix to three fields including grading and installation 6530 15,000 15,000 0 0 0 0
of turfaface material. Approximately 45 tons of material per field @ $5k/field.
MAA will fund 50% of cost.
Idle Isle Pay Station - Install two stations that will accept credit card or cash payments for parking and boat launch 6579 30,000 30,000 0 0 0 0
fees and will allow for continual collection vs. only when staff are present. 0 0 0
000000
000000
TOTAL EXPENDITURES 1,023,536 1,023,536 0 0 0 0
GO Borrowing 000000
Park Dedication (Landfill Funds)662,500 662,500 0 0 0 0
Park Improvements (Subdivider Fees)353,536 353,536 0 0 0 0
Other Source - Sports Organizations 7,500 7,500 0 0 0 0
TOTAL FUNDING SOURCE 1,023,536 1,023,536 0 0 0 0
EXPENDITURE SCHEDULE
FUNDING SOURCE
AMOUNT
Page 28