Public Works Committee Packet - 6/20/2016
CITY OF MUSKEGO
PUBLIC WORKS COMMITTEE AGENDA
June 20, 2016
6:00 PM
Muskego Room, W182 S8200 Racine Avenue
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
STATEMENT OF PUBLIC NOTICE
APPROVAL OF MINUTES HELD MAY 16, 2016
STATUS OF PROJECTS
Discussion update. No formal action may be taken on any of the following:
1. Annual Road Improvement Program
2. Woods Road Recreational Trail (Racine to Windover Drive)
3. North Cape Road Recreational Trail (Hwy 36 to Aster Hills Subdivision)
4. Lake Street/Wildwood Drive Storm Sewer
5. Flintlock Drive Storm Sewer
6. Moorland Road Reconstruction
7. Automated Refuse Collection Transition
UNFINISHED BUSINESS
Discussion update and possible action may be taken on any or all of the following:
1. Discuss Request for Proposal for Preliminary Engineering of the Martin Drive
Recreation Trail (Janesville Road to Lannon Drive)
2. Discuss Princeton Drive traffic calming request
NEW BUSINESS
Discussion update and possible action may be taken on any or all of the following:
1. Approve use of remaining letter of credit funds for installation of subdivision trees in
Crystal Lake Subdivision
2. Discuss potential replacement of WE Energies bridge near Sandy Beach Drive and
design agreement approval
3. Review Agreement from WE Energies Agreement for Bridge Removal and Replacement
4. Review drainage easement requirements for proposed Thode Drive land division
5. Review and approval of detour route for Tess Corners Drive closure in Franklin
6. Review and approval of the 2015 Compliance Maintenance Annual Report
7. Approve acquisition of Permanent and Temporary Limited Easements for the North
Cape Road Recreational Trail
8. Review and approval of the Parkland Towne Center Public Infrastructure Construction
Plans
9. Approval of a water main easement for Rainbow Day Care property on Princeton Drive
(tax key 2172-030-006)
NEW BUSINESS PLACED ON FILE
(The following items have been placed on file for staff review. Upon completion of review, staff
will submit a supplement detailing options and possible course of action to committee
members.)
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
ADJOURNMENT
NOTICE
IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF
THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION
WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL
BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE.
ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136.
Unapproved
CITY OF MUSKEGO
PUBLIC WORKS COMMITTEE MINUTES
May 16, 2016
6:00 PM
Aldermen’s Room – Upper Level of City Hall,
W182 S8200 Racine Avenue
CALL TO ORDER
Alderman Kubacki called the meeting to order at 6:02PM.
PLEDGE OF ALLEGIANCE
Those present recited the Pledge of Allegiance.
ROLL CALL
Present: Alderman Kubacki, Alderman Madden. Also present Public Works Director David
Simpson.
Absent: Alderman Kapusta
STATEMENT OF PUBLIC NOTICE
The meeting was noticed in accordance with the open meeting laws.
APPROVAL OF MINUTES HELD April 18, 2016.
Alderman Madden made a motion to approve MINUTES for meeting HELD April 18,
2016. Alderman Kubacki seconded.
Motion Passed 2 in favor.
STATUS OF PROJECTS
Discussion update. No formal action may be taken on any of the following:
Annual Road Improvement Program
Woods Road Recreational Trail (Racine Ave to Windover Drive)
North Cape Road Recreational Trail (Hwy 36 to Aster Hills Subdivision)
Lake Street/Wildwood Drive Storm Sewer
Flintlock Drive Storm Sewer
Moorland Road Reconstruction
Automated Refuse Collection Transition
UNFINISHED BUSINESS
Discussion update and possible action may be taken on any or all of the following:
Discuss Princeton Drive traffic calming request
Deferred until the next meeting.
NEW BUSINESS
Discussion update and possible action may be taken on any or all of the following:
Discuss Road Program Construction Method for Parker Drive
Alderman Madden made a motion to approve pulvering Parker Drive and adding
additional oil for a cost of around $20,000. Alderman Kubacki seconded.
Motion Passed 2 in favor.
Approve Request for Proposal for Preliminary Engineering of the Woods Road Recreational
Trail (Windover Drive to Janesville Road)
Alderman Madden made a motion to deny the request for Preliminary Engineering of
the Woods Road Recreational Trail (Windover Drive to Janesville Road). Alderman
Kubacki seconded.
Motion Passed 2 in favor.
This project has been put on hold.
Approve Request for Proposal for Preliminary Engineering of the Martin Drive Recreational
Trail (Janesville Road to Lannon Drive)
Alderman Madden made a motion to defer the Proposal for Preliminary Engineering
of the Martin Drive Recreational Trail (Janesville Road to Lannon Drive). Alderman
Kubacki seconded.
Project is in the early stages of planning. Looking for feedback from residents.
Motion Passed 2 in favor.
NEW BUSINESS PLACED ON FILE
(The following items have been placed on file for staff review. Upon completion of review, staff
will submit a supplement detailing options and possible course of action to committee
members.)
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
ADJOURNMENT
Alderman Madden made a motion to ADJOURN at 6:40PM. Alderman Kubacki
seconded.
Motion Passed 2 in favor.
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Approve Request for Proposal for Preliminary Engineering of the Martin
Drive Recreational Trail (Janesville Road to Lannon Drive).
Date: June 16, 2016
Previously Reported/Discussed. The attached request for proposals (RFP) has been
developed in order to obtain proposals for professional services for the preliminary
design and budgeting for the construction of a recreational trail along Martin Drive from
Janesville Road to Lannon Drive. This segment would connect to the section the City has
in place on Martin already down to Janesville Road. Because there are unknown
environmental constraints and the right-of-way is restrictive, we are asking for an
analysis of the pathway on both sides. A PIM would be done in September and feedback
analyzed by the Committee before moving ahead with a full design if the project were
budgeted.
Letters were mailed out to residents asking for input from residents. We mailed a
letter to all residents asking for input so further discussion could be had. I received
the attached emails and two verbal responses. The residents who I talked to at the
counter and over the phone do not want the pathway installed at this time.
Recommendation for Action by Committee:
Discuss whether to move ahead with the project at this time or to postpone the
project until it can be constructed in conjunction with a road reconstruction project
and direct staff accordingly.
Page 1 of 1
From:bruce.angle@thomsonreuters.com
To:David Simpson
Subject:Bike Path
Date:Thursday, June 02, 2016 2:11:05 PM
Mr. David Simpson:
I live in the Chamberlain Hills subdivision on lot 24. You may remember me from several years ago.
One of the items that makes Muskego special are both the quantity and quality of our bike paths.
As long as it’s not raining, it seems that people are using our bike paths in both winter and
summer. My wife and I fully support this bike trail and all others that the city is considering. They
seemed to be used by a broad spectrum of our population and they make our little city unique.
New Berlin, Franklin, and Hales Corners do not offer our level of trails. What a great city asset that
we need to continue to invest in. We are thrilled that our city views these trails as an asset too.
For this trail in particular, Martin Drive needs a bike trail. It’s a main road in our city and walking,
jogging, or riding a bike on this road can be dangerous. Martin Drive has elevation changes and it
can be difficult for drivers to see pedestrians as they crest the hill. Heading west, the sun can also
be an issue in the evening. The land in front of our subdivision would be enhanced with a trail.
Bruce…
Bruce and Michelle Angle
W164S6779 Chamberlain Hill Dr.
Muskego, WI 53150
262 227-2216
From: Chamberlain Hill [mailto:chamberlainhill@gmail.com ]
Sent: Friday, May 27, 2016 11:28 PM
To: (01) Tim & Alana Riemer; (01) Tim & Alana Riemer; (02) Matthew & Jennifer Rasmussen; (02)
Matthew & Jennifer Rasmussen; (03) Kelly Lynn Baierl; (04) Tony & Michelle Heger; (05) Chris &
October Blodgett; (06) Nick & Kathy Macht; (07) Jeff & Alison Riedi; (07) Jeff & Alison Riedi; (08)
Dustin & Julie McCoy; (08) Dustin & Julie McCoy; (09) Paul Stankevich & Jill Berenz; (10) Dan & Lisa
Piessens; (11) Jim & Amber Burke; (12) Eric & Colleen Krueger; (12) Eric & Colleen Krueger; (13) Larry
& Yvonne Meyer; (14) Mark & Dorothy Zimmer; (15) Cassie Skenandore & Melanie Kastner; (15) Cassie
Skenandore & Melanie Kastner; (16) Greg & Amy Lentz; (17) Octavio and Beth Castro; (18) Eric & Tina
Lois; (18) Eric & Tina Lois; (19) Dan and Karen Smith; (20) Steve & Amy Ryan; (21) Jim & Michelle
Gross; (22)Andrew Seidler; (23) John & Cathleen Hockers; Angle, Bruce A. (Financial&Risk); (25) Justin
& Allison Helmer; (25) Justin & Allison Helmer; (26) Chris & Lynn Roob; (27) Tom & Ruth Nelson; (27)
Tom & Ruth Nelson; (28) Paul E Ralston Tonya Duranso; (29) Brent & Sarah Seifert
Subject: Bike Path
Hello HOA members,
The City of Muskego contacted Chamberlain Hill via mail informing us that the bike path on
Martin Dr. has been bumped up on the calendar. Attached is the letter along with a map
showing the proposed path. Please note that the path goes all the way to Lannon Drive. I was
not able to fit that part of the document on the scanner.
Jeff Riedi
From:bulkmailwks@att.net
To:David Simpson
Subject:Recreation Trail on Martin Drive
Date:Tuesday, June 07, 2016 7:24:19 AM
Thank you for your letter concerning a proposed Recreation Trail on Martin Drive. Martin Drive is,
in our opinion, a peaceful and scenic road which has been enjoyed by the all citizens of Muskego
for decades. Any changes deserve an honest and open consideration. However, the information
provided appears to be short of details. While there is mention of a Public Works Committee
Meeting on June 20, 2016, there is no mention of the ”Request for Proposal” dated May 12, 2016
or that creators of a proposal should be prepared to defend the proposal in a public meeting on
September 15, 2016. Not mentioning the “Request for Proposal” and time table for the action plan
shows, at a minimum, an appearance of the Committee attempting to sneak the project through
without appropriate input from affected property owners.
In your letter you indicated any questions should be directed to you. There are all kinds of
questions that come to mind such as the following presented in random order:
1. Who requested and/or thought such a “Recreation Trail” would be a significant benefit to
the majority of Muskego citizens.
2. What weight will be given to the property owners affected by this change? For example, if
all of the owners are against the creation of the path, would that result in reconsideration
of the project?
3. Your “Request for Proposal” indicates both the North and South sides of the street should
be considered. Why is the route on the north side of the street shown on the map
provided? It would appear a plan showing a path on the south side of the street should
also be provided. Such a “south side plan” should, in our opinion, be developed and
provided to the property owners with adequate time to respond, if it hasn’t already. The
houses on the south side have a greater set back. At least one house on the north side of
the street would, at a minimum require moving and/or purchase.
4. Exactly, which properties will be offered compensation for the land used and how will the
amount of compensation be determined?
5. Exactly what property changes will be included in the construction? For example, a
number of properties may need their driveways altered.
6. If trees are to be removed, what will be erected to provide screen and noise abatement?
Note that the current trees help provide ground erosion which could increase significantly
after their removal.
7. What steps will be taken to prevent straying on to the adjoining property such as fences,
screens, walls, etc.?
8. Exactly what landscaping changes will be made? For example, in a couple of cases there is
a steep slope to the street. If the bank is leveled, what type of retaining wall will be
constructed and will the retaining wall be high enough to allow leveling of the property?
9. Will the construction include the removal of all excess material? For example, over the
years a few trees have been cut with the resulting logs piled on the property and/or
easement. Will all such material be removed?
10. What compensation will be provided for the reduction of property value after being
assessed by an independent individual/organization?
11. The purpose path will cross two or more streets. Will appropriate crosswalks and lighting
be provided? Will it be necessary to install traffic light at the busy and/or concealed
intersections? Notice that if the path was on the south side of the street, there would be
less streets to be crossed.
12. How will current drainage ditches be crossed? Bridges?
13. When will a detailed plan be available which will address the esthetics of the path?
14. What railing, on the street side, will be provided to prevent unattended children from
straying on to the Martin Drive?
15. Will the path be lighted? – Will there be any limit to the times of use?
16. Will the path be limited to foot traffic or would bicycles, skateboards, etc. be allowed?
We are confident that all of the above questions will be addressed in any proposal. However, it
would be prudent to include many of the items sited above in the “Request for Proposal” and any
revised request.
We will be looking forward to receiving your response to the questions listed above. Please
respond promptly to allow adequate time for us and other concerned property owners adequate
time to review your comments before the June 20 th meeting.
Thank you.
Mr. & Mrs. S. M. Mundro
W170S6820 Timber Court
Muskego, WI 53150
eMail: BulkMailWks@ATT.Net
May 12, 2016
Request for Proposal- Martin Drive Recreational Trail
The City of Muskego is requesting proposals for professional services in order to evaluate alignments and complete
preliminary design of an eight foot wide recreational trail to be constructed on Martin Drive from Janesville Road
to Lannon Drive. Proposals for professional services shall be submitted no later than 4:00 pm on June 3, 2016.
The City would like to begin planning for the construction of an eight foot wide recreational trail along Martin
Drive from Janesville Road to Lannon Drive. The construction would be planned for no earlier than 2017,
however, we would like to examine alternative alignments and their associated costs now so that discussions can
take place during this year’s budget process for 2017.
The proposal’s scope should use the following guidelines and include the following items:
Survey data shall be collected to obtain all necessary information that could be used to complete full 100%
plan sets in the future. Limits of data collection should include, at a minimum, Martin Drive ROW and a
minimum of 20 feet onto all private property along said ROWs. This data will become property of the City
in a format acceptable to the City such as AutoCAD. No survey will be required in the section of existing
pathway and it can be assumed that the pathway will stay on the northeast side of Martin Drive from
Janesville Road to the church so survey data will only be needed on that side of the road in that section.
Wetland delineation by an assured delineator is required.
All environmental, utility, right-of-way, and any other constraints shall be identified and surveyed.
After data collection proceed to 30% design of an alignment on both sides of Martin Drive so that impacts
to the environment and private property can be analyzed.
Assist with creation of a project cost estimate for City budgeting needs by July 29th, 2016.
Complete an Engineer’s Estimate of probable construction costs with the 30% plans for both alternatives.
The scope should include meetings with City staff as needed to complete the project.
The scope should include attending and providing exhibits for one public informational meeting once the
alternatives have been completed.
The scope shall include attending one Public Works Committee meeting.
The proposal shall include resumes of key staff that will work on the project.
The project schedule should plan the public informational meeting to be completed no later than
September 15th, 2016 with adequate time for City staff to approve the 30% plan alternatives prior to that
meeting date. It can be assumed that a notice to proceed will be given no later than June 15, 2016.
Fee shall be lump sum and all draft plans and survey data shall be provided to the City in AutoCAD
format and shall not be protected against use by the City or others the City may chose in the future to
utilize the data.
The contents of the letter proposal for professional services shall spell out the Scope of Services to be provided, the
Services Not Included, the proposed Completion Schedule, the Professional Fees, and the Assumptions and Conditions
under which the proposal is being made. Should you like to submit for both RFP you may do so in one document,
however, please provide a fee for each project separately as well as include any costs savings offered if you are selected
for both projects. Thank you in advance for your potential interest in this project. If you have any questions, please do
not hesitate to contact me directly at (262) 679-5686.
Thank you,
City of Muskego
David Simpson, P.E.
Director of Public Works/City Engineer
ENGINEERING DIVISION
W182 S8200 Racine Avenue, PO Box 749
Muskego, Wisconsin 53150-0749
(262) 679-4145 FAX (262) 679-5614
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Discuss Princeton Drive Traffic Calming Request
Date: June 14, 2016
Previously Reported: During the annual review of the operations of Taco Bell some
comments were received that drivers were speeding on Princeton Drive. The Plan
Commission asked that we examine the area and discuss potential solutions if there was
in fact a problem.
The Police Department was able to install traffic counters that monitor speed and
number of vehicles and the report is attached. They were also able to have officers
observe the operations and they saw no violations. Based on the 25mph speed limit, we
hope to see speeds in the 85th percentile be no more than 30mph based on standard
practices. The counter shows that the 85th percentile is 25mph in the average per day
traffic count is 506 vehicles (WB only).
Based on the data collected the roadway is currently operating better than expected. The
average motorist is respecting the speed limit and traffic counts are not very high.
New Information: The DPW and PD worked to install a new sign post and were able
to monitor traffic in both directions on Princeton Drive mid-block between
Moorland Road and Sandalwood Drive. The attached results show the results of the
signs being placed with no “your speed” signs and the speed indication sign turned
off. This was done to ensure we were able to gather accurate data as drivers can
sometimes be influenced by the speed indication sign.
The 85th percentile in the eastbound direction is 29mph and in the westbound
direction is 25mph. The average daily volume is 399 cars in the eastbound direction
and 180 cars in the westbound direction. This yields an average vehicle count of
around 600 vehicles for the roadway, which is within what one would expect for this
roadway.
Recommendation for Action by Committee:
Monitor and enforce current speed limit as issues arise.
Page 1 of 1
CITY OF MUSKEGO
Staff Report to Finance Committee
To: Finance Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Crystal Lake Subdivision – Street Tree Planting
Date: June 16, 2016
The Developer of the Crystal Lake Subdivision, Weber Homes Inc, represented by
Tracy Weber has failed to complete the remaining items within the Crystal Lake
development. The City revoked his Letter of Credit and we have completed a good
amount of the remaining items with the $66K LOC. We issued a citation to the
company, Weber Homes, Inc and have received a judgment against said company.
The attorney for the company has written the attached letter asking to settle the
case for $6,000. They are claiming that the business is not active and they have no
assets so we will likely never collect against the judgment.
I have attached the costs to date vs. amount of estimated remaining costs. As you
can see we have already installed the final lift of asphalt, adjusted inlets, and
repaired curb damage. After subtracting the amount owed for the Developer
Deposit we have a remaining $9,700.45 from the LOC to utilize for remaining items.
Since the last Finance Committee Meeting we have asked the Developer for the
additional funds that they promised, however, nothing has been delivered to date. I
think we need to assume we will never see additional money from the Developer and
move ahead with utilizing the last of the funds for some of the improvements.
I have asked the property owners to give us their opinion as to what should be done
with the remaining funds and we are currently proposing to complete street tree
plantings per the attached.
Recommendation for Action by Committee:
Proceed with obtaining bids installing street trees per the attached plans with the
condition that the costs remain within the remaining letter of credit fund balance.
Page 1 of 1
!.
!.
!.
!.
!.
!.
QMC
GTI
GTI
QMC
COP
!.
QBI
QBI
AMM!.
!.
!.
!.
!.
TAR
GDO
!.QMC
!.TAR
!.GTI
GTI
!.
!.
!.
ASC
QBI
ASC
TAR
!.
COP
COP
GDO
GDO
AMM
!.
!.
QMC
!.
!.
ASC
!.
30'30'
30'30'
!.
C
R
Y
S
T
A
L
D
R
C
R
Y
S
T
A
L
D
R
M U S K E G O D A M D RMUSKEGO D A M D R O
R
I
O
L
E
L
N
O
R
I
O
L
E
L
N
MMUUSSKKEEGGOO DDAA MM DD RR
Text
CRYSTAL LAKE SU BDIVISION - PROPOSED STR EET TREES
Date: 5/24/2016
1.The l andscape Instal l e r must contact the Ci ty Fore ste r
pri or to pl anti ng.
2.Tre e s shal l be pl ante d i n accordance to the Tre e Pl anti ng
Di agram.
3.Any substi tuti ons or al te rati ons to the pl an must re ce i ve
approv al f rom the Ci ty Fore ste r.
4.Unde rground uti l i ti e s must be l ocate d pri or to
i nstal l ati on; It i s the re sponsi bi l i ty of the l andscape
i nstal l e r to contact Di gge rs Hotl i ne .
5.Pl ant mate ri al shal l conf orm to A me ri can Standard f or
Nurse ry (AN SI Z600) and compl y wi th al l appl i cabl e state
and f e de ral l aw s gove rni ng i nspe cti on, shi ppi ng, se l l i ng
and handl i ng of nurse ry stock.
6.Stock shal l be handl e d prope rl y so that root bal l s are not
l oose ne d or al l ow e d to dry out and trunks and branche s
are not damage d.
7.Pl anti ngs shal l be guarante e d to be i n a he al thy and
f l ouri shi ng condi ti on f or a pe ri od of e i ghte e n (18)
months.
G ENERAL NOTES
PLANTING LOCATIONS
Tre e s must be at l e ast:
10' f rom a f i re hydrant
*Tre e s shoul d be pl ante d outsi de of ROW, on
pri vate prope rty, w i thi n f i ve f oot (5') stre e t tre e
e ase me nt (se e subdi v i si on pl at f or de tai l s).
20' f rom a stre e tl i ght or uti l i ty pol e
10' f rom a dri ve w ay
30' f rom any stre e t corne r
10' f rom a gas/w ate r val ve or uti l i ty l ate ral s
SYMBOL COM MON N AME SCIENTIFIC NAM E CALIPER QUANTITY
GDO COFFEETREE, KENTUCKY (MALE SEEDLESS ONLY)GYMNO CLADUS DI OI CA 1.75"3
COP HACKBERRY, PRAI RI E PRI DE CELTI S O CCI DENTALI S 'PRAI RI E PRI DE'1.75"3
GTI HO NEYLOCUST, SKYLI NE GLEDI TSI A TRI ACANTHO S I NERMI S ' SKYLI NE'1.75"4
TAR LI NDEN, RED MO ND TI LI A AMERI CANA CV 'REDMOND'1.75"3
AMM MAPLE, STATE STREET MI YABEI ACER MI YABEI 'MORTON'1.75"2
ASC MAPLE, SUGAR ACER SACCHARUM 1.75"3
QMC O AK, BUR QUERCUS MACROCARPA 1.75"4
QBI O AK, SWAMP WHI TE QUERCUS BI COLOR 1.75"3TOTAL25
±0 130 26065 Feet
1 inch = 60 feet
LEGEND
!.PROPOSED TREE
STREET CENTERLINE
STREET CURB EDGE
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Discuss potential replacement of WE Energies bridge near Sandy Beach
Drive and potential design agreement approval
Date: June 16, 2016
I was able to get the WDNR to give the City an initial opinion that they will permit a
box culvert at the location of the failing bridge. This opinion was not given with
enough time to obtain multiple quotes for design, however, I was able to obtain one
from GRAEF as they are familiar with the project as they were helping us through
the process thus far when we thought the bridge might be salvageable (at no cost).
Because the cost is very reasonable, they are knowledgeable about the project, and
we have had good luck with GRAEF in the past, I think we should move ahead with
GRAEF for this project’s design now so that we can establish a budget number
prior to budgeting for 2017.
Recommendation for Action by Committee:
Authorize proceeding design and permitting of a box culvert on the WE Energies
trail with design by GRAEF for $5,000.
Page 1 of 1
One Honey Creek Corporate Center
125 South 84th Street, Suite 401
Milwaukee, WI 53214-1470
414 / 259 1500
414 / 259 0037 fax
www.graef-usa.com
0016-0108.00
June 13, 2016
David Simpson, P.E.
Director of Public Works/City Engineer
City of Muskego
W182 S8200 Racine Ave., Box 749
Muskego, WI 53150-0749
Subject: WE Energies Trail Bridge Replacement
Dear David:
Per your request, Graef-USA Inc. (GRAEF) is pleased to provide this proposal for services to
City of Muskego (Client). An executed copy of this proposal will become our Agreement.
This proposal is for professional services for the WE Energies Trail Bridge Replacement
(Project). This proposal is subject to GRAEF’s Standard Terms and Conditions, a copy of
which is attached and incorporated by reference.
It is our understanding that the nature of the Project involves providing construction plans
and specifications for a replacement bridge owned by WE Energies in the City of Muskego. It
is our understanding that the trail bridge will be replaced by a box culvert of similar size and
shape of the existing bridge.
For this Project, GRAEF proposes to provide the following Basic Services:
Perform one site visit to visually evaluate the existing stream hydrology
Attendance at a meeting with the City of Muskego
Construction Plans and Specifications
Bidding Documents
GRAEF will endeavor to perform the proposed Basic Services per the following schedule:
Provide analysis and report within 6 weeks of notice to proceed.
At your written request, GRAEF will provide the following Additional Services for additional
compensation as detailed below:
Alternatives Analysis
Hydraulic Analysis
Meetings or site visits in addition to that described above in Basic Services.
Preparation of a CLOMR Application
Preparation of a LOMR Application
Prepare Chapter 30 Permit Application
Prepare Endangered Resource Review
Mr. David Simpson, P.E. -2- June 13, 2016
0016-0108.00
A Conditional Letter of map Revision (CLOMR) and Letter of Map Revision (LOMR) would be
required with any increase in the floodplain elevations near the bridge and would include
permit fees of $16,000. A LOMR would be required with any decrease in the floodplain
elevations near the bridge and would include permit fees of $8,800. It is our understanding
that the proposed bridge shall not increase or decrease the floodplain elevations and would
not trigger the need for a CLOMR or LOMR application.
For this Project, it is our understanding Client will provide the following services, items
and/or information:
Access to the bridge.
Any plans or reports regarding the existing bridge
For all Basic Services, Client agrees to compensate GRAEF for a lump sum fee of $5,000
plus reimbursable expenses such as mileage and permit fees.
For all Additional Services, Client agrees to compensate GRAEF as follows as mutually
agreed upon at the time of the request for services.
To accept this proposal, please sign and date both of the enclosed copies and return one to
us. Upon receipt of an executed copy, GRAEF will commence work on the Project.
Graef-USA Inc. looks forward to providing services to the City of Muskego.
Sincerely,
Graef-USA Inc. Accepted by: City of Muskego
____________________________
Bridget S. Henk, P.E., ENV SP, LEED AP BD+C (Signature)
Project Manager
____________________________
(Name Printed)
____________________________
(Title)
Michael N. Paulos P.E., C.D.T., LEED AP
Mr. David Simpson, P.E. -3- June 13, 2016
0016-0108.00
Municipal Market Team Leader
Principal Date: _______________________
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Review Agreement from WE Energies Agreement for Bridge Removal and
Replacement
Date: June 16, 2016
The attached draft agreement between the City and WE Energies outlines the
responsibilities of each party. The essentials of the agreement include the fact that
the City will own the box culvert and pay for its installation and maintenance. WE
Energies will pay for the removal of the existing bridge, but the City will contract
for it and then bill WE Energies upon completion, and said removal must occur no
later than September 30, 2017.
If these essential components of the agreement are agreeable, I will have the
agreement reviewed by the City Attorney and then bring it forth Council for final
approval.
Recommendation for Action by Committee:
Approve Addendum #8 to the Muskego Recreation Trail Agreement with WE
Energies.
Page 1 of 1
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Review drainage easement requirements for proposed Thode Drive land
Division
Date: June 16, 2016
As part of all land divisions, the Engineering Department reviews said proposals for
compliance with all City ordinances and policies. As part of this review we look for
drainage routes that currently exist without easements and ask that those routes be
placed within an easement to protect future land owners from purchasing land
without knowing that a drainage patter exists. The attached letter, CSM and
exhibit show the location of a drainage easement that staff believes should be
created as part of the proposed land division. While the water must be allowed to
drain through the land, which is described under State law, we also ask for the
easement to further clarify the use of the land.
Recommendation for Action by Committee:
Require a 20 foot wide easement centered over the existing drainage way on Lot 1 of
the proposed CSM prior to City approval and signatures.
Page 1 of 1
576RIM 782.35782.35 15"
582RIM 783.16783.16 15"
575RIM 781.96781.96 15"
632RIM 786.22784.50 12" SW
631RIM 786.67783.82 12" NE783.77 15" SE783.77 18" SW
627RIM 787.53782.88 18" NE782.83 12" SE782.78 18" SW
626RIM 787.50782.95 12" NW782.95 12" SE
625RIM 787.31783.66 12" NW783.66 12" SE
623RIM 787.12782.42 18" NE783.12 15" SE782.42 21" SW
628RIM 789.08784.63 12" NW
629RIM 788.70784.55 12" NW784.55 12" SE
630RIM 788.51784.06 15" NW784.06 12" SE
581RIM 783.45783.45 15"
W151S10282
TH
O
D
E
D
R
HEINRICH DR784
786
78
2
78
0
778
77
6
774
788 790
788
7
8
2
7
8
0
788
784
78
6
786
7
8
6
782
78
6
786
7
7
8
788
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Review and approval of detour route for Tess Corners Drive closure in
Franklin
Date: June 16, 2016
The City of Franklin will be reconstructing a box culvert on Tess Corners Drive just
over the Franklin/Muskego border. They are requesting that the City allow a
posting of a detour down Woods Road west into Franklin (see attached). They are
stating that the detour will last from August 1st through October 30th, 2016.
Recommendation for Action by Committee:
Recommend allowing the detour as shown on the attached.
Page 1 of 1
Detour Route
SHEET NUMBER
DA
T
E
DE
S
C
R
I
P
T
I
O
N
W1
5
6
N
1
1
3
5
7
P
i
l
g
r
i
m
R
o
a
d
,
G
e
r
m
a
n
t
o
w
n
,
W
I
5
3
0
2
2
Of
f
i
c
e
:
2
6
2
.
5
0
2
.
0
0
6
6
,
F
a
x
:
2
6
2
.
5
0
2
.
0
0
7
7
ww
w
.
h
i
m
a
l
a
y
a
n
l
l
c
.
c
o
m
CHECKED BY:
DESIGNED BY:
JOB NO.:
DATE:
&23<5,*+7+,0$/$<$1&2168/7$176//&
03/02/2016
1014CFRANKLIN
M BABICH
M MALAS
W.
S
T
.
M
A
R
T
I
N
S
R
O
A
D
O
V
E
R
T
E
S
S
C
O
R
N
E
R
S
C
R
E
E
K
DE
T
O
U
R
P
L
A
N
BR
I
D
G
E
R
E
P
L
A
C
E
M
E
N
T
FR
A
N
K
L
I
N
,
W
I
7 of 16
Feet
0 400 800
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Recommend approval of the Compliance Maintenance Annual Report
(CMAR) for 2015
Date: June 16, 2016
One of our responsibilities in the operation of the City’s Sanitary Sewer Conveyance
System comes from the WDNR. They require an annual report titled “Compliance
Maintenance Annual Report” (CMAR). Part of the report (see attached) is a
requirement to have a resolution such as the attached resolution in order to ensure
that elected officials are aware of the current state of the system by sharing the
CMAR and ensuring adequate funding is available to the Utility.
For the year 2015 the City’s Grade was an A (4.0) as can be seen on the attached
report.
Recommendation:
Recommend approval of the attached resolution.
Page 1 of 1
COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION #____-2016
WISCONSIN DEPARTMENT OF NATURAL RESOURCES
NR 208 - COMPLIANCE MAINTENANCE RESOLUTION
FOR 2015
WHEREAS, It is a requirement under a Wisconsin Pollutant Discharge Elimination
System (WPDES) permit issued by the Wisconsin Department of Natural Resources to
file a Compliance Maintenance Annual Report (CMAR) for the City of Muskego’s
wastewater collection system under Wisconsin Administrative Code NR 208; and
WHEREAS, It is necessary to acknowledge that the governing body has reviewed the
Compliance Maintenance Annual Report (CMAR) for 2015.
WHEREAS, The Muskego Sewer Utility had a 4.0 average in 2014.
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of
Muskego, upon the recommendation of the Public Works Committee, does hereby
commit the necessary funding to operate the City’s sewer utility efficiently and maintain
its above 3.0 grade point average.
DATED THIS _ DAY OF _ , 2016.
SPONSORED BY:
PUBLIC WORKS COMMITTEE
This is to certify that this is a true and accurate copy of Resolution #___-2016 which
was adopted by the Common Council of the City of Muskego.
_______________________
Clerk-Treasurer
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
Financial Management
1.Provider of Financial Information
Name: Scott Kloskowski
Telephone:262 679 4149 (XXX) XXX-XXXX
E-Mail Address
(optional):skloskowski@cityofmuskego.org
2.Treatment Works Operating Revenues
2.1 Are User Charges or other revenues sufficient to cover O&M expenses for your wastewater
treatment plant AND/OR collection system ?
Yes (0 points)
No (40 points)
If No,please explain:
2.2 When was the User Charge System or other revenue source(s)last reviewed and/or revised?
Year: 2015
0-2 years ago (0 points)
3 or more years ago (20 points)
N/A (private facility)
2.3 Did you have a special account (e.g.,CWFP required segregated Replacement Fund,etc.)or
financial resources available for repairing or replacing equipment for your wastewater treatment
plant and/or collection system?
Yes (0 points)
No (40 points)
0
REPLACEMENT FUNDS [PUBLIC MUNICIPAL FACILITIES SHALL COMPLETE QUESTION 3]
3.Equipment Replacement Funds
3.1 When was the Equipment Replacement Fund last reviewed and/or revised?
Year: 2015
1-2 years ago (0 points)
3 or more years ago (20 points)
N/A
If N/A,please explain:
3.2 Equipment Replacement Fund Activity
3.2.1 Ending Balance Reported on Last Year's CMAR $843,694.69
3.2.2 Adjustments -if necessary (e.g.earned interest,
audit correction,withdrawal of excess funds,increase
making up previous shortfall,etc.)
$0.00
3.2.3 Adjusted January 1st Beginning Balance $ 843,694.69
3.2.4 Additions to Fund (e.g.portion of User Fee,
earned interest,etc.)+$ 27,260.82
3.2.5 Subtractions from Fund (e.g.,equipment
replacement,major repairs -use description box
3.2.6.1 below*)-$ 0.00
3.2.6 Ending Balance as of December 31st for CMAR
Reporting Year $ 870,955.51
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
All Sources:This ending balance should include all
Equipment Replacement Funds whether held in a
bank account(s),certificate(s)of deposit,etc.
3.2.6.1 Indicate adjustments,equipment purchases,and/or major repairs from 3.2.5 above.
3.3 What amount should be in your Replacement Fund?$ 215,000.00
Please note:If you had a CWFP loan,this amount was originally based on the Financial
Assistance Agreement (FAA)and should be regularly updated as needed.Further calculation
instructions and an example can be found by clicking the HELP link under Info in the left-side
menu.
3.3.1 Is the December 31 Ending Balance in your Replacement Fund above,(#3.2.6)equal to,or
greater than the amount that should be in it (#3.3)?
Yes
No
If No,please explain.
0
4.Future Planning
4.1 During the next ten years,will you be involved in formal planning for upgrading,rehabilitating,
or new construction of your treatment facility or collection system?
Yes - If Yes, please provide major project information, if not already listed below.
No
Project
#
Project Description Estimated
Cost
Approximate
Construction
Year
1 pump replacement-McShane Lift station 30,000 2017
2 Replace VFD's and controls-Loomis Rd LS 50,000 2018
3 Replace VFD's and controls-Woods Rd LS 70,000 2019
4 Replace controls Sobek La Lift Station 30,000 2020
5 Replace controls Kurtze La Lift Station 50000 2021
5.Financial Management General Comments
Total Points Generated 0
Score (100 -Total Points Generated)100
Section Grade A
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
Sanitary Sewer Collection Systems
1.CMOM Program
1.1 Do you have a Capacity,Management,Operation &Maintenance (CMOM)requirement in your
WPDES permit?
Yes
No
1.2 Did you have a documented (written records/files,computer files,video tapes,etc.)sanitary
sewer collection system operation &maintenance (O&M)or CMOM program last calendar year?
Yes (Continue with question 1)
No (30 points) (Go to question 2)
1.3 Check the elements listed below that are included in your O&M or CMOM program.
Goals
Describe the specific goals you have for your collection system:
Properly manage,operate and maintain all parts of the collection system,provide adequate
capacity to convey base and peak flows prevent and mitigate impacts of SSO's,provide
notification to those with reasonable potential for exposure to pollutants associated with SSO's.
Organization
Do you have the following written organizational elements (check only those that apply)?
Ownership and governing body description
Organizational chart
Personnel and position descriptions
Internal communication procedures
Public information and education program
Legal Authority
Do you have the legal authority for the following (check only those that apply)?
Sewer use ordinance Last Revised Date (MM/DD/YYYY) 05/22/2003
Pretreatment/industrial control Programs
Fat, oil and grease control
Illicit discharges (commercial, industrial)
Private property clear water (sump pumps, roof or foundation drains, etc.)
Private lateral inspections/repairs
Service and management agreements
Maintenance Activities (provide details in question 2)
Design and Performance Provisions
How do you ensure that your sewer system is designed and constructed properly?
State plumbing code
DNR NR 110 standards
Local municipal code requirements
Construction, inspection, and testing
Others:
Overflow Emergency Response Plan:
Does your emergency response capability include (check only those that apply)?
Alarm system and routine testing
Emergency equipment
Emergency procedures
Communications/notifications (DNR, internal, public, media, etc.)
Capacity Assurance:
How well do you know your sewer system?Do you have the following?
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
Current and up-to-date sewer map
Sewer system plans and specifications
Manhole location map
Lift station pump and wet well capacity information
Lift station O&M manuals
Within your sewer system have you identified the following?
Areas with flat sewers
Areas with surcharging
Areas with bottlenecks or constrictions
Areas with chronic basement backups or SSOs
Areas with excess debris, solids, or grease accumulation
Areas with heavy root growth
Areas with excessive infiltration/inflow (I/I)
Sewers with severe defects that affect flow capacity
Adequacy of capacity for new connections
Lift station capacity and/or pumping problems
Annual Self-Auditing of your O&M/CMOM Program to ensure above components are being
implemented,evaluated,and re-prioritized as needed
Special Studies Last Year (check only those that apply):
Infiltration/Inflow (I/I) Analysis
Sewer System Evaluation Survey (SSES)
Sewer Evaluation and Capacity Managment Plan (SECAP)
Lift Station Evaluation Report
Others:
0
2.Operation and Maintenance
2.1 Did your sanitary sewer collection system maintenance program include the following
maintenance activities?Complete all that apply and indicate the amount maintained.
Cleaning 6 % of system/year
Root removal 0 % of system/year
Flow monitoring 100 % of system/year
Smoke testing 0 % of system/year
Sewer line
televising 20 % of system/year
Manhole
inspections 21 % of system/year
Lift station O&M 52 # per L.S./year
Manhole
rehabilitation .1 % of manholes rehabbed
Mainline
rehabilitation .1 % of sewer lines rehabbed
Private sewer
inspections 0 % of system/year
Private sewer I/I
removal 0 % of private services
Please include additional comments about your sanitary sewer collection system below:
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
3.Performance Indicators
3.1 Provide the following collection system and flow information for the past year.
32.84 Total actual amount of precipitation last year in inches
34.76 Annual average precipitation (for your location)
152 Miles of sanitary sewer
26 Number of lift stations
0 Number of lift station failures
0 Number of sewer pipe failures
0 Number of basement backup occurrences
0 Number of complaints
1.57 Average daily flow in MGD (if available)
2.53 Peak monthly flow in MGD (if available)
8.6 Peak hourly flow in MGD (if available)
3.2 Performance ratios for the past year:
0.00 Lift station failures (failures/year)
0.00 Sewer pipe failures (pipe failures/sewer mile/yr)
0.00 Sanitary sewer overflows (number/sewer mile/yr)
0.00 Basement backups (number/sewer mile)
0.00 Complaints (number/sewer mile)
1.6 Peaking factor ratio (Peak Monthly:Annual Daily Avg)
5.5 Peaking factor ratio (Peak Hourly:Annual Daily Avg)
4.Overflows
LIST OF SANITARY SEWER (SSO)AND TREATMENT FACILITY (TFO)OFERFLOWS REPORTED **
Date Location Cause Estimated
Volume (MG)
None reported
**If there were any SSOs or TFOs that are not listed above,please contact the DNR and stop work
on this section until corrected.
5.Infiltration /Inflow (I/I)
5.1 Was infiltration/inflow (I/I)significant in your community last year?
Yes
No
If Yes,please describe:
5.2 Has infiltration/inflow and resultant high flows affected performance or created problems in
your collection system,lift stations,or treatment plant at any time in the past year?
Yes
No
If Yes,please describe:
5.3 Explain any infiltration/inflow (I/I)changes this year from previous years:
Do to work we have done in repairing leaks and a decrease in storm events and intensity,our
base flows have been reduced.
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
5.4 What is being done to address infiltration/inflow in your collection system?
We repair leaks in mainlines and manholes as we find them.
Total Points Generated 0
Score (100 -Total Points Generated)100
Section Grade A
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
Grading Summary
WPDES No: 0047341
SECTIONS LETTER GRADE GRADE POINTS WEIGHTING
FACTORS
SECTION
POINTS
Financial A 4 1 4
Collection A 4 3 12
TOTALS 4 16
GRADE POINT AVERAGE (GPA)=4.00
Notes:
A = Voluntary Range (Response Optional)
B = Voluntary Range (Response Optional)
C = Recommendation Range (Response Required)
D = Action Range (Response Required)
F = Action Range (Response Required)
Compliance Maintenance Annual Report
Muskego City Last Updated:Reporting For:
6/2/2016 2015
Resolution or Owner's Statement
Name of Governing
Body or Owner:
Date of Resolution or
Action Taken:
Resolution Number:
Date of Submittal:
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO SPECIFIC CMAR
SECTIONS (Optional for grade A or B.Required for grade C,D,or F):
Financial Management:Grade =A
Collection Systems:Grade =A
(Regardless of grade,response required for Collection Systems if SSOs were reported)
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO THE OVERALL
GRADE POINT AVERAGE AND ANY GENERAL COMMENTS
(Optional for G.P.A.greater than or equal to 3.00,required for G.P.A.less than 3.00)
G.P.A.=4.00
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Approve acquisition of Permanent and Temporary Limited Easements for
the North Cape Road Recreation Trail
Date: June 16, 2016
As part of the construction of the North Cape Road Recreation Trail, which is
scheduled to have bids open June 23rd, it is necessary to purchase a Permanent
Limited Easement (PLE) and Temporary Limited Easements (TLE) in order to
construct the pathway. The design plans have progressed to a point in which we are
able to establish limits for TLE and PLE. We must now begin the acquisition of the
appropriate land interests.
The attached acquisition exhibit also labeled Exhibit A, shows each area of the PLE
and the attached plans show the areas of the TLE. There are a total of 7 properties
affected. The PLE area will be purchased as permanent interest that will become a
City easement necessary for continuous City ownership while areas identified as
TLE will be temporary easements for grading and/or access which will be returned
to the property owner upon completion of the project.
The attached Resolution acts as the necessary first step in acquiring the necessary
land interests. Once this Relocation Order is complete, staff will begin contacting
residents to complete the appraisal (only needed on the PLE) and purchase process.
The TLEs are able to be purchased via direct offers not to exceed the values
established for similar interests on other projects if the Committee desires. This
would save substantial money over completing appraisals for each. I would also
anticipate that these offers would not exceed $500 per property.
Recommendation for Action by Committee:
Approve the attached relocation order for the construction of the North Cape Road
recreation trail.
Page 1 of 1
COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION #___-2016
RELOCATION ORDER OF THE CITY OF MUSKEGO,
WAUKESHA COUNTY, WISCONSIN
North Cape Road Recreation Trail
NOW COMES the City of Muskego, Waukesha County, Wisconsin, by its
Common Council and for its Relocation Order hereby resolves as follows:
1. That this Resolution is a Relocation Order in accordance with §32.05(1),
Wisconsin Statutes, for the purposes of the within described public
improvement project and it is also a determination of necessity for that
project in accordance with §32.07(2), Wisconsin Statutes.
2. That the City of Muskego hereby determines that it is a necessary and
public purpose to reconstruct highways and other transportation facilities,
watercourse facilities, and similar improvements (Improvements) along
and adjacent to the North Cape Road Recreation Trail.
3. That the site of said Improvements is contained in Exhibit “A” entitled
which is incorporated herein;
4. That the City of Muskego will acquire a permanent limited easement for
said improvements as indicated on Exhibit "A".
Passed and approved this ______ day of __________, 2016.
I hereby certify that on the ____ day of _________, 2016, the within Relocation
Order was adopted by a vote of ______ ayes to ______ nays by the Common Council
of the City of Muskego, Waukesha County, Wisconsin.
APPROVED: CITY OF MUSKEGO
______________________________
Kathy Chiaverotti, Mayor
ATTEST:
_______________________________
Sharon Mueller, Clerk
CITY OF MUSKEGO
C.T.H. "OO" (NORTH CAPE ROAD)
PLAN OF PROPOSED IMPROVEMENT
RECREATION TRAIL
FINAL PLANS
06/07/2016
CI
T
Y
O
F
M
U
S
K
E
G
O
WA
U
K
E
S
H
A
C
O
U
N
T
Y
,
W
I
S
C
O
N
S
I
N
CT
Y
O
O
(
N
O
R
T
H
C
A
P
E
)
RE
C
R
E
A
T
I
O
N
T
R
A
I
L
C.
T
.
H
.
"
O
O
"
RE
C
T
R
A
I
L
G
E
N
E
R
A
L
N
O
T
E
S
CI
T
Y
O
F
M
U
S
K
E
G
O
WA
U
K
E
S
H
A
C
O
U
N
T
Y
,
W
I
S
C
O
N
S
I
N
C.
T
.
H
.
"
O
O
"
(
N
O
R
T
H
C
A
P
E
R
D
)
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
CI
T
Y
O
F
M
U
S
K
E
G
O
WA
U
K
E
S
H
A
C
O
U
N
T
Y
,
W
I
S
C
O
N
S
I
N
50 FEET
*
*
C.
T
.
H
.
"
O
O
"
(
N
O
R
T
H
C
A
P
E
D
R
)
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
CI
T
Y
O
F
M
U
S
K
E
G
O
WA
U
K
E
S
H
A
C
O
U
N
T
Y
,
W
I
S
C
O
N
S
I
N
C.
T
.
H
.
"
O
O
"
(
N
O
R
T
H
C
A
P
E
D
R
)
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
CI
T
Y
O
F
M
U
S
K
E
G
O
WA
U
K
E
S
H
A
C
O
U
N
T
Y
,
W
I
S
C
O
N
S
I
N
Document Number
Permanent Recreation Trail Easement
Document Title
1. FOR AND IN CONSIDERATION of good and valuable
consideration, the receipt and sufficiency of which is hereby
acknowledged, Susan R Thomson-Vanselow Revocable Trust
of 2011, owner and Grantor of the lands herein described does
hereby grant unto the City of Muskego, Waukesha County,
Wisconsin (Grantee) an easement with the right, permission
and authority to enter upon, construct, install, use, maintain,
replace and repair a public recreation trail (Facilities)
together with appurtenances thereto, in, through, under,
across, and upon the tract of land described as follows:
Being part of the Northeast ¼ of the Northeast ¼ of Section
25, Town 5 North, Range 20 East, in the City of Muskego,
Waukesha County, Wisconsin,
Commencing at the Northwest corner of said Northeast ¼
Section; thence N 87°17’23” E 1,329.34 feet along the North
line of said ¼ Section; thence S01°42’37” E 477.40 feet;
thence N 87°17’23” E 415.92 feet to the point of beginning;
thence N 87°17’23” E 252.04 feet, to the center line of North
Cape Road; thence S 05°04’16” E 195.22 feet along said
centerline; thence S 87°17’23” W 252.04 feet; thence N
05°04’16” W 195.22 feet to the point of beginning. Excepting
the East 33 feet for Roadway purposes. Said easement area
more particularly described as follows: The Easterly 15 feet
of above said property, as measured perpendicular and
running parallel to the east line of said property.
Recording Area
Name and Return Address
City of Muskego
W182S8200 Racine Ave
Muskego, WI 53150-0749
Parcel Identification Number/s (PIN)
MSKC 2257-994
2. Grantor hereby warrants that he/she has legal title to the lands which are the subject of
this easement and that he/she has lawful authority to grant this easement. Further,
Grantor shall defend and indemnify the City of Muskego in its exercise of rights under
the easement herein granted against any defect in title to the land involved or the right of
the Grantor to make the grant herein contained.
3. The right, permission and authority is also granted said Grantee, to trim and/or cut down
certain trees and/or brush where said trees and/or brush interfere with the installation or
maintenance of the Facilities or represent a hazard to such Facilities.
4. The Grantors, their successors and assigns, covenants and agrees to restrict the use of the
land included in the easement described hereinabove as follows:
A. The land will only be put to uses consistent with this easement.
Page 1 of 3
B. No obstruction of access to the Facilities or its appurtenances shall be created in
the future in that no building, trees or other structures or items that may interfere
with inspection, maintenance or repair shall be located in the easement.
C. The surface elevation of the land within the easement shall not be raised or
lowered without the prior written approval of the Grantee.
5. Grantors, their successors and assigns, covenants and agrees to permit and allow grantee
to have Facilities and its appurtenances to be installed at such time and in such location as
grantee may deem necessary.
6. Grantee and its agents shall have the right to enter upon the premises of the Grantor for
the purpose of exercising its rights herein acquired. Grantee agrees to restore or cause to
have restored said premises, as nearly as is reasonably possible, to the condition existing
prior to such entry by the Grantee or its agents. The restoration, however, does not apply
to any brush or trees which may be removed at any time pursuant to the rights herein
granted.
7. The undersigned understands that the City could not condemn the easement across said
lands without following Wisconsin Condemnation Law procedures which provide
protection to the rights of the property owners including, but not limited to, obtaining an
appraisal at the City’s expense and payment of fair compensation to the property owner.
The undersigned wishes to grant a perpetual recreation trail easement across said lands to
the City for good and valuable consideration to the City and waive any and all
condemnation rights which it may have including, but not limited to, the right to an
appraisal, the rights to condemnation and any and all appeal rights.
8. All the provisions in this Easement Agreement shall run with the land and be binding
upon and inure to the benefit of the parties and their respective successors and assigns.
IN WITNESS WHEREOF, Susan R Thomson-Vanselow Revocable Trust of 2011, Grantor, has
caused these presents to be signed on this ______ day of _______________________, 2016.
GRANTOR/S: ___________________________ ____________________________
Signature Signature
STATE OF WISCONSIN )
) SS
WAUKESHA COUNTY )
Personally came before me this _____ day of __________________, 20____, the above named
__________________________, to me known to be the person/s who executed the foregoing
instrument and acknowledged the same.
Page 2 of 3
_________________________________________
Notary Public
__________________________County, Wisconsin
My Commission Expires: ____________________
IN WITNESS WHEREOF, the City of Muskego, Grantee, has caused these presents to be signed
on this ______ day of _______________________, 2016.
BY:
Kathy Chiaverotti, Mayor
BY:
Sharon Mueller, City Clerk-Treasurer
STATE OF WISCONSIN )
) SS
WAUKESHA COUNTY )
PERSONALLY came before me this _____ day of ____________, 2016, the above named
Kathy Chiaverotti, Mayor, and Sharon Mueller, City Clerk-Treasurer of the City of Muskego, to
me known to be the persons executed the foregoing instrument, and to me known to be such
Mayo r and City Clerk-Treasurer of said municipal corporation, and acknowledged that they
executed the foregoing instrument as such officers as the deed of said municipal corporation by
its authority and pursuant to the authorization by the Common Council from their meeting on the
_____ day of _____________, 2016.
_____________________________
Notary Public
__________________________County, Wisconsin
My Commission Expires: ____________________
Page 3 of 3
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by Mark Dahlman and Patricia Collins
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Being part of the Southeast ¼ of Section 24, Town 5 North, Range 20 East, City of
Muskego, Waukesha County, Wisconsin as described in warranty deed Reel 2866,
Image 790 as Document No. 2435875 recorded on March 22, 1999 at Waukesha
County Register of Deeds Office. Said easement area more particularly described as
follows: The East 14.00 feet of the above described property, as measured
perpendicular and running parallel to the East line of said property.
This temporary easement shall end upon the earlier of:
a) the date upon which improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed
agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2256-992
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2256-992
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by William/Sharon Garbett Trust
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Parcel A of Certified Survey Map No.660. part of the Southeast ¼ of Section 24, Town 5
North, Range 20 East, City of Muskego, Waukesha County, Wisconsin. Said easement
area more particularly described as follows: The East 9 feet of the North 58 feet of
above described property, as measured perpendicular and running parallel to the
east line of said property.
This temporary easement shall end upon the earlier of: (a) the date upon which
improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed
agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2256-987-001
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2256-987-001
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by Marshall P. Hecker
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Lot 2 of Certified Survey Map No.9968. part of the Southeast ¼ of the Southeast ¼ of
Section 24, Town 5 North, Range 20 East, City of Muskego, Waukesha County,
Wisconsin. Said easement area more particularly described as follows: Commencing
at the Southeast corner of said lot 2; thence S 87°17’23” W along the South line of
said Lot 2, a distance of 19.00 feet; thence N 07°11’39” W 48.00 feet; thence N
87°17’23” E 7.00 feet, to the Westerly Northcape Road right-of-way line; thence S
07°11’39” E 47.00 fee to the point of beginning. Along with
Commencing at the Northeast corner of said Lot 2; thence S 07°11’39” E along the
Westerly Northcape Road right-of-way line, 57.50 feet, to the point of beginning;
thence continuing S 07°11’39” E along said right-of way line, 92.00 feet; thence S
87°17’23” W 6.00 feet; thence N 07°11’39” W 92.00 feet; thence N 87°17’23” E 6.00
feet to the point of beginning.
This temporary easement shall end upon the earlier of:
a) the date upon which improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2256-989-002
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2256-989-002
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by Donald and Gail Miller
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Being part of the Southeast ¼ of Section 24, Town 5 North, Range 20 East, City of
Muskego, Waukesha County, Wisconsin as described in warranty deed R1453/I453
recorded April of 1992 in Waukesha County Register of Deeds Office. Said easement
area more particularly described as follows: The East 6.00 feet of the above described
property, as measured perpendicular and running parallel to the East line of said
property
This temporary easement shall end upon the earlier of:
a) the date upon which improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed
agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2256-990
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2256-990
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by Richard and Kathleen Patterson
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Being part of the South ½ of the Northeast ¼ of the Southeast ¼ of Section 24, Town 5
North, Range 20 East, City of Muskego, Waukesha County, Wisconsin as described in
Restriction Document as Document No. 2550141 recorded on March 31, 2000 and
Warranty Deed Reel 1833 Image 533 on November of 1993 at Waukesha County
Register of Deeds Office. Said easement area more particularly described as follows:
The East 14.00 feet of the South 406 feet of the above described property, as
measured perpendicular and running parallel to the East line of said property.
This temporary easement shall end upon the earlier of:
a) the date upon which improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed
agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2256-993
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2256-993
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by Susan R Thomson-Vanselow Revocable trust of 2011
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Being part of the Northeast ¼ of the Northeast ¼ of Section 25, Town 5 North, Range 20
East, in the City of Muskego, Waukesha County, Wisconsin,
Commencing at the Northwest corner of said Northeast ¼ Section; thence N 87°17’23”
E 1,329.34 feet along the North line of said ¼ Section; thence S01°42’37” E 477.40 feet;
thence N 87°17’23” E 415.92 feet to the point of beginning; thence N 87°17’23” E 252.04
feet, to the center line of North Cape Road; thence S 05°04’16” E 195.22 feet along said
centerline; thence S 87°17’23” W 252.04 feet; thence N 05°04’16” W 195.22 feet to the
point of beginning. Excepting the East 33 feet for Roadway purposes. Said easement
area more particularly described as follows: The Easterly 21 feet of the North 156 feet
of above described property, as measured perpendicular and running parallel to
the east line of said property.
This temporary easement shall end upon the earlier of: (a) the date upon which
improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2257-994
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2257-994
Document Number
TEMPORARY LIMITED EASEMENT
THIS EASEMENT, made by James and Theresa Wells
,
GRANTOR, conveys a Temporary Limited Construction easement as described below to the _____City
of Muskego____________________________________________________GRANTEE, for the sum
of valuable consideration
( ).
for the purpose of Grading.
Other persons having an interest of record in the property: None
Legal Description
Being part of the Southeast ¼ of Section 24, Town 5 North, Range 20 East, City of
Muskego, Waukesha County, Wisconsin as described in warranty deed 3941717
recorded August 15, 2012 in Waukesha County Register of Deeds Office. Said
easement area more particularly described as follows: The East 6.00 feet of the South
71 feet of the above described property, as measured perpendicular and running
parallel to the East line of said property.
This temporary easement shall end upon the earlier of:
a) the date upon which improvements have been completed; (b) June 30, 2017
All disturbed areas will be restored with topsoil, seed and mulch only, unless a signed
agreement exists with the City of Muskego.
(Signature) (Date)
(Print Name)
(Signature) State of Wisconsin )
) ss.
County )
(Print Name) On the above date, this instrument was acknowledged before
me by the named person(s).
(Signature)
(Print Name) (Signature, Notary Public, State of Wisconsin)
(Signature) (Print or Type Name, Notary Public, State of Wisconsin)
(Print Name) (Date Commission Expires)
Project ID CTH OO Northcape Rd. Recreation Trail This instrument was drafted by Daniel Flamini Parcel No. MSKC 2256-991
This space is reserved for recording data
Return to
Engineering Department
City of Muskego
W182 S8200 Racine Avenue
Muskego, WI 53150
Parcel Identification Number/Tax Key Number
MSKC 2256-991
PARKLAND TOWNE CENTER DEVELOPMENT
JANESVILLE ROAD AND LANNON DRIVE IMPROVEMENTS
MUSKEGO, WISCONSIN
CIVIL ENGINEERING PLANS
Submittal Date: February 19, 2016
SHEET INDEX
SHEET NO.DESCRIPTION
-COVER SHEET
C 001 SITE SURVEY
C 002 OVERALL PLAN
C 003 SITE PLAN
C 100 EROSION CONTROL AND SITE PREPARATION PLAN
C 200 ROADWAY GRADING PLAN
C 300 MEDIAN TRAFFIC CONTROL PLAN
C 301 OVERALL TRAFFIC CONTROL PLAN
C 400 DETAILS
C 401 DETAILS
C 402 DETAILS
C 403 TYPICAL SECTIONS
SITE LOCATION MAP:
NOT TO SCALE
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PREPARED BY :
LANNON DRIVE JANESVILLE ROAD
Re-Submittal Date: March 23, 2016
Re-Submittal Date: May 27, 2016
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
" P
i
p
e
" P
i
p
e
P
P
" P
i
p
e
" P
i
p
e
" P
i
p
e
T
T
T
W W W
W
TT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
ST
ST
ST
ST
ST
ST
ST
X
X
X
XX
CTV
E
E
E
E
ST
81
0
810810
806
806
80
6
808
812
814
8
0
0
810
79
8
79
8
80
2
80
4
8
0
6
806
806
808
808
8
0
8
812
W
1
/
4
C
O
R
.
SE
C
.
1
0
,
T
5
N
,
R
2
0
E
C
O
N
C
.
M
O
N
.
W/
B
R
A
S
S
C
A
P
Y
=
3
3
6
,
8
2
0
.
3
7
X
=
2
,
5
0
1
,
1
4
8
.
4
3
EL
.
=
8
0
7
.
9
1
4
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
BIT
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
.
P
A
D
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
DUMPSTER
CONTAINMENT
W
A
L
K
I
N
G
P
A
T
H
SIDEWALK
PARKING
GARAGE
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
CO
N
C
R
E
T
E
CONCRETE
GR
A
S
S
GR
A
S
S
ME
T
A
L
F
E
N
C
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
EX
I
S
T
.
H
O
U
S
E
EX
I
S
T
I
N
G
P
O
N
D
W
A
T
E
R
S
ED
G
E
W
A
T
E
R
S
ED
G
E
W
A
T
E
R
S
ED
G
E
CO
N
C
R
E
T
E
P
A
D
DU
M
P
S
T
E
R
CO
N
T
A
I
N
M
E
N
T
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
EX
I
S
T
I
N
G
P
O
S
T
OF
F
I
C
E
B
U
I
L
D
I
N
G
SA
N
MH
1
SA
N
M
H
2
SA
N
M
H
3
SA
N
MH
4
SA
N
MH
5
SA
N
MH
6
SA
N
M
H
7
SA
N
M
H
8
SA
N
MH
9
ST
M
M
H
1
ST
M
M
H
2
ST
M
M
H
3
ST
M
M
H
4
ST
M
M
H
5
ST
M
M
H
6
ST
M
M
H
7
ST
M
M
H
8
ST
M
M
H
9
ST
M
MH
1
0
1
8
.
1
2
'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
12. NO ACCESS PER DOC. #84085712. NO ACCESS PER DOC. #840857
IP
F
D
.
S 0
.
1
3
'
W
0
.
1
3
'
IP
F
D
.
S 0
.
1
3
'
IP
F
D
.
W
0
.
0
5
'
IP
F
D
.
N
0
.
0
5
'
E
0
.
0
9
'
NO
R
E
B
A
R
SE
T
TR
E
E
A
T
CO
R
N
E
R
IP
F
D
.
IP
F
D
.
IP
F
D
.
IP
F
D
.
IP
F
D
.
N
0
.
0
6
'
60.0000
60.000
0
9.7066
10'
20'
20'
20'
SI
G
N
MU
S
K
E
G
O
P
A
R
T
N
E
R
S
L
L
C
#S7
4
W
1
6
8
9
0
J
A
N
E
S
V
I
L
L
E
R
D
.
KRA
U
S
E
#W1
7
1
S
7
3
7
4
L
A
N
N
O
N
D
R
.
ZAL
E
W
S
K
I
#W1
7
1
S
7
3
5
4
L
A
N
N
O
N
D
R
.
ST.
F
R
A
N
C
I
S
SAV
I
N
G
S
&
L
O
A
N
#S7
4
W
1
7
1
0
0
50.000
0
50.00
0
0
N 8
8
°
4
6
'
1
6
"
E
1
0
0
.
0
0
'
N 0
1
°
1
3
'
4
4
"
W
2
0
0
.
0
0
'
S
7
7
°
3
9
'
1
7
"
E
2
9
3
.
3
7
'
S
2
7
°
3
7
'
1
7
"
E
2
1
0
.
0
0
'
N 62°22'43" E 160.00'S 2
7
°
3
7
'
1
7
"
E
2
8
.
2
2
'
N
6
2
°
2
2
'
4
3
"
E
1
6
.
0
8
'
S
2
7
°
3
7
'
1
7
"
E
4
1
7
.
3
1
'
S 62°22'43" W 726.81'
N
2
7
°
0
8
'
1
7
"
W
1
7
6
.
8
0
'
S 8
8
°
4
6
'
1
6
"
W
1
0
6
.
0
0
'
N 0
1
°
1
3
'
4
4
"
W
5
4
1
.
8
4
'
N
8
8
°
4
6
'
1
6
"
E
50.
0
0
'
(S 62°27' W)
(S
8
8
°
5
0
'
3
3
"
W
)
(N
8
8
°
5
0
'
3
3
"
E
)
(N
8
8
°
5
0
'
3
3
"
E
)
(N 62°27' E)
(N
6
2
°
2
7
'
E
)
(N
0
1
°
0
9
'
2
7
"
W
)
(N
0
1
°
0
9
'
2
7
"
W
)
(
S
7
7
°
3
5
'
E
)
(S
2
7
°
3
3
'
E
)
(S
2
7
°
3
3
'
E
)
(S
2
7
°
3
3
'
E
)
(N
2
7
°
0
4
'
W
)
17.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
DO
C
.
#
8
5
1
7
9
7
14. APPX. LOCATION OF C/L UTILITY EASE. DOC. #695960
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
SE
E
D
E
T
A
I
L
N 8
8
°
4
6
'
1
6
"
E
P.
O
.
B
.
SE
T
#
6
RE
B
A
R
48.477
0
(N
0
1
°
0
9
'
2
7
"
W
)
N 0
1
°
1
3
'
4
4
"
W
7
7
4
.
0
0
'
W.
L
I
N
E
N
W
1
/
4
S
E
C
.
1
0
,
T
5
N
,
R
2
0
E
N
1
°
2
3
'
1
6
"
W
(
R
E
C
.
)
22. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #391194922. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #3911949
ST
ST ST ST ST ST ST ST
ST
ST
BL
O
C
K
W
A
L
L
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
S
T
ST
S
A
N
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
ST
M
CB
1
6
SI
T
E
S
U
R
V
E
Y
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Public Survey.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PJI
1-25-16
15577
JBL
JBL
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE
LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED.
THERE MAY BE ADDITIONAL UNDERGROUND UTILITY
INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT
SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3.DRAWING IS BASED ON FIELD SURVEY COMPLETED BY B. ROZITE
ON 09-09-2015.
4.DATUM FOR THE PROJECT SURVEY IS NGVD 1929. BENCHMARK
FOR THE PROJECT SURVEY IS CHISELED CROSS IN CONCRETE
SHOWN ON SURVEY AS "BENCHMARK #1" WITH AN ELEVATION OF
808.91.
CATCH BASIN REBAR FOUND/SET
HYDRANT
MANHOLE
GUY WIRE
CHAIN LINK FENCE
PROPERTY LINE
OVERHEAD UTILITY LINE
WATER MAIN
ELECTRIC
SANITARY SEWER
STORM SEWER
CONIFEROUS TREE
DECIDUOUS TREE
LIGHT POLE
IRON PIPE FOUND/SET
UTILITY PEDESTAL
TELEPHONE
CB
BENCHMARK
MONUMENT
CHISELED CROSS FOUND/SET
PK PK NAIL FOUND/SET
SPIKE/NAIL
ELECTRIC METER
UTILITY POLE
TRAFFIC SIGNAL
SOIL BORING
WATER VALVE
SIGN
BUSH
FORCE MAIN
FIBER OPTIC
CABLE TV
TREE LINE
EASEMENT
OH OH
G G
E E
T T
ST ST
SAN SAN
x x
FO FO
FM FM
W W
x
CTV CTV
SECTION 1/4 SECTION LINE
670
P
GAS
EXISTING CONTOUR
EM
GM GAS METER
GAS VALVE
POST
MONITORING WELL
RD ROOF DRAIN
CB CATCH BASIN (ROUND)
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
0
-
S
i
t
e
S
u
r
v
e
y
\
1
5
5
7
7
P
u
b
l
i
c
S
u
r
v
e
y
.
d
w
g
LEGEND:
C 001THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
GRAPHIC SCALE
00 50'100'
JANESVILLE RD
LA
N
N
O
N
D
R
.
SANITARY MEASURE DOWNS
SAN MH 1
RIM: 808.03
N INV: 791.27
S INV: 791.23
SE INV: 794.19
SAN MH 2
RIM: 808.48
N INV: 790.76
S INV: 790.71
SAN MH 3
RIM: 812.21
NE INV: 790.5
SW INV: 790.4
SAN MH 4
RIM: 814.26
NE INV: 791.4
SW INV: 791.4
SAN MH 5
RIM: 814.08
NE INV: 792.1
SW INV: 792.08
S INV : 793.0
S INV: 802.2
SAN MH 6
RIM: 811.92
N INV: 793.3
NE INV: 792.9
SW INV: 793.0
SAN MH 7
RIM: 806.39
NW INV: 794.16
SE INV: 794.14
SAN MH 8
RIM: 806.33
NW INV: 794.84
SE INV: 794.76
SAN MH 9
RIM: 806.88
NW INV: 795.92
STORM MEASURE DOWNS
STM MH 1
RIM: 805.75
15" NE INV: 804.04
12" SW INV: 804.04
STM MH 2
RIM: 806.79
15" NE INV: 803.57
15" SW INV: 803.54
8" CLAY S INV: 803.37
STM MH 3
RIM:806.07
8" CLAY N INV: 803.67
STM MH 4
RIM: 805.25
12" NE INV: 803.03
12" SW INV: 803.00
STM MH 5
RIM: 807.04
24" N INV: 802.62
24" NE INV: 802.80
12" SW INV: 802.74
STM MH 6
RIM: 807.08
18" SE INV: 803.80
24" SW INV: 803.33
STM MH 7
RIM: 806.23
18" NW INV: 804.63
STM MH 8
RIM: 806.14
24" NW INV: 800.74
18" E INV: 801.84
15" SE INV: 800.76
24" SW INV: 801.24
STM MH 9
RIM: 805.64
18" SE INV: 803.30
STM MH 10
RIM: 804.86
48" NW INV: 799.05
24" SE INV: 799.21
STORM CATCH BASIN MEASURE DOWNS
STM CB 1
RIM: 810.16
15" NE INV:
12" SW INV:
STM CB 2
RIM: 812.26
15" NE INV:
15" SW INV:
8" CLAY S INV:
STM CB 3
RIM: 809.75
8" CLAY N INV:
STM CB 4
RIM: 807.79
12" NE INV:
12" SW INV:
STM CB 5
RIM: 806.80
24" N INV:
24" NE INV:
12" SW INV:
STM CB 6
RIM: 807.84
24" N INV:
24" NE INV:
12" SW INV:
STM CB 7
RIM: 808.10
24" N INV:
24" NE INV:
12" SW INV:
STM CB 8
RIM: 808.09
12" SE INV: 805.9
12" W INV: 805.12
STM CB 9
RIM:807.92
16" N INV: 804.9
12" NW INV: 804.80
12" NE INV: 804.77
16" S INV: 804.62
STM CB 10
RIM:806.48
12" SE INV: 804.89
STM CB 11
RIM: 807.07
16" N INV: 804.22
16" S INV: 804.12
12" E INV: 804.32
STM CB 12
RIM:806.99
12" E INV: 804.86
STM CB 13
RIM:807.09
16" N INV: 804.08
16" S INV: 803.99
12" W INV: 804.79
STM CB 14
RIM: 808.48
16" N INV: 803.32
16" S INV: 803.27
STM CB 15
RIM:809.10
12" SW INV: 807.12
STM CB 16
RIM: 805.65
12" NW INV: 802.58
12" E INV: 802.86
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
T
T
T
W W W
W
TT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
ST
ST
ST
ST
ST
ST
ST
X
X
XX
CTV
E
E
E
E
ST
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
.
P
A
D
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
DUMPSTER
CONTAINMENT
W
A
L
K
I
N
G
P
A
T
H
SIDEWALK
PARKING
GARAGE
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
CO
N
C
R
E
T
E
CONCRETE
GR
A
S
S
GR
A
S
S
ME
T
A
L
F
E
N
C
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
EX
I
S
T
I
N
G
P
O
N
D
W
A
T
E
R
S
ED
G
E
W
A
T
E
R
S
ED
G
E
CO
N
C
R
E
T
E
P
A
D
DU
M
P
S
T
E
R
CO
N
T
A
I
N
M
E
N
T
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
EX
I
S
T
I
N
G
P
O
S
T
OF
F
I
C
E
B
U
I
L
D
I
N
G
SA
N
M
H
1
SA
N
M
H
2
SA
N
MH
3
SA
N
M
H
4
SA
N
M
H
5
SA
N
M
H
6
SA
N
MH
7
SA
N
MH
8
SA
N
M
H
9
ST
M
M
H
1
ST
M
M
H
2
ST
M
MH
3
ST
M
M
H
4
ST
M
MH
5
ST
M
M
H
6
ST
M
M
H
7
ST
M
MH
8
ST
M
MH
9
ST
M
M
H
1
0
1
8
.
1
2
'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
12. NO ACCESS PER DOC. #84085712. NO ACCESS PER DOC. #840857
SI
G
N
P
/
L
P/
L
P/LP/L
P/L
P/L
17.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
DO
C
.
#
8
5
1
7
9
7
14. APPX. LOCATION OF C/L UTILITY EASE. DOC. #695960
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
22. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #391194922. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #3911949
ST
ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
S
T
ST
S
A
N
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
ST
M
CB
1
6
PROPOSED FUTURE GROCERY
(30,000 SF) FFE = 810.00
PROPOSED FUTURE
COMMERCIAL
(12,000 SF) FFE: 811.80
PROPOSED
FUTURE
COMMERCIAL
(4,000 SF)
FFE = 811.80
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED FUTURE
COMMERCIAL
(7,500 SF) FFE = 808.87
FU
T
U
R
E
PO
O
L
E E E E
E
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED BUILDING
21,600 SF
FFE = 809.00
ON
L
Y
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SANSANSAN
SA
N
SA
N
SA
N
SANSANSAN
>>
>>
>
>
>
>
>
>
>
>
>
R3
0
.
0
'
R3
.
0
'
R2
.
0
'
R1
8
.
0
'
R1
4
.
0
'
>
>
W W W W
W
W
W
W
W
W
W
W
W
W
W
W
>
>
>
>
OV
E
R
A
L
L
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 - Public Site.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
3
-
S
i
t
e
D
i
m
e
n
s
i
o
n
P
l
a
n
\
1
5
5
7
7
-
P
u
b
l
i
c
S
i
t
e
.
d
w
g
C 002
GRAPHIC SCALE
00 50'100'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PJI
1-25-16
15577
JBL
JBL
SE
E
S
H
E
E
T
C
0
0
3
SEE SHEET C003
LA
N
N
O
N
D
R
I
V
E
JANESVILLE ROAD
GENERAL NOTES:
1.CONSTRUCTION OF ROAD IMPROVEMENTS SHALL BE
COORDINATED WITH CONSTRUCTION OF MASTER
SITE INFRASTRUCTURE IMPROVEMENTS FOR THE
PARKLAND TOWNE CENTER DEVELOPMENT.
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
W
W
W
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
GEE E E E E
E
E E E E
E E E E E E E E E E E E E E E E
T
W
W
WSA
N
SA
N
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
E
E
E
E
T
GR
A
V
E
L
G
R
A
V
E
L
EX
I
S
T
I
N
G
FO FO FO FO FO FO FO FO FO FO FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
SA
N
M
H
3
SA
N
M
H
4
SA
N
M
H
5
P/LP/LP/LP/L
ST ST ST ST ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
ST
M
CB
2
E E E E E E
E
EON
L
Y
JANESVILLE ROAD
TTTTTTTTTTTTTTTTTTTTTTT
T
T
TTT
TTTTTTT
"
P
i
p
e
"
P
i
p
e
E
E
E
E
E
E
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
W
P
E
E
T
T
T
T
T
T
T
T
T
T
G
G
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
STST
S
T
S
T
X
X
X
ST
ST
ST
T
T
T
T
T
T
T
T
TTTTTTTTTTTTTTTTTTT
T
GR
A
S
S
GR
A
S
S
GR
A
S
S
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT.PAD
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
GRASSGRASS
LT
P
BA
S
E
LT
P
BA
S
E
12
"
C
M
P
IN
V
:
8
0
5
.
4
5
12
"
C
M
P
IN
V
:
8
0
4
.
9
0
12
"
C
M
P
IN
V
:
8
0
4
.
8
8
12
"
C
M
P
IN
V
:
8
0
4
.
7
9
DU
M
P
S
T
E
R
CO
N
T
A
I
N
M
E
N
T
SA
N
MH
1
SA
N
MH
2
SA
N
MH
9
ST
M
MH
1
ST
M
MH
2
ST
M
MH
3
ST
M
MH
9
P/L P/L P/L
17
.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
ST
ST
S
T
S
T
S
T
S
T
ST
ST
ST
ST
ST
SA
N
SA
N
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
LANNON DRIVE
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
SA
N
SA
N
SA
N
SA
N
SAN
SA
N
SA
N
S
A
N
S
A
N
SA
N
SA
N
SA
N
SA
N
SAN SAN
>
>
>
>
>
R30.0'
R3.0'R2.0'
R18.0'R14.0'
>
>
>
W
W
W
W
W
>
>
>
>
SI
T
E
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 - Public Site.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
3
-
S
i
t
e
D
i
m
e
n
s
i
o
n
P
l
a
n
\
1
5
5
7
7
-
P
u
b
l
i
c
S
i
t
e
.
d
w
g
LEGEND:
C 003
A
C401
CURB & GUTTER
(REJECT)
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
B
C401
ASPHALT SURFACE
PJI
1-25-16
15577
JBL
JBL
GRAPHIC SCALE
00 30'60'
GRAPHIC SCALE
00 30'60'
12.0'
100.0'100'
30" CONCRETE CURB AND GUTTER
(REJECT)
8-INCH WHITE EPOXY
PAVEMENT MARKING (SOLID)
SLOPED CONCRETE MEDIAN NOSE
W/YELLOW EPOXY PAVEMENT MARKING
12.0'
8-INCH WHITE EPOXY PAVEMENT
MARKING (2' LINE, 6' GAP)
PAVEMENT MARKING WHITE EPOXY
ARROW TYPE 2
8-INCH WHITE EPOXY PAVEMENT
MARKING (SOLID)
PAVEMENT MARKING WHITE EPOXY
ARROW TYPE 2
8-INCH WHITE EPOXY PAVEMENT
MARKING (SOLID)
4-INCH DOUBLE YELLOW EPOXY
PAVEMENT MARKING
67.3'
112.6'
4-INCH WHITE EPOXY PAVEMENT
MARKING
INSTALL NEW TYPE "C" BASE AND
RELOCATE EXISTING BANNER POLE.
PULL BACK EXISTING WIRING (3 #10 AND 1 #10 GROUND)
TO NEAREST PULL BOX OR POLE. CONNECT NEW CONDUIT
TO EXISTING AS SHOWN. PULL EXISTING WIRE THROUGH
NEW CONDUIT TO NEW POLE LOCATION AND RECONNECT.
PULL BACK EXISTING WIRING (3 #10 AND 1 #10 GROUND)
TO NEAREST PULL BOX OR POLE. CONNECT NEW CONDUIT
TO EXISTING AS SHOWN. PULL EXISTING WIRE THROUGH
NEW CONDUIT TO NEW POLE LOCATION AND RECONNECT
PAVEMENT MARKING WHITE EPOXY
WORD TYPE 2
CONCRETE DRIVE APPROACH
5" CONCRETE SIDEWALK
5" CONCRETE SIDEWALK
HMA PAVEMENT
RELOCATE EXISTING ATMOSPHERIC VACUUM BREAKER
AND IRRIGATION VALVE BOX BEHIND CURB. INSTALL NEW
IRRIGATION PIPING, TRACER WIRE, AND ELECTRIC LINES
TO MATCH EXISTING.
CONCRETE SIDEWALK
5-INCH
D
C402
CONCRETE DRIVEWAY
7-INCH
65.7'100.0'
CONCRETE DRIVE APPROACH
5" CONCRETE SIDEWALK
HMA PAVEMENT
CONCRETE DRIVE APPROACH
5" CONCRETE SIDEWALK
HMA PAVEMENT
30" CURB AND GUTTER
(TYP)
YELLOW CONCRETE MEDIAN NOSE
5" CONCRETE SIDEWALK
ADA RAMPA
C402
A
C402
REINSTALL BRICK PAVERSE
C401
C
C401
C
C402
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE
LOCATION AND ACCURACY OF WHICH CANNOT BE
GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND
UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE
NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES
AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE
LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT
FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON
CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR
DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT
LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND RAMPS,
PAVING, AND CURB AND GUTTER SHALL BE COMPLETED PER
MUNICIPAL AND/OR COUNTY REQUIREMENTS AND STANDARDS.
30" CURB AND GUTTER
NOTE:
ALL IMPROVEMENTS WITHIN JANESVILLE ROAD ROW SHALL BE
IN ACCORDANCE WITH THE WISDOT STANDARD
SPECIFICATIONS FOR HIGHWAY AND STRUCTURE
CONSTRUCTION, LATEST EDITION.
NOTE:
ALL IMPROVEMENTS WITHIN LANNON DRIVE ROW SHALL BE IN
ACCORDANCE WITH THE CITY OF MUSKEGO STANDARD
SPECIFICATIONS.
6.0'
11.0'
11.0'
6.0'
11.0'
100.0'
F
C401
BRICK PAVERS
1.CITY RESUBMITTAL 3/23/16 TPM
PAVEMENT MARKING WHITE EPOXY
ARROW TYPE 2
LEVEL LANDING
(MAX. 2% IN ANY
DIRECTION)
ADA RAMP
(MAX. 8.33% SLOPE)
ADA RAMP
(MAX. 8.33% SLOPE)
2.CITY RESUBMITTAL 5/27/16 TPM
JANESVILLE ROAD
W
W
W
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
GE E E E E
E
E E E E
E E E E E E E E E E E E E E E E
T
W
W
WSA
N
SA
N
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
E
E
E
E
81
0
810810
808
812
814
810
808
812
T
G
R
A
V
E
L
G
R
A
V
E
L
FO FO FO FO FO FO FO FO FO FO FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO
SA
N
M
H
3
SA
N
M
H
4
SA
N
M
H
5
P/LP/LP/LP/L
P/
L
ST ST ST ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
ST
M
CB
2
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
////////
/
/
//
/
/
812
813
814
811
812
81
1
81
1811
8
1
1
810
810
8
0
8
8
0
8
809
8
0
9
811
81
2
81
3
8
1
4
815 815
LANNON DRIVE
TTTTTTTTTTTTTTTTTTTTTTT
T
T
TTT
TTTTTTT
"
P
i
p
e
"
P
i
p
e
E
E
E
E
E
E
W
W
W
W
W
W
W
G
G
G
G
G
G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
W
P
E
T
T
T
T
T
T
T
T
T
G
G
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
STST
S
T
S
T
X
X
X
ST
ST
ST
T
T
T
T
T
T
T
TTTTTTTTTTTTTTTTTTT
T
GR
A
S
S
GR
A
S
S
GR
A
S
S
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT.PAD
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
GRASSGRASS
LT
P
BA
S
E
LT
P
BA
S
E
12
"
C
M
P
IN
V
:
8
0
5
.
4
5
12
"
C
M
P
IN
V
:
8
0
4
.
9
0
12
"
C
M
P
IN
V
:
8
0
4
.
8
8
12
"
C
M
P
IN
V
:
8
0
4
.
7
9
DU
M
P
S
T
E
R
CO
N
T
A
I
N
M
E
N
T
SA
N
MH
1
SA
N
MH
2
SA
N
MH
9
ST
M
MH
1
ST
M
MH
2
ST
M
MH
3
ST
M
MH
9
P/L P/L P/L
17
.
A
P
P
X
.
L
O
C
A
T
I
O
N
ST
ST
S
T
S
T
S
T
S
T
ST
ST
ST
ST
ST
SA
N
SA
N
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
////////////////////////////////
8
0
8
80
8
80
8
80
9
807
8
0
9
8
0
9
809
806807
8
0
8
80
9809
809
ER
O
S
I
O
N
C
O
N
T
R
O
L
A
N
D
S
I
T
E
PR
E
P
A
R
A
T
I
O
N
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 PUBLIC PREP.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PJI
1-25-16
15577
JBL
JBL
5
B
C400
5
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE
LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED.
THERE MAY BE ADDITIONAL UNDERGROUND UTILITY
INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT
SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND
EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT
FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON
CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR
DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES.
5.SEE SHEET C400 FOR A COMPLETE LIST OF EROSION CONTROL
NOTES AND DETAILS. EROSION CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO START OF LAND DISTURBING ACTIVITIES.
6.DO NOT BEGIN LAND DISTURBING ACTIVITIES UNTIL AN EROSION
CONTROL PERMIT IS OBTAINED FROM LOCAL JURISDICTION.
PROPOSED INLET PROTECTION
PROPOSED EROSION MATTING WISDOT
APPROVED CLASS 1 TYPE B
EXISTING CONTOUR
PROPOSED CONTOUR
PAVEMENT REMOVAL
C
C401
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
1
-
S
i
t
e
P
r
e
p
a
r
a
t
i
o
n
&
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
1
5
5
7
7
P
U
B
L
I
C
P
R
E
P
.
d
w
g
LEGEND:
C 100THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PROPOSED INLET
PROTECTION, TYP.
PROPOSED INLET
PROTECTION
CURB
REMOVAL
CURB REMOVAL
GRAPHIC SCALE
00 30'60'
GRAPHIC SCALE
00 30'60'
PROPOSED INLET
PROTECTION, TYP.
PAVEMENT
REMOVAL
PAVEMENT
REMOVAL
BRICK PAVER
REMOVAL
BRICK PAVER REMOVAL
PROPOSED DITCH CHECK
EROSION BALES
PROPOSED DITCH CHECK
EROSION BALES
A
C401
REMOVE EXISTING TREE
REMOVE EXISTING PLANTS AND
DRIP IRRIGATION SYSTEM
RELOCATE EXISTING POLE
(SEE SHEET 003). REMOVE
EXISTING TYPE C BASE.
REINSTALL
BRICK PAVERS
CONCRETE DRIVE
REMOVAL
CONCRETE SIDEWALK
REMOVAL
CONCRETE DRIVE
REMOVAL
PAVEMENT
REMOVAL
PAVEMENT
REMOVAL
CURB REMOVAL
REMOVE EXISTING PLANTS AND
DRIP IRRIGATION SYSTEM
///////////////////////SAWING PAVEMENT
PARKLAND MALL DEVELOPMENT. NOT
IN CONTRACT.
REFER TO CIVIL PLANS FOR
INFORMATION.
PARKLAND MALL DEVELOPMENT. NOT
IN CONTRACT.
REFER TO CIVIL PLANS FOR
INFORMATION.
CONTRACTOR TO
MAINTAIN ACCESS
TO EXISTING BANK
SITE AT ALL TIMES
DURING
CONSTRUCTION.
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
W
W
W
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
GEE E E E E
E
E E E E
E E E E E E E E E E E E E E E E
T
W
W
WSA
N
SA
N
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
E
E
E
E
81
0
810810
808
812
814
810
808
812
T
G
R
A
V
E
L
G
R
A
V
E
L
EX
I
S
T
I
N
G
FO FO FO FO FO FO FO FO FO FO FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
SA
N
M
H
3
SA
N
M
H
4
SA
N
M
H
5
P/LP/LP/LP/L
P/
L
ST
M
CB
2
815
815
JANESVILLE ROAD
P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L
P/
L
P/
L
ON
L
Y
EX. 814.91±
815.45 T/C
814.95 FL
815.67 T/C
815.17 FL
EX. 814.71±
EX. 814.76±
EX. 814.84±EX. 814.96±EX. 814.73±EX. 814.06±MATCH TO EX.
814.64 T/C
814.14 FL
815.82 T/C
815.32 FL
MATCH TO EX.
815.50 T/C
815.00 FL
815.06
EX. 814.32±
814.54
814.65
814.55
EX. 814.05±
814.28
814.39814.57
815.00
815.00
815.00
814.99
EX. 814.92±
815.20 815.08
815.00
814.87
EX. 814.92±EX. 814.69±
EX. 813.86±
EX. 814.09±EX. 814.00±EX. 813.00±
EX. 814.42±
EX. 814.28±
TTTTTTTTTTTTTTTTTTTTTTT
T
T
TTT
TTTTTTT
"
P
i
p
e
"
P
i
p
e
E
E
E
E
E
E
W
W
W
W
W
W
W
G
G
G
G
G
G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
W
P
E
T
T
T
T
T
T
T
T
T
G
G
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
STST
S
T
S
T
XX
X
X
ST
ST
ST
T
T
T
T
T
T
T
TTTTTTTTTTTTTTTTTTT
T
GR
A
S
S
GR
A
S
S
GR
A
S
S
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT.PAD
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
GRASSGRASS
METAL FENCE
LT
P
BA
S
E
LT
P
BA
S
E
12
"
C
M
P
IN
V
:
8
0
5
.
4
5
12
"
C
M
P
IN
V
:
8
0
4
.
9
0
12
"
C
M
P
IN
V
:
8
0
4
.
8
8
12
"
C
M
P
IN
V
:
8
0
4
.
7
9
DU
M
P
S
T
E
R
CO
N
T
A
I
N
M
E
N
T
SA
N
MH
1
SA
N
MH
2
SA
N
MH
9
ST
M
MH
1
ST
M
MH
2
ST
M
MH
3
ST
M
MH
9
P/L P/L P/L
17
.
A
P
P
X
.
L
O
C
A
T
I
O
N
ST
ST
S
T
S
T
S
T
S
T
ST
ST
ST
ST
ST
SA
N
SA
N
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
LANNON DRIVE
STORM CB12
RIM:806.37
808
807
806
806
806
807
808
810
808
8
0
8
8
0
8
8
0
9
809
80
7
808
809
807
808
809 80
9
8
0
8
806
806
80
7
81
0
81
0
8
0
8 808 809
8
0
9
81
0
8
1
0
809
809
809
808
LANNON DRIVE
P/
L
P/
L
P/LP/
L
P/
L
P/
L
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
STORM CB12A
RIM:806.39 809.12 T/C
808.62 FL
EX. 808.58±
808.93
809.04
808.14 T/C
807.64 FL
EX. 807.76±
808.52
808.63
807.78 T/C
807.28 FL
EX. 807.40±
808.29
808.40
EX. 807.00±
807.38 T/C
806.88 FL
807.91
808.02
EX. 806.83±
807.21 T/C
806.71 FL
807.63
807.75
806.88 T/C
806.38 FL
807.29
807.41
EX. 806.77±
807.14 T/C
806.64 FL
807.77
807.87
EX. 807.66±
808.00 T/C
807.50 FL
808.53
808.60
EX. 808.00±
808.45 T/C
807.95 FL
808.89
808.94
EX. 808.54±
809.08 T/C
808.58 FL
809.38
809.41
EX. 808.91±
809.71 T/C
809.21 FL
809.88
809.89
810.30 T/C
809.80 FL
809.85
809.94
809.35
809.44
EX. 808.88±
809.27
809.24
809.40
809.63 T/C
809.13 FL
EX. 808.82±
EX. 808.87±
EX. 808.73±
809.03 T/C
808.53 FL
809.41
809.50
EX. 808.67±
808.89 T/C
808.39 FL
808.38
808.48
EX. 808.44±
808.27808.17
808.81 T/C
808.31 FL
808.63 T/C
808.13 FL
808.37808.47
808.05
808.60 T/C
808.10 FL
808.47
808.59
808.41 T/C
807.91 FL
808.15
808.25
EX. 808.14±
EX. 807.90±
808.33 T/C
807.83 FL
EX. 808.43±
809.26 T/C
808.76 FL
MATCH TO EX.
808.71 T/C
808.21 FL
808.91 T/C
808.41 FL
MATCH TO EX.
809.42 T/C
808.92 FL
809.45 T/C
808.95 FL
EX. 808.69±
EX. 809.08±
EX. 808.96±
EX. 809.21±
EX. 809.00±
EX. 808.76±
EX. 808.81±
EX. 808.58±
EX. 808.43±
EX. 808.55±
EX. 808.25±
EX. 808.00±
807.00
EX. 808.00±
EX. 807.70±
807.42
EX. 807.35±EX. 807.66±
EX. 807.88±809.30 T/C
808.80 FL
809.06
808.96
EX. 808.70±
809.10
809.20
810.06
808.67 T/C
808.17 FL
EX. 807.88±
808.94
808.01
807.91
EX. 808.18±
808.39
808.25
PR. RIM 808.10±
808.26
808.36
EX. 808.62±
EX. 808.39±809.00 809.00
810.06
810.06
807.03
807.16
806.96 T/C
806.46 FL
EX. 806.56±
806.54
807.47
807.35
807.04 T/C
806.54 FL
806.62
EX. 806.62±
806.46
EX. 806.50±
EX. 808.25±
EX. 808.27±
808.67
808.56 808.76
EX. 808.53±
809.72
809.29 808.66 808.03 807.58
806.72
806.79 806.96
807.36
807.72
808.53
EX. 809.01±
EX. RIM 808.02±
EX. 808.71±EX. 808.71±
809.32
808.99 809.12
EX. 808.85±
809.43 T/C
808.93 FL
EX. 808.22±
808.81 T/C
808.31 FL
EX. 810.10±
810.52 T/C
810.02 FL
EX. 810.25±
810.67 T/C
810.17 FL
EX. 810.73±
811.15 T/C
810.65 FL
EX. 810.61±
811.01 T/C
810.51 FL
EX. 809.76±
810.35 T/C
809.85 FL
EX. 809.63±
810.21 T/C
809.71 FL
810.66 T/C
810.16 FL
810.08809.08
809.64 T/C
809.14 FL
810.45 T/C
809.95 FL
809.53
EX. 810.47±
EX. 809.17±
809.11
RO
A
D
W
A
Y
G
R
A
D
I
N
G
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 PUBLIC GRADING.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PJI
1-25-16
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
5
-
G
r
a
d
i
n
g
P
l
a
n
\
1
5
5
7
7
P
U
B
L
I
C
G
R
A
D
I
N
G
.
d
w
g
C 200
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON
THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR
RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY
COMPANIES. THE LOCATION AND ACCURACY OF WHICH
CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL
UNDERGROUND UTILITY INSTALLATIONS WITHIN THE
PROJECT AREA THAT ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD.
ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE
LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT
TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO
LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR
OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS OF BUILDING AND
ARCHITECTURAL FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT
NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND
RAMPS, PAVING, AND CURB AND GUTTER SHALL BE
COMPLETED PER MUNICIPAL AND/OR COUNTY
REQUIREMENTS AND STANDARDS.
7.EARTHWORK SHALL BE IN ACCORDANCE WITH
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
5
5 EXISTING CONTOUR
PROPOSED CONTOUR
B
C402
ASPHALT SURFACE
LEGEND:
PROPOSED CURB & GUTTER
SPOT GRADE
T/C: TOP OF CURB GRADE
FL: FLOW LINE CURB GRADE
PROPOSED ASPHALT
SPOT GRADE100.00
100.50 T/C
100.00 FL
GRAPHIC SCALE
00 30'60'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
GRAPHIC SCALE
00 30'60'
INSTALLED BY OTHERS.
COORDINATE UTILITY
CONSTRUCTION WITHIN
R.O.W. WITH PARKLAND
TOWNE CENTER
DEVELOPMENT.
PARKLAND TOWNE CENTER
DEVELOPMENT. NOT IN CONTRACT.
REFER TO CIVIL PLANS FOR
INFORMATION.
PARKLAND TOWNE CENTER
DEVELOPMENT. NOT IN CONTRACT.
REFER TO CIVIL PLANS FOR
INFORMATION.
ALL IMPROVEMENTS IN LANNON DRIVE
SHALL BE IN ACCORDANCE WITH CITY
OF MUSKEGO STANDARD
SPECIFICATIONS.
ALL IMPROVEMENTS IN JANESVILLE
ROAD SHALL BE IN ACCORDANCE
WITH WISDOT STANDARD
SPECIFICATIONS.
2' CURB OPENING
1.CITY RESUBMITTAL 3/23/16 TPM
CONCRETE FLUME
FROM CURB OPENING
TO CATCH BASIN
2.CITY RESUBMITTAL 5/27/16 TPM
T
T
T
T
T
T
T
T
T
T
T
T
T
T TTT
T
T
T
T
T
T
T
T
T
T
X
X
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
INV
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
60"
C
C
P
INV
:
7
9
6
.
3
7
"V"
C
H
A
N
N
E
L
:
79
6
.
5
5
SA
N
MH
1
SA
N
MH
2
SA
N
MH
3
SA
N
MH
4
SA
N
MH
5
SA
N
MH
6
SA
N
MH
7
SA
N
MH
8
SA
N
MH
9
ST
M
M
H
1
ST
M
MH
2
ST
M
MH
3
ST
M
MH
4
ST
M
MH
5
ST
M
MH
6
ST
M
MH
7
ST
M
MH
8
ST
M
MH
9
ST
M
MH
1
0
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
ST
M
CB
1
6
P/L
P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L P/L
P/
L
P/
L
P/
L
P/
L
P/LP/LP/LP/LP/LP/LP/L
P/
L
P/L
P/L
P/L
P/L
P/L
P/L
FU
T
U
R
E
PO
O
L
ON
L
Y
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
LA
N
N
O
N
D
R
I
V
E
JANESVILLE R
O
A
D
700'
200'
400'
400'
700'
100'
100'
500'
500'
700'350'
700'
350'
200'
ME
D
I
A
N
T
R
A
F
F
I
C
C
O
N
T
R
O
L
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 - Public TC.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
9
-
T
r
a
f
f
i
c
C
o
n
t
r
o
l
\
1
5
5
7
7
-
P
u
b
l
i
c
T
C
.
d
w
g
C 300
GRAPHIC SCALE
00 80'160'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PJI
1-25-16
15577
JBL
JBL
PROPOSED TRAFFIC CONTROL DRUM
LEGEND:
PROPOSED TYPE III BARRICADE WITH
TRAFFIC CONTROL SIGN
WORK ZONE
PROPOSED TRAFFIC CONTROL SIGN PERMANENT SUPPORT
PROPOSED TRAFFIC CONTROL DRUM WITH TYPE "C" STEADY BURN LIGHT
FLASHING ARROW BOARD
1.CITY RESUBMITTAL 3/23/16 TPM
NOTE:
TRAFFIC CONTROL SHALL
BE IN ACCORDANCE WITH
WISDOT SDD 15D20-2 AND
15D21-2.
2.CITY RESUBMITTAL 5/27/16 TPM
T
T
T
T
T
T
T
T
T
T
T
T
T
P
PT TTT
T
T
T
T
T
P
T
T
T
T
T
X
X
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
INV
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
60"
C
C
P
INV
:
7
9
6
.
3
7
"V"
C
H
A
N
N
E
L
:
79
6
.
5
5
SA
N
MH
1
SA
N
MH
2
SA
N
MH
3
SA
N
MH
4
SA
N
MH
5
SA
N
MH
6
SA
N
MH
7
SA
N
MH
8
SA
N
MH
9
ST
M
M
H
1
ST
M
MH
2
ST
M
MH
3
ST
M
MH
4
ST
M
MH
5
ST
M
MH
6
ST
M
MH
7
ST
M
MH
8
ST
M
MH
9
ST
M
MH
1
0
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
ST
M
CB
1
6
P/L
P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L P/L
P/
L
P/
L
P/
L
P/
L
P/LP/LP/LP/LP/LP/LP/L
P/
L
P/L
P/L
P/L
P/L
P/L
P/L
FU
T
U
R
E
PO
O
L
ON
L
Y
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
LA
N
N
O
N
D
R
I
V
E
JANESVILLE R
O
A
D
200'
100'
200'
OV
E
R
A
L
L
T
R
A
F
F
I
C
C
O
N
T
R
O
L
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 - Public TC.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
9
-
T
r
a
f
f
i
c
C
o
n
t
r
o
l
\
1
5
5
7
7
-
P
u
b
l
i
c
T
C
.
d
w
g
C 301
GRAPHIC SCALE
00 80'160'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PJI
1-25-16
15577
JBL
JBL
PROPOSED TRAFFIC CONTROL DRUM
LEGEND:
PROPOSED TYPE III BARRICADE WITH
TRAFFIC CONTROL SIGN
WORK ZONE
PROPOSED TRAFFIC CONTROL SIGN PERMANENT SUPPORT
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 PUBLIC DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PJI
1-25-16
15577
JBL
CTC
C 400
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
P
U
B
L
I
C
D
E
T
A
I
L
S
.
d
w
g
INLET PROTECTION TYPE A, B, C, AND D: WDNR TS-1060
EROSION CONTROL NOTES:
1.CONSTRUCTION SITE EROSION CONTROL AND SEDIMENTATION CONTROL SHALL COMPLY WITH THE REQUIREMENTS OF THE LOCAL MUNICIPALITY AND SHALL
EMPLOY EROSION CONTROL METHODS AS SHOWN AND SPECIFIED IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS.
2.ALL EROSION CONTROL MEASURES SHALL BE ADJUSTED TO MEET FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND SHALL BE INSTALLED PRIOR TO ANY
GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIAL ON THE SITE.
3.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION AFTER A RAINFALL OF 0.5 INCHES OR MORE, BUT NO LESS
THAN ONCE EVERY WEEK. MAINTENANCE OF ALL EROSION CONTROL STRUCTURES SHALL BE PROVIDED TO INSURE INTENDED PURPOSE IS ACCOMPLISHED.
CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REMOVAL OF ALL SEDIMENT WHEN LEAVING PROPERTY. EROSION CONTROL MEASURES MUST BE IN
WORKING CONDITION AT END OF EACH WORK DAY. DOCUMENT AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH WDNR NR216 REQUIREMENTS.
4.SILT FENCE SHALL BE INSTALLED IN THE LOCATIONS SHOWN ON THE CONSTRUCTION PLANS. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE SILT
FENCE WHEN DEPOSITS REACH A DEPTH OF 6 INCHES. THE SILT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER.
5.FILTER FABRIC SHALL BE INSTALLED BENEATH INLET COVERS TO TRAP SEDIMENT PER INLET PROTECTION DETAIL IN THE LOCATIONS SHOWN ON THE
CONSTRUCTION PLANS.
6.EROSION CONTROL MEASURES SHALL BE MAINTAINED ON A CONTINUING BASIS UNTIL SITE IS FULLY STABILIZED.
7.PERIODIC STREET SWEEPING SHALL BE COMPLETED TO MAINTAIN ADJACENT STREETS FREE OF DUST AND DIRT.
8.SILT FENCE SHALL BE INSTALLED IN HORSESHOE FASHION AROUND ANY TOPSOIL AND FILL STOCKPILES.
9.SITE DEWATERING. WATER PUMPED FROM THE SITE SHALL BE TREATED BY SEDIMENT BASINS OR OTHER APPROPRIATE MEASURES SPECIFIED IN THE WISCONSIN
DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS. WATER MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION OF THE SITE,
ADJACENT SITES, OR RECEIVING CHANNELS.
10.WASTE AND MATERIAL DISPOSAL. ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, WASTEWATER, TOXIC
MATERIALS, OR HAZARDOUS MATERIALS) SHALL BE PROPERLY DISPOSED AND NOT ALLOWED TO BE CARRIED OFF-SITE BY RUNOFF OR WIND.
11.SEDIMENT CLEANUP. ALL OFF-SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT OF A STORM EVENT SHALL BE CLEANED UP BY THE END OF THE NEXT
WORKDAY. ALL OTHER OFF-SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT OF CONSTRUCTION ACTIVITIES SHALL BE CLEANED UP BY THE END OF THE
WORKDAY.
12.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN OR MORE DAYS SHALL BE STABILIZED BY TEMPORARY OR PERMANENT SEEDING, MULCHING, SODDING,
COVERING WITH TARPS, OR EQUIVALENT PRACTICE FOUND IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARD. IF TEMPORARY
SEEDING IS USED, A PERMANENT COVER SHALL ALSO BE REQUIRED AS PART OF THE FINAL SITE STABILIZATION. SEEDING OR SODDING SHALL BE REQUIRED AS
PART OF THE FINAL SITE STABILIZATION.
13.SOIL OR DIRT STORAGE PILES SHALL BE LOCATED A MINIMUM OF TWENTY-FIVE FEET FROM ANY DOWNSLOPE ROAD, LAKE, STREAM, WETLAND, OR DRAINAGE
CHANNEL. STRAW BALE OR FILTER FABRIC FENCES SHALL BE PLACED ON THE DOWN SLOPE SIDE OF THE PILES. IF REMAINING FOR MORE THAN THIRTY DAYS,
PILES SHALL BE STABILIZED BY MULCHING, VEGETATIVE COVER, TARPS OR OTHER MEANS.
14.WHEN THE DISTURBED AREA HAS BEEN STABILIZED BY PERMANENT VEGETATION OR OTHER MEANS, TEMPORARY PRACTICES, SUCH AS FILTER FABRIC FENCES,
STRAW BALES, SEDIMENT AND SEDIMENT TRAPS, FOUND IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS SHALL BE REMOVED.
15.NOTIFY THE LOCAL MUNICIPALITY HAVING JURISDICTION WITHIN TWO WORKING DAYS OF COMMENCING ANY LAND DEVELOPMENT OR LAND DISTURBING ACTIVITY.
16.OBTAIN PERMISSION FROM THE LOCAL MUNICIPALITY HAVING JURISDICTION PRIOR TO MODIFYING THE EROSION CONTROL PLAN.
17.REPAIR ANY SILTATION OR EROSION DAMAGE TO ADJOINING SURFACES AND DRAINAGE WAYS RESULTING FROM LAND DEVELOPMENT OR LAND DISTURBING
ACTIVITIES.
18.KEEP A COPY OF THE EROSION CONTROL PLAN ON SITE.
19.CONTRACTOR SHALL, TO THE EXTENT POSSIBLE, MINIMIZE DISTURBANCE OF EXISTING VEGETATION DURING CONSTRUCTION.
20.CONTRACTOR SHALL, TO THE EXTENT POSSIBLE, MINIMIZE COMPACTION OF TOPSOIL AND PRESERVE TOPSOIL IN GREENSPACE AREAS.
21.WASH WATER FROM VEHICLES AND WHEEL WASHING SHALL BE CONTAINED AND TREATED PRIOR TO DISCHARGE.
22.CONTRACTOR SHALL MAINTAIN SPILL KITS ON-SITE.
23.PERMANENT TURF SEEDING OF DISTURBED AREA MUST OCCUR PRIOR TO SEPTEMBER 15TH. IF ADEQUATE TIME IS NOT AVAILABLE TO APPLY PERMANENT
SEEDING PRIOR TO SEPTEMBER 15, THEN DISTURBED AREAS SHALL BE TEMPORARILY SEEDED WITH AN ANNUAL RYE GRASS PER WDNR TECHNICAL STANDARD
1059, WHERE THE TEMPORARY SEEDING MUST OCCUR PRIOR TO OCTOBER 15TH.
24.IF TEMPORARY SEEDING IS NOT COMPLETED BY OCTOBER 15TH, APPLY SOIL STABILIZERS AND DORMANT SEED TO DISTURBED AREA PER WDNR TECHNICAL
STANDARD 1050. INSPECT ANIONIC PAM APPLICATION AT A MINIMUM FREQUENCY OF EVERY TWO MONTHS AND REAPPLY AS NECESSARY.
B
CONSTRUCTION SEQUENCE FOR EROSION CONTROL INCLUDES:
1.INSTALL SILT FENCING AND INLET PROTECTION. INSTALL ASSOCIATED DITCH CHECKS.
2.REMOVE EXISTING PAVEMENTS AND STRUCTURES AS REQUIRED FOR PROPOSED
IMPROVEMENTS. ALL PAVEMENTS SHALL BE SAW CUT TO FULL-DEPTH PRIOR TO
REMOVAL.
3.STRIP TOPSOIL AND STOCKPILE.
4.PERFORM ROUGH SITE GRADING. STABILIZE FINISHED AREAS AS THE WORK
PROGRESSES. USE EROSION MATTING WHERE CALLED FOR ON THE PLANS. PER WDNR
TECHNICAL STANDARD 1059: AREAS THAT RECEIVE TEMPORARY SEEDING SHALL HAVE A
MINIMUM TOPSOIL DEPTH OF 2 INCHES. AREAS THAT RECEIVE PERMANENT SEEDING
SHALL HAVE A MINIMAL TOPSOIL DEPTH OF 4 INCHES.
5.INSTALL UTILITIES. INSTALL ANY ADDITIONAL INLET PROTECTION ON NEW STORM SEWER.
6.PERFORM FINE SITE GRADING AND INSTALL STONE BASE(S).
7.INSTALL PAVEMENTS.
8.LANDSCAPE AND STABILIZE REMAINING AREAS WITHIN 7 DAYS OF COMPLETION OF FINAL
GRADING AND TOPSOILING.
9.REMOVE EROSION CONTROL MEASURES ONLY WHEN SITE IS FULLY STABILIZED.
GRATED INLET
2" X 4" STAKE AND
CROSS BRACING
BURIED FABRIC
MIN. 6" DEPTH
GEOTEXTILE FABRIC,
TYPE FF
DIRECTION OF
RUNOFF WATER
FLOW 4'
2'
GEOTEXTILE FABRIC,
TYPE FF
GEOTEXTILE FABRIC,
TYPE FF
2" X 4" STAKE AND
CROSS BRACING
INLET WITH OR
WITHOUT GRATE
ATTACH GEOTEXTILE
FABRIC, TYPE FF TO
THE STAKES AND
CROSSING BRACING
2'
GEOTEXTILE FABRIC,
TYPE FF WOOD 2" X 4" EXTENDS 7"
BEYOND GRATE WIDTH ON
BOTH SIDES, LENGTH
VARIES. SECURE TO
GRATE WITH WIRE OR
PLASTIC TIES
GEOTEXTILE FABRIC,
TYPE FF
FRONT, BACK, AND
BOTTOM TO BE MADE
FROM SINGLE PIECE
OF FABRIC.
MINIMUM DOUBLE STITCHED
SEAMS ALL AROUND SIDE PIECES
AND ON FLAP POCKETS
INLET SPECIFICATIONS AS
PER THE PLAN DIMENSION
LENGTH AND WIDTH TO MATCH
INLET SPECIFICATIONS AS
PER THE PLAN DIMENSION
LENGTH AND WIDTH TO MATCH
USE REBAR OR STEEL ROD
FOR REMOVAL
OR
FOR INLETS WITH CAST
CURB BOX USE WOOD 2"X4",
EXTEND 10" BEYOND GRATE
WIDTH ON BOTH SIDES,
LENGTH VARIES. SECURE TO
GRATE WITH WIRE OR
PLASTIC TIES.
4"X6" OVAL HOLE SHALL BE HEAT CUT
INTO ALL FOUR SIDE PANELS.
GENERAL NOTE:
INLET PROTECTION SHALL CONFORM TO WDNR
CONSERVATION PRACTICE STANDARD #1060
THIS DRAWING IS BASED ON
WISCONSIN DEPARTMENT
OF TRANSPORTATION
STANDARD DETAIL DRAWING
8 E 10-2
GENERAL NOTES
1.MANUFACTURED ALTERNATIVES APPROVED AND LISTED ON THE
DEPARTMENT'S EROSION CONTROL PRODUCT ACCEPTABILITY LIST
MAY BE SUBSTITUTED.
2.WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARE
SHALL BE TAKEN SO THAT THE SEDIMENT TRAPPED ON THE
GEOTEXTILE FABRIC DOES NOT FALL INTO THE INLET. ANY
MATERIAL FALLING INTO THE INLET SHALL BE REMOVED
IMMEDIATELY.
3.FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED,
SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TO
FACILITATE MAINTENANCE OR REMOVAL.
4.FOR INLET PROTECTION, TYPE C (WITH CURB BOX), AN ADDITIONAL
18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED
WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT
OF THE CURB BOX OPENING.
5.FLAP POCKETS SHALL BE LARGE ENOUGH TO ACCEPT WOOD 2X4.
INSTALLATION NOTES
TYPE B & C
TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE. THE CONTRACTOR SHALL
DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDS OR OTHER
METHOD TO PREVENT ACCUMULATED SEDIMENT FROM ENTERING THE INLET.
TYPE D
DO NOT INSTALL INLET PROTECTION TYPE D IN INLETS SHALLOWER THAN 30", MEASURED FROM
THE BOTTOM OF THE INLET TO THE TOP OF THE GRATE. TRIM EXCESS FABRIC IN THE FLOW LINE
TO WITHIN 3" OF THE GRATE. THE INSTALLED BAG SHALL HAVE A MINIMUM SIDE CLEARANCE,
BETWEEN THE INLET WALLS AND THE BAG, MEASURED AT THE BOTTOM OF THE OVERFLOW
HOLES, OF 3". WHERE NECESSARY THE CONTRACTOR SHALL CINCH THE BAG, USING PLASTIC ZIP
TIES, TO ACHIEVE THE 3" CLEARANCE. THE TIES SHALL BE PLACED AT A MAXIMUM OF 4" FROM THE
BOTTOM OF THE BAG.
INLET PROTECTION, TYPE A INLET PROTECTION, TYPE C
(WITH CURB BOX)
INLET PROTECTION, TYPE B
(WITHOUT CURB BOX)
(CAN BE INSTALLED IN ANY INLET
WITHOUT A CURB BOX)
INLET PROTECTION, TYPE D
(CAN BE INSTALLED IN ANY INLET WITH OR
WITHOUT A CURB BOX AS PER NOTE)
NOT TO SCALE
12"
12"
4"
8"
A
B
A
A
A
DI
R
E
C
T
I
O
N
O
F
F
L
O
W
SLOP
E
V
A
R
.
SL
O
P
E
V
A
R
.
DITCH CHECKS: WDNR TS-1062ANOT TO SCALE
FRONT ELEVATION
PLAN VIEW
SECTION A-A
EMBED
BALES
WOOD STAKES (2 PER BALE)
NOMINAL 2"X2"X30" MIN. LENGTH
OR EQUIVALENT.
DRIVEN FLUSH WHEN SOIL
CONDITIONING PERMITS
FOR SCOUR PROTECTION USE:
EROSION MAT FOR CHANNEL
LINING. LAP MAT UNDER
UPSTREAM BALES AND SECURE
FABRIC WITH WOOD STAKES AT 3
FOOT INTERVALS
STRAW BALES 2"X2"X30" WOOD POSTS
DRIVEN FLUSH WHEN SOIL
CONDITIONING PERMITS
STAGGER JOINTS
BETWEEN ADJACENT
ROWS OF BALES
GENERAL NOTE:
STRAW BALE BARRIES (DITCH CHECKS) SHALL CONFORM TO WDNR
CONSERVATION PRACTICE STANDARD #1062
THIS DRAWING IS BASED ON WISCONSIN DEPARTMENT OF
TRANSPORTATION STANDARD DETAIL DRAWING 8 E 8-3
BOTTOM ELEVATION OF END BALES (A) SHALL BE EQUAL
TO OR GREATER THAN TOP OF LOWEST MIDDLE BALE (B).
NOTE:
ALL DIMENSIONS ARE
APPROXIMATE
14" NOM
.
4" NOM.
14" NOM.
30"
M
I
N
.
7" NOM.
7"
N
O
M
.
EROSION MATTING: WDNR TS-1052C
1.PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS
(RECP'S), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED
MUST BE INSTALLED WITH PAPER SIDE DOWN.
2.BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP'S IN A 6" (15 CM) DEEP X
6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF RECP'S EXTENDE3D
BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S WITH A
ROW OF STAPLES / STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF
THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED
TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP'S BACK
OVER SEED AND COMPACTED SOIL. SECURE RECP'S OVER COMPACTED SOIL WITH A
ROW OF STAPLES / STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS
THE WIDTH OF THE RECP'S
3.ROLL THE RECP'S (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP'S
WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'S
MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES / STAKES IN
APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING
THE DOT SYSTEM, STAPLES / STAKES SHOULD BE PLACED THROUGH EACH OF THE
COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4.THE EDGES OF PARALLEL RECP'S MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5
CM - 12.5 CM) OVERLAP DEPENDING ON RECP'S TYPE.
5.CONSECUTIVE RECP'S SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END
(SHINGLE STLYE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH
OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE RECP'S
WIDTH. NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTH
GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP'S.
NOTE:
1.EROSION MATTING SHALL CONFORM TO WDNR CONSERVATION
PRACTICE STANDARD #1052.
2.INSTALL PER MANUFACTURERS SPECIFICATIONS.
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 PUBLIC DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PJI
1-25-16
15577
JBL
CTC
C 401
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
P
U
B
L
I
C
D
E
T
A
I
L
S
.
d
w
g
NOT TO SCALEB
COMPACTED SUBGRADE
A'
A'
NOT TO SCALE
CONCRETE DRIVEWAY
(WITH CONCRETE WALK)D
PLACE DUMMY JOINT AT CENTER
LINE OF DRIVEWAY AND/OR
AT ALL JOINTS IN THE GUTTER.
DRIVEWAY THROUGH WALK SECTION
SHALL HAVE A TRANSVERSE
PITCH OF A MAX. 2.0%
1/2" X 24" DEFORMED TIE
BARS 36" O.C.
1/2"
E
X
P
A
N
S
I
O
N
J
O
I
N
T
M
A
T
E
R
I
A
L
EXIS
T
I
N
G
W
A
L
K
7" C
O
N
C
R
E
T
E
W
A
L
K
EXIS
T
I
N
G
W
A
L
K
6'-0"
1'-0"
2
%
M
A
X
.
1:
1
2
M
A
X
.
D"7"
SECTION A'-A'
D = 7" FOR COMMERCIAL DRIVEWAYS
NOT TO SCALE
CONCRETE MEDIAN NOSEC
CONCRETE PAVERS AT TURF
CONCRETE PAVERS AT BACK OF CURB
NOT TO SCALE
CONCRETE PAVER DETAILE
NOT TO SCALE
30" CONCRETE CURB & GUTTER SECTION
FOR WORK WITHIN LANNON DRIVEA
NOT TO SCALE
CONCRETE SIDEWALK SECTIONF
NOT TO SCALE
ASPHALT PAVEMENT SECTION
WITHIN JANESVILLE RD.B
6 INCH HMA PAVEMENT, TYPE E-3
(2 INCH SURFACE)
(WITH TACK COAT)
(4 INCH BINDER)
4 INCH BASE AGGREGATE OPEN GRADED
24 INCH BREAKER RUN
10 INCH BASE AGGREGATE DENSE (1-1/4")
ASPHALT PAVEMENT SECTION
WITHIN LANNON DR.
6 INCH HMA PAVEMENT, TYPE E-0.3
(2 INCH 9.5 mm SURFACE)
(WITH TACK COAT)
(4 INCH -19 mm BINDER)
12 INCH BASE AGGREGATE DENSE (1-1/4")
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 PUBLIC DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
PJI
1-25-16
15577
JBL
CTC
C 402
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
P
U
B
L
I
C
D
E
T
A
I
L
S
.
d
w
g
NOT TO SCALE
BANNER POLE BASEC
NOT TO SCALE
ADA CONCRETE RAMP (TYPE 4B1)A
NOT TO SCALE
DETECTABLE WARNING FIELD DETAILB
DETECTABLE WARNING
FIELD
B
-
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
5" THICK
CONCRETE
SIDEWALK
3" OF 3/4" CRUSHED
LIMESTONE OPEN
GRADE NO. 1
12 INCH BASE
AGGREGATE
BASE DENSE
1-1/4" INCH
6 INCH HMA PAVEMENT,
TYPE E-0.3
(2 INCH 9.5mm SURFACE)
(WITH TACK COAT)
(4 INCH 19 mm BINDER)
EXISTING
PAVEMENT EXISTING
PAVEMENT
12 INCH BASE
AGGREGATE
BASE DENSE
1-1/4" INCH
CONCRETE CURB &
GUTTER, 30-INCH
TYPE D TYP.
TOPSOIL, SOD
TOPSOIL, SOD
VARIES 2.5'7'6'3'
EXISTING
NORTHBOUND
LANE
16'
EXISTING
SOUTHBOUND
LANE
PL
EDGE OF
PAVEMENT
EXISTING
GREENSPACE
LANNON
TYPICAL PROPOSED SECTION
LANNON DRIVE
SECTION A-A
AGGREGATE TO
EXTEND 6-INCHES
BEYOND SIDEWALK,
TYP.AGGREGATE TO
EXTEND 1.5 FEET
BEYOND CURB, TYP.
6 INCH HMA PAVEMENT,
TYPE E-0.3
(2 INCH 9.5mm SURFACE)
(WITH TACK COAT)
(4 INCH 19 mm BINDER)
5'2.5'12'
EX. 12'
EAST BOUND
LANE
2.5'EX. 25' WEST BOUND LANE 2.5'10'5'9'
PL
6 INCH HMA PAVEMENT,
TYPE E-3
(2 INCH 9.5mm SURFACE)
(WITH TACK COAT)
(4 INCH 19mm BINDER)
EXISTING
PAVEMENT
4 INCH BASE AGGREGATE OPEN GRADED
10 INCH BASE AGGREGATE BASE DENSE 1-1/4" INCH
24 INCH BREAKER RUN
EXISTING
PAVEMENT
EXISTING
SIDEWALK
EXISTING
CONCRETE CURB &
GUTTER, 30-INCH TYPE D
EXISTING
CONCRETE CURB &
GUTTER, 30-INCH TYPE D
CONCRETE CURB & GUTTER,
30-INCH TYPE D
TYPICAL PROPOSED SECTION
JANESVILLE ROAD
SECTION B-B
CONCRETE PAVERS
REFER TO SHEET C401.
AGGREGATE TO
EXTEND 1.5 FEET
BEYOND CURB, TYP.DRAWING NO.
DRAWN BY: TPM
DATE: 5-24-16
PROJECT NO: 15577
CHECKED BY: JBL
APPROVED BY:JBL
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
D
E
V
E
L
O
P
M
E
N
T
JA
N
E
S
V
I
L
L
E
R
O
A
D
A
N
D
L
A
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577-DOT- Typical Sections.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
P
u
b
l
i
c
\
5
1
1
-
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
\
1
5
5
7
7
-
D
O
T
-
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
.
d
w
g
TY
P
I
C
A
L
S
E
C
T
I
O
N
S
C 403
1.CITY RESUBMITTAL 5/27/16 TPM
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
T
T
T
W W W
W
TT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
ST
ST
ST
ST
ST
ST
ST
X
X
X
XX
CTV
E
E
E
E
ST
81
0
810810
806
806
80
6
808
812
814
8
0
0
810
79
8
79
8
8
0
2
80
4
8
0
6
806
806
808
808
8
0
8
812
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
V
E
L
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
GR
A
S
S
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BI
T
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
U
M
I
N
O
U
S
PA
V
E
M
E
N
T
BIT
.
P
A
D
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
DUMPSTER
CONTAINMENT
W
A
L
K
I
N
G
P
A
T
H
SIDEWALK
PARKING
GARAGE
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
CO
N
C
R
E
T
E
CONCRETE
GR
A
S
S
GR
A
S
S
ME
T
A
L
F
E
N
C
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
LT
P
BA
S
E
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
EX
I
S
T
.
H
O
U
S
E
EX
I
S
T
I
N
G
P
O
N
D
W
A
T
E
R
S
ED
G
E
W
A
T
E
R
S
ED
G
E
CO
N
C
R
E
T
E
P
A
D
DU
M
P
S
T
E
R
CO
N
T
A
I
N
M
E
N
T
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
EX
I
S
T
I
N
G
P
O
S
T
OF
F
I
C
E
B
U
I
L
D
I
N
G
60"
C
C
P
IN
V
:
7
9
6
.
3
7
"V"
C
H
A
N
N
E
L
:
79
6
.
5
5
SA
N
M
H
1
SA
N
M
H
2
SA
N
MH
3
SA
N
M
H
4
SA
N
M
H
5
SA
N
M
H
6
SA
N
MH
7
SA
N
MH
8
SA
N
MH
9
ST
M
M
H
1
ST
M
M
H
2
ST
M
MH
3
ST
M
M
H
4
ST
M
M
H
5
ST
M
M
H
6
ST
M
M
H
7
ST
M
MH
8
ST
M
M
H
9
ST
M
M
H
1
0
1
8
.
1
2
'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
12. NO ACCESS PER DOC. #84085712. NO ACCESS PER DOC. #840857
SI
G
N
N 8
8
°
4
6
'
1
6
"
E
1
0
0
.
0
0
'
N 0
1
°
1
3
'
4
4
"
W
2
0
0
.
0
0
'
S
7
7
°
3
9
'
1
7
"
E
2
9
3
.
3
7
'
S
2
7
°
3
7
'
1
7
"
E
2
1
0
.
0
0
'
N 62°22'43" E 160.00'S 2
7
°
3
7
'
1
7
"
E
2
8
.
2
2
'
N
6
2
°
2
2
'
4
3
"
E
1
6
.
0
8
'
S
2
7
°
3
7
'
1
7
"
E
4
1
7
.
3
1
'
S 62°22'43" W 726.81'
N
2
7
°
0
8
'
1
7
"
W
1
7
6
.
8
0
'
S 8
8
°
4
6
'
1
6
"
W
1
0
6
.
0
0
'
N 0
1
°
1
3
'
4
4
"
W
5
4
1
.
8
4
'
N 8
8
°
4
6
'
1
6
"
E
50.
0
0
'
(S 62°27' W)
(S
8
8
°
5
0
'
3
3
"
W
)
(N
8
8
°
5
0
'
3
3
"
E
)
(N
8
8
°
5
0
'
3
3
"
E
)
(N 62°27' E)
(N
6
2
°
2
7
'
E
)
(N
0
1
°
0
9
'
2
7
"
W
)
(N
0
1
°
0
9
'
2
7
"
W
)
(
S
7
7
°
3
5
'
E
)
(S
2
7
°
3
3
'
E
)
(S
2
7
°
3
3
'
E
)
(S
2
7
°
3
3
'
E
)
(N
2
7
°
0
4
'
W
)
17.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
DO
C
.
#
8
5
1
7
9
7
14. APPX. LOCATION OF C/L UTILITY EASE. DOC. #695960
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
(N
0
1
°
0
9
'
2
7
"
W
)
N 0
1
°
1
3
'
4
4
"
W
7
7
4
.
0
0
'
W.
L
I
N
E
N
W
1
/
4
S
E
C
.
1
0
,
T
5
N
,
R
2
0
E
N
1
°
2
3
'
1
6
"
W
(
R
E
C
.
)
22. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #391194922. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #3911949
ST
ST ST ST ST ST ST ST
ST
ST
BL
O
C
K
W
A
L
L
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
S
T
ST
S
A
N
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
5
ST
M
CB
1
6
SANITARY MEASURE DOWNS
SAN MH 1
RIM: 808.03
N INV: 791.27
S INV: 791.23
SE INV: 794.19
SAN MH 2
RIM: 808.48
N INV: 790.76
S INV: 790.71
SAN MH 3
RIM: 812.21
NE INV: 790.5
SW INV: 790.4
SAN MH 4
RIM: 814.26
NE INV: 791.4
SW INV: 791.4
SAN MH 5
RIM: 814.08
NE INV: 792.1
SW INV: 792.08
S INV : 793.0
S INV: 802.2
SAN MH 6
RIM: 811.92
N INV: 793.3
NE INV: 792.9
SW INV: 793.0
SAN MH 7
RIM: 806.39
NW INV: 794.16
SE INV: 794.14
SAN MH 8
RIM: 806.33
NW INV: 794.84
SE INV: 794.76
SAN MH 9
RIM: 806.88
NW INV: 795.92
STORM MEASURE DOWNS
STM MH 1
RIM: 805.75
15" NE INV: 804.04
12" SW INV: 804.04
STM MH 2
RIM: 806.79
15" NE INV: 803.57
15" SW INV: 803.54
8" CLAY S INV: 803.37
STM MH 3
RIM:806.07
8" CLAY N INV: 803.67
STM MH 4
RIM: 805.25
12" NE INV: 803.03
12" SW INV: 803.00
STM MH 5
RIM: 807.04
24" N INV: 802.62
24" NE INV: 802.80
12" SW INV: 802.74
18
"
S
T
O
R
M
S
E
W
E
R
6"
C
L
A
Y
S
T
O
R
M
S
E
W
E
R
15" STORM SEWER
12" ST
O
R
M
S
E
W
E
R
1
8
"
S
T
O
R
M
S
E
W
E
R
18" STORM SEWER
24
"
S
T
O
R
M
S
E
W
E
R
48
"
S
T
O
R
M
S
E
W
E
R
24
"
S
T
O
R
M
S
E
W
E
R
24" STORM SEWER
P
/
L
P/L
P/L P/L
P/
L
P/L
P
/
L
P/
L
P/L
P/L
P/L
P
/
L
P/
L
P/LP/L
P/L
P/L
N62° 07' 53"E 241.28'N62° 07' 53"E 653.34'
L=208.33
R=1909.86
CH B=N59° 00' 23"E
SI
T
E
S
U
R
V
E
Y
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Site Survey.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
FPF
12-4-15
15577
JBL
JBL
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE
LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED.
THERE MAY BE ADDITIONAL UNDERGROUND UTILITY
INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT
SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3.DRAWING IS BASED ON FIELD SURVEY COMPLETED BY B. ROZITE
ON 09-09-2015.
4.DATUM FOR THE PROJECT SURVEY IS NGVD 1929. BENCHMARK
FOR THE PROJECT SURVEY IS CHISELED CROSS IN CONCRETE
SHOWN ON SURVEY AS "BENCHMARK #1" WITH AN ELEVATION OF
808.91.
CATCH BASIN REBAR FOUND/SET
HYDRANT
MANHOLE
GUY WIRE
CHAIN LINK FENCE
PROPERTY LINE
OVERHEAD UTILITY LINE
WATER MAIN
ELECTRIC
SANITARY SEWER
STORM SEWER
CONIFEROUS TREE
DECIDUOUS TREE
LIGHT POLE
IRON PIPE FOUND/SET
UTILITY PEDESTAL
TELEPHONE
CB
BENCHMARK
MONUMENT
CHISELED CROSS FOUND/SET
PK PK NAIL FOUND/SET
SPIKE/NAIL
ELECTRIC METER
UTILITY POLE
TRAFFIC SIGNAL
SOIL BORING
WATER VALVE
SIGN
BUSH
FORCE MAIN
FIBER OPTIC
CABLE TV
TREE LINE
EASEMENT
OH OH
G G
E E
T T
ST ST
SAN SAN
x x
FO FO
FM FM
W W
x
CTV CTV
SECTION 1/4 SECTION LINE
670
P
GAS
EXISTING CONTOUR
EM
GM GAS METER
GAS VALVE
POST
MONITORING WELL
RD ROOF DRAIN
CB CATCH BASIN (ROUND)
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
0
-
S
i
t
e
S
u
r
v
e
y
\
1
5
5
7
7
S
i
t
e
S
u
r
v
e
y
.
d
w
g
LEGEND:
C 001THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
GRAPHIC SCALE
00 50'100'
JANESVILLE RD
LA
N
N
O
N
D
R
.
PROPOSED
PROPERTY
LINE
PROPOSED
PROPERTY
LINE
PROPOSED
PROPERTY
LINE
STM MH 6
RIM: 807.08
18" SE INV: 803.80
24" SW INV: 803.33
STM MH 7
RIM: 806.23
18" NW INV: 804.63
STM MH 8
RIM: 806.14
24" NW INV: 800.74
18" E INV: 801.84
15" SE INV: 800.76
24" SW INV: 801.24
STM MH 9
RIM: 805.64
18" SE INV: 803.30
STM MH 10
RIM: 804.86
48" NW INV: 799.05
24" SE INV: 799.21
STORM CATCH BASIN MEASURE DOWNS
STM CB 1
RIM: 810.16
15" NE INV:
12" SW INV:
STM CB 2
RIM: 812.26
15" NE INV:
15" SW INV:
8" CLAY S INV:
STM CB 3
RIM: 809.75
8" CLAY N INV:
STM CB 4
RIM: 807.79
12" NE INV:
12" SW INV:
STM CB 5
RIM: 806.80
24" N INV:
24" NE INV:
12" SW INV:
STM CB 6
RIM: 807.84
24" N INV:
24" NE INV:
12" SW INV:
STM CB 7
RIM: 808.10
24" N INV:
24" NE INV:
12" SW INV:
STM CB 8
RIM: 808.09
12" SE INV: 805.9
12" W INV: 805.12
STM CB 9
RIM:807.92
16" N INV: 804.9
12" NW INV: 804.80
12" NE INV: 804.77
16" S INV: 804.62
STM CB 10
RIM:806.48
12" SE INV: 804.89
STM CB 11
RIM: 807.07
16" N INV: 804.22
16" S INV: 804.12
12" E INV: 804.32
STM CB 12
RIM:806.99
12" E INV: 804.86
STM CB 13
RIM:807.09
16" N INV: 804.08
16" S INV: 803.99
12" W INV: 804.79
STM CB 14
RIM: 808.48
16" N INV: 803.32
16" S INV: 803.27
STM CB 15
RIM:809.10
12" SW INV: 807.12
STM CB 16
RIM: 805.65
12" NW INV: 802.58
12" E INV: 802.86
PROPOSED
FUTURE
PROPERTY
LINE
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
PROPOSED
MUNICIPAL EASEMENT
PROPOSED
30' WATER
UTILITY
EASEMENT
PROPOSED
30' WATER
UTILITY
EASEMENT
PROPOSED
30' WATER
UTILITY
EASEMENT
WATER
UTILITY
EASEMENT
PROPOSED 5' EASEMENT
FOR EXISTING PATH
PROPOSED
30' WATER
UTILITY
EASEMENT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
" P
i
p
e
" P
i
p
e
P
P
" P
i
p
e
" P
i
p
e
" P
i
p
e
T
T
T
W W W
W
TTT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
ST
ST
ST
ST
ST
ST
ST
X
X
X
XX
CTV
E
E
E
E
ST
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
SA
N
M
H
1
SA
N
M
H
2
SA
N
MH
3
SA
N
M
H
4
SA
N
M
H
5
SA
N
M
H
6
SA
N
M
H
7
SA
N
M
H
8
SA
N
M
H
9
ST
M
MH
1
ST
M
M
H
2
ST
M
M
H
3
ST
M
M
H
4
ST
M
M
H
7
ST
M
M
H
9
ST
M
M
H
1
0
1
8
.
1
2
'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
12. NO ACCESS PER DOC. #84085712. NO ACCESS PER DOC. #840857
P/
L
P/
L
P/LP/L
P/L
P/L
17.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
DO
C
.
#
8
5
1
7
9
7
14. APPX. LOCATION OF C/L UTILITY EASE. DOC. #695960
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
22. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #391194922. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #3911949
ST
ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
S
T
ST
S
A
N
///////////
/////////////////////////////////////////////////////////////////////////
/////////////////////////////////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////////////////////////////////////////////////////
/////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
////////////////////
810
808
80
8
809
809
809809
8
0
9
80
9
80
9
80
9
809
80
9
80
9
811
81
2
809
80
9
80
5
805
810
804
80
4
80
6
806
807
808
80
8
808
8
0
8
808
809
811
81
2
81
3
81
4
800
80
0
80
5
805
810
79
8
798799
79
9
80
1
801
80
2
802
80
3
803
80
4
804
80
6
806
80
7
807
808
80
8
80
8
808
80
9
80
9
809
809
809
809
80
9
811
812
813
80
7
807
80
8
80
8
80
8
80
8
80
9
809
809
80
9
80
8
80
0
79
4
80
5
80
4
80
1
80
780
8
80
6
80
7
80
8
8
0
6
8
0
7
8
0
8
8
0
9
8
0
9
8
1
0
80
6
807
8
0
8
8
0
9
810
8
0
6
806
807
808
809
811
812
810
807
807
808
809
806
80
6
80
6
806
81
0
81
0
807
808
809
807
80
7
8
0
8
80
8
808
808
8
0
9
809
81
0
8118118
1
2
812 813
813
8
1
4
814
800
80
0
8
0
5
799
79
9
80
1
801
80
2
80
3
8
0
4
8
0
6
8
0
7
80
7
8
0
0
8
0
5
7
9
8
7
9
9
8
0
1
8
0
2
8
0
3
8
0
4
8
0
6
ER
O
S
I
O
N
C
O
N
T
R
O
L
A
N
D
S
I
T
E
PR
E
P
A
R
A
T
I
O
N
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 EROSION.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
FPF
12-4-15
15577
JBL
JBL
5
A
C400
B
C400
C
C400
5
///////////
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE
LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED.
THERE MAY BE ADDITIONAL UNDERGROUND UTILITY
INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT
SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND
EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT
FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON
CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR
DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES.
5.SEE SHEET C400 FOR A COMPLETE LIST OF EROSION CONTROL
NOTES AND DETAILS. EROSION CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO START OF LAND DISTURBING ACTIVITIES.
6.DO NOT BEGIN LAND DISTURBING ACTIVITIES UNTIL AN EROSION
CONTROL PERMIT IS OBTAINED FROM LOCAL JURISDICTION.
7.CONTRACTOR TO COORDINATE CONSTRUCTION WITH LANNON
DR. IMPROVEMENTS. REFER TO PUBLIC ROAD IMPROVEMENT
PLANS.
8.CONTRACTOR SHALL MAINTAIN PROPER DRAINAGE ON LANNON
ROAD AT ALL TIMES. PHASE STORM SEWER ABANDONMENTS
AND NEW STORM SEWER INSTALLATION AND/OR PROVIDE
TEMPORARY MEANS SUCH AS PUMPS AND TEMPORARY STORM
SEWERS AS REQUIRED TO MAINTAIN DRAINAGE FROM LANNON
ROAD.
PROPOSED SILT FENCE
PROPOSED INLET PROTECTION
PROPOSED TRACKING PAD
PROPOSED EROSION MATTING WISDOT
APPROVED CLASS 1 TYPE B
EXISTING CONTOUR
UTILITY ABANDONMENT,
REMOVE AS NECESSARY
PROPOSED CONTOUR
STRUCTURE REMOVAL
PAVEMENT REMOVAL
D
C400
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
1
-
S
i
t
e
P
r
e
p
a
r
a
t
i
o
n
&
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
1
5
5
7
7
E
R
O
S
I
O
N
.
d
w
g
LEGEND:
C 002THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
GRAPHIC SCALE
00 50'100'
PROPOSED SILT
FENCE, TYP.
PROPOSED
TRACKING
PAD
PROPOSED INLET
PROTECTION, TYP.
REMOVE EXISTING
LIGHT POLE BASE
ABANDONED EXISTING
STORM SEWER AND
STRUCTURES.
REMOVE AS
NECESSARY
REMOVE EXISTING
LIGHT POLE BASE
PROPOSED
EROSION
MATTING
PROPOSED
EROSION
MATTING
TYP,
PROPOSED INLET
PROTECTION
TYP.
PROPOSED INLET
PROTECTION
TYP.
ABANDONED EXISTING
STORM SEWER AND
STRUCTURES.
REMOVE AS
NECESSARY
EXISTING STORM SEWER
AND STRUCTURES TO
REMAIN AND BE REUSED
CONTRACTOR SHALL
TELEVISE SEWERS AND
DETERMINE CONDITION FOR
REUSE.
CURB REMOVAL
PROPOSED TURF REINFORCED MATTING
WISDOT APPROVED CLASS 3 TYPE C
D
C400
PROPOSED SYNTHETIC
TURF REINFORCED
MATTING CLASS 3 TYPE D,
TYP.
D
C400
COORDINATE
IMPROVEMENTS
WITHIN R.O.W. FOR
UTILITIES
CONSTRUCTION
WITH PUBLIC ROAD
IMPROVEMENTS
COORDINATE
IMPROVEMENTS
WITHIN R.O.W. FOR
UTILITIES
CONSTRUCTION
WITH PUBLIC ROAD
IMPROVEMENTS
PLUG ABANDON
SANITARY
SERVICE AT
MANHOLE
PLUG ABANDON
SANITARY
SERVICE AT
R.O.W.
JANESVILLE RD
LA
N
N
O
N
D
R
.
REMOVE
AND
REPLACE
PATH AS
NECESSARY
CUT AND CAP
PROPOSED
TURF
REINFORCED
MATTING,
TYP.
PROPOSED RIP-RAP SWALE
BOTTOM
F
C403
PROPOSED
RIP RAP
F
C403
PROPOSED
TEMPORARY TOPSOIL
STOCK PILE
DIVERSION DITCH
DIVERSION DITCH
E
C400
E
C400
PROPOSED DIVERSION DITCH
(MINIMUM 1.0%)
E
C400
1.CITY RESUBMITTAL 3/23/16 TPM
TEMPORARY
DIVERSION DITCH
TO BE MAINTAINED
UNTIL GROCERY
STORE IS
DEVELOPED.
2.CITY RESUBMITTAL 5/27/16 TPM
CONTRACTOR TO INSTALL MH4,
STORM SEWER, AND ASSOCIATED
FLARED END SECTION TO OUTFALL
INTO SEDIMENTATION BASIN. REFER
TO C300 FOR STORM SEWER
DESIGN.
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
P
P
T
T
T
W W W
W
TT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
ST
ST
ST
ST
ST
ST
ST
X
X
X
XX
CTV
E
E
E
E
ST
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
60"
C
C
P
IN
V
:
7
9
6
.
3
7
"V"
C
H
A
N
N
E
L
:
79
6
.
5
5
SA
N
M
H
1
SA
N
M
H
2
SA
N
MH
3
SA
N
M
H
4
SA
N
M
H
5
SA
N
M
H
6
SA
N
MH
7
SA
N
MH
8
SA
N
MH
9
ST
M
M
H
1
ST
M
M
H
2
ST
M
MH
3
ST
M
M
H
4
ST
M
M
H
5
ST
M
M
H
6
ST
M
M
H
7
ST
M
MH
8
ST
M
M
H
9
ST
M
M
H
1
0
1
8
.
1
2
'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
12. NO ACCESS PER DOC. #84085712. NO ACCESS PER DOC. #840857
17.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
DO
C
.
#
8
5
1
7
9
7
14. APPX. LOCATION OF C/L UTILITY EASE. DOC. #695960
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
16. APPX. LOCATION OF C/L UTILITY EASE. DOC. #810369
22. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #391194922. TEMPORARY LIMITED EASEMENT (EXPIRED) DOC. #3911949
ST
ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
S
T
ST
S
A
N
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
5
ST
M
CB
1
6
PROPOSED FUTURE GROCERY
(30,000 SF) FFE = 810.00
PROPOSED FUTURE
COMMERCIAL
(12,000 SF) FFE: 811.80
PROPOSED
FUTURE
COMMERCIAL
(4,000 SF)
FFE = 811.80
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED FUTURE
COMMERCIAL
(7,500 SF) FFE = 808.87
22
11
8
17
20
19
9
9
1212 12 10 10 12
20
14
33
11
FU
T
U
R
E
PO
O
L
14
E E E E
E
2
8
3
9
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
9
25.
0
'
36.
0
'
25.
0
'
25.
0
'
25.
0
'
24.
0
'
24.
0
'
24.
0
'
24.
0
'
24.
0
'
24.
0
'
24.
5
'
25.
0
'
12
.
0
'
25.
0
'
25.
0
'
12.
0
'
25.
0
'
15.
0
'
25.
0
'
24.
0
'
26.
5
'
27.
0
'
6.0
'
25.
0
'
25.
0
'
24.
0
'
25.
0
'
27.
0
'
24.
0
'
24.
0
'
12
5
.
0
'
60.
0
'
20
0
.
0
'
60.
0
'
25
0
.
0
'
12
0
.
0
'
26.
5
'
70.
0
'
50.
0
'
24.
5
'
18.
1
'
24.
5
'
15.
0
'
25.
0
'
12.
0
'
12.
0
'
11
.
0
'
11
.
0
'
1
1
.
0
'
10
0
.
0
'
1
1
.
0
'
10
6
.
9
'
6.0
'
1
3
.
0
'
15.
4
'
19.
3
'
40
.
0
'
40
.
0
'
10
.
0
'
10
.
0
'
10
.
0
'
10
.
0
'
15
.
0
'
15
.
0
'
15
.
0
'
33
.
0
'
33
.
0
'
12.
0
'
15.
0
'
20
.
3
'
32
.
8
'
12
.
0
'
5.0
'
22.
9
'
P
/
L
P/L
P/L P/L
P/
L
P/L
P
/
L
P/
L
P/L
P/L
P/L
N62° 07' 53"E 241.28'N62° 07' 53"E 653.34'
L=208.33
R=1909.86
CH B=N59° 00' 23"E
CH L=208.23
D=6°15'00"
SI
T
E
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577-site.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
SITE INFORMATION:
TOTAL SITE = 10.76 ACRES
TOTAL DISTURBED AREA = 10.76 ACRES
PROPOSED IMPERVIOUS AREA = ±6.98 ACRES
PROPOSED PERVIOUS AREA = ±3.78 ACRES
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
3
-
S
i
t
e
D
i
m
e
n
s
i
o
n
P
l
a
n
\
1
5
5
7
7
-
s
i
t
e
.
d
w
g
LEGEND:
C 100
A
C401
CURB & GUTTER
(ACCEPT)
A
C401
CURB & GUTTER
(REJECT)
GRAPHIC SCALE
00 50'100'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
JANESVILLE RD
LA
N
N
O
N
D
R
.
B
C4015" THICK CONCRETE WALK
C
C401
ASPHALT SURFACE
(HEAVY DUTY )
9' x 18' TYP.
9' x 18' TYP.
PARCEL A
5.884 ACRES
PARCEL B
2.937 ACRES
PARCEL C
1.26 ACRES
PARCEL D
0.679 ACRES
TPM/FPF/VMS/PJI
1-29-16
15577
JBL
JBL
9'
x
1
8
'
T
Y
P
.
NOTES:
DASHED GRAY LINES INDICATE FUTURE
(POTENTIAL) IMPROVEMENTS
SEE PUBLIC INFRASTRUCTURE PLAN SET FOR
LANNON DRIVE IMPROVEMENTS BEYOND ROW LINE
SEE PUBLIC INFRASTRUCTURE PLAN SET FOR
LANNON DRIVE IMPROVEMENTS BEYOND ROW LINE
SEE PUBLIC INFRASTRUCTURE PLAN SET FOR
JANESVILLE ROAD IMPROVEMENTS BEYOND ROW
LINE
ADA SIGN
TYP.
F
C401
ADA SIGN
TYP.
F
C401
1 FT CURB
TAPER AT
PROPERTY
LINE. TYP.
E
C401
1 FT CURB
TAPER AT
PROPERTY
LINE. TYP.
E
C401
PAVEMENT MARKING "LANE
LINE", SOLID YELLOW, 4"
PAVEMENT MARKING "LANE
LINE", SOLID WHITE, 4"
PAVEMENT MARKING
"LANE LINE",
DASHED WHITE, 4"
PAVEMENT MARKING
"DIRECTIONAL ARROWS",
SOLID WHITE
TYP.
PAVEMENT MARKING
"DIRECTIONAL ARROWS",
SOLID WHITE
TYP.
PAVEMENT MARKING "LANE
LINE", SOLID WHITE, 4"
PAVEMENT MARKING "LANE
LINE", SOLID YELLOW, 4"
ADA RAMP
TYP.
I
C401
PAVEMENT MARKING
"CROSS WALK", WHITE
TYP.
PAVEMENT MARKING
"PARKING LINE",
SOLID WHITE, 4"
TYP.
ADA RAMP
TYP.
H
C401
MONUMENT SIGN
REFER TO ARCHITECTURAL
PLANS FOR DETAILS
TYP.
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN
ON THIS DRAWING IS BASED ON FIELD LOCATIONS
AND/OR RECORDS FURNISHED BY MUNICIPALITIES
AND UTILITY COMPANIES. THE LOCATION AND
ACCURACY OF WHICH CANNOT BE GUARANTEED.
THERE MAY BE ADDITIONAL UNDERGROUND UTILITY
INSTALLATIONS WITHIN THE PROJECT AREA THAT
ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE
FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR
DISCREPANCIES SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER PRIOR TO
PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD
TYPE LINES AND EXISTING CONDITIONS ARE
INDICATED BY LIGHT TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON
WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL
FILES TO LAYOUT FOUNDATIONS, COLUMN LINES,
LIGHT POLES, OR OTHER NON CIVIL SITE WORK.
REFER TO ARCHITECTURAL DRAWINGS FOR
DIMENSIONS OF BUILDING AND ARCHITECTURAL
FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY,
INCLUDING BUT NOT LIMITED TO DRIVEWAY
OPENINGS, SIDEWALK AND RAMPS, PAVING, AND
CURB AND GUTTER SHALL BE COMPLETED PER
MUNICIPAL AND/OR COUNTY REQUIREMENTS AND
STANDARDS.
MUNICIPAL EASEMENT
30'
WATER
UTILITY
EASEMENT
30'
WATER
UTILITY
EASEMENT
30'
WATER
UTILITY
EASEMENT
30'
UTILITY
EASEMENT
PROPOSED PROPERTY LINE
PROPOSED PROPERTY LINE
PROPOSED
FUTURE
PROPERTY LINE
PROPOSED
PROPERTY LINE
PROPOSED
PROPERTY LINE
J
C401
J
C401
REPLACE ASPHALT TRAIL
AS NECESSARY
K
C401
STOP LINE AND
STOP SIGN
STOP LINE AND
STOP SIGN
DRY STORM
WATER BASIN
100 YR=806.45
2 YR=806.14
BOTTOM = 806
STORM
WATER BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
6 FT CURB
TAPER TO
PROPERTY
LINE. TYP.
L
C401
PROPOSED 30'
SANITARY
UTILITY
EASEMENT
WATER
UTILITY
EASEMENT
PROPOSED
CROSS
ACCESS
EASEMENT
PROPOSED STORM WATER
BASIN EASEMENT
FOR EXISTING STORM
WATER BASIN LOCATED
NORTH
PROPOSED 5' EASEMENT
FOR EXISTING PATH
1.CITY RESUBMITTAL 3/23/16 TPM
2 FT CURB
OPENING
MONUMENT SIGN
REFER TO ARCHITECTURAL
PLANS FOR DETAILS
TYP.
MONUMENT SIGN
REFER TO ARCHITECTURAL
PLANS FOR DETAILS
TYP.
MONUMENT SIGN
REFER TO ARCHITECTURAL
PLANS FOR DETAILS
TYP.
MONUMENT SIGN
REFER TO ARCHITECTURAL
PLANS FOR DETAILS
TYP.
MONUMENT SIGN
REFER TO ARCHITECTURAL
PLANS FOR DETAILS
TYP.
9' x
1
8
'
T
Y
P
.
SEE PUBLIC INFRASTRUCTURE PLAN SET FOR
LANNON DRIVE IMPROVEMENTS BEYOND ROW LINE
LEVEL LANDING
(MAX. 2% IN ANY
DIRECTION)
ADA RAMP
(MAX. 8.33% SLOPE)
ADA RAMP
(MAX. 8.33% SLOPE)
PROPOSED
RETAINING WALL.
REFER TO
ARCHITECTURAL
PLANS FOR DETAILS.
2.CITY RESUBMITTAL 5/27/16 TPM
P/L
P/L
P/L
P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L
P/
L
P/
L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
PROPOSED FUTURE GROCERY
(30,000 SF) FFE = 810.00
PROPOSED FUTURE
COMMERCIAL
(12,000 SF) FFE: 811.80
PROPOSED
FUTURE
COMMERCIAL
(4,000 SF)
FFE = 811.80
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED FUTURE
COMMERCIAL
(7,500 SF) FFE = 808.87
22
11
8
17
20
19
9
9
1212 12 10 10 12
20
14
33
11
FU
T
U
R
E
PO
O
L
14
E E E E
E
2
8
3
9
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED BUILDING
21,600 SF
FFE = 809.00
ON
L
Y
P
/
L
P/L
P/
L
P/LP/L
P/L
P/L
P/L
P
/
L
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
9
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
" P
i
p
e
" P
i
p
e
P
P
" P
i
p
e
" P
i
p
e
" P
i
p
e
T
T
T
W W W
W
TT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
X
X
X
XX
CTV
E
E
E
E
81
0
810810
806
806
80
6
808
812
814
8
0
0
810
79
8
79
8
8
0
2
80
4
8
0
6
806
806
808
808
8
0
8
812
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
60"
C
C
P
IN
V
:
7
9
6
.
3
7
"V"
C
H
A
N
N
E
L
:
79
6
.
5
5
SA
N
M
H
1
SA
N
M
H
2
SA
N
MH
3
SA
N
M
H
4
SA
N
M
H
5
SA
N
M
H
6
SA
N
MH
7
SA
N
MH
8
SA
N
MH
9
ST
M
M
H
1
ST
M
M
H
2
ST
M
MH
3
ST
M
M
H
4
ST
M
M
H
5
ST
M
M
H
6
ST
M
M
H
7
ST
M
MH
8
ST
M
M
H
9
ST
M
M
H
1
0
P
/
L
P/
L
P/LP/L
P/L
P/L
ST
S
A
N
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
5
ST
M
CB
1
6
STORM CB1
RIM:807.00
STORM CB3
RIM:806.75
STORM MH1
RIM:808.06
STORM CB 16
RIM:807.35
STORM CB12
RIM:806.37
808
80
8
80
9
809
8098
0
9
80
9
810
811
812
813
814
810
8
0
9
811
80
0
80
0
80
0
80
5
80
5
805
79
9
79980
180
1
80
1
80
2
80
3
80
4
8
0
6
80
6
806
8
0
6
80
6
STORM CB4
RIM:807.00
810
811811
8
1
1
81
2812
8
0
8
8
0
9809809
80
9
808
8
0
8
80
8
809
STORM MH3
RIM:808.72
STORM CB5
RIM:808.03STORM CB8
RIM:808.00
STORM CB7
RIM:808.05
80
7
80
7
80
8
810
80
9
809
811
812
80
0
80
0
80
1
80
1
80
280
2
80
0
80
5
80
1
80
2
80
3
80
4
80
6
STORM CB6
RIM:808.02
STORM EXMH5
RIM:807.50
STORM CB2
RIM:808.00
80
5
80
1
80
2
80
3
80
4
80
6
80
7
80
8
80
5
80
480
680
780780
8
80
8
81
0
81
0
80
7
8
0
7
808
80
8
80
8
8
0
8
80
8
80
8
80
8
80
8
8
0
8
8
0
9
8
0
9
8
0
9
80
9
80
9 80
9
80
9
80
9
80
9
80
9
80
9
809
STORM CB11
RIM:807.00
STORM EXMH6
RIM:807.00
805
80
4
804
806
807
80
8
80
9
STORM MH5
RIM:805.40FES6
FES5
STORM OCS1
RIM:806.87
STORM MH4
RIM:803.22
STORM CB9
RIM:807.76
809
STORM CB13
RIM:806.66
80
6
8
0
6
80
7
8
0
7
80
8
8
0
8
8
0
9
8
0
9
80
9
STORM CB 14
RIM:807.50
79
5
795 796 797 798 799
STORM CB2A
RIM:808.04
STORM MH7
RIM:808.44
STORM CB 1A
RIM:807.05
FES4
STORM CB 3A
RIM:806.78
STORM CB 4A
RIM:807.04
STORM CB 11A
RIM:807.17
STORM CB10
RIM:807.76
STORM CB 10A
RIM:807.81STORM CB 9A
RIM:807.78
STORM CB 5A
RIM:808.06
STORM CB 15
RIM:808.73
STORM CB 6A
RIM:808.07
STORM CB 7A
RIM:808.09
STORM CB12A
RIM:806.39
808.70 808.70
-1
.
2
%
-1
.
2
%
-1.2%
-1
.
2
%
-1
.
1
%
-1.2%
FES2
FES1
OV
E
R
A
L
L
G
R
A
D
I
N
G
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 GRADING.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
CJS
11-24-15
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
5
-
G
r
a
d
i
n
g
P
l
a
n
\
1
5
5
7
7
G
R
A
D
I
N
G
.
d
w
g
C 200
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON
THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR
RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY
COMPANIES. THE LOCATION AND ACCURACY OF WHICH
CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL
UNDERGROUND UTILITY INSTALLATIONS WITHIN THE
PROJECT AREA THAT ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD.
ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE
LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT
TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO
LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR
OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS OF BUILDING AND
ARCHITECTURAL FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT
NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND
RAMPS, PAVING, AND CURB AND GUTTER SHALL BE
COMPLETED PER MUNICIPAL AND/OR COUNTY
REQUIREMENTS AND STANDARDS.
7.EARTHWORK SHALL BE IN ACCORDANCE WITH
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
5
5 EXISTING CONTOUR
PROPOSED CONTOUR
LEGEND:
PROPOSED CURB & GUTTER
SPOT GRADE
T/C: TOP OF CURB GRADE
FL: FLOW LINE CURB GRADE
PROPOSED ASPHALT
SPOT GRADE100.00
100.50 T/C
100.00 FL
GRAPHIC SCALE
00 50'100'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
A
C401
CURB & GUTTER
(ACCEPT)
A
C401
CURB & GUTTER
(REJECT)
B
C4015" THICK CONCRETE WALK
C
C401
ASPHALT SURFACE
(HEAVY DUTY )
PROPOSED STORM INLET
PROPOSED STORM MANHOLE
PROPOSED SANITARY MANHOLE
C
C402
A
C402
B
C402
JANESVILLE RD
LA
N
N
O
N
D
R
.
STORM
WATER
BASIN
B
C403
E
C403
REINFORCED
TURF
MATTING
C
C403
30'
WATER
UTILITY
EASEMENT
30' WATER UTILITY
EASEMENT
30' UTILITY
EASEMENT
30'
WATER
UTILITY
EASEMENT
MUNICIPAL
UTILITY
EASEMENT
A
C403
REPLACE EXISTING PATH
AS NECESSARY
OVERLAND FLOW PATH
PROPOSED
FUTURE
PROPERTY
LINE
PROPOSED
FUTURE
PROPERTY
LINE
PROPOSED
FUTURE
PROPERTY
LINE
REINFORCED
TURF
MATTING
C
C403
REPLACE MANHOLE
COVER WITH
TEMPORARY GRATE.
REFER TO STORM
STRUCTURE TABLE
ON SHEET C402.
REPLACE MANHOLE
COVER WITH
TEMPORARY GRATE.
REFER TO STORM
STRUCTURE TABLE
ON SHEET C402.
2' CURB OPENING
STORM
WATER BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
DRY STORM
WATER BASIN
100 YR=806.45
2 YR=806.14
BOTTOM = 806
1.CITY RESUBMITTAL 3/23/16 TPM
TEMPORARY
DIVERSION DITCH
TO BE MAINTAINED
UNTIL GROCERY
STORE IS
DEVELOPED.
6 FT CURB
TAPER TO
PROPERTY
LINE. TYP.
STORM MANHOLE 4 STRUCTURE AND
FRAME AND GRATE TO BE ADJUSTED
ONCE THE FINAL PROPOSED FUTURE
GROCERY DEVELOPMENT HAS BEEN
DESIGNED.
PROPOSED RETAINING
WALL. REFER TO
ARCHITECTURAL
PLANS FOR DETAILS.
2.CITY RESUBMITTAL 5/27/16 TPM
P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
PROPOSED FUTURE
COMMERCIAL
(12,000 SF) FFE: 811.80
PROPOSED
FUTURE
COMMERCIAL
(4,000 SF)
FFE = 811.80
21,600 SF
FFE = 809.00
PROPOSED FUTURE
COMMERCIAL
(7,500 SF) FFE = 808.87
P/
L
P
/
L
P/
L
P/LP/LP/LP/L
P/
L
P/
L
P/
L
P/LP/L
P/L
P/L P/L P/L
P
/
L
P
/
L
P
/
L
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
T
T
" P
i
p
e
" P
i
p
e
W
W
W
W
E E E E E E E E
E
E E E E E E E E E E E E E E E E E E E E E E
E E E E E E E
E
EWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
P
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
SA
N
SA
N
SA
N
W
ST ST ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
E
E
E
E
E
E
E
81
0
810810
806
806
80
6
808
812
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
SA
N
SA
N
M
H
4
SA
N
M
H
5
M
H
3
ST
M
M
H
4
ST
M
M
H
5
ST
M
M
H
6
ST
M
M
H
7
P/LP/LP/LP/L
P/
L
P/L
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
ST
M
CB
2
808.20
809.05
809.65 T/C
809.15 FL
809.18 T/C
808.68 FL 809.28 T/C
808.78 FL
810.00 T/C
809.50 FL
808.84 T/C
808.34 FL
809.90 T/C
809.40 FL
814.57
814.55
809.53 T/C
809.03 FL
809.63 T/C
809.13 FL
808
80
8
80
9
809
809
8
0
980
9
810
811
812
813
814
8
0
8
810
811
811
8
1
1
81
2812
8
0
8
8
0
9809809
80
9
809.25 T/C
808.75 FL
808
8
0
8
808
809
810
80
9
809
811
812
809.12 T/C
808.62 FL
809.50 T/C
809.00 FL
808.68 T/C
808.18 FL
810.00 T/C
809.50 FL
809.50 T/C
809.00 FL
809.19 T/C
808.69 FL
808.77 T/C
808.27 FL
808.04
810.26 T/C
809.76 FL
811.94 T/C
811.44 FL
808.34 T/C
807.84 FL
808.05 T/C
807.55 FL
806.88
808.96 T/C
808.46 FL
807.50 T/C
807.00 FL
810.18 T/C
809.68 FL
810.50 T/C
810.00 FL
812.79 T/C
812.29 FL
809.18 T/C
808.68 FL
810.68 T/C
810.18 FL
810.97 T/C
810.47 FL
810.42 T/C
809.92 FL
809.81 T/C
809.31 FL
809.45 T/C
808.95 FL
808.35
808.83 T/C
808.33 FL
808.78 T/C
808.28 FL
809.40
809.25 T/C
808.75 FL
808.51 T/C
808.01 FL
810.08 T/C
809.58 FL
809.49 T/C
808.99 FL
80
8
809
808.05
807
80
8
80
9
808.05
808.14
808.94
809.56 808.35 809.60
808.75 808.42
808.03
807.58
806.96
807.03
808.66 T/C
808.16 FL
808.73
808.61 T/C
808.11 FL
808.71
808.95 T/C
808.45 FL
809.30 T/C
808.80 FL
STORM CB6
RIM:808.02
STORM CB7
RIM:808.05
STORM CB5
RIM:808.03
STORM MH3
RIM:808.72
STORM CB8
RIM:808.00
STORM CB9
RIM:807.76
STORM CB10
RIM:807.76
STORM CB11
RIM:807.00
STORM EXMH6
RIM:807.00
STORM EXMH5
RIM:807.50
8
1
0
8
0
9
8
1
1
8
1
2
814.29
814.65
814.55
814.30 814.05
814.39
814.97
815.00
814.99
815.00
Ex. 809.32
809
STORM CB 14
RIM:807.50
STORM CB 15
RIM:808.73
STORM CB 6A
RIM:808.07
STORM CB 5A
RIM:808.06
STORM CB 7A
RIM:808.09
STORM CB9
RIM:807.76
STORM CB 10A
RIM:807.81
STORM CB 11A
RIM:807.17
814.83 T/C
814.33 FL
Ex. 808.62
809.75
809.44
809.35 809.94
809.85
809.32
809.27
809.24
810.30 T/C
809.80 FL
GR
A
D
I
N
G
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 GRADING.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
CJS
11-24-15
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
5
-
G
r
a
d
i
n
g
P
l
a
n
\
1
5
5
7
7
G
R
A
D
I
N
G
.
d
w
g
C 201
GRAPHIC SCALE
00 20'40'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
15577
JBL
JBL
SEE SHEET C202
SE
E
P
U
B
L
I
C
I
N
F
R
A
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
T
F
O
R
LA
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
B
E
Y
O
N
D
R
O
W
L
I
N
E
SEE PUBLIC INFRASTRUCTURE PLAN SET FOR
JANESVILLE ROAD IMPROVEMENTS BEYOND ROW
LINE
5
5 EXISTING CONTOUR
PROPOSED CONTOUR
LEGEND:
PROPOSED CURB & GUTTER
SPOT GRADE
T/C: TOP OF CURB GRADE
FL: FLOW LINE CURB GRADE
PROPOSED ASPHALT
SPOT GRADE100.00
100.50 T/C
100.00 FL
A
C401
CURB & GUTTER
(ACCEPT)
A
C401
CURB & GUTTER
(REJECT)
B
C4015" THICK CONCRETE WALK
C
C401
ASPHALT SURFACE
(HEAVY DUTY )
PROPOSED STORM INLET
PROPOSED STORM MANHOLE
PROPOSED SANITARY MANHOLE
C
C402
A
C402
B
C402
JANESVILLE RD
LA
N
N
O
N
D
R
.
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON
THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR
RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY
COMPANIES. THE LOCATION AND ACCURACY OF WHICH
CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL
UNDERGROUND UTILITY INSTALLATIONS WITHIN THE
PROJECT AREA THAT ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD.
ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE
LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT
TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO
LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR
OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS OF BUILDING AND
ARCHITECTURAL FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT
NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND
RAMPS, PAVING, AND CURB AND GUTTER SHALL BE
COMPLETED PER MUNICIPAL AND/OR COUNTY
REQUIREMENTS AND STANDARDS.
7.EARTHWORK SHALL BE IN ACCORDANCE WITH
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED
FUTURE
PROPERTY
LINE
PROPOSED
FUTURE
PROPERTY
LINE
PROPOSED
FUTURE
PROPERTY
LINE
30'
UTILITY
EASEMENT
30'
UTILITY
EASEMENT
30'
UTILITY
EASEMENTPROPOSED
FUTURE
PROPERTY
LINE
REPLACE MANHOLE
COVER WITH
TEMPORARY GRATE.
REFER TO STORM
STRUCTURE TABLE
ON SHEET C402.
REPLACE MANHOLE
COVER WITH
TEMPORARY GRATE.
REFER TO STORM
STRUCTURE TABLE
ON SHEET C402.
1.CITY RESUBMITTAL 3/23/16 TPM
6 FT CURB
TAPER TO
PROPERTY
LINE. TYP.
LEVEL LANDING
(MAX. 2% IN ANY
DIRECTION)
ADA RAMP
(MAX. 8.33% SLOPE)
ADA RAMP
(MAX. 8.33% SLOPE)
2.CITY RESUBMITTAL 5/27/16 TPM
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED FUTURE
COMMERCIAL
(7,500 SF) FFE = 808.87
11 17
FU
T
U
R
E
PO
O
L
14
8
9
P/LP/LP/L
P/L
P/
L
P/L P/L P/L
9
T
T
T
T
T
T
T
T
T
T
T
" P
i
p
e
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
S
T
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
80
6
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
12
"
C
M
P
IN
V
:
8
0
4
.
9
0
12
"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
SA
N
M
H
9
ST
M
M
H
1
ST
M
M
H
2
ST
M
M
H
3
ST
M
M
H
8
P/L
P/L
P/L
S
T
ST
ST
808
80
0
80
0
80
0
80
5
79
9
799
80
180
1
80
1
80
2
80
3
80
4
80
6
8
0
8
8
0
9809809
80
9
800
805
80
5
805
801
80
1
801
802
80
2
802
803
80
3
803
804
80
4
804
806808.50 T/C
808.00 FL
808.80 T/C
808.30 FL
808.80 T/C
808.30 FL
809.04 T/C
808.54 FL
809.09 T/C
808.59 FL
809.14 T/C
808.64 FL
80
5
80
4
80
6
80
7
807
80
8
80
8
808
80
8
80
9
80
9
809
808.81
809.00
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.80 T/C
808.30 FL
808.80 T/C
808.30 FL
808.70 T/C
808.20 FL
809.00
808.81
808.70 T/C
808.20 FL
808.81
808.70 T/C
808.20 FL
808.81
808.90 T/C
808.40 FL
808.98 T/C
808.48 FL
808.90 T/C
808.40 FL
809.50 T/C
809.00 FL
809.50 T/C
809.00 FL
809.00
808.90 T/C
808.40 FL
809.50 T/C
809.00 FL
809.50 T/C
809.00 FL
809.00
808.98 T/C
808.48 FL
809.50 T/C
809.00 FL
809.50 T/C
809.00 FL
809.00
807.93
807.93
807.93
807.93
807.93
807.93
807.93
807.93
805
80
4
804
806
807
80
8
80
9
809.48
808.73
808.90
810
809
809
808
80
9
STORM CB6
RIM:808.02
STORM CB7
RIM:808.05
STORM CB5
RIM:808.03
STORM MH3
RIM:808.72
STORM CB9
RIM:807.76
STORM CB10
RIM:807.76
STORM CB 16
RIM:807.35
STORM MH1
RIM:808.06
STORM CB12
RIM:806.37
STORM CB3
RIM:806.75
STORM CB4
RIM:807.00
Ex. 808.06
808.30
809
STORM CB 14
RIM:807.50
809.00
808.44
809.00
809.00
809.00
808.45
STORM CB 15
RIM:808.73
STORM CB 6A
RIM:808.07
STORM CB 5A
RIM:808.06
STORM CB 7A
RIM:808.09
STORM CB9
RIM:807.76
STORM CB 10A
RIM:807.81
STORM CB 4A
RIM:807.04
STORM CB12A
RIM:806.39
STORM CB 3A
RIM:806.78
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.78808.78
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.70
808.70
808.80 T/C
808.30 FL
808.78
808.78
808.20
808.20
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
FES7
FES3
GR
A
D
I
N
G
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 GRADING.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
CJS
11-24-15
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
5
-
G
r
a
d
i
n
g
P
l
a
n
\
1
5
5
7
7
G
R
A
D
I
N
G
.
d
w
g
C 202
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON
THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR
RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY
COMPANIES. THE LOCATION AND ACCURACY OF WHICH
CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL
UNDERGROUND UTILITY INSTALLATIONS WITHIN THE
PROJECT AREA THAT ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD.
ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE
LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT
TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO
LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR
OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS OF BUILDING AND
ARCHITECTURAL FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT
NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND
RAMPS, PAVING, AND CURB AND GUTTER SHALL BE
COMPLETED PER MUNICIPAL AND/OR COUNTY
REQUIREMENTS AND STANDARDS.
7.EARTHWORK SHALL BE IN ACCORDANCE WITH
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
GRAPHIC SCALE
00 20'40'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
15577
JBL
JBL
SEE SHEET C201
SE
E
P
U
B
L
I
C
I
N
F
R
A
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
T
F
O
R
LA
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
B
E
Y
O
N
D
R
O
W
L
I
N
E
SEE SHEET C203
LA
N
N
O
N
D
R
.
5
5 EXISTING CONTOUR
PROPOSED CONTOUR
LEGEND:
PROPOSED CURB & GUTTER
SPOT GRADE
T/C: TOP OF CURB GRADE
FL: FLOW LINE CURB GRADE
PROPOSED ASPHALT
SPOT GRADE100.00
100.50 T/C
100.00 FL
A
C401
CURB & GUTTER
(ACCEPT)
A
C401
CURB & GUTTER
(REJECT)
B
C4015" THICK CONCRETE WALK
C
C401
ASPHALT SURFACE
(HEAVY DUTY )
PROPOSED STORM INLET
PROPOSED STORM MANHOLE
PROPOSED SANITARY MANHOLE
C
C402
A
C402
B
C402
PROPOSED
FUTURE
PROPERTY
LINE
30'
UTILITY
EASEMENT
PROPOSED
FUTURE
PROPERTY
LINE
30'
UTILITY
EASEMENT STORM
WATER BASIN
100YR=805.4
2 YR=803.79
NWL=800
BOTTOM = 795
1.CITY RESUBMITTAL 3/23/16 TPM
2' CURB OPENING
30'
UTILITY
EASEMENT
2.CITY RESUBMITTAL 5/27/16 TPM
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
FU
T
U
R
E
PO
O
L
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED BUILDING
21,600 SF
FFE = 809.00
T
T
T
T
T
" P
i
p
e
G
G
G
G
G
G
G
G
G
G
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
ST
ST
X
X
X
X
X
X
X
X
X
X
X
X
X
X
8
0
0
79
8
79
8
80
2
80
4
8
0
6
806
806
808
8
0
8
T T
T
T
T
T
T
T
T
T
48
"
C
C
P
IN
V
:
7
9
7
.
2
2
SA
N
M
H
9
ST
M
M
H
9
ST
M
M
H
1
0
P/L
P
/
L
P
/
L
P/
L
P/L
P/L
809.50 T/C
809.00 FL
806.87
STORM CB1
RIM:807.00
STORM CB3
RIM:806.75
STORM CB 16
RIM:807.35
808
80
9
809.42 T/C
808.92 FL
809.19 T/C
808.69 FL
808.34 T/C
807.84 FL
808.38 T/C
807.88 FL
808.50 T/C
808.00 FL808.49 T/C
807.99 FL
809.37 T/C
808.87 FL
809.40 T/C
808.90 FL
809.21 T/C
808.71 FL
809.00 T/C
808.50 FL
809.25 T/C
808.75 FL
809.03 T/C
808.53 FL
808.95 T/C
808.45 FL
808.87 T/C
808.37 FL
808.96 T/C
808.46 FL
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
STORM CB2
RIM:808.00
809.12
808.99
80
0
80
5
79
879
9
80
180
280
380
480
680
7
80
8
80
6
8
0
6
80
7
8
0
7
80
8
8
0
8
8
0
8
8
0
9
809
808.56
808.56
808.56
808.56
809.00
809.50 T/C
809.00 FL
809.00
808.92
809.00
809.00
809.50 T/C
809.00 FL
809.50 T/C
809.00 FL
809.00
STORM MH5
RIM:805.40
FES6
FES5
STORM OCS1
RIM:806.87
8
0
0
8
0
5
8
0
1
8
0
2
8
0
3
8
0
4
8
0
6
8
0
6
8
0
5
8
0
4
8
0
6
805.50
805.50
805.38
805.37
805.50
806.00
805.50
806.00
806.00 805.43
805.43
806.00
806.00
808.50
808.50
809.00
809.00
STORM CB13
RIM:806.66
808.65
807.40
Ex. 807.23
Ex. 807.45
STORM CB2A
RIM:808.04
STORM MH7
RIM:808.44
STORM CB 1A
RIM:807.05
STORM CB 3A
RIM:806.78
807.04
809.00
809.00
808.92
806.50 B.O.W.
806.00 B.O.W.
807.50 T/C
807.00 FL
807.64 T/C
807.14 FL
807.00 B.O.W.
808.83 T/C
808.33 FL
806.50 B.O.W.
809.00 T.O.W.
809.00 T.O.W.
809.50 T/C
809.00 FL
809.36 T/C
808.86 FL
809.36 T/C
808.86 FL
809.07 T/C
808.92 FL 809.00
809.00
808.92
808.97 T/C
808.92 FL
809.39 T/C
809.00 FL
808.80 T/C
808.30 FL
806.00 B.O.W.
807.35
809.00
809.00
808.81
808.81
808.78
808.78
808.20
808.20
807.93
807.93
807.93
807.93
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.70 T/C
808.20 FL
808.71 T/C
808.21 FL
806.00
809.00
806.00
812.42
812.35
812.00
811.44
810.00
810.24
809.04
809.06
809.11
FES2
FES1
808.83 T.O.W.
808.34 T.O.W.
807.64 T.O.W.
GR
A
D
I
N
G
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 GRADING.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
CJS
11-24-15
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
5
-
G
r
a
d
i
n
g
P
l
a
n
\
1
5
5
7
7
G
R
A
D
I
N
G
.
d
w
g
C 203
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON
THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR
RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY
COMPANIES. THE LOCATION AND ACCURACY OF WHICH
CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL
UNDERGROUND UTILITY INSTALLATIONS WITHIN THE
PROJECT AREA THAT ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD.
ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE
LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT
TYPE LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO
LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR
OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS OF BUILDING AND
ARCHITECTURAL FEATURES.
5.DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF
PAVEMENT.
6.WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT
NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND
RAMPS, PAVING, AND CURB AND GUTTER SHALL BE
COMPLETED PER MUNICIPAL AND/OR COUNTY
REQUIREMENTS AND STANDARDS.
7.EARTHWORK SHALL BE IN ACCORDANCE WITH
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
GRAPHIC SCALE
00 20'40'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
15577
JBL
JBL
SEE SHEET C202
SE
E
P
U
B
L
I
C
I
N
F
R
A
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
T
F
O
R
LA
N
N
O
N
D
R
I
V
E
I
M
P
R
O
V
E
M
E
N
T
S
B
E
Y
O
N
D
R
O
W
L
I
N
E
LA
N
N
O
N
D
R
.
5
5 EXISTING CONTOUR
PROPOSED CONTOUR
LEGEND:
PROPOSED CURB & GUTTER
SPOT GRADE
T/C: TOP OF CURB GRADE
FL: FLOW LINE CURB GRADE
PROPOSED ASPHALT
SPOT GRADE100.00
100.50 T/C
100.00 FL
A
C401
CURB & GUTTER
(ACCEPT)
A
C401
CURB & GUTTER
(REJECT)
B
C4015" THICK CONCRETE WALK
C
C401
ASPHALT SURFACE
(HEAVY DUTY )
PROPOSED STORM INLET
PROPOSED STORM MANHOLE
PROPOSED SANITARY MANHOLE
C
C402
A
C402
B
C402
30'
UTILITY
EASEMENT
MUNICIPAL
UTILITY
EASEMENT
MONUMENT SIGN
REFER TO
ARCHITECTURAL
PLANS FOR DETAILS
STORM
WATER
BASIN
B
C403
E
C403
REINFORCED
TURF
MATTING
A
C403
SLOPE PATH AT 5.0% MAX
SLOPE PATH AT 5.0% MAX
C
C403
REINFORCED
TURF
MATTING
C
C403
EXPOSED FOUNDATION
STORM
WATER BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
DRY STORM
WATER BASIN
100 YR=806.45
2 YR=806.14
BOTTOM = 806
1.CITY RESUBMITTAL 3/23/16 TPM
RAMP ASPHALT
TO TOP OF CURB
RAMP ASPHALT
TO TOP OF CURB
PROPOSED TOP OF WALL GRADE100.00 T.O.W
PROPOSED BOTTOM OF WALL
GRADE100.00 B.O.W.
2.CITY RESUBMITTAL 5/27/16 TPM
P/L
P/L
P/L
P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L P/L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L
P/
L
P/
L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
P/L
PROPOSED FUTURE GROCERY
(30,000 SF) FFE = 810.00
PROPOSED FUTURE
COMMERCIAL
(12,000 SF) FFE: 811.80
PROPOSED
FUTURE
COMMERCIAL
(4,000 SF)
FFE = 811.80
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED FUTURE
COMMERCIAL
(7,500 SF) FFE = 808.87
FU
T
U
R
E
PO
O
L
E E E E
E
PROPOSED BUILDING
21,600 SF
FFE = 809.00
PROPOSED BUILDING
21,600 SF
FFE = 809.00
ON
L
Y
P
/
L
P/L
P/
L
P/LP/L
P/L
P/L
P/L
P
/
L
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
" P
i
p
e
" P
i
p
e
P
P
" P
i
p
e
" P
i
p
e
" P
i
p
e
T
T
T
W W W
W
TT
E
E
E
E
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
G
G
W
E
T
T
T
T
T
T
T
T
E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
P
E E E E E E E E E
E E E E E E E E E
T
T
T
T
T
T
T
T
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
W
W
E
G
SA
N
G G G G G G G G G G G G G G G G G G G G G
ST
ST
ST
ST
ST
ST
ST
X
X
X
XX
CTV
E
E
E
E
ST
81
0
810810
806
806
80
6
808
812
814
8
0
0
810
79
8
79
8
8
0
2
80
4
8
0
6
806
806
808
808
8
0
8
812
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
12"
C
M
P
IN
V
:
8
0
5
.
4
5
12"
C
M
P
IN
V
:
8
0
4
.
9
0
12"
C
M
P
IN
V
:
8
0
4
.
8
8
12"
C
M
P
IN
V
:
8
0
4
.
7
9
48"
C
C
P
IN
V
:
7
9
7
.
2
2
FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO
60"
C
C
P
IN
V
:
7
9
6
.
3
7
"V"
C
H
A
N
N
E
L
:
79
6
.
5
5
SA
N
M
H
1
SA
N
MH
2
SA
N
M
H
3
SA
N
M
H
4
SA
N
M
H
5
SA
N
MH
6
SA
N
MH
7
SA
N
MH
8
ST
M
M
H
5
ST
M
MH
6
ST
M
M
H
8
P
/
L
P/
L
P/LP/L
P/L
P/L
ST
ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
S
T
ST
S
A
N
ST
M
CB
1
ST
M
CB
2
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
5
ST
M
CB
1
6
>>
>>
>
STORM CB1
RIM:807.00
18" W INV:802.18
18" SE INV:801.00
STORM CB3
RIM:806.75
12" S INV:802.31
STORM MH1
RIM:808.06
30" S INV:800.41
30" W INV:801.93
12" N INV:801.93
30" NE INV:800.17
STORM CB 16
RIM:807.35
12" S INV:803.92
24" SW INV:802.58
30" E INV:802.39
STORM CB12
RIM:806.37
24" S INV:802.70
24" NE INV:802.70
STORM CB9
RIM:807.76
15" NE INV:804.05
15" SW INV:804.05
>
>
STORM CB4
RIM:807.00
24" S INV:801.19
12" E INV:802.12
30" N INV:800.69
811
810
80
9
811
812
812
81
2
81
2
810
8
0
9
811
808
80
8
808
8
0
8
805
80
5
805
804
80
4
806
806
806
807
808
8
0
6
806
8
0
6
8
0
7
810
8
0
9
809
8
1
1
>
>
>
>
STORM MH3
RIM:808.72
15" NE INV:803.74
24" SW INV:801.99
24" N INV:801.74
104 L.F. of 15" STORM @ 0.30%
44 L.F. of 24" STORM @ 0.27%
4 L.F. of 30" STORM @ 0.29%
112 L.F. of 12" STORM @ 0.33%
35 L.F. of 18" STORM @ 2.82%
86 L.F. of 30" STORM @ 0.33%
44 L.F. of 24" STORM @ 0.41%
96 L.F. of 24" STORM @ 0.40%
17 L.F. of 12" STORM @ 1.88%
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
EX SAN MH 2
EX. 15" N INV: 790.76
EX. 15" S INV: 790.71
PR. 8" E INV: 797.18
EX SAN MH 1
N INV: 791.27
S INV: 791.23
SE INV: 794.19
810
8078
0
7
808
80
9
811
812
813
>
>
>
>
>
>
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SANSANSANSAN
SA
N
SA
N
SA
N
SA
N
STORM CB6
RIM:808.02
12" S INV:803.34
12" W INV:803.40
12" E INV:803.34
37 L.F. of 12" STORM @ 0.30%
54 L.F. of 24" STORM @ 0.30%
STORM CB8
RIM:808.00
24" NW INV:802.35
STORM CB5
RIM:808.03
12" W INV:803.10
24" SW INV:802.25
24" SE INV:802.19
24" NE INV:802.17
STORM CB2
RIM:808.00
12" S INV:804.58
15" W INV:804.33
12" NE INV:804.00
18" E INV:804.00
STORM ROOF1
12" N INV:804.82
12 L.F. of 12" STORM @ 1.92%
112 L.F. of 18" STORM @ 0.57%
STORM ROOF3
12" N INV:804.23
STORM ROOF2
RIM:808.66
12" E INV:804.02
35 L.F. of 12" STORM @ 11.65%
SANSANSANSAN
STORM PLUG1
12" E INV:803.70
STORM CB10
RIM:807.76
18" E INV:802.83
12" W INV:803.33
24" SE INV:802.23
12" W INV:803.13
EX 24" NW INV:802.23
STORM CB11
RIM:807.00
12" E INV:803.60
12" NW INV:803.50
18" W INV:803.00
STORM EXMH5
RIM:807.50
EX 24" NE INV:802.80
EX 24" NW INV:802.62
RECONSTRUCT MANHOLE
AND ADJUST TO
FINAL GRADE
STORM EXMH6
RIM:807.00
EX 24" SW INV:803.33
RECONSTRUCT MANHOLE
AND ADJUST TO
FINAL GRADE
>
>
>
STORM FES6
6" E INV:806.00
STORM OCS1
RIM:806.87
36" SE INV:800.00
36" NW INV:800.00
STORM MH5
RIM:805.40
6" W INV:801.32
36" SE INV:799.32
48" N INV:797.82
53 L.F. of 36" STORM @ 0.00%
63 L.F. of 36" STORM @ 1.09%
67 L.F. of 6" STORM @ 6.99%
STORM MH4
RIM:803.22
24" NW INV:800.10
37 L.F. of 24" STORM @ 0.26%
STORM FES5
36" NW INV:800.00
808
80
9
80
9
809809 8
0
8
8
0
9809
807
80
8
80
9
806
807
808
80
8
80
8
80
9
809
808
80
7
808
809
80
7
808
80
8
80
0
79
4
80
5
80
6
80
1 79
6
8
0
8
8
0
6
80
6
8
0
7
80
7
8
0
8
80
8
808
80
9
809
80
9
8
0
8
80
9
22 L.F. of 12" STORM @ 1.65%
61 L.F. of 18" STORM @ 0.28%
36 L.F. of 12" STORM @ 0.31%
10
.
0
'
156 L.F. of 8" SAN @ 1.00% 8" PUBLIC SAN
8"
P
U
B
L
I
C
S
A
N
8" PUBLIC WATER
8"
P
U
B
L
I
C
W
A
T
E
R
6" WATER SERVICE
6" WATER SERVICE
6" WATER SERVICE
STORM PLUG
12" SE INV:803.60
21 L.F. of 12" STORM @ 0.48%
STORM CB7
RIM:808.05
12" SW INV:803.45
12" W INV:803.45
12" N INV:803.45
12
5
°
'
84°
'
>
>
STORM PLUG2
12" W INV:802.21
EX SAN MH 1
EX. 15" N INV: 791.25
EX. 15" S INV: 791.25
PR. 8" E INV: 797.71
W
W
W
W
W
W
30 L.F. of 12" STORM @ 0.30%
W W W W
W
W
W
W
STORM CB 14
RIM:807.50
12" NE INV:803.54
STORM CB 15
RIM:808.73
12" W INV:803.23
12" E INV:803.23
STORM FES4
24" SE INV:800.00
W
W
STORM CB12A
RIM:806.39
24" N INV:802.71
STORM CB2A
RIM:808.04
15" E INV:804.35
2 L.F. of 15" STORM @ 0.81%
STORM MH7
18" W INV:803.36
18" SE INV:803.36
53 L.F. of 12" STORM @ 0.30%
STORM CB13
RIM:806.66
12" SW INV:804.16
75 L.F. of 18" STORM @ 0.72%4 L.F. of 18" STORM @ 1.00%
STORM CB 1A
RIM:807.05
18" NW INV:802.82
18" E INV:802.22
STORM CB 3A
RIM:806.78
12" N INV:802.30
12" S INV:802.30
3 L.F. of 12" STORM @ 0.37%
1 L.F. of 24" STORM @ 0.78%
STORM CB 5A
RIM:808.06
24" NE INV:802.28
3 L.F. of 24" STORM @ 1.19%
42 L.F. of 12" STORM @ 0.31%
STORM CB 6A
RIM:808.07
12" E INV:803.43
3 L.F. of 12" STORM @ 1.19%
STORM CB 7A
RIM:808.09
12" E INV:803.47
2 L.F. of 12" STORM @ 0.81%
31 L.F. of 12" STORM @ 0.29%
STORM CB 9A
RIM:807.78
15" SW INV:804.08
2 L.F. of 15" STORM @ 1.97%
155 L.F. of 24" STORM @ 1.01%
STORM CB 10A
RIM:807.81
12" E INV:803.15
2 L.F. of 12" STORM @ 1.21%
STORM CB 11A
RIM:807.17
12" W INV:803.52
2 L.F. of 12" STORM @ -4.00%
STORM CB 4A
RIM:807.04
24" S INV:801.36
24" N INV:801.20
2 L.F. of 24" STORM @ 0.40%
W
W
W
W
>
>
>
>
STORM FES3
24" SE INV:800.00
31 L.F. of 24" STORM @ 2.12%
STORM MH2
RIM:806.36
24" SE INV:800.66
24" NW INV:800.66
8" PUBLIC WATER
52 L.F. of 30" STORM @ 0.33%
155 L.F. of 30" STORM @ 0.29%
4 L.F. of 30" STORM @ 0.29%
STORM CB 16A
RIM:807.39
30" W INV:802.38
30" E INV:802.38
W
W
STORM FES7
30" SW INV:800.00
STORM FES1
18" NW INV:800.00
STORM FES2
12" W INV:800.00
UT
I
L
I
T
Y
P
L
A
N
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 UTILITY.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
12-4-15
15577
JBL
JBL
GENERAL NOTES:
1.THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS
DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS
FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES.
THE LOCATION AND ACCURACY OF WHICH CANNOT BE
GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND
UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT
ARE NOT SHOWN.
2.VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY
POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR
TO PROCEEDING WITH CONSTRUCTION.
3.WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES
AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE
LINES.
4.ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN
REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT
FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON
CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS
FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL
FEATURES.
5.ALL UTILITIES WITHIN 5 FEET OF PAVED AREAS SHALL
REQUIRE GRANULAR BACKFILL.
6.PRIVATE STORM INLETS IN PAVEMENT SHALL REQUIRE DRAIN
TILE STUBS OF 10 FEET IN TWO DIRECTIONS FOR
SUBDRAINAGE. RIM GRADE FOR STORM INLETS IN CURB AND
GUTTER ARE FLOW LINE GRADES.
7.WORK IN PUBLIC RIGHT OF WAY SHALL FOLLOW MATERIAL
AND INSTALLATION REQUIREMENTS PER MUNICIPAL AND/OR
COUNTY.
8.PRIVATE STORM SEWER 12-INCH DIAMETER OR LARGER
SHALL BE HDPE. BELOW 12-INCH DIAMETER SHALL BE PVC
SDR-35 ASTM D3034. PRIVATE WATER MAIN SHALL BE CLASS
150 DR 18 PVC CONFORMING TO AWWA C-900. PRIVATE
SANITARY SEWER SHALL BE PVC SDR-35 ASTM D3034.
9.COORDINATE FINAL LOCATION AND DESIGN OF PRIVATE
UTILITY SERVICES (ELECTRIC, GAS, PHONE, CABLE) WITH
UTILITY COMPANIES.
10.FOR PUBLIC SANITARY SEWER PLAN AND PROFILE DESIGN
REFER TO SHEET C301 AND C302.
11.FOR PUBLIC WATER PLAN AND PROFILE DESIGN REFER TO
SHEET C303 - C305
12.PUBLIC SEWER AND WATER SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE CITY OF MUSKEGO STANDARD
SPECIFICATIONS.
W
SAN
>
E
T
G
PROPOSED WATER MAIN
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED ELECTRICAL SERVICE
PROPOSED TELEPHONE SERVICE
PROPOSED GAS SERVICE
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
6
-
U
t
i
l
i
t
y
P
l
a
n
\
1
5
5
7
7
U
T
I
L
I
T
Y
.
d
w
g
LEGEND:
C 300
GRAPHIC SCALE
00 50'100'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
ST EXISTING STORM SEWER
EX MH 10
48" NW INV: 799.05
24" SE INV: 799.21
EX MH 2
15" NE INV: 803.57
15" SW INV: 803.54
8" CLAY S INV: 803.37
EX MH 7
18" NW INV: 804.63
EXISTING STORM
TO BE REUSED
EXISTING
HYDRANT
EXISTING
HYDRANT
PROPOSED STORM INLET
PROPOSED STORM MANHOLE
PROPOSED SANITARY MANHOLE
C
C402
A
C402
B
C402
PROPOSED WATER VALVE (BUTTERFLY)
PROPOSED WATER HYDRANT
EXISTING STORM
TO BE REUSED
UTILITY CROSSING
8" SAN INV:799.37
18" STM. INV: 802.19
UTILITY CROSSING
8" SAN INV: 797.28
12" STM. INV: 803.46
UTILITY CROSSING
8" SAN INV: 796.54
12" WATER INV: 800.65
MUNICIPAL
UTILITY
EASEMENT
30'
WATER
UTILITY
EASEMENT 30'
WATER
UTILITY
EASEMENT
30'
WATER
UTILITY
EASEMENT
30'
WATER
UTILITY
EASEMENT
D
C402
REPLACE
EXISTING
PATH AS
NECESSARY
JANESVILLE RD
LA
N
N
O
N
D
R
.
COORDINATE WORK
WITHIN THE RIGHT
OF WAY WITH THE
PUBLIC ROAD
IMPROVEMENTS .
COORDINATE WORK
WITHIN THE RIGHT
OF WAY WITH THE
PUBLIC ROAD
IMPROVEMENTS .
COORDINATE WORK
WITHIN THE R.O.W
WITH THE PUBLIC
ROAD IMPROVEMENTS.
UTILITY CROSSING
8" WATER INV: 797.63
24" STM. INV: 800.02
REPLACE MANHOLE
COVER WITH
TEMPORARY GRATE.
REFER TO STORM
STRUCTURE TABLE
ON SHEET C402.
REPLACE MANHOLE
COVER WITH
TEMPORARY GRATE.
REFER TO STORM
STRUCTURE TABLE
ON SHEET C402.
FUTURE WATER SERVICE. TO BE
DESIGNED AND CONSTRUCTED
WHEN THE PROPOSED FUTURE
COMMERCIAL BUILDING IS
DEVELOPED.
FUTURE WATER SERVICE. TO BE
DESIGNED AND CONSTRUCTED
WHEN THE PROPOSED FUTURE
COMMERCIAL BUILDING IS
DEVELOPED.
FUTURE SANITARY SERVICE. TO BE
DESIGNED AND CONSTRUCTED
WHEN THE PROPOSED FUTURE
GROCERY BUILDING IS DEVELOPED.
STORM WATER
BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
DRY STORM
WATER BASIN
100 YR=806.45
2 YR=806.14
BOTTOM = 806
1.CITY RESUBMITTAL 3/23/16 TPM
UTILITY CROSSING
8" SAN INV: 798.07
6" WATER INV: 802.40
UTILITY CROSSING
8" SAN INV: 797.91
12" WATER INV: 802.34
UTILITY CROSSING
6" SAN INV: 803.08
12" WATER INV: 800.50
UTILITY CROSSING
12" STORM INV: 804.01
12" WATER INV: 800.72
UTILITY CROSSING
8" WATER INV: 800.72
12" STORM INV: 804.01
UTILITY CROSSING
8" SANITARY INV: 798.45
12" STORM INV: 804.05
UTILITY CROSSING
8" SANITARY INV: 798.82
6" STORM INV: 801.75
UTILITY CROSSING
6" WATER INV: 801.37
18" STORM INV: 803.47
UTILITY CROSSING
8" WATER INV: 801.13
18" STORM INV: 803.38
UTILITY CROSSING
6" SAN INV: 800.13
18" STORM INV: 802.51
UTILITY CROSSING
8" WAT INV: 799.28
30" STM INV: 801.88
UTILITY CROSSING
8" WAT INV: 797.69
30" STM INV: 800.37 UTILITY CROSSING
8" WAT INV: 797.69
24" STM INV: 800.68
UTILITY CROSSING
6" WAT INV: 799.22
24" STM INV: 801.22
UTILITY CROSSING
6" WAT INV: 801.21
15" STM INV: 803.76
UTILITY CROSSING
6" WAT INV: 800.86
12" STM INV: 803.36
UTILITY CROSSING
6" SAN INV: 803.33
6" WATER INV: 800.84
UTILITY CROSSING
24" STM INV: 802.61
12" WATER INV: 799.80
2.CITY RESUBMITTAL 5/27/16 TPM
808
809
P/L
P/L
P/L
P/L
P
/
L
P/LP/L
P/
L
P/
L
P/
L
P/
L
P/
L
E
E
EON
L
Y
P
/
L
P/L
P/L
P
/
L
P/L
P/L
P/L
P
/
L
POSSIBLE FUTURE
ACCESS DRIVE
20+00 21+00
22+0
0
23+0
0
24+0
0
24+7
3
T
T
T
T
T
T
T
T
T
T
" Pipe " Pipe
W
E
E
E
E
E
E
W
W
W
W
W
W
W
SAN
SAN
SAN
SAN
G
G
G
G
G
G
G
G
G
G
P
E
E
E
T T
T
T T T
T
T
T
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
ST
ST
G
ST
ST
S
T
S
T
S
T
81
0
810810
80
6
806
8
0
6
808
812
101616 GPS809.4610055 GPS808.06
3627
TPED
809.46
T
T
TT
T T
T
T
T
T
T
T
T
T
T
12" CMP
INV: 804.79
FO
FO
SAN
MH 2
SAN
MH 4
MH 1
STM
MH 3
STM
MH 4
STM
MH 5
STM
MH 6
P/L
P/
L
ST
ST
ST
ST
ST
ST
ST
STM
CB 7STM
CB 10
STM
STM
CB 8
SAN
SAN
SAN
SAN
SANSAN
SA
N
W
W
W
W
W
W
W
W
W
W
W
W
>
>
>
>
>
>
>
>
>
>
EX .SAN MH 2
STA:20+00.00 OFF:0.00
RIM:808.47
EX. 15" N INV: 790.76±
EX. 15" S INV: 790.71±
8" E INV:796.00
SAN WYE
STA:21+06.81 OFF:0.00
RIM:808.58
8" E INV:797.07
8" W INV:797.07
6" N INV:802.66
SAN SERVICE
STA:21+06.81 OFF:-64.21L
RIM:809.47
6" S INV:804.00
64.2 L.F. of 6" PRIVATE SAN @ -2.08%
15.5 L.F. of 6" PRIVATE SAN @ -2.08%
SAN LATERAL
CAP LATERAL 5' BEYOND R/W
STA:22+91.00 OFF:15.47R
RIM:809.72
6" NW INV:803.49
SAN WYE
STA:22+91.05 OFF:0.00
RIM:809.31
8" NE INV:799.01
6" SE INV:803.17
8" SW INV:799.01
SAN LATERAL
CAP SAN. LATERAL 5' BEYOND R/W
STA:24+43.64 OFF:-27.90L
RIM:809.40
6" SE INV:801.11
16.2 L.F. of 6" PRVATE SAN @ -2.08%
SAN LATERAL
CAP SAN. LATERAL 5' BEYOND R/W
STA:24+68.28 OFF:16.20R
RIM:809.49
6" NW INV:803.51
27.95' of 8" PVC @ 1.00%
106.81' of 8" PVC @ 1.00%
156.29' of 8" PVC @ 1.00%
5.00' of 8" PVC @ 1.00%
SAN
SAN
SAN
SAN
27.9 L.F. of 6" PRIVATE SAN @ 2.08%
>
810
808
808
80
9
809
80
9
809
809
81
1
810
809
809
810
809
809
811
808
809
809
809
809
808 80
8
809
80
9
EX. 15" N INV:790.76EX. 15" S INV: 790.71
SAN MH 4
STA:21+34.77 OFF:0.00
RIM:808.55
8" NE INV:797.45
8" W INV:797.35
>
SAN WYE
STA:24+68.34 OFF:0.00
RIM:809.02
8" NE INV:800.78
8" SW INV:800.78
6" SE INV:803.17
152.5
2
'
o
f
8
"
P
V
C
@
1
.
0
0
%
24.76' of 8" PVC @ 1.01%
>
>
>
>
>SAN MH 5
STA:24+73.34 OFF:0.00
RIM:808.94
8" SW INV:800.83
W
W W
W
780
785
790
795
800
805
810
815
780
785
790
795
800
805
810
815
20+00 21+00 22+00 23+00 24+00 25+00 26+00
EX
.
S
A
N
M
H
2
ST
A
:
2
0
+
0
0
.
0
0
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
4
7
EX
.
1
5
"
N
I
N
V
:
7
9
0
.
7
6
±
EX
.
1
5
"
S
I
N
V
:
7
9
0
.
7
1
±
8"
E
I
N
V
:
7
9
6
.
0
0
SA
N
W
Y
E
ST
A
:
2
1
+
0
6
.
8
1
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
5
8
8"
E
I
N
V
:
7
9
7
.
0
7
8"
W
I
N
V
:
7
9
7
.
0
7
6"
N
I
N
V
:
8
0
2
.
6
6
SA
N
M
H
4
ST
A
:
2
1
+
3
4
.
7
7
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
5
5
8"
N
E
I
N
V
:
7
9
7
.
4
5
8"
W
I
N
V
:
7
9
7
.
3
5
SA
N
W
Y
E
ST
A
:
2
2
+
9
1
.
0
5
O
F
F
:
0
.
0
0
RI
M
:
8
0
9
.
3
1
8"
N
E
I
N
V
:
7
9
9
.
0
1
6"
S
E
I
N
V
:
8
0
3
.
1
7
8"
S
W
I
N
V
:
7
9
9
.
0
1
SA
N
M
H
5
ST
A
:
2
4
+
7
3
.
3
4
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
9
4
8"
S
W
I
N
V
:
8
0
0
.
8
3
134.77' of 8" PVC .
@
1
.
0
0
%
18" STORM
INV:802.19
12" WATER
INV:800.65
SA
N
W
Y
E
ST
A
:
2
4
+
4
3
.
5
8
O
F
F
:
0
.
0
0
RI
M
:
8
0
9
.
2
5
8"
N
E
I
N
V
:
8
0
0
.
5
3
6"
N
W
I
N
V
:
8
0
0
.
5
3
8"
S
W
I
N
V
:
8
0
0
.
5
3
SA
N
W
Y
E
ST
A
:
2
4
+
6
8
.
3
4
O
F
F
:
0
.
0
0
RI
M
:
8
0
9
.
0
2
8"
N
E
I
N
V
:
8
0
0
.
7
8
8"
S
W
I
N
V
:
8
0
0
.
7
8
6"
S
E
I
N
V
:
8
0
3
.
1
7
338.57' of 8" PVC .
@
1
.
0
0
%
473.3' CRUSHED STONE BACKFILL
1.7'
3.4'
4.9'
12" STORM
INV:803.46
5.6'5.4'5.2'
PU
B
L
I
C
S
A
N
I
T
A
R
Y
S
E
W
E
R
P
L
A
N
&
P
R
O
F
I
L
E
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Public SAN P&P.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
2-9-16
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
6
-
U
t
i
l
i
t
y
P
l
a
n
\
P
u
b
l
i
c
S
A
N
P
&
P
\
1
5
5
7
7
P
u
b
l
i
c
S
A
N
P
&
P
.
d
w
g
C 301
GRAPHIC SCALE
00 40'80'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PROPOSED SURFACE
ABOVE SANITARY SEWER
EXISTING SURFACE
ABOVE SANITARY SEWER
PROPOSED 8" PVC,
ASTM D-3034, SDR 35,
SANITARY SEWER
IN
:
E
A
S
E
M
E
N
T
FR
O
M
:
4
6
9
.
5
F
T
E
A
S
T
O
F
L
A
N
N
O
N
D
R
.
TO
:
L
A
N
N
O
N
D
R
.
LA
N
N
O
N
D
R
.
JANE
S
V
I
L
L
E
R
D
.
PROPOSED BUILDING
21,600 SF
FFE 809.00
PROPOSED
FUTURE
PROPERTY
LINE
30'
UTILITY
EASEMENT
PROPOSED
FUTURE
PROPERTY
LINE
30'
UTILITY
EASEMENT
SCALE:
HORIZONTAL 1" = 4'
VERTICAL 1" = 40'
SAN PRIVATE SANITARY LATERAL
LEGEND:
SAN PUBLIC SANITARY SEWER
(TOP OF RISER)
(BOTTOM OF RISER) 6" N INV: 797.07
6" SE INV: 799.01 (BOTTOM OF RISER)
(TOP OF RISER)
6" SE INV: 800.78 (BOTTOM OF RISER)
(TOP OF RISER)
6"
N
I
N
V
:
7
9
7
.
0
7
(
B
O
T
T
O
M
O
F
R
I
S
E
R
)
(T
O
P
O
F
R
I
S
E
R
)
6"
S
E
I
N
V
:
7
9
9
.
0
1
(
B
O
T
T
O
M
O
F
R
I
S
E
R
)
(T
O
P
O
F
R
I
S
E
R
)
6"
S
E
I
N
V
:
8
0
0
.
7
8
(
B
O
T
T
O
M
O
F
R
I
S
E
R
)
(T
O
P
O
F
R
I
S
E
R
)
PROPOSED 8" PVC,
ASTM D-3034, SDR 35,
SANITARY SEWER
SANITARY RISER SANITARY RISER
SANITARY RISER
NOTE:
1.ALL PUBLIC SEWER WORK AND WORK IN THE RIGHT OF WAY
SHALL BE IN ACCORDANCE WITH THE CITY OF MUSKEGO
STANDARD SPECIFICATIONS.
1.CITY RESUBMITTAL 3/23/16 TPM
M
C401EXTERNAL DROP SAN. MH
EXISTING GAS SHOWN IS
APPROXIMATE.
CONTRACTOR TO VERIFY
ELEVATION AND SIZE.
EXISTING ABANDONED
TELEPHONE LINE.
LOCATION IS APPROXIMATE.
2.CITY RESUBMITTAL 5/27/16 TPM
P/L P/L
P/
L
P/
L
P
/
L
P
/
L
P
/
L
P/L
P/
L
P/
L
P/
L
P/
L
33
FUTURE POOL
2
3
9
P/L
P/L
10+00 11+00 12+00 12+78
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
S
T
S
T
S
T
S
T
X
X
X
XX
806
806
3042IP806.90
3
6
1
1
T
P
E
D
8
0
6
.
6
0
3643IP807.95
T
T
T
T
T
T
12" CMP
INV: 805.45
SAN
MH 1
SAN
MH 9
STM
MH 8STM
MH 9
STM
MH 10
P/
L
SAN
SAN SAN SAN SAN SAN SAN SAN
SA
N
W
W
W
W
W
W
W
W
>
>
>
>
>>>
>
SAN MH 2
STA:12+77.93 OFF:0.00
RIM:808.69
8" W INV:799.16
SAN MH 1
STA:10+00.00 OFF:0.00
RIM:810.48
EX. 15" N INV: 791.61±
EX. 15" S INV: 791.61±
8" E INV:797.71
SAN WYE
STA:11+15.04 OFF:0.000
8" W INV:798.31
6" S INV:802.89
8" E INV:798.31
SAN SERVICE
STA:12+69.93 OFF:-16.68L
RIM:809.08
6" S INV:803.00
16.7 L.F. of 6" PRIVATE SAN @ 2.08%
56.6 L.F. of 6" PRIVATE SAN @ -2.96%
SAN SERVICE
STA:12+72.89 OFF:56.631
6" N INV:800.81SAN SERVICE
STA:11+14.68 OFF:30.03R
RIM:809.00
6" N INV:803.51
30.0 L.F. of 6" PRIVATE SAN @ -2.08%
>
>
794
804
79
7
79
8
79
9
80
0
80
5
80
7
80
8
809
8
0
9
809809
809
8
0
9
8
0
9
80
9
>
>
>
SAN WYE
STA:12+69.93 OFF:0.000
8" W INV:799.12
6" N INV:802.65
8" E INV:799.12
SAN WYE
STA:12+72.93 OFF:0.000
8" W INV:799.13
8" E INV:799.13
6" S INV:799.13
W
W
W
W
W
W
W
>
W
W
W
W W
W
5.0 L.F. of 8" SAN @ -0.52%
W
W
W
277.93' of 8" PVC @ -0.52%
780
785
790
795
800
805
810
815
780
785
790
795
800
805
810
815
10+00 11+00 12+00 13+00 14+00
SA
N
M
H
1
ST
A
:
1
0
+
0
0
.
0
0
O
F
F
:
0
.
0
0
RI
M
:
8
1
0
.
4
8
EX
.
1
5
"
N
I
N
V
:
7
9
1
.
6
1
±
EX
.
1
5
"
S
I
N
V
:
7
9
1
.
6
1
±
8"
E
I
N
V
:
7
9
7
.
7
1
SA
N
W
Y
E
ST
A
:
1
1
+
1
5
.
0
4
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
5
7
8"
W
I
N
V
:
7
9
8
.
3
1
6"
S
I
N
V
:
8
0
2
.
8
9
8"
E
I
N
V
:
7
9
8
.
3
1
SA
N
M
H
2
ST
A
:
1
2
+
7
7
.
9
3
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
6
9
8"
W
I
N
V
:
7
9
9
.
1
6
12" WATER
INV:802.34
SA
N
W
Y
E
ST
A
:
1
2
+
6
9
.
9
3
O
F
F
:
0
.
0
0
L
RI
M
:
8
0
8
.
6
9
8"
W
I
N
V
:
7
9
9
.
1
2
6"
N
I
N
V
:
8
0
2
.
6
5
8"
E
I
N
V
:
7
9
9
.
1
2
SA
N
W
Y
E
ST
A
:
1
2
+
7
2
.
9
3
O
F
F
:
0
.
0
0
RI
M
:
8
0
8
.
6
9
8"
W
I
N
V
:
7
9
9
.
1
3
8"
E
I
N
V
:
7
9
9
.
1
3
6"
S
I
N
V
:
7
9
9
.
1
3
277.9' CRUSHED STONE BACKFILL
3.9'2.5'
12" STORM
INV:804.055.1'6.0'
6" WATER
INV:802.40
6" WATER
INV:801.75
277.93' of 8" PVC @ -0.52%
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Public SAN P&P.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
2-9-16
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
6
-
U
t
i
l
i
t
y
P
l
a
n
\
P
u
b
l
i
c
S
A
N
P
&
P
\
1
5
5
7
7
P
u
b
l
i
c
S
A
N
P
&
P
.
d
w
g
C 302
GRAPHIC SCALE
00 40'80'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PROPOSED SURFACE
ABOVE SANITARY SEWER
EXISTING SURFACE
ABOVE SANITARY SEWERPROPOSED 8" PVC,
ASTM D-3034, SDR 35,
SANITARY SEWER
PU
B
L
I
C
S
A
N
I
T
A
R
Y
S
E
W
E
R
P
L
A
N
&
P
R
O
F
I
L
E
IN
:
E
A
S
E
M
E
N
T
FR
O
M
:
2
7
7
.
9
F
T
E
A
S
T
O
F
L
A
N
N
O
N
D
R
.
TO
:
L
A
N
N
O
N
D
R
.
LA
N
N
O
N
D
R
.
PROPOSED BUILDING
21,600 SF
FFE 809
PROPOSED BUILDING
21,600 SF
FFE 809
SCALE:
HORIZONTAL 1" = 4'
VERTICAL 1" = 40'
PROPOSED
FUTURE
PROPERTY
LINE
30'
UTILITY
EASEMENT
30'
UTILITY
EASEMENT
MUNICIPAL
UTILITY
EASEMENT
SAN PRIVATE SANITARY LATERAL
LEGEND:
SAN PUBLIC SANITARY SEWER
6" N INV: 799.12 (BOTTOM OF RISER)
(TOP OF RISER)
(BOTTOM OF RISER) 6" S INV: 798.91
(TOP OF RISER)
8"
N
I
N
V
:
7
9
9
.
1
2
(
B
O
T
T
O
M
O
F
R
I
S
E
R
)
(T
O
P
O
F
R
I
S
E
R
)
8"
S
I
N
V
:
7
9
8
.
3
1
(
B
O
T
T
O
M
O
F
R
I
S
E
R
)
(T
O
P
O
F
R
I
S
E
R
)
PROPOSED 8" PVC,
ASTM D-3034, SDR 35,
SANITARY SEWER
STORM
WATER BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
SANITARY RISER SANITARY RISER
NOTE:
1.ALL PUBLIC SEWER WORK AND WORK IN THE RIGHT OF WAY
SHALL BE IN ACCORDANCE WITH THE CITY OF MUSKEGO
STANDARD SPECIFICATIONS.
1.CITY RESUBMITTAL 3/23/16 TPM
M
C401EXTERNAL DROP SAN. MH
EXISTING GAS SHOWN IS
APPROXIMATE.
CONTRACTOR TO VERIFY
ELEVATION AND SIZE.
EXISTING ABANDONED
TELEPHONE LINE.
LOCATION IS APPROXIMATE.
30'
UTILITY
EASEMENT
2.CITY RESUBMITTAL 5/27/16 TPM
TTTTTTTTTTTTTTTTTT
T
TTTTTTTT
"
P
i
p
e
"
P
i
p
e
W
E
E
E
E
E
E
E
E
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
G
G
G
G
G
G
G G G G G G G G G G G G G G G G G G G G G G G
W
PE
E
E
E
E
T
T
T
T
T
T
T
T
T
T
G
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
S
T
S
T
G
X
XXXX
X
E
E
EE
E
E
ST
ST
806
8
0
6
8
0
8
808
171
G
P
S
80
7
.
9
1
10
0
0
1
C
H
E
C
K
80
7
.
9
1
10
1
5
15
G
P
S
81
1
.
4
4
10
1
6
16
G
P
S
80
9
.
4
6
10
0
5
5
G
P
S
80
8
.
0
6
30
4
2
IP80
6
.
9
0
36
2
7
TP
E
D
80
9
.
4
6
36
4
3
IP80
7
.
9
5
T
T
T
T
T
T
TTTTTTTTTTTTTT
T
12
"
C
M
P
IN
V
:
8
0
5
.
4
5
12
"
C
M
P
IN
V
:
8
0
4
.
9
0
12
"
C
M
P
IN
V
:
8
0
4
.
8
8
12
"
C
M
P
IN
V
:
8
0
4
.
7
9
F
O
F
O
SA
N
MH
1
SA
N
MH
2
SA
N
MH
3
SA
N
MH
9
ST
M
MH
1
ST
M
MH
2
ST
M
MH
3
ST
M
MH
9
18
.
1
2
'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
1
2
.
N
O
A
C
C
E
S
S
P
E
R
D
O
C
.
#
8
4
0
8
5
7
P/
L
P/L
P/L
17
.
A
P
P
X
.
L
O
C
A
T
I
O
N
OF
U
T
I
L
I
T
Y
E
A
S
E
.
DO
C
.
#
8
5
1
7
9
7
1
4
.
A
P
P
X
.
L
O
C
A
T
I
O
N
O
F
C
/
L
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
6
9
5
9
6
0
ST
ST
S
T
S
T
S
T
S
T
S
T
S
T
STSTST
ST
SA
N
ST
M
CB
3
ST
M
CB
4
ST
M
CB
6
ST
M
CB
5
ST
M
CB
7
ST
M
CB
1
0
ST
M
CB
9
ST
M
CB
8
ST
M
CB
1
1
ST
M
CB
1
3
ST
M
CB
1
2
ST
M
CB
1
4
ST
M
CB
1
5
P/
L
P/
L
P/L P/L P/L
P/L
P/L
P
/
L
P/L
P/L
P/L
P/
L
P/
L
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
FU
T
U
R
E
PO
O
L
PO
S
S
I
B
L
E
F
U
T
U
R
E
AC
C
E
S
S
D
R
I
V
E
>
>
>>>>>
>
>
>>
>
>
>
>
W W W W W W W W W W W W W W W W W W W W W W W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
S
A
N
S
A
N
S
A
N
S
A
N
SA
N
SA
N
SAN
0+00
1+
0
0
2+
0
0
3+004+00
5
+
0
0
37+42
30+00 31+00 32+00 33+00 34+00
35+00
36+00 37+00
CONNECT TO
EXISTING 12" WM
STA:30+00.00
12" X 6" ANCHOR TEE
HYDRANT ASSEMBLY
7.5' OF 6" PVC HYD. LEAD
(RESTRAIN JOINTS AS REQUIRED)
2.5' OFFSET
6" BUTTERFLY VALVE, V2
WITH VALVE BOX
HYDRANT FULLY RESTRAINED, HYD 1
HYD. NOZZLE ELEV. 809.93±
STA:34+06.21
6" INV:802.00
12" X 12" TEE
12" X 8" REDUCER (EAST)
STA:0+45.80
6" WATER SERVICE
STA:36+19.01
6" WATER SERVICE
STA:33+91.74
12" X 6" TEE
STA:33+91.74
12" X 6" TEE
STA:36+18.99
14.9 L.F. of 6" W.M. @ 0.00%
6" BUTTERFLY VALVE, V1
WITH VALVE BOX
STA:33+91.74
15.39' of 6" @ 0.00%
6" BUTTERFLY VALVE, V3
WITH VALVE BOX
STA:36+18.96
STATION EQUATION
STATION=37+42.43 = 0+45.80
STATION EQUATION
STATION=32+90.04 = 40+00.00
12" BUTTERFLY VALVE, V4
STA:37+39.44
120.4 L.F. of 12" W.M. @ -1.74%
212.8 L.F. of 12" W.M. @ 0.12%
14.5 L.F. of 12" W.M. @ 0.12%
101.7 L.F. of 12" W.M. @ 0.58%
290.0 L.F. of 12" W.M. @ 0.36%
8" - 90° BEND
HYDRANT ASSEMBLY
(RESTRAIN JOINTS AS REQUIRED)
6" BUTTERFLY VALVE
WITH VALVE BOX
HYDRANT FULLY RESTRAINED
HYD. NOZZLE ELEV. 810.94±
STA:33+50.19
6" INV:801.44
S
A
N
>
81
0
80
8
80880
8
808
80
9
8
0
9
8
0
9
81
1
8
0
9
8
1
0
810810810
807 807808 808 809
8
0
9
809
809
80980
9
80
9
80
9
8
0
9
80
9
809
>
>
>
>
W
WWWWW
W
W
W
90° BEND
STA:33+35.40
6" INV:801.07
6" NW INV:801.07
16.5 L.F. of 6" W.M. @ -2.23%
35.0 L.F. of 6" W.M. @ 2.37%
22.5° BEND
(TOTAL DEFL 27°)
STA:32+90.22
6" INV:800.62
6" NE INV:800.62
86.6 L.F. of 6" W.M. @ 0.36%
3.0 L.F. of 6" W.M. @ 2.55%
12" X 6" ANCHORED HYD TEE
STA:32+90.04
12" INV:800.61
12" N INV:800.61
6" E INV:801.90
12" BUTTERFLY VALVE, V19
WITH VALVE BOX
STA:32+90.04
6" INV:801.82
6" E INV:801.82
W
W
W
W
W
>
>
>
>
>
3.0 L.F. of 12" W.M. @ 0.06%
VERT. GRADE
BREAK
STA:41+59.15
6" INV:799.79
6" NE INV:799.79
VERT GRADE
BREAK
STA:41+69.18
6" INV:799.81
6" NE INV:799.81
10.0 L.F. of 6" W.M. @ -0.20%
55.4 L.F. of 6" W.M. @ -2.28%
785
790
795
800
805
810
815
820
785
790
795
800
805
810
815
820
30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00
12
"
X
1
2
"
T
E
E
12
"
X
8
"
R
E
D
U
C
E
R
(
E
A
S
T
)
ST
A
:
0
+
4
5
.
8
0
12
"
I
N
V
:
8
0
1
.
8
3
12
"
I
N
V
:
8
0
2
.
3
1
12
"
B
U
T
T
E
R
F
L
Y
V
A
L
V
E
,
V
4
ST
A
:
3
7
+
3
9
.
4
4
12
"
I
N
V
:
8
0
1
.
8
4
12
"
N
I
N
V
:
8
0
1
.
8
4
12
"
X
6
"
T
E
E
ST
A
:
3
6
+
1
8
.
9
9
12
"
I
N
V
:
7
9
9
.
7
4
12
"
N
I
N
V
:
7
9
9
.
7
4
6"
E
I
N
V
:
8
0
0
.
5
6
12
"
X
6
"
A
N
C
H
O
R
E
D
H
Y
D
.
T
E
E
ST
A
:
3
4
+
0
6
.
2
3
12
"
I
N
V
:
8
0
0
.
0
0
12
"
N
I
N
V
:
8
0
0
.
0
0
6"
W
I
N
V
:
7
9
9
.
5
0
12
"
X
6
"
T
E
E
ST
A
:
3
3
+
9
1
.
7
4
12
"
I
N
V
:
8
0
0
.
0
2
12
"
N
I
N
V
:
8
0
0
.
0
2
6"
E
I
N
V
:
8
0
1
.
2
7
12
"
X
6
"
A
N
C
H
O
R
E
D
H
Y
D
T
E
E
ST
A
:
3
2
+
9
0
.
0
4
12
"
I
N
V
:
8
0
0
.
6
1
12
"
N
I
N
V
:
8
0
0
.
6
1
6"
E
I
N
V
:
8
0
1
.
9
0
290.0 L.F. 12" PVC @ 0.36%
101.7 L.F. 12" PVC @ 0.58%
14.5 L.F. 12" PVC @ 0.12%
212.8 L.F. 12" PVC @ 0.12%
120.4 L.F. 12" PVC @ -1.74%
3.0 L.F. 12" PVC @ 0.06%
8" SAN
INV:796.54
24" STORM
INV:802.61
CO
N
N
E
C
T
T
O
EX
I
S
T
I
N
G
1
2
"
W
M
ST
A
:
3
0
+
0
0
.
0
0
12
"
I
N
V
:
8
0
1
.
6
5
±
742.4' CRUSHED STONE BACKFILL
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Public WM P&P.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
2-9-16
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
6
-
U
t
i
l
i
t
y
P
l
a
n
\
P
u
b
l
i
c
W
M
P
&
P
\
1
5
5
7
7
P
u
b
l
i
c
W
M
P
&
P
.
d
w
g
C 303
GRAPHIC SCALE
00 40'80'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
SEE SHEET C304
PROPOSED BUILDING
21,600 SF
FFE 809
PROPOSED BUILDING
21,600 SF
FFE 809
PROPOSED BUILDING
21,600 SF
FFE 809
PU
B
L
I
C
W
A
T
E
R
M
A
I
N
P
L
A
N
&
P
R
O
F
I
L
E
IN
:
L
A
N
N
O
N
R
O
A
D
R
.
O
.
W
.
FR
O
M
:
J
A
N
E
S
V
I
L
L
E
R
O
A
D
TO
:
3
8
0
F
E
E
T
E
A
S
T
O
F
J
A
N
E
S
V
I
L
L
E
R
O
A
D
LANNON DRIVE
J
A
N
E
S
V
I
L
L
E
R
O
A
D
PROPOSED SURFACE
ABOVE WATER MAIN
EXISTING SURFACE
ABOVE WATER MAIN
PUBLIC 12" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
PROPOSED SURFACE
ABOVE WATER MAIN
EXISTING SURFACE
ABOVE WATER MAIN
SCALE:
HORIZONTAL 1" = 4'
VERTICAL 1" = 40'
30'
UTILITY
EASEMENT
MUNICIPAL
EASEMENT
PUBLIC 12" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
PUBLIC 12" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
PUBLIC 12" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
DRY STORM
WATER BASIN
100 YR=806.45
2 YR=806.14
BOTTOM = 806
1.CITY RESUBMITTAL 3/23/16 TPM
NOTES:
1.ALL PUBLIC WATER MAIN WORK AND ALL WORK IN THE
PUBLIC RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE
CITY OF MUSKEGO STANDARD SPECIFICATIONS.
2.INSULATION SHALL BE INSTALLED ON LARGE DIAMETER (12"
OR LARGER) STORM SEWER CROSSINGS WHEN WITHIN 18"
OF EACH OTHER.
UTILITY CROSSING
8" SAN INV: 803.33
6" WATER INV: 800.88
UTILITY CROSSING
12" STM INV: 804.55
6" WATER INV: 800.86
UTILITY CROSSING
24" STM INV: 803.41
6" WATER INV: 800.92
EXISTING GAS SHOWN IS
APPROXIMATE.
CONTRACTOR TO VERIFY
ELEVATION AND SIZE.
EXISTING ABANDONED
TELEPHONE LINE.
LOCATION IS APPROXIMATE.
EXISTING 8" SAN SEWER
TO BE ABANDONED / REMOVED
EXISTING 12" STORM SEWER
TO BE ABANDONED / REMOVED
EXISTING TELEPHONE SHOWN IS
APPROXIMATE.
CONTRACTOR TO VERIFY
ELEVATION AND SIZE.
30' UTILITY
EASEMENT
2.CITY RESUBMITTAL 5/27/16 TPM
STATION EQUATION
STATION=??? = 0+29.91
T
T
T
T
T
T
T
T
T
T
" Pipe
P P " Pipe
" Pipe
T
T
T
T
W
W
W
TE
E
E
E
E
E
W
W
W
W
W
W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
E
T
T
T
G
G
G
G
G
G
G
G
G
G
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
S
T
S
T
S
T
S
T
S
T
S
T
X
X
X
X
XX CTV
806
806
808
101212 GPS806.28
101313 GPS807.00
3522IP798.31
3523IP798.28
3042IP806.90
3
6
1
1
T
P
E
D
8
0
6
.
6
0
3643IP807.95
T
T
T
T
T
T
T
12" CMP
INV: 805.45
12" CMP
INV: 804.90
12" CMP
INV: 804.88
12" CMP
SAN
MH 1 SAN
MH 7
SAN
MH 8
SAN
MH 9
STM
MH 1
STM
MH 2
STM
MH 8STM
MH 9
STM
MH 10
18. 12'
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
8
5
1
0
5
P/L
P/
L
17. APPX. LOCATION
OF UTILITY EASE.
DOC. #851797
14. A
P
P
X
.
L
O
C
A
T
I
O
N
O
F
C
/
L
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
6
9
5
9
6
0
16. A
P
P
X
.
L
O
C
A
T
I
O
N
O
F
C
/
L
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
1
0
3
6
9
ST
SAN
P/L P/L
P/
L
P/
L
P/
L
P/L
P/L
P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/L
P/L
P/L
P/L
P
/
L
P
/
L
P
/
L
P/
L
P/
L
P/
L
P/
L
P/
L
33
11
FUTURE POOL
14
2
8
3
9
>
>
>
>
>
>
>>>
>
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SAN SAN SAN SAN SAN SAN SAN
SA
N
10+3
0
0+00
1+00 2+00
3+
0
0
4+
0
0
5+00
6+00
7
+
0
0
8+00
9+00
10+0
0
37
+
4
2
35+00
36
+
0
0
37
+
0
0
CONNEC TO
EXISTING 12" WM
STA:0+00.00
12" HORZ. BEND (45°)
STA:0+28.09
28.1 L.F. of 12" W.M. @ 0.37%
10.0 L.F. of 12" W.M. @ 0.50%
12" X 12" TEE
12" X 8" REDUCER (EAST)
STA:0+45.80
12" X 8" REDUCER
8" BUTTERFLY VALVE, V6
WITH VALVE BOX
STA:0+47.86
8" X 6" ANCHOR TEE
HYDRANT ASSEMBLY
21.7'' OF 6" PVC HYD. LEAD
(RESTRAIN JOINTS AS REQUIRED)
6" BUTTERFLY VALVE, V7
WITH VALVE BOX
HYDRANT FULLY RESTRAINED, HYD 2
HYD. NOZZLE ELEV. 8010.54±
STA:0+63.50
6" INV:802.44
15.6 L.F. of 8" W.M. @ 0.68%
35.7 L.F. of 8" W.M. @ 5.20%
6" BUTTERFLY VALVE, V8
WITH VALVE BOX
STA:2+06.47
8" X 6" TEE
STA:2+06.47
2.9 L.F. of 6" W.M. @ -4.25%
5.3 L.F. of 8" W.M. @ 0.00%
23.8 L.F. of 6" W.M. @ -4.25%
6" WATER SERVICE
STA:2+06.47
8" X 6" ANCHOR TEE
HYDRANT ASSEMBLY
23.5' OF 6" PVC HYD. LEAD
(RESTRAIN JOINTS AS REQUIRED)
4' OFFSET
6" BUTTERFLY VALVE, V9
WITH VALVE BOX
HYDRANT FULLY RESTRAINED, HYD 3
HYD. NOZZLE ELEV. 810.37±
STA:2+41.21
6" BUTTERFLY VALVE, V10
WITH VALVE BOX
STA:2+77.89
11.0 L.F. of 6" W.M. @ 4.58%
6" HORZ DEFL
STA:2+77.89
18.2 L.F. of 6" W.M. @ 0.54%
6" WATER SERVICE
STA:2+77.89
3.0 L.F. of 8" W.M. @ 0.56%
45° BEND
STA:7+09.02
8" BUTTERFLY VALVE, V11
WITH VALVE BOX
STA:6+68.56
10.0 L.F. of 8" W.M. @ 0.56%
8" X 6" TEE
STA:8+67.44
12.3 L.F. of 8" W.M. @ -3.97%
3.0 L.F. of 6" W.M. @ -96.21%
6" BUTTERFLY VALVE, V13
WITH VALVE BOX
STA:8+67.44
21.6 L.F. of 6" W.M. @ 0.94%
6" PLUG AND BUTTRESS
STA:8+67.44
8" X 6" ANCHOR TEE
HYDRANT ASSEMBLY
21.5' OF 6" PVC HYD. LEAD
(RESTRAIN JOINTS AS REQUIRED)
3' OFFSET
6" BUTTERFLY VALVE, V14
WITH VALVE BOX
HYDRANT FULLY RESTRAINED, HYD 4
HYD. NOZZLE ELEV. 808.80±
STA:8+79.77
148.7 L.F. of 8" W.M. @ 0.02%
8" BUTTERFLY VALVE, V15
WITH VALVE BOX
STA:10+28.43
CONNECT TO
EX WM
STA:10+30.43
2.0 L.F. of 8" W.M. @ -1.65%
5
1
+
4
0
50+00
5
1
+
0
0
STATION EQUATION
STATION=51+40.43 = 6+71.56
>
>
>
W
W
W
W
W
W
W
W
W
W
8" X 6" TEE
STA:2+77.89
16
8
.
7
L
.
F
.
o
f
8
"
W
.
M
.
@
0
.
8
7
%
22.5° BEND
(TOTAL DEFL 26°)
STA:4+84.43
164.4
L
.
F
.
o
f
8
"
W
.
M
.
@
-
0
.
0
1
%
45° BEND
STA:2+23.34
>
>
>
>
>
8.0 L.F. of 8" W.M. @ 0.87%
45° BEND
STA:2+15.34
45° BEND
STA:4+46.56
10.0 L.F. of 8" W.M. @ 15.42%
45° BEND
STA:4+56.56 27.9 L.F. of 8" W.M. @ 0.02%
W
W
W
W W
W
W
W
W
>
>>>>
45° BEND
STA:0+38.09
VERT. GRADE
BREAK
STA:6+48.86
8" X 8" TEE
STA:6+71.56
45° BEND
STA:7+19.02
34.5 L.F. of 8" W.M. @ -0.56%
8" BUTTERFYLY VALVE, V12
WITH VALVE BOX
STA:6+74.56
3.0 L.F. of 8" W.M. @ -0.57%
3.0 L.F. of 8" W.M. @ -1.66%
8" BUTTERFYLY VALVE, V16
WITH VALVE BOX
STA:51+37.43
19.7 L.F. of 8" W.M. @ -12.53%
72.9 L.F. of 8" W.M. @ 3.01%
VERT. GRADE
BREAK
STA:7+91.90
27.0 L.F. of 8" W.M. @ 0.25%
VERT. GRADE
BREAK
STA:8+18.90
48.5 L.F. of 8" W.M. @ -3.97%
54.5 L.F. of 8" W.M. @ 0.86%
785
790
795
800
805
810
815
785
790
795
800
805
810
815
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 10+75
CO
N
N
E
C
T
T
O
EX
W
M
ST
A
:
1
0
+
3
0
.
4
3
8"
I
N
V
:
8
0
0
.
0
9
8"
B
U
T
T
E
R
F
L
Y
V
A
L
V
E
,
V
1
5
WI
T
H
V
A
L
V
E
B
O
X
ST
A
:
1
0
+
2
8
.
4
3
8"
I
N
V
:
8
0
0
.
0
6
8"
N
E
I
N
V
:
8
0
0
.
0
6
8"
X
6
"
A
N
C
H
O
R
E
D
H
Y
D
.
T
E
E
ST
A
:
8
+
7
9
.
7
7
8"
I
N
V
:
8
0
0
.
0
9
8"
N
E
I
N
V
:
8
0
0
.
0
9
6"
S
E
I
N
V
:
7
9
7
.
7
0
8"
X
6
"
T
E
E
ST
A
:
8
+
6
7
.
4
4
8"
I
N
V
:
7
9
9
.
6
0
8"
N
E
I
N
V
:
7
9
9
.
6
0
6"
S
E
I
N
V
:
8
0
0
.
0
5
28.1 L.F. 12" PVC @ 0.37%
10.0 L.F. 12" PVC @ 0.50%
2.1 L.F. 8" PVC @ 0.70%
15.6 L.F. 8" PVC @ 0.68%
35.7 L.F. 8" PVC @ 5.20%
5.3 L.F. 8" PVC
@ 0.00%
3.0 L.F. 8" PVC @ 0.56%
10.0 L.F. 8" PVC @ 0.56%
12.3 L.F. 8" PVC @ -3.97%
148.7 L.F. 8" PVC @ 0.02%2.0 L.F. 8" PVC @ -1.65%
12" STORM
INV:804.01
168.7 L.F. of 8" W.M. @ 0.87%
164.4 L.F. of 8" W.M. @ -0.01%
8"
X
6
"
T
E
E
ST
A
:
2
+
7
7
.
8
9
O
F
F
:
0
.
0
0
R
8"
N
I
N
V
:
8
0
0
.
7
4
8"
S
I
N
V
:
8
0
0
.
7
4
6"
E
I
N
V
:
7
9
7
.
9
0
22
.
5
°
B
E
N
D
(T
O
T
A
L
D
E
F
L
2
6
°
)
ST
A
:
4
+
8
4
.
4
3
8"
I
N
V
:
7
9
7
.
7
3
PR. 24" STORM
INV:800.68
470.0' CRUSHED STONE BACKFILL 190.0' EXCAVATED BACKFILL
EX. 8" SAN
INV:795.09±
45
°
B
E
N
D
ST
A
:
4
+
4
6
.
5
6
8"
I
N
V
:
7
9
9
.
2
8
8"
S
E
I
N
V
:
7
9
9
.
2
8
45
°
B
E
N
D
ST
A
:
4
+
5
6
.
5
6
8"
I
N
V
:
7
9
7
.
7
4
8"
E
I
N
V
:
7
9
7
.
7
4
27.9 L.F. 8" PVC @ 0.02%
10.0 L.F. 8" PVC @ 15.42%
8.0 L.F. 8" PVC @ 0.87%
VE
R
T
.
G
R
A
D
E
BR
E
A
K
ST
A
:
8
+
1
8
.
9
0
8"
I
N
V
:
7
9
7
.
6
7
VE
R
T
.
G
R
A
D
E
BR
E
A
K
ST
A
:
7
+
9
1
.
9
0
8"
I
N
V
:
7
9
7
.
7
4
45
°
B
E
N
D
ST
A
:
7
+
1
9
.
0
2
8"
I
N
V
:
7
9
9
.
9
3
45
°
B
E
N
D
ST
A
:
7
+
0
9
.
0
2
O
F
F
:
0
.
0
0
8"
N
I
N
V
:
7
9
9
.
9
9
8"
S
E
I
N
V
:
7
9
9
.
9
9
8"
B
U
T
T
E
R
F
Y
L
Y
V
A
L
V
E
,
V
1
2
WI
T
H
V
A
L
V
E
B
O
X
ST
A
:
6
+
7
4
.
5
6
8"
I
N
V
:
8
0
0
.
1
8
8"
X
8
"
T
E
E
ST
A
:
6
+
7
1
.
5
6
8"
I
N
V
:
8
0
0
.
1
9
8"
I
N
V
:
8
0
0
.
1
9
8"
B
U
T
T
E
R
F
L
Y
V
A
L
V
E
,
V
1
1
WI
T
H
V
A
L
V
E
B
O
X
ST
A
:
6
+
6
8
.
5
6
8"
I
N
V
:
8
0
0
.
2
1
VE
R
T
.
G
R
A
D
E
BR
E
A
K
ST
A
:
6
+
4
8
.
8
6
8"
I
N
V
:
7
9
7
.
7
4
12
"
H
O
R
Z
.
B
E
N
D
(
4
5
°
)
ST
A
:
0
+
2
8
.
0
9
12
"
I
N
V
:
8
0
2
.
4
1
45
°
B
E
N
D
ST
A
:
0
+
3
8
.
0
9
12
"
I
N
V
:
8
0
2
.
3
6
CO
N
N
E
C
T
O
EX
I
S
T
I
N
G
1
2
"
W
M
ST
A
:
0
+
0
0
.
0
0
O
F
F
:
0
.
0
0
12
"
S
I
N
V
:
8
0
2
.
5
2
12
"
X
1
2
"
T
E
E
12
"
X
8
"
R
E
D
U
C
E
R
(
E
A
S
T
)
ST
A
:
0
+
4
5
.
8
0
12
"
I
N
V
:
8
0
1
.
8
3
12
"
I
N
V
:
8
0
2
.
3
1
12
"
X
8
"
R
E
D
U
C
E
R
8"
B
U
T
T
E
R
F
L
Y
V
A
L
V
E
,
V
6
WI
T
H
V
A
L
V
E
B
O
X
ST
A
:
0
+
4
7
.
8
6
8"
I
N
V
:
8
0
2
.
4
7
8"
X
6
"
A
N
C
H
O
R
E
D
H
Y
D
.
T
E
E
ST
A
:
0
+
6
3
.
4
9
8"
I
N
V
:
8
0
2
.
3
6
VE
R
T
.
G
R
A
D
E
BR
E
A
K
ST
A
:
0
+
9
9
.
1
8
8"
I
N
V
:
8
0
0
.
5
0
VE
R
T
.
G
R
A
D
E
B
R
E
A
K
ST
A
:
1
+
2
9
.
4
1
8"
I
N
V
:
8
0
0
.
8
0
VE
R
T
.
G
R
A
D
E
BR
E
A
K
ST
A
:
1
+
3
8
.
2
0
8"
I
N
V
:
8
0
0
.
8
8
8"
X
6
"
T
E
E
ST
A
:
2
+
0
6
.
4
7
O
F
F
:
0
.
0
0
R
8"
W
I
N
V
:
8
0
1
.
2
8
8"
E
I
N
V
:
8
0
1
.
2
8
6"
N
I
N
V
:
8
0
1
.
3
7
8"
X
6
"
A
N
C
H
O
R
E
D
H
Y
D
.
T
E
E
ST
A
:
2
+
1
1
.
7
9
O
F
F
:
0
.
0
0
R
8"
W
I
N
V
:
8
0
1
.
2
8
8"
E
I
N
V
:
8
0
1
.
2
8
6"
S
I
N
V
:
8
0
1
.
3
7
45
°
B
E
N
D
ST
A
:
2
+
1
5
.
3
4
8"
I
N
V
:
8
0
1
.
2
8
45
°
B
E
N
D
ST
A
:
2
+
2
3
.
3
4
8"
I
N
V
:
8
0
1
.
2
1
7.7 L.F. 12" PVC @ 0.64%
30.2 L.F. 8" PVC @ -0.97%
8.8 L.F. 8" PVC @ -0.97%
68.3 L.F. 8" PVC @ -0.59%
3.6 L.F. 8" PVC @ 0.00%
54.5 L.F. 8" PVC @
0
.
8
6
%
19.7 L.F. 8" PVC @ -12.53%
3.0 L.F. 8" PVC @ -0.57%
34.5 L.F. 8" PVC @ -0.56%
72.9
L
.
F
.
8
"
P
V
C
@
3
.
0
1
%
27.0 L.F. 8" PVC @ 0.25%
48.5 L.F. 8" PVC @ -3.97%
6" SAN
INV:803.08
18" STORM
INV:803.38
PR. 24" STORM
INV:800.02
318.4' EXCAVATED BACKFILL52.0' CRUSHED
STONE
BACKFILL
8" SAN
INV:797.91
30" STORM
INV:801.88
30" STORM
INV:800.37
G
G
G
G
G
W
T
T
T
T
T
T
T
P/
L
P/L
P/
L
P/
L
P/
L
W
W W W
W
W
W
W
W
W
SAN SAN SAN SAN SAN SAN SAN
0+00
37
+
4
2
12" HORZ. BEND (45°)
STA:0+28.09
10.0 L.F. of 12" W.M.
@ 0.50%
CONNEC TO
EXISTING 12" WM
STA:0+00.00
28.1 L.F. of 12" W.M
@ 0.37%
12" X 12" TEE
12" X 8" REDUCER (EAST)
STA:0+45.80
2.1 L.F. of 8" W.M. @ 0.70%
12" X 8" REDUCER
8" BUTTERFLY VALVE, V6
WITH VALVE BOX
STA:0+47.86
15.6 L.F. of 8" W.M. @ 0.68%
3.0 L.F. of 12" W.M. @ 0.06%
12" BUTTERFLY VALVE, V4
STA:37+39.44
STATION EQUATION
STATION=37+42.44 = 0+45.80
W
45° BEND
STA:0+38.09
S
T
S
T
S
T
S
T
S
T
33
5
1
+
4
0
3.0 L.F. of 8" W.M. @ 0.56%
8" BUTTERFLY VALVE, V11
WITH VALVE BOX
STA:6+68.56
STATION EQUATION
STATION=51+40.43 = 6+71.56
W
W
W
>
>
W
W
W
W
W
W
W
W
>
8" BUTTERFYLY VALVE, V16
WITH VALVE BOX
STA:51+37.43
8" BUTTERFYLY VALVE, V12
WITH VALVE BOX
STA:6+74.56
3.0 L.F. of 8" W.M. @ -0.57%
3.0 L.F. of 8" W.M. @ -1.66%
8" X 8" TEE
STA:6+71.56
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Public WM P&P.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
2-9-16
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
6
-
U
t
i
l
i
t
y
P
l
a
n
\
P
u
b
l
i
c
W
M
P
&
P
\
1
5
5
7
7
P
u
b
l
i
c
W
M
P
&
P
.
d
w
g
C 304
GRAPHIC SCALE
00 40'80'
PU
B
L
I
C
W
A
T
E
R
M
A
I
N
P
L
A
N
&
P
R
O
F
I
L
E
IN
:
E
A
S
E
M
E
N
T
FR
O
M
:
L
A
N
N
O
N
D
R
I
V
E
TO
:
7
6
4
F
E
E
T
E
A
S
T
O
F
L
A
N
N
O
N
D
R
I
V
E
LA
N
N
O
N
D
R
I
V
E
PROPOSED
BUILDING
21,600 SF
FFE 809
PROPOSED BUILDING
21,600 SF
FFE 809
PROPOSED SURFACE
ABOVE WATER MAIN
EXISTING SURFACE
ABOVE WATER MAIN
PUBLIC
8" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
SCALE:
HORIZONTAL 1" = 4'
VERTICAL 1" = 40'
SEE SHEET C303 SEE SHEET C305
30'
UTILITY
EASEMENT
30'
UTILITY
EASEMENT
MUNICIPAL
UTILITY
EASEMENT
PUBLIC
8" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
PUBLIC
8" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
PUBLIC
8" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
ENLARGEMENT STA 6+71.56
ENLARGEMENT STA 0+45.80
SEE ENLARGEMENT
SEE ENLARGEMENT
GRAPHIC SCALE
00 10'20'
GRAPHIC SCALE
00 10'20'
STORM
WATER BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
DRY STORM
WATER BASIN
100 YR=806.45
2 YR=806.14
BOTTOM = 806
1.CITY RESUBMITTAL 3/23/16 TPM
NOTES:
1.ALL PUBLIC WATER MAIN WORK AND ALL WORK IN THE
PUBLIC RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE
CITY OF MUSKEGO STANDARD SPECIFICATIONS.
2.INSULATION SHALL BE INSTALLED ON LARGE DIAMETER (12"
OR LARGER) STORM SEWER CROSSINGS WHEN WITHIN 18"
OF EACH OTHER.
EXISTING GAS SHOWN IS
APPROXIMATE.
CONTRACTOR TO VERIFY
ELEVATION AND SIZE.
EXISTING ABANDONED
TELEPHONE LINE.
LOCATION IS APPROXIMATE.
EXISTING ELECTRIC AND
TELEPHONE LINE.
LOCATION IS APPROXIMATE.
CONTRACTOR TO VERIFY
SIZE AND LOCATION
30'
UTILITY
EASEMENT
2.CITY RESUBMITTAL 5/27/16 TPM
W
E
E
E
E
E
E
E
E
W
W
W
W
W
W
W
W
W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
E
E
E
E
E
E
E
E
WW
SAN
G
G
G
G
G
G
G
G
ST
ST
ST ST ST ST ST ST ST ST
GR
A
V
E
L
GR
A
V
E
L
CO
N
C
R
E
T
E
P
A
D
FO
FO
FO
FO
FO
FO
SA
N
MH
4
SA
N
MH
5
ST
M
MH
5
ST
M
MH
6
ST
M
MH
7
ST
M
MH
8
12
.
N
O
A
C
C
E
S
S
P
E
R
D
O
C
.
#
8
4
0
8
5
7
P/
L
S
6
2
°
2
2
'
4
3
"
W
7
2
6
.
8
1
'
(S
6
2
°
2
7
'
W
)
16
.
A
P
P
X
.
L
O
C
A
T
I
O
N
O
F
C
/
L
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
1
0
3
6
9
16
.
A
P
P
X
.
L
O
C
A
T
I
O
N
O
F
C
/
L
U
T
I
L
I
T
Y
E
A
S
E
.
D
O
C
.
#
8
1
0
3
6
9
22
.
T
E
M
P
O
R
A
R
Y
L
I
M
I
T
E
D
E
A
S
E
M
E
N
T
(
E
X
P
I
R
E
D
)
D
O
C
.
#
3
9
1
1
9
4
9
22
.
T
E
M
P
O
R
A
R
Y
L
I
M
I
T
E
D
E
A
S
E
M
E
N
T
(
E
X
P
I
R
E
D
)
D
O
C
.
#
3
9
1
1
9
4
9
ST
ST
ST
ST
ST
ST
ST
P/
L
P/
L
P/
L
P/
L
P/
L
8
17
9
12
12
20
33
11
FU
T
U
R
E
PO
O
L
14
E
E
E
E
E
ONLY
>
WWW
6+
0
0
7+00
8+
0
0
51+40
50+00
51+00
90° BEND
HYDRANT ASSEMBLY
12' OF 6" PVC HYD. LEAD
(RESTRAIN JOINTS AS REQUIRED)
6" BUTTERFLY VALVE, V18
WITH VALVE BOX
HYDRANT FULLY RESTRAINED, HYD 5
HYD. NOZZLE ELEV. 809.54±
STA:50+00.00
6" PLUG AND BUTRESS
STA:50+93.04
8" X 6" TEE
8" X 6" REDUCER (SOUTHEAST)
STA:50+93.00
93.0 L.F. of 6" W.M. @ -0.80%
6" BUTTERFLY VALVE, V17
WITH VALVE BOX
STA:50+93.01
28.0 L.F. of 6" W.M. @ 5.23%
3.0 L.F. of 6" W.M. @ 0.00%
STATION EQUATION
STATION=51+40.43 = 6+71.56
W
W
W
W
>
>>>>>
>
>
>
WW
W
W
44.4 L.F. of 8" W.M. @ -0.74%
8" BUTTERFYLY VALVE, V16
WITH VALVE BOX
STA:51+37.43
8" X 8" TEE
STA:6+71.56
3.0 L.F. of 8" W.M. @ -1.66%
785
790
795
800
805
810
815
785
790
795
800
805
810
815
50+00 51+00 52+00 53+00
HO
R
Z
.
D
E
F
L
.
(
9
0
°
B
E
N
D
)
ST
A
:
5
0
+
0
0
.
0
0
6"
I
N
V
:
8
0
1
.
4
2
6"
S
W
I
N
V
:
8
0
1
.
4
2
8"
X
6
"
T
E
E
8"
X
6
"
R
E
D
U
C
E
R
(
S
O
U
T
H
E
A
S
T
)
ST
A
:
5
0
+
9
3
.
0
0
8"
I
N
V
:
8
0
0
.
5
9
6"
S
E
I
N
V
:
8
0
0
.
6
7
6"
S
W
I
N
V
:
8
0
0
.
6
7
93.0 L.F. 6" PVC @ -
0
.
8
0
%
184.9' CRUSHED STONE BACKFILL
8"
B
U
T
T
E
R
F
Y
L
Y
V
A
L
V
E
,
V
1
6
WI
T
H
V
A
L
V
E
B
O
X
ST
A
:
5
1
+
3
7
.
4
3
8"
I
N
V
:
8
0
0
.
2
6
8"
X
8
"
T
E
E
ST
A
:
6
+
7
1
.
5
6
8"
I
N
V
:
8
0
0
.
1
9
8"
I
N
V
:
8
0
0
.
1
9
44.4 L.F. 8" PVC @ -0.74%
3.0 L.F. 8" PVC @ -1.66%
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 Public WM P&P.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
2-9-16
15577
JBL
JBL
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
6
-
U
t
i
l
i
t
y
P
l
a
n
\
P
u
b
l
i
c
W
M
P
&
P
\
1
5
5
7
7
P
u
b
l
i
c
W
M
P
&
P
.
d
w
g
C 305
GRAPHIC SCALE
00 30'60'
THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD
MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL
MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED.
PU
B
L
I
C
W
A
T
E
R
M
A
I
N
P
L
A
N
&
P
R
O
F
I
L
E
IN
:
E
A
S
E
M
E
N
T
FR
O
M
:
2
7
7
.
9
F
T
E
A
S
T
O
F
L
A
N
N
O
N
D
R
.
TO
:
L
A
N
N
O
N
D
R
.
PROPOSED SURFACE
ABOVE WATER MAIN
EXISTING SURFACE
ABOVE WATER MAIN
6" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
JA
N
E
S
V
I
L
L
E
R
O
A
D
SEE SHEET C304
30'
UTILITY
EASEMENT
8" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
8" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
6" PVC, C-900
CLASS 235 (DR18)
WATER MAIN
STORM
WATER BASIN
100YR=805.40
2 YR=803.79
NWL=800
BOTTOM = 795
1.CITY RESUBMITTAL 3/23/16 TPM
NOTES:
1.ALL PUBLIC WATER MAIN WORK AND ALL WORK IN THE
PUBLIC RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE
CITY OF MUSKEGO STANDARD SPECIFICATIONS.
2.INSULATION SHALL BE INSTALLED ON LARGE DIAMETER (12"
OR LARGER) STORM SEWER CROSSINGS WHEN WITHIN 18"
OF EACH OTHER.
SEE SHEET C304
30'
UTILITY
EASEMENT
2.CITY RESUBMITTAL 5/27/16 TPM
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
12-4-15
15577
JBL
CTC
C 400
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
D
E
T
A
I
L
S
.
d
w
g
CONSTRUCTION ENTRANCE/
EXIT DETAIL: WDNR TS-1057C
A NOT TO SCALE
SILT FENCE: WDNR TS-1056
INLET PROTECTION TYPE A, B, C, AND D: WDNR TS-1060
EROSION CONTROL NOTES:
1.CONSTRUCTION SITE EROSION CONTROL AND SEDIMENTATION CONTROL SHALL COMPLY WITH THE REQUIREMENTS OF THE LOCAL MUNICIPALITY AND SHALL
EMPLOY EROSION CONTROL METHODS AS SHOWN AND SPECIFIED IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS.
2.ALL EROSION CONTROL MEASURES SHALL BE ADJUSTED TO MEET FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND SHALL BE INSTALLED PRIOR TO ANY
GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIAL ON THE SITE.
3.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION AFTER A RAINFALL OF 0.5 INCHES OR MORE, BUT NO LESS
THAN ONCE EVERY WEEK. MAINTENANCE OF ALL EROSION CONTROL STRUCTURES SHALL BE PROVIDED TO INSURE INTENDED PURPOSE IS ACCOMPLISHED.
CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REMOVAL OF ALL SEDIMENT WHEN LEAVING PROPERTY. EROSION CONTROL MEASURES MUST BE IN
WORKING CONDITION AT END OF EACH WORK DAY. DOCUMENT AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH WDNR NR216 REQUIREMENTS.
4.SILT FENCE SHALL BE INSTALLED IN THE LOCATIONS SHOWN ON THE CONSTRUCTION PLANS. SEDIMENT DEPOSITS SHALL BE REMOVED FROM BEHIND THE SILT
FENCE WHEN DEPOSITS REACH A DEPTH OF 6 INCHES. THE SILT FENCE SHALL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER.
5.FILTER FABRIC SHALL BE INSTALLED BENEATH INLET COVERS TO TRAP SEDIMENT PER INLET PROTECTION DETAIL IN THE LOCATIONS SHOWN ON THE
CONSTRUCTION PLANS.
6.EROSION CONTROL MEASURES SHALL BE MAINTAINED ON A CONTINUING BASIS UNTIL SITE IS FULLY STABILIZED.
7.PERIODIC STREET SWEEPING SHALL BE COMPLETED TO MAINTAIN ADJACENT STREETS FREE OF DUST AND DIRT.
8.SILT FENCE SHALL BE INSTALLED IN HORSESHOE FASHION AROUND ANY TOPSOIL AND FILL STOCKPILES.
9.SITE DEWATERING. WATER PUMPED FROM THE SITE SHALL BE TREATED BY SEDIMENT BASINS OR OTHER APPROPRIATE MEASURES SPECIFIED IN THE WISCONSIN
DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS. WATER MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION OF THE SITE,
ADJACENT SITES, OR RECEIVING CHANNELS.
10.WASTE AND MATERIAL DISPOSAL. ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANING WASTES, WASTEWATER, TOXIC
MATERIALS, OR HAZARDOUS MATERIALS) SHALL BE PROPERLY DISPOSED AND NOT ALLOWED TO BE CARRIED OFF-SITE BY RUNOFF OR WIND.
11.TRACKING. EACH SITE SHALL HAVE GRAVELED ROADS, ACCESS DRIVES AND PARKING AREAS OF SUFFICIENT WIDTH AND LENGTH TO PREVENT SEDIMENT FROM
BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS. ANY SEDIMENT REACHING A PUBLIC OR PRIVATE ROAD SHALL BE REMOVED BY STREET CLEANING, TO
THE SATISFACTION OF THE MUNICIPALITY, BEFORE THE END OF EACH WORKDAY. FLUSHING MAY NOT BE USED UNLESS SEDIMENT WILL BE CONTROLLED BY A
SEDIMENT BASIN OR PRACTICE SPECIFIED IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS. NOTIFY MUNICIPALITY OF ANY
CHANGES IN STABILIZED CONSTRUCTION ENTRANCE LOCATION.
12.SEDIMENT CLEANUP. ALL OFF-SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT OF A STORM EVENT SHALL BE CLEANED UP BY THE END OF THE NEXT
WORKDAY. ALL OTHER OFF-SITE SEDIMENT DEPOSITS OCCURRING AS A RESULT OF CONSTRUCTION ACTIVITIES SHALL BE CLEANED UP BY THE END OF THE
WORKDAY.
13.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN OR MORE DAYS SHALL BE STABILIZED BY TEMPORARY OR PERMANENT SEEDING, MULCHING, SODDING,
COVERING WITH TARPS, OR EQUIVALENT PRACTICE FOUND IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARD. IF TEMPORARY
SEEDING IS USED, A PERMANENT COVER SHALL ALSO BE REQUIRED AS PART OF THE FINAL SITE STABILIZATION. SEEDING OR SODDING SHALL BE REQUIRED AS
PART OF THE FINAL SITE STABILIZATION.
14.SOIL OR DIRT STORAGE PILES SHALL BE LOCATED A MINIMUM OF TWENTY-FIVE FEET FROM ANY DOWNSLOPE ROAD, LAKE, STREAM, WETLAND, OR DRAINAGE
CHANNEL. STRAW BALE OR FILTER FABRIC FENCES SHALL BE PLACED ON THE DOWN SLOPE SIDE OF THE PILES. IF REMAINING FOR MORE THAN THIRTY DAYS,
PILES SHALL BE STABILIZED BY MULCHING, VEGETATIVE COVER, TARPS OR OTHER MEANS.
15.WHEN THE DISTURBED AREA HAS BEEN STABILIZED BY PERMANENT VEGETATION OR OTHER MEANS, TEMPORARY PRACTICES, SUCH AS FILTER FABRIC FENCES,
STRAW BALES, SEDIMENT AND SEDIMENT TRAPS, FOUND IN THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES TECHNICAL STANDARDS SHALL BE REMOVED.
16.NOTIFY THE LOCAL MUNICIPALITY HAVING JURISDICTION WITHIN TWO WORKING DAYS OF COMMENCING ANY LAND DEVELOPMENT OR LAND DISTURBING ACTIVITY.
17.OBTAIN PERMISSION FROM THE LOCAL MUNICIPALITY HAVING JURISDICTION PRIOR TO MODIFYING THE EROSION CONTROL PLAN.
18.REPAIR ANY SILTATION OR EROSION DAMAGE TO ADJOINING SURFACES AND DRAINAGE WAYS RESULTING FROM LAND DEVELOPMENT OR LAND DISTURBING
ACTIVITIES.
19.KEEP A COPY OF THE EROSION CONTROL PLAN ON SITE.
20.CONTRACTOR SHALL, TO THE EXTENT POSSIBLE, MINIMIZE DISTURBANCE OF EXISTING VEGETATION DURING CONSTRUCTION.
21.CONTRACTOR SHALL, TO THE EXTENT POSSIBLE, MINIMIZE COMPACTION OF TOPSOIL AND PRESERVE TOPSOIL IN GREENSPACE AREAS.
22.WASH WATER FROM VEHICLES AND WHEEL WASHING SHALL BE CONTAINED AND TREATED PRIOR TO DISCHARGE.
23.CONTRACTOR SHALL MAINTAIN SPILL KITS ON-SITE.
24.PERMANENT TURF SEEDING OF DISTURBED AREA MUST OCCUR PRIOR TO SEPTEMBER 15TH. IF ADEQUATE TIME IS NOT AVAILABLE TO APPLY PERMANENT
SEEDING PRIOR TO SEPTEMBER 15, THEN DISTURBED AREAS SHALL BE TEMPORARILY SEEDED WITH AN ANNUAL RYE GRASS PER WDNR TECHNICAL STANDARD
1059, WHERE THE TEMPORARY SEEDING MUST OCCUR PRIOR TO OCTOBER 15TH.
25.IF TEMPORARY SEEDING IS NOT COMPLETED BY OCTOBER 15TH, APPLY SOIL STABILIZERS AND DORMANT SEED TO DISTURBED AREA PER WDNR TECHNICAL
STANDARD 1050. INSPECT ANIONIC PAM APPLICATION AT A MINIMUM FREQUENCY OF EVERY TWO MONTHS AND REAPPLY AS NECESSARY.
B
CONSTRUCTION SEQUENCE FOR EROSION CONTROL INCLUDES:
1.INSTALL STABILIZED CONSTRUCTION ENTRANCE.
2.INSTALL SILT FENCING AND INLET PROTECTION.
3.INITIATE STOCKPILING OF IMPORTED MATERIAL. PLACE SILT FENCE AROUND STOCKPILE(S).
4.STRIP TOPSOIL FROM STORM WATER BASIN LOCATION AND STOCKPILE.
5.CONSTRUCT STORM WATER BASIN AND INSTALL OUTLET AND EMERGENCY OVERFLOW. BASIN IS TO
BE USED AS A SEDIMENTATION BASIN DURING THE COURSE OF CONSTRUCTION.
6.INSTALL REINFORCED TURF MATTING AT STORM WATER BASIN AS SHOWN ON THE PLANS.
7.CONSTRUCT DIVERSION SWALES, DIRECT RUNOFF TO STORM BASIN.
8.STRIP TOPSOIL FROM REMAINDER OF SITE IN A PROGRESSIVE MANNER, AND STOCKPILE. PLACE
SILT FENCE AROUND STOCKPILE(S).
9.PERFORM ROUGH SITE GRADING. STABILIZE FINISHED AREAS AS THE WORK PROGRESSES. USE
EROSION MATTING WHERE CALLED FOR ON THE PLANS. PER WDNR TECHNICAL STANDARD 1059:
AREAS THAT RECEIVE TEMPORARY SEEDING SHALL HAVE A MINIMUM TOPSOIL DEPTH OF 2 INCHES.
AREAS THAT RECEIVE PERMANENT SEEDING SHALL HAVE A MINIMAL TOPSOIL DEPTH OF 4 INCHES.
10.PREPARE BUILDING PAD AND BEGIN FOUNDATIONS WORK FOR BUILDING.
11.INSTALL UTILITIES. INSTALL ANY ADDITIONAL INLET PROTECTION ON NEW STORM SEWER AND
INSTALL RIP-RAP AT NEW STORM SEWER OUTFALLS.
12.PERFORM FINE SITE GRADING AND INSTALL STONE BASE(S).
13.INSTALL PAVEMENTS.
14.LANDSCAPE AND STABILIZE REMAINING AREAS WITHIN 7 DAYS OF COMPLETION OF FINAL GRADING
AND TOPSOILING.
15.REMOVE EXCESS SEDIMENT FROM STORMWATER BASINS AND RETURN BASINS TO THEIR DESIGN
DIMENSIONS AND VOLUMES.
16.REMOVE EROSION CONTROL MEASURES ONLY WHEN SITE IS FULLY STABILIZED.
NOT TO SCALE
GENERAL NOTES
1.HORIZONTAL BRACE REQUIRED WITH 2"X4"
WOODEN FRAME OR EQUIVALENT AT TOP OF
POSTS.
2.TRENCH SHALL BE A MINIMUM OF 4" WIDE & 6" DEEP
TO BURY AND ANCHOR THE GEOTEXTILE FABRIC.
FOLD MATERIAL TO FIT TRENCH AND BACKFILL &
COMPACT TRENCH WITH EXCAVATED SOIL.
3.WOOD POSTS SHALL BE A MINIMUM SIZE OF 1-1/32"
X 1-1/32" OF OAK OR HICKORY.
4.SILT FENCE TO EXTEND ACROSS THE TOP OF THE
PIPE.
5.CONSTRUCT SILT FENCE FROM A CONTINUOUS
ROLL IF POSSIBLE BY CUTTING LENGTHS TO AVOID
JOINTS. IF A JOINT IS NECESSARY USE ON THE
FOLLOWING TWO METHODS: A) OVERLAP THE END
POSTS AND TWIST OR ROTATE, AT LEAST 180
DEGREES. B) HOOK THE END OF EACH SILT FENCE
LENGTHS.
GENERAL NOTES
SILT FENCE SHALL
CONFORM TO WDNR
CONSERVATION PRACTICE
STANDARD #1056
THIS DRAWING IS BASED ON
WISCONSIN DEPARTMENT
OF TRANSPORTATION
STANDARD DETAIL DRAWING
8 E 9-6TRENCH DETAILSILT FENCE TIE BACK
SILT FENCE
JOINGING TWO LENGTHS OF SILT FENCE
HOOK METHOD
(WHEN ADDITIONAL SUPPORT REQUIRED)
TWIST METHOD
ANCHOR STAKE
MIN. 18" LONG
TIEBACK BETWEEN FENCE
POST AND ANCHOR
SILT
FENCE
GEOTEXTILE
FABRIC
EXCESS
FABRIC
FLOW DIRECTION
FLOW DIRECTION
* NOTE: 8'-0" POST SPACING ALLOWED IF
A WOVEN GEOTEXTILE FABRIC IS USED.
FLO
W
D
I
R
E
C
T
I
O
N
GEOTEXTILE
FABRIC ONLY
BACKFILL & COMPACT
TRENCH WITH
EXCAVATED SOIL
ATTACH THE FABRIC TO
THE POSTS WITH WIRE
STAPLES OR WOODEN
LATH AND NAILS
WOOD POSTS
LENGTH 3'-4'
20" DEPTH IN
GROUND
NOTE: ADDITIONAL POST
DEPTH OR TIE BACKS MAY BE
REQUIRED IN UNSTABLE
SOILS
GEOTEXTILE
FABRIC
SUPPORT CORD
FOLD
3" MAX.
FLOW
2'
-
0
"
3'-
0
"
M
A
X
.
*
3'-
0
"
M
A
X
.
*
3'-
0
"
M
A
X
.
*
3'-
0
"
M
A
X
.
*
WOOD POST
WOOD POST
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
WOOD POST
WOOD POST
GEOTEXTILE
FABRIC
FLOW DIRECTION
FLOW DIRECTION
2'-0" MIN.
1'-0" MIN.
GRATED INLET
2" X 4" STAKE AND
CROSS BRACING
BURIED FABRIC
MIN. 6" DEPTH
GEOTEXTILE FABRIC,
TYPE FF
DIRECTION OF
RUNOFF WATER
FLOW 4'
2'
GEOTEXTILE FABRIC,
TYPE FF
GEOTEXTILE FABRIC,
TYPE FF
2" X 4" STAKE AND
CROSS BRACING
INLET WITH OR
WITHOUT GRATE
ATTACH GEOTEXTILE
FABRIC, TYPE FF TO
THE STAKES AND
CROSSING BRACING
2'
GEOTEXTILE FABRIC,
TYPE FF WOOD 2" X 4" EXTENDS 7"
BEYOND GRATE WIDTH ON
BOTH SIDES, LENGTH
VARIES. SECURE TO
GRATE WITH WIRE OR
PLASTIC TIES
GEOTEXTILE FABRIC,
TYPE FF
FRONT, BACK, AND
BOTTOM TO BE MADE
FROM SINGLE PIECE
OF FABRIC.
MINIMUM DOUBLE STITCHED
SEAMS ALL AROUND SIDE PIECES
AND ON FLAP POCKETS
INLET SPECIFICATIONS AS
PER THE PLAN DIMENSION
LENGTH AND WIDTH TO MATCH
INLET SPECIFICATIONS AS
PER THE PLAN DIMENSION
LENGTH AND WIDTH TO MATCH
USE REBAR OR STEEL ROD
FOR REMOVAL
OR
FOR INLETS WITH CAST
CURB BOX USE WOOD 2"X4",
EXTEND 10" BEYOND GRATE
WIDTH ON BOTH SIDES,
LENGTH VARIES. SECURE TO
GRATE WITH WIRE OR
PLASTIC TIES.
4"X6" OVAL HOLE SHALL BE HEAT CUT
INTO ALL FOUR SIDE PANELS.
GENERAL NOTE:
INLET PROTECTION SHALL CONFORM TO WDNR
CONSERVATION PRACTICE STANDARD #1060
THIS DRAWING IS BASED ON
WISCONSIN DEPARTMENT
OF TRANSPORTATION
STANDARD DETAIL DRAWING
8 E 10-2
GENERAL NOTES
1.MANUFACTURED ALTERNATIVES APPROVED AND LISTED ON THE
DEPARTMENT'S EROSION CONTROL PRODUCT ACCEPTABILITY LIST
MAY BE SUBSTITUTED.
2.WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARE
SHALL BE TAKEN SO THAT THE SEDIMENT TRAPPED ON THE
GEOTEXTILE FABRIC DOES NOT FALL INTO THE INLET. ANY
MATERIAL FALLING INTO THE INLET SHALL BE REMOVED
IMMEDIATELY.
3.FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED,
SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TO
FACILITATE MAINTENANCE OR REMOVAL.
4.FOR INLET PROTECTION, TYPE C (WITH CURB BOX), AN ADDITIONAL
18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED
WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT
OF THE CURB BOX OPENING.
5.FLAP POCKETS SHALL BE LARGE ENOUGH TO ACCEPT WOOD 2X4.
INSTALLATION NOTES
TYPE B & C
TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE. THE CONTRACTOR SHALL
DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDS OR OTHER
METHOD TO PREVENT ACCUMULATED SEDIMENT FROM ENTERING THE INLET.
TYPE D
DO NOT INSTALL INLET PROTECTION TYPE D IN INLETS SHALLOWER THAN 30", MEASURED FROM
THE BOTTOM OF THE INLET TO THE TOP OF THE GRATE. TRIM EXCESS FABRIC IN THE FLOW LINE
TO WITHIN 3" OF THE GRATE. THE INSTALLED BAG SHALL HAVE A MINIMUM SIDE CLEARANCE,
BETWEEN THE INLET WALLS AND THE BAG, MEASURED AT THE BOTTOM OF THE OVERFLOW
HOLES, OF 3". WHERE NECESSARY THE CONTRACTOR SHALL CINCH THE BAG, USING PLASTIC ZIP
TIES, TO ACHIEVE THE 3" CLEARANCE. THE TIES SHALL BE PLACED AT A MAXIMUM OF 4" FROM THE
BOTTOM OF THE BAG.
INLET PROTECTION, TYPE A INLET PROTECTION, TYPE C
(WITH CURB BOX)
INLET PROTECTION, TYPE B
(WITHOUT CURB BOX)
(CAN BE INSTALLED IN ANY INLET
WITHOUT A CURB BOX)
INLET PROTECTION, TYPE D
(CAN BE INSTALLED IN ANY INLET WITH OR
WITHOUT A CURB BOX AS PER NOTE)
NOT TO SCALE
12"
12"
4"
8"
EXISTING ASPHALT, CONCRETE
OR GRASS SURFACE
EXISTING ASPHALT, CONCRETE
OR GRASS SURFACE
3" TO 6" CLEAR
OR WASHED STONE
12" MIN.
50' MIN.
GENERAL NOTE:
STONE TRACKING PAD SHALL CONFORM TO WDNR CONSERVATION PRACTICE
STANDARD #1057
2.0'
CONSTRUCTION SITE DIVERSION: WDNR TS-1066ENOT TO SCALE
GENERAL NOTE:
CONSTRUCTION SITE DIVERSION SWALES SHALL CONFORM TO WDNR
CONSERVATION PRACTICE STANDARD #1066
NOTE:
1.MATCH BERMS TO EXISTING GROUND AND GRADE
SWALES TO DRAIN TO BASIN.
2.FOR SWALES THAT ARE TO SERVE LONGER THAN 30 DAYS,
THE SIDE SLOPES, INCLUDING THE RIDGE AND DOWN
SLOPE SIDE, SHALL BE STABILIZED AS SOON AS THEY ARE
CONSTRUCTED.
3.TEMPORARY TOP SOILING AND SEEDING WITH CLASS 1
TYPE B EROSION MATTING SHALL BE USED FOR
STABILIZATION. WATER-SOLUBLE ANIONIC
POLYACRYLAMIDE (PAM) SHALL NOT BE USED IN
DIVERSION SWALES.
4.FOR SWALES SERVING LESS THAN 30 DAYS, ONLY THE
DOWN SLOPE SIDE OF THE SWALE SHALL BE STABILIZED
AS SOON AS CONSTRUCTED.
5.THE DIVERSION DITCH SHALL HAVE A MINIMUM
LONGITUDINAL SLOPE OF 1.0% TO THE EXTENT
PRACTICAL.
3:
1
S
L
O
P
E
3:1 S
L
O
P
E
1'-0" TYP.
1'-0" TYP.
2.0'
EROSION MATTING: WDNR TS-1052D
1.PREPARE SOIL BEFORE INSTALLING ROLLED EROSION
CONTROL PRODUCTS (RECP'S), INCLUDING ANY NECESSARY
APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN
USING CELL-O-SEED DO NOT SEED PREPARED AREA.
CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2.BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE
RECP'S IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH
APPROXIMATELY 12" (30 CM) OF RECP'S EXTENDE3D
BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR
THE RECP'S WITH A ROW OF STAPLES / STAKES
APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE
TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER
STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD
REMAINING 12" (30 CM) PORTION OF RECP'S BACK OVER
SEED AND COMPACTED SOIL. SECURE RECP'S OVER
COMPACTED SOIL WITH A ROW OF STAPLES / STAKES
SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE
WIDTH OF THE RECP'S
3.ROLL THE RECP'S (A.) DOWN OR (B.) HORIZONTALLY ACROSS
THE SLOPE. RECP'S WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL RECP'S MUST BE
SECURELY FASTENED TO SOIL SURFACE BY PLACING
STAPLES / STAKES IN APPROPRIATE LOCATIONS AS SHOWN
IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT
SYSTEM, STAPLES / STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE
APPROPRIATE STAPLE PATTERN.
4.THE EDGES OF PARALLEL RECP'S MUST BE STAPLED WITH
APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP
DEPENDING ON RECP'S TYPE.
5.CONSECUTIVE RECP'S SPLICED DOWN THE SLOPE MUST BE
PLACED END OVER END (SHINGLE STLYE) WITH AN
APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH
OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART
ACROSS ENTIRE RECP'S WIDTH. NOTE: IN LOOSE SOIL
CONDITIONS, THE USE OF STAPLE OR STAKE LENGTH
GREATER THAN 6" (15 CM) MAY BE NECESSARY TO
PROPERLY SECURE THE RECP'S.
NOTE:
1.EROSION MATTING SHALL CONFORM TO WDNR CONSERVATION
PRACTICE STANDARD #1052.
2.INSTALL PER MANUFACTURERS SPECIFICATIONS.
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
2'-0" C.C.X
6"
4"
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
12-4-15
15577
JBL
CTC
C 401
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
D
E
T
A
I
L
S
.
d
w
g
NOT TO SCALEL
PAVEMENT EDGE
EXPANSION JOINT
1' CURB TAPER
1'-0"
NOT TO SCALE
CONCRETE SIDEWALK SECTIONB
NOT TO SCALE
ASPHALT PAVEMENT SECTION
(HEAVY DUTY)C
5" CONCRETE PAVEMENT
6" DENSE GRADED
AGGREGATE BASE COURSE (3/4")
COMPACTED SUBGRADE
1 1/2" SURFACE
OVER TACK COAT
2 1/2" BINDER (LOWER LAYER)
COMPACTED SUBGRADE
10" DENSE GRADED
AGGREGATE BASE COURSE (1-1/4")
LANDING AREA
(5'x5' @ MAX. 2% IN ANY DIRECTION)
ADA PARKING STALL
(MAX. 2% IN ANY DIRECTION)
SIDEWALK FLUSH WITH PARKING DECK
LANDING AREA
(5'x5' @ MAX. 2% IN ANY DIRECTION)
ADA PARKING STALL
(MAX. 2% IN ANY DIRECTION)
NO PARKING AREA
(MAX. 2% IN ANY DIRECTION)
LANDING AREA
(5'x5' @ MAX. 2% IN ANY DIRECTION)
1:12
M
A
X
.
SLO
P
E
1:12
M
A
X
.
SLO
P
E
5'-0"
6'-0"
6'-0"
NOTES:
PROVIDE DETECTABLE WARNING
CONSISTING OF RAISED TRUNCATED DOMES
OF SIZE, SPACING AND CONTRAST REQUIRED
BY ADA GUIDELINES. WISDOT SDD 8D5
(PATINA IRON)
NOT TO SCALE
ADA RAMP DETAIL (TYPE 1)G
ACCEPT REJECT
7"24"
6"
1.5"4.5"
1.0'
6"
6"
7.5"
1-1/4" DENSE GRADED
AGGREGATE BASE
COURSE
7"24"
1.0'
6"
6"1-1/4" DENSE GRADED
AGGREGATE BASE
COURSE
6"
31"
3/4" R
2" R
3/4" R
2" R
31"
1/4" R1/4" R
TIE-BAR IF ADJACENT TO CONCRETE
(NO.4 X 2'-0" TIE BARS SPACED AT 3'-0" C-C)
TIE-BAR IF ADJACENT TO CONCRETE
(NO.4 X 2'-0" TIE BARS SPACED AT 3'-0" C-C)
SLOPE 1:12 M
A
X
.
SECTION A-A
A
A
SLOPE 1:12 M
A
X
.
PROVIDE DETECTABLE WARNING
SURFACE COMPLYING WITH ADA
REQUIREMENTS
(SEE NOTE BELOW)
6" CURB
FACE
0" CURB
FACE
2'-0"
4'-0"
5'-0"
6'-0"
PLAN
NOTES:
PROVIDE DETECTABLE
WARNING CONSISTING OF
RAISED TRUNCATED DOMES OF
SIZE, SPACING AND CONTRAST
REQUIRED BY ADA GUIDELINES.
WISDOT SDD 8D5 (PATINA IRON).
NOT TO SCALE
ADA RAMP DETAILH
CL
1.5"
8"8"
3500 PSI
CONCRETE (MIN.)
VEHICLES WITH
VET OR DIS PLATES OR
STATE DISABLED CARD
THIS SPACE
RESERVED
PARKING
NOT TO SCALE
HANDICAP SIGN & POSTF
1/2" RADIUS
GREEN
BLUE
WHITE
GREEN
VAN
ACCESSIBLE
THIS SPACE
RESERVED
PARKING
VEHICLES WITH
VET OR DIS PLATES OR
STATE DISABLED CARD
CAP TOP OF
STEEL PIPE
3/8" BLACK
STEEL BOLT
NOTE:
PROVIDE ADDITIONAL SIGN
"VAN ACCESSIBLE" BELOW THE
SYMBOL OF ACCESSIBILITY,
WHEN PROVIDING A MIN. 8"
WIDE ACCESS AISLE. SIGN
SHOULD BE LOCATED SO IT
CANNOT BE OBSCURED BY A
VEHICLE PARKED IN THE
SPACE.
12"
18"
12"
18"
42"
36"
12"
18"
3/8" ZINC PLATED
ANCHOR BOLT AND NUT
2 1/2" SQUARE X 18"
2 1/4" SQUARE X 36"
3/8" ZINC PLATED
ANCHOR BOLT AND NUT
2" STEEL
TUBULAR
SQUARE
UPPER
SECTION
ALL HOLES 7/16"
SPACED 1" C-C
ALL FOUR SIDES
NOT TO SCALE
31" CONCRETE CURB AND GUTTER SECTIONA
NOTES:
1.PUBLIC ADA RAMP SHALL BE CONSTRUCTED PER CITY OF
MUSKEGO STANDARDS.
2.CONTRACTOR TO VERIFY ADA RAMP DETAIL WITH CITY AND
ADJUST AS NEEDED.
3.PROVIDE DETECTABLE WARNING CONSISTING OF RAISED
TRUNCATED DOMES OF SIZE, SPACING AND CONTRAST
REQUIRED BY ADA GUIDELINES.
4.DETECTABLE WARNINGS SHALL BE PER WISDOT SDD 8D5
STANDARDS (PATINA IRON).
PROVIDE DETECTABLE WARNING
SURFACE COMPLYING WITH ADA
REQUIREMENTS
(SEE NOTE BELOW)
SLOPE 1:12 MAX
EDGE OF ASPHALT
6'-0"
EDGE OF ASPHALT
NOT TO SCALE
ADA RAMP DETAILI
FINISHED GRADE
NOT TO SCALE
CONCRETE PAVEMENT WITH INTEGRAL CURBD
ADJACENT PAVEMENT
6" DENSE GRADED
AGGREGATE BASE
COURSE (3/4")
COMPACTED
SUBGRADE
5" CONCRETE SIDEWALK
SLOPE PER PLAN 2" R
12"12"
AS SHOWN ON PLAN
6"
6"
NOT TO SCALE
PAVEMENT MARKING DETAILJ
NOT TO SCALE
ASPHALT TRAIL DETAILK
6'-0"
NOT TO SCALE
6' CURB TAPERL
PAVEMENT EDGE
EXPANSION JOINT
1:12 MAX. SLOPOE
EXISTING WALK
1.CITY RESUBMITTAL 3/23/16 TPM
NOT TO SCALE
SANITARY EXTERNAL DROP
MANHOLE DETAILM
COMPACTED SUBGRADE
6"6"
2% TYPICAL
6" OF 3/4 " CRUSHED
LIMESTONE T.B.
TOPSOIL,
FERTILIZE,
SEED AND
MULCH
3" SURFACE COURSE, STATE
GRADATION NO. 3 BITUMINOUS
CONCRETE (E-0.3, 9.5 mm)
3' MIN.
(MATCH TO EXISTING TRAIL WIDTH)
2.CITY RESUBMITTAL 5/27/16 TPM
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
12-4-15
15577
JBL
CTC
C 402
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
D
E
T
A
I
L
S
.
d
w
g
NOTES:
1. CONSTRUCT MANHOLE IN ACCORDANCE WITH FILE NO. 12
OF THE STATE STANDARD SPECIFICATIONS FOR SEWER
AND WATER. 3.5.0 AND 8.39.0
2. ADJUST FRAME TO GRADE WITH CONCRETE RINGS OF
VARIABLE THICKNESS. MAXIMUM RING HEIGHT = 6".
MINIMUM RING HEIGHT = 2". CONCRETE RINGS SHALL BE
REINFORCED WITH ONE LINE OF STEEL CENTERED
WITHIN THE RING. WHERE NECESSARY RINGS SHALL BE
GROOVED TO RECEIVE STEP.
3. CONCRETE AND REINFORCEMENT STEEL SHALL
CONFORM TO THE REQUIREMENTS OF ASTM
DESIGNATION C-478.
4. JOINTS SHALL BE WATERTIGHT AND SHALL BE MADE
USING MORTAR, FLEXIBLE PLASTIC GASKETS OR RUBBER
TYPE GASKETS FOR STORM MANHOLES.
5. AREA OF CIRCUMFERENTIAL STEEL = 0.12 SQ. INCH PER
LINEAL FOOT MIN.
6. 3" OF BEDDING STONE UNDER BASE REQUIRED ON WET
SUB-GRADE.
7. ALL SANITARY MANHOLES SHALL BE PROVIDED WITH
SELF-SEALING CONCEALED PICK HOLES, WITH NO VENTS.
BOLTED-DOWN COVERS REQUIRED OUTSIDE PAVEMENT
AREAS.
8.FRAME 8 CHIMNEY SEAL SHALL HAVE AN INTERNAL
RUBBER SLEEVES. APPROVED PRODUCTS INCLUDE
CRETEX SPECIALITY PRODUCTS AND NPC FLEXRIB
SEAL. FRAME & CHIMNEY SEALANTS SHALL BE IN
ACCORDANCE TO STANDARD SPECIFICATIONS FOR
SEWER AND WATER 8.42.0.
9.FLAT DECK SHALL BE RATED FOR HS20 TRAFFIC
LOADING.
10.PRECAST SANITARY MANHOLE SHALL BE AN
ANCHORED MANHOLE FRAME & COVER PER THE
STANDARD SPECIFICATIONS FOR SEWER AND WATER
FILE NO. 32.
11.MANHOLES SHALL HAVE AN EXTERNAL JOINT WRAP
UTILIZING ONE OF THE FOLLOWING.
PER STANDARD SPEC. 3.2.12.
-MACWRAP EXTERNAL JOINT SEALER
-ESKY WRAP
-CADDILLOC INC.
NOT TO SCALE
PRECAST SANITARY MANHOLEB
PRECAST REINFORCED
CONCRETE FLAT DECK
CONCRETE
ADJUSTING RINGS
(2 RINGS MIN.)
FINISHED GRADE
1'-4" MIN.
26 1/4"
VARIES 9" MAX.
FLAT-TOP SECTION
MANHOLE STEPS 3/8" DIA.
STEEL REINFORCING
ROD WITH MOLDED
PLASTIC COVER
PIPE TO MANHOLE CONNECTION SHALL BE
IN ACCORDANCE TO STANDARD SPECIFICATIONS
FOR SEWER AND WATER3.5,7.
ACCEPTABLE PRODUCT SHALL BE
NPC KOR-N-SEAL HIGH PRESSURE SERIES.
NEENAH R-1661-B (NON-MODERNIZED)
OR EAST JORDAN 1641
PRECAST CONCRETE
SOLID BOTTOM CONCRETE BENCHING
CAST-IN-PLACE
PRECAST
MANHOLE
SECTIONS
NOTE:
PROVIDE A MINIMUM 1/2"
DIA. HOLE FOR LEAKAGE
TEST, NOT GREATER
THAN 2' ABOVE LOWEST
PIPE.
48"
16"
4"
D
6"
6"
0.5D
2"
4.5" MIN.
MANHOLE SIZES (UNLESS OTHERWISE NOTED)
PIPE DIA. [D]MANHOLE DIA.WALL THICKNESS
* ALL PUBLIC MANHOLES SHALL BE A MINIMUM OF
48" IN DIAMETER.
8" THRU 27"
30"
36"
42"
3'-6"
4'-0"
5'-0"
6'-0"
5"
6"
7"
4 1/2"
BENCH SLOPE
-SANITARY MANHOLE 2" PER FOOT
NOTES:
1. CONSTRUCT MANHOLE IN ACCORDANCE WITH FILE NO. 12 OF THE
STATE STANDARD SPECIFICATIONS FOR SEWER AND WATER.
2. ADJUST FRAME TO GRADE WITH CONCRETE RINGS OF VARIABLE
THICKNESS. MAXIMUM RING HEIGHT = 6". MINIMUM RING HEIGHT = 2".
CONCRETE RINGS SHALL BE REINFORCED WITH ONE LINE OF STEEL
CINTERED WITHIN THE RING. WHERE NECESSARY RINGS SHALL BE
GROOVED TO RECEIVE STEP.
3. CONCRETE AND REINFORCEMENT STEEL SHALL CONFORM TO THE
REQUIREMENTS OF ASTM DESIGNATION C-478.
4. JOINTS SHALL BE WATERTIGHT AND SHALL BE MADE USING MORTAR,
FLEXIBLE PLASTIC GASKETS OR RUBBER TYPE GASKETS FOR STORM
MANHOLES.
5. AREA OF CIRCUMFERENTIAL STEEL = 0.12 SQ. INCH PER LINEAL FOOT
MIN.
6. 3" OF BEDDING STONE UNDER BASE REQUIRED ON WET SUB-GRADE.
NOT TO SCALE
PRECAST STORM MANHOLEA
PRECAST REINFORCED
CONCRETE ECCENTRIC
CONE STANDARD
CONCRETE
ADJUSTING RINGS
(2 RINGS MIN.)
FINISHED GRADE
CONE-TOP SECTION
TYPE III JOINT REQUIRED FOR
ALL STORM MANHOLES
1'-4" MIN.
26 1/4"
VARIES 9" MAX.
33" FOR 3'-6" MANHOLE
48" FOR 4'-0" MANHOLE
FLAT-TOP SECTION
MANHOLE STEPS 3/8" DIA.
STEEL REINFORCING
ROD WITH MOLDED
PLASTIC COVER
SPACE BETWEEN PIPE AND PRECAST MANHOLE
WALL TO BE FILLED WITH BRICK AND MORTAR
INTO PLACE. THE ANNULAR SPACE BETWEEN
THE PIPE AND MANHOLE WILL SHALL BE FILLED
WITH FLEXIBLE BUTYL RUBBER GASKET MATERIAL
BELOW SURFACE OF BENCH OR SPRINGLINE.
CONCRETE
ADJUSTING
RINGS
FINISHED GRADE NEENAH R-1550 WITH
TYPE B SEALING LID
PRECAST CONCRETE
SOLID BOTTOM
PRECAST
MANHOLE
SECTIONS
NOTE:
PROVIDE A MINIMUM 1/2"
DIA. HOLE FOR LEAKAGE
TEST, NOT GREATER
THAN 2' ABOVE LOWEST
PIPE.
1'-4" MIN.VARIES 9" MAX.
VARIES
16"
4"
D
6"
4.5" MIN.
MANHOLE SIZES (UNLESS OTHERWISE NOTED)
PIPE DIA. [D]MANHOLE DIA.WALL THICKNESS
* ALL PUBLIC MANHOLES SHALL BE A MINIMUM OF
48" IN DIAMETER.
8" THRU 27"
30"
36"
42"
3'-6"
4'-0"
5'-0"
6'-0"
5"
6"
7"
4 1/2"
NOT TO SCALE
CATCH BASINC
CURB INLET LOCATION
SECTION
>
CURB INLET
WITHIN CURB & GUTTER
>>
CATCH BASIN
WITHIN PAVEMENT AREA
NOTES:
1.ADJUST FRAME TO GRADE WITH CONCRETE RINGS OF VARIABLE THICKNESS.
MAXIMUM RING HEIGHT = 6". MINIMUM RING HEIGHT = 2". CONCRETE RINGS
SHALL BE REINFORCED WITH ONE LINE OF STEEL CENTERED WITHIN THE
RING. WHERE NECESSARY RINGS SHALL BE GROOVED TO RECEIVE STEP.
2.CONCRETE AND REINFORCEMENT STEEL SHALL CONFORM TO THE
REQUIREMENTS OF ASTM DESIGNATION C-478.
3.SPACE BETWEEN PIPE AND PRECAST MANHOLE WALL TO BE FILLED WITH
BRICK MORTARED IN PLACE EXCEPT THAT AN APPROVED FLEXIBLE
WATERTIGHT PIPE TO MANHOLE SEAL IS REQUIRED FOR ALL FLEXIBLE
SANITARY SEWER CONNECTIONS. THE ANNULAR SPACE BETWEEN THE PIPE
AND MANHOLE WALL SHALL BE FILLED WITH FLEXIBLE BUTYL RUBBER
GASKET MATERIAL BELOW SURFACE OF BENCH OR SPRINGLINE.
4.AREA OF CIRCUMFERENTIAL STEEL = 0.12 SQ INCH PER LINEAR FOOT MIN.
5.3" BEDDING OF STONE UNDER BASE REQUIRED ON WET SUB-GRADE.
CURB SIDE C.B. FRAME AND GRATE
PAVEMENT / LANDSCAPE C.B. FRAME AND GRATE
TOP OF CURB
FLOW LINE
OF GUTTER
VARIES
48" DIA.
12"
STORM LEAD
SEE STORM STRUCTURE TABLE
NEENAH FRAME AND GRATE
INFORMATION
FINAL GRADE PRECAST SHIMS
1/2" MORTAR BACKPLASTER
4" PERFORATED DRAIN TILE
4" PERFORATED
DRAIN TILE
5" PRECAST
STORM LEAD
STRUCTURE FOOTING
CLASS "D" CONCRETE
VARIES
48" DIA.
10' MIN.10' MIN.
12"
STORM SEWER
(SIZE AND
LOCATION VARIES)
STORM SEWER
(SIZE AND LOCATION VARIES)
CATCH BASIN
WITHIN PAVEMENT AREA
4" PERFORATED DRAIN TILE
(10' MIN. LENGTH
PROPOSED CURB & GUTTER
STORM SEWER
(SIZE AND LOCATION VARIES)
CATCH BASIN
WITHIN CURB & GUTTER
4" PERFORATED DRAIN TILE
(10' MIN. LENGTH)
DRAIN TILE TO BE INSTALLED UNDER
GUTTER & ASPHALT INTERFACE
4" PERFORATED DRAIN TILE
(10' MIN. LENGTH)
NOTE:
DRAIN TILE SHALL HAVE TWO (2)
SEGMENTS POSITIONED ALONG
THE GUTTER & ASPHALT
INTERFACE.
NOTE:
DRAIN TILE SHALL HAVE TWO (2)
SEGMENTS AT 90° ANGLES FROM
ONE ANOTHER.
18" MAX.
4" MIN.4" MIN.
4" MIN.
1'-4" MIN.
8" MIN.
PROPOSED FINAL GRADE
ASPHALT PAVEMENT
CRUSHED AGGREGATE
BASE COURSE
SUBGRADE
GEOTEXTILE FABRIC TO BE
OVERLAPPED BY 4" MIN.
GEOTEXILE FABRIC TYPE
DF SCHEDULE A
4" DIA. PCP PERFORATED DRAIN
TILE. SLOPE MIN. 1/8" PER FOOT TO
INLET
1" CLEAR STONE
NOT TO SCALE
TYPICAL HYDRANT DETAILSD
STRUCTURE TABLE
STRUCTURE
ID
STRUCTURE
DIAMETER
NEENAH
CASTING
MH 1 6'-0"R-1550
MH3 6'-0"R-1550
MH5 7'-0"R-1550
MH6 6'-0"R-1550
MH7 5'-0"R-1550
OCS1 6'-0"R-1648
CB1 5'-0"R-3228-BD
CB1A 5'-0"R-3228-BD
CB2 4'-0"R-3228-BD
CB2A 4'-0"R-3228-BD
CB3 5'-0"R-3228-BD
CB3A 5'-0"R-3228-BD
CB4 4'-0"R-3228-BD
CB4A 4'-0"R-3228-BD
CB5 5'-0"R-3228-BD
CB5A 5'-0"R-3228-BD
CB6 4'-0"R-3228-BD
CB6A 4'-0"R-3228-BD
CB7 4'-0"R-3228-BD
CB7A 4'-0"R-3228-BD
CB8 4'-0"R-2561
CB9 4'-0"R-3228-BD
CB9A 4'-0"R-3228-BD
CB10 7'-0"R-3228-BD
CB10A 7'-0"R-3228-BD
CB11 7'-0"R-3228-BD
CB11A 7'-0"R-3228-BD
CB12 4'-0"R-3228-BD
CB12A 4'-0"R-3228-BD
CB13 4'-0"R-2561
CB14 4'-0"R-2561
CB 15 4'-0"R-2561
CB 16 4'-0"R-2561
CB 16A 4'-0"R-2561
CB 17 4'-0"R-3228-BD
1.CITY RESUBMITTAL 3/23/16 TPM
STRUCTURE TABLE
STRUCTURE
ID
STRUCTURE
DIAMETER
NEENAH
CASTING
SAN MH 1 4'-0"R-1661
SAN MH 2 4'-0"R-1661
SAN MH 4 4'-0"R-1661
SAN MH 5 4'-0"R-1661
2.CITY RESUBMITTAL 5/27/16 TPM
DE
T
A
I
L
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 DETAILS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
12-4-15
15577
JBL
CTC
C 403
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
7
-
D
e
t
a
i
l
s
\
1
5
5
7
7
D
E
T
A
I
L
S
.
d
w
g
NOT TO SCALEA
OUTLET CONTROL MANHOLE
CONSTRUCTION CONDITIONS
POND LINER:
TYPE B LINERS—FOR SITES WITH MEDIUM POTENTIAL
FOR GROUNDWATER POLLUTION OR WHERE NEED FOR A
FULL POOL LEVEL IS HIGH. THEY INCLUDE:
•HIGH DENSITY POLYETHYLENE (HDPE)
•POLYETHYLENE POND LINER (PPL)
HDPE LINER CRITERIA:
a.MINIMUM THICKNESS SHALL BE 40 MILS.
b.DESIGN ACCORDING TO THE CRITERIA IN TABLE 3
OF THE NRCS 313, WASTE STORAGE
FACILITY TECHNICAL STANDARD.
c.INSTALL ACCORDING TO NRCS WISCONSIN
CONSTRUCTION SPECIFICATION 202,
POLYETHYLENE GEOMEMBRANE LINING.
PPL LINER CRITERIA:
a.MINIMUM THICKNESS SHALL BE 30 MILS.
b.ALL OTHER CRITERIA SAME AS FOR TYPE A
HDPE LINER.
CLEARING AND SUBGRADE PREPARATION:
ALL EXISTING TOPSOIL, ROOTMAT, AND ANY OTHER SOFT OR UNSUITABLE MATERIALS SHALL BE REMOVED FROM THE CLEARING AND STRIPPING LIMITS.
PRIOR TO INITIATION OF FILL PLACEMENT, THE STRIPPED AREA SHALL BE OBSERVED BY AN EXPERIENCED GEOTECHNICAL ENGINEER OR HIS AUTHORIZED
REPRESENTATIVE TO AID IN LOCATING UNSUITABLE AND/OR HIGHLY PLASTIC MATERIALS WHICH REQUIRE COMPLETE AND/OR PARTIAL REMOVAL.
THE PREPARATION OF FILL SUBGRADES OF EMBANKMENTS SHALL BE OBSERVED ON A FULL-TIME BASIS BY AN EXPERIENCED GEOTECHNICAL ENGINEER
OR HIS AUTHORIZED REPRESENTATIVE TO ENSURE THAT ALL UNSUITABLE MATERIALS HAVE BEEN COMPLETELY REMOVED.
FILL PLACEMENT:
FILL MATERIALS SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE PROJECT GEOTECHNICAL RECOMMENDATIONS.
THE FOOTPRINT OF THE EMBANKMENT AREAS SHALL BE WELL DEFINED, INCLUDING THE LIMITS OF THE FILL ZONES, AT THE TIME OF FILL PLACEMENT, WITH
GRADE CONTROL MAINTAINED THROUGHOUT THE FILL PLACEMENT OPERATIONS.
ALL FILL OPERATIONS SHALL BE OBSERVED ON A FULL-TIME BASIS BY A QUALIFIED SOIL TECHNICIAN, WHO SHALL PERFORM IN PLACE DENSITY TESTS TO
DETERMINE IF MINIMUM COMPACTION REQUIREMENTS ARE BEING MET.
FILL MATERIALS SHALL NOT BE PLACED ON FROZEN SOILS. SIMILARLY, BORROW FILL MATERIALS SHALL NOT CONTAIN FROZEN MATERIALS AT THE TIME
PLACEMENT. ALL FROZEN SOILS, FROM BOTH SUBGRADE AND FILL, SHALL BE REMOVED PRIOR TO CONTINUATION OF FILL OPERATIONS.
ALL AREAS RECEIVING FILL SHALL BE GRADED TO FACILITATE POSITIVE DRAINAGE OF ANY FREE WATER ASSOCIATED WITH PRECIPITATION AND SURFACE
RUNOFF.
BASIN 806.0 805.54 800.00 795.00
TOP OF BERM
MIN. (FT)
BOTTOM
ELEVATION
(FT)
HWL
(FT)
NWL
(FT)
WET DETENTION BASIN CONSTRUCTION INFORMATION
WET DETENTION
POND
6"
1
10*
NOT TO SCALE
WET DETENTION BASIN CROSS SECTIONE
1
3
1
4
1
3
806.0 805.50 10' 0.50' 805.50BASIN
HEIGHT
(FT)(min.)
WIDTH
(FT)
CREST ELEVATION
(FT)
TOP OF BERM
(FT)
EMERGENCY SPILLWAY CONSTRUCTION INFORMATION
WET DETENTION
POND
100-YEAR HWL
(FT)
NOT TO SCALE
EMERGENCY SPILLWAY BASINC
≥ 3 ≥ 2
1 1
≥ 3
1 2' MIN.8' MIN.
(FOR 3' PONDING
AGAINST THE
EMBANKMENT)
PRIMARY PRINCIPLE
OUTLET
ACTIVE STORAGE VOLUME
100 YEAR STORAGE ELEVATION 1'
NOT TO SCALE
TYP. EMBANKMENT CROSS SECTION FOR
WET DETENTION PONDB
ORIFICE DIAMETER = 4.0"
INVERT ELEVATION = 800.00
MANHOLE FRAME AND COVER SHALL BE
NEENAH NO. R-2540 OR EQUAL WITH
TYPE A GRATE
RIM ELEV. = 806.87
(SECTION A'-A')(SECTION B'-B')
24" PIPE
24" PIPE
INVERT ELEV.
800.00
INVERT ELEV.
800.00
4.0" ORIFICE
CONCRETE DIVIDER MANHOLE STEPS
MASTIC SEALER BETWEEN
FRAME AND TOP
RIM ELEV. = REFER
TO GRADING PLAN
6 FT DIA.
MANHOLE STEPS SHALL BE PLACED
OVER THE OUTLET PIPE PRECAST CONCRETE MANHOLE SECTION
PRECAST CONCRETE MANHOLE BASE
A'
A'
B
'
B'
(PLAN)
I
N
L
E
T
OUTLET
POND VEGETATION: SEED
TOPSOIL AREAS PER LANDSCAPE PLAN
TOP OF BERMTOP WIDTH BERM TYP. 10 FT HIGH WATER LEVEL
ELEVATION (100-YR)
NORMAL WATER
LEVEL ELEVATION
BOTTOM
ELEVATION
AGRI-DRAIN CORPORATION
ANTI SEEP COLLAR
(2 ANTI-SEEP COLLARS FOR 20' LONG
OUTLET PIPE AND LONGER)
*SAFETY SHELF
SAFETY SHELF SHALL BE 10
FOOT WIDE.
INSTALL RIP-RAP AT OUTLET PER
RIP-RAP DETAIL. (RIP-RAP NOT
SHOWN HERE FOR CLARITY)
TO OUTLET
CONTROL MH
FREEBOARD
12"
GENERAL EARTH FILL
TOP OF BERM
ELEVATION
SYNTHETIC TURF
REINFORCED
MATTING. WISDOT
CLASS 3 TYPE D.
CREST ELEVATION
LAYER OF GEOXTEXTILE
AND WEED CONTROL
FABRICS
HEIGHT
WIDTH
1
20
MIN 6" STRIPPED TOPSOIL
UNDER EMBANKMENT
EMERGENCY SPILLWAY
ELEVATION
CORE TRENCH OR KEYWAY
PERMANENT POOL
SAFETY SHELF
8' MIN.
10:1 MAX.
TOP WIDTH 4' MIN.
(10'MIN. FOR MAINTENANCE)
NOTES:
1.INSTALL RIPRAP WHERE SHOWN ON PLANS.
2.FOR PERMANENT POOL (WET) DETENTION BASINS: EXTEND RIP-RAP FROM OUTFALL
TO AT LEAST 5 FEET BEYOND THE NORMAL WATER LEVEL.
3.INSTALL MEDIUM RIPRAP PER DOT STANDARD SPECIFICATIONS FOR HIGHWAY AND
STRUCTURE CONSTRUCTION
4.INSTALL TYPE HR GEOTEXTILE FABRIC PER DOT STANDARD SPECIFICATIONS PER
HIGHWAY AND STRUCTURE CONSTRUCTION.
5.WHERE RIP-RAP IS REQUIRED AT AN AREA PER PLAN, AND THERE IS NO OUTFALL
PIPE, THE RIP RAP SHALL BE PLACED A MINIMUM 6 FEET WIDE.
6.RIP-RAP SHALL EXTEND THE ENTIRE LENGTH OF THE SAFETY SHELF.
NOT TO SCALE
RIP-RAP DISCHARGE APRONF
CHANNELIZE AND DEPRESS RIP-RAP
ALONG MIDLINE TO PREVENT FLOW FROM
CIRCUMVENTING THE PATH OF THE
RIP-RAP.
MAKE TOP OF RIP-RAP FLUSH WITH
EXISTING GROUND SURFACE AT EDGES.
STANDARD
APRON ENDWALL
TYPE HR GEOTEXTILE FABRIC
1.5' MIN.
1'
VA
R
I
E
S
1'
WEIR
DRY BASIN 809.0 808.50 10' 0.50' 806.42
806.37
805.70
806.37
805.70
804.25
12" SUMP
SYNTHETIC
LINER, TYPE B
PER WDNR
TECHNICAL
STANDARD 1001
(HDPE OR PPL)
SYNTHETIC
LINER, TYPE B
PER WDNR
TECHNICAL
STANDARD 1001
(HDPE OR PPL)
SECTION THROUGH TURF
REINFORCEMENT MATTING
GENERAL EARTH FILL
TOP OF ASPHALT
TRAIL
WIDTH
1
20
SECTION THROUGH ASPHALT TRAIL
NOTE: REFER TO ASPHALT SECTION FOR MATERIAL STRUCTURE ON SHEET C401
NOT TO SCALE
6$1,7$5<5,6(5D
1.CITY RESUBMITTAL 3/23/16 TPM
MINIMUM 6" CLAY
SOIL OVER TOP
OF SYNTHETIC
LINER
MINIMUM 6" CLAY
SOIL OVER TOP
OF SYNTHETIC
LINER
RIP-RAP CROSS SECTION DOWNSTREAM OF OUTFALL
ANCHOR GEOTEXTILE PER
MANUFACTURER'S
RECOMMENDATIONS
TYPE HR GEOTEXTILE FABRIC
MEDIUM RIP-RAP (1.5'
MIN THICKNESS)
COMPACTED
SUBGRADE
2.CITY RESUBMITTAL 5/27/16 TPM
SYNTHETIC LINER, TYPE B PER
WDNR TECHNICAL STANDARD
1001 (HDPE OR PPL)
SYNTHETIC LINER, TYPE
B PER WDNR TECHNICAL
STANDARD 1001 (HDPE
OR PPL)
EXTEND RIP-RAP THE
LENGTH OF SAFETY SHELF.
SP
E
C
I
F
I
C
A
T
I
O
N
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 SPECS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
9-15-15
15577
JBL
CTC
C 500
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
8
-
S
p
e
c
i
f
i
c
a
t
i
o
n
s
\
1
5
5
7
7
S
P
E
C
S
.
d
w
g
EARTH MOVING:
1.ALL EARTH WORK SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER PRESENTED IN THE SITE
GEOTECHNICAL REPORT. IN THE FIELD AND THESE SPECIFICATIONS. IN CASE OF CONFLICT BETWEEN THESE SPECIFICATIONS AND THE
RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER, THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER SHALL GOVERN.
2.CONTRACTOR SHALL PROVIDE MATERIAL TEST REPORTS FROM A QUALIFIED TESTING AGENCY INDICATING TEST RESULTS FOR CLASSIFICATION
ACCORDING TO ASTM D2487 AND LABORATORY COMPACTION CURVES ACCORDING TO ASTM D 1557 FOR EACH ON-SITE AND OFF-SITE SOIL
MATERIAL PROPOSED FOR FILL AND BACKFILL.
3.CONTRACTOR SHALL PROVIDE PREEXCAVATION PHOTOS OR VIDEOS SHOWING EXISTING CONDITIONS OF ADJOINING STRUCTURES AND SITE
IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY EARTHWORK OPERATIONS.
4.OLD BUILDING FOUNDATIONS, BUILDING REMNANTS OR UNSUITABLE BACKFILL MATERIAL SHALL BE COMPLETELY REMOVED FROM WITHIN AND A
MINIMUM OF 10 FEET BEYOND THE NEW BUILDING PAD AREAS. THE RESULTING EXCAVATION SHALL BE BACKFILLED WITH COMPACTED
ENGINEERED FILL.
5.FOUNDATIONS, FOUNDATION WALLS OR CONCRETE FLOOR SLABS SHALL BE REMOVED TO A MINIMUM OF TWO FEET BELOW PROPOSED
SUBGRADE WITHIN PROPOSED PARKING AND GREENSPACE AREAS. BASEMENT SLABS LOCATED BELOW 2 FEET FROM PLANNED SUBGRADE
ELEVATION MAY BE LEFT IN PLACE BUT SHALL BE BROKEN INTO MAXIMUM 6 INCH PIECES TO FACILITATE DRAINAGE.
6.SATISFACTORY SOILS FOR FILL: ASTM D 2487 SOIL CLASSIFICATION GROUPS GW, GP, GM, SW, SP, AND SM OR A COMBINATION OF THESE
GROUPS; FREE OF ROCK OR GRAVEL LARGER THAN 3 INCHES IN ANY DIMENSION, DEBRIS, WASTE, FROZEN MATERIALS, VEGETATION, AND
OTHER DELETERIOUS MATTER OR ANY SOIL GROUP OR COMBINATION OF GROUPS APPROVED OF BY THE PROJECT GEOTECHNICAL ENGINEER.
7.UNSATISFACTORY SOILS FOR FILL: SOIL CLASSIFICATION GROUPS GC, SC, CL, ML, OL, CH, MH, OH, AND PT ACCORDING TO ASTM D 2487 OR A
COMBINATION OF THESE GROUPS UNLESS DEEMED SATISFACTORY BY THE PROJECT GEOTECHNICAL ENGINEER. UNSATISFACTORY SOILS ALSO
INCLUDE SOILS NOT MAINTAINED WITHIN 3 PERCENT OF OPTIMUM SOIL MOISTURE CONTENT AT THE TIME OF COMPACTION.
8.AGGREGATE BASE COURSE BENEATH PAVEMENTS: SHALL BE 1-1/4” DENSE GRADED BASE COURSE CONFORMING TO SECTION 305 OF THE STATE
OF WISCONSIN STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION, LATEST EDITION.
9.ENGINEERED FILL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR
CRUSHED SAND; ASTM D 2940; WITH AT LEAST 90 PERCENT PASSING A 1-1/2-INCH (37.5-MM) SIEVE AND NOT MORE THAN 12 PERCENT PASSING A
NO. 200 SIEVE OR ANY SOIL DEEMED ACCEPTABLE FOR ENGINEERED FILL BY THE PROJECT GEOTECHNICAL ENGINEER. ENGINEERED FILL SHALL
BE FREE OF ORGANIC, FROZEN, OR OTHER DELETERIOUS MATERIAL AND HAVE A MAXIMUM PARTICLE SIZE LESS THAN 3 INCHES. CLAY FILLS
SHALL HAVE A LIQUID LIMIT OF LESS THAN 49 AND PLASTICITY INDEX BETWEEN 11 AND 25.
10.BEDDING COURSE FOR SEWERS AND WATER SERVICE: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL,
CRUSHED STONE, AND NATURAL OR CRUSHED SAND CONFORMING TO THE REQUIREMENTS OF SECTION 8.43.2 OF THE STANDARD
SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN, LATEST EDITION.
11.DRAINAGE COURSE BENEATH BUILDING SLABS: NARROWLY GRADED MIXTURE OF WASHED, CRUSHED STONE, OR CRUSHED OR UNCRUSHED
GRAVEL; ASTM D 448; COARSE-AGGREGATE GRADING SIZE 57; WITH 100 PERCENT PASSING A 1-1/2-INCH (37.5-MM) SIEVE AND 0 TO 5 PERCENT
PASSING A NO. 8 SIEVE.
12.TRENCH BACKFILL MATERIAL SHALL BE GRANULAR BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OF THE STANDARD SPECIFICATIONS BENEATH
AND WITHIN FIVE FEET OF PAVEMENT AREAS; COMPACTED SPOIL BACKFILL IN ACCORDANCE WITH SECTION 8.43.5 OF THE STANDARD
SPECIFICATIONS MAY BE USED BENEATH LANDSCAPE AREAS.
13.PIPE COVER MATERIAL: CONFORM TO SECTION 8.43.3 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN
WISCONSIN, LATEST EDITION.
14.PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM
FLOODING PROJECT SITE AND SURROUNDING AREA.
15.SHORING, SHEETING AND BRACING: SHORE, BRACE OR SLOPE BANKS OF EXCAVATION TO PROTECT WORKWEN, BANKS, ADJACENT PAVING,
STRUCTURES, AND UTILITIES TO MEET OSHA REQUIREMENTS. DESIGN OF TEMPORARY SUPPORT OF EXCAVATION IS THE RESPONSIBILITY OF THE
CONTRACTOR.
16.EXCAVATE TO SUBGRADE ELEVATIONS REGARDLESS OF THE CHARACTER OF SURFACE AND SUBSURFACE CONDITIONS ENCOUNTERED.
UNCLASSIFIED EXCAVATED MATERIALS MAY INCLUDE ROCK, SOIL MATERIALS, AND OBSTRUCTIONS. NO CHANGES IN THE CONTRACT SUM OR
THE CONTRACT TIME WILL BE AUTHORIZED FOR ROCK EXCAVATION OR REMOVAL OF OBSTRUCTIONS.
17.PROOF-ROLL SUBGRADE BELOW THE BUILDING SLABS AND PAVEMENTS WITH FULLY LOADED TANDEM AXLE DUMP TRUCK OR RUBBER TIRED
VEHICLE OF SIMILAR SIZE AND WEIGHT, TYPICALLY 9 TONS/AXLE, WHERE COHESIVE SOILS ARE ENCOUNTERED OR WITH A SMOOTH DRUMMED
VIBRATORY ROLLER WHERE GRANULAR SOILS ARE PRESENT. DO NOT PROOF-ROLL WET OR SATURATED SUBGRADES AND PROOFROLL IN DRY
WEATHER. PROOF ROLL IN PRESENCE OF PROJECT GEOTECHNICAL ENGINEER OR TECHNICIAN. SOILS THAT ARE OBSERVED TO RUT OR DEFLECT
EXCESSIVELY UNDER THE MOVING LOAD (TYPICALLY >1”) SHALL BE UNDERCUT AND REPLACED WITH PROPERLY COMPACTED ENGINEERED FILL.
IN PAVEMENT AREAS WHERE UNDERCUTS ARE PERFORMED, THE EDGES OF THE OVEREXCAVATIONS SHALL BE FEATHERED INOT THE
SURROUNDING SUITABLE SOIL SO THAT EDGE FAILURE OF THE OVEREXCAVATED AREA DOES NOT OCCUR.
18.DUE TO CLAYEY SOILS, IF UNDERCUTS OCCUR WITHIN PAVEMENT AREAS AND THEY ARE BACKFILLED WITH GRANULAR SOILS, THE BOTTOM OF
THE OVEREXCAVATION SHALL BE SLOPED TO A DRAINTILE THAT IS IN KIND SLOPED TOWARD THE NEAREST STORM SEWER. MINIMUM SLOPES OF
SUCH DRAINTILES SHALL BE 0.5%.
19.CONVENTIONAL DISKING AND AERATION TECHNIQUES SHALL BE USED TO DRY SOILS BEFORE PROOF ROLLING. ALLOT FOR PROPER DRYING TIME
IN PROJECT SCHEDULE.
20.ENGINEERED FILL SHALL BE PLACED IN MAXIMUM LIFTS OF EIGHT INCHES OF LOOSE MATERIAL AND COMPACTED WITHIN 3% OF OPTIMUM SOIL
MOISTURE CONTENT VALUE AND A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST ASTM
D1557. EACH LIFT OF COMPACTED ENGINEERED FILL SHALL BE OBSERVED AND TESTED BY A QUALIFIED GEOTECHNICAL ENGINEER OR
TECHNICIAN.
21.EXISTING OLD FILL MATERIAL SHALL BE REMOVED BELOW FOOTINGS OR FOUNDATION SUPPORTING FILL. ENGINEERED FILL BELOW FOOTINGS
SHOULD HAVE AN IN-PLACE DENSITY OF 95% OF THE MAXIMUM DRY DENSITY AND A MOISTURE CONTENT WITHIN 3% OF OPTIMUM AS
DETERMINED BY ASTM D1557. ENGINEERED FILL BELOW FOOTINGS SHALL BE EVALUATED BY IN-FIELD DENSITY TESTS DURING CONSTRUCTION.
22. WHERE UNSUITABLE BEARING SOILS ARE ENCOUNTERED IN A FOOTING EXCAVATION, THE EXCAVATION SHALL BE DEEPENED TO COMPETENT
BEARING SOIL AND THE FOOTING LOWERED OR AN OVEREXCAVATION AND BACKFILL PROCEDURE PERFORMED. OVEREXCATION AND BACKFILL
TREATMENT REQUIRES WIDENING THE DEEPENED EXCAVATION IN ALL DIRECTIONS AT LEAST 6 INCHES BEYOND THE EDGE OF THE FOOTING FOR
EACH 12 INCHES OF OVEREXCAVATION DEPTH. THE OVEREXCAVATION SHALL BE BACKFILLED UP TO FOOTING BASE ELEVATION IN MAXIMUM 8
INCH LOOSE LIFTS WITH SUITABLE GRANULAR FILL MATERIAL AND COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY AND A MOISTURE
CONTENT WITHIN 3% OF OPTIMUM AS DETERMINED BY ASTM D1557. SOILS AT FOUNDATION BEARING ELEVATION IN THE FOOTING EXCAVATIONS
SHALL BE OBSERVED AND TESTED BY A QUALIFIED GEOTECHNICAL ENGINEER OR TECHNICIAN.
23.A MINIMUM OF FOUR INCHES OF DRAINAGE COURSE MAT SHALL BE PLACED BELOW BUILDING FLOOR SLABS. DRAINAGE COURSE SHALL BE
COMPACTED TO A MINIMUM OF 95% COMPACTION WITH RESPECT TO THE MODIFIED PROCTOR (ASTM D1557)
24.UTILITY TRENCHES FOR SEWER AND WATER SHALL CONFORM TO CLASS B COMPACTED TRENCH SECTION IN ACCORDANCE WITH FILE NO. 4 OF
THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN, LATEST EDITION.
25.BACKFILL UTILITY TRENCHES IN 4 TO 6 INCH LOOSE LIFTS COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D1557.
BACKFILL SHALL BE MOISTURE CONDITIONED TO BE WITH 3% OF OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D1557.
26.UTILITY BEDDING PLACEMENT: CONFORM TO SECTION 3.2.6 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN
WISCONSIN, LATEST EDITION. BEDDING MATEERIAL SHALL BE COMPACTED TO A MINIMUM OF 90% COMPACTION WITH RESPECT TO THE MODIFIED
PROCTOR (ASTM D1557).
27.COMPACTION TESTING OF UTILITY TRENCHES SHALL BE PERFORMED FOR EVERY 200 CUBIC YARDS OF BACKFILL PLACED OR EACH LIFT WITHIN
200 LINEAR FEET OF TRENCH, WHICHEVER IS LESS.
28.AGGREGATE BASE COURSE BENEATH PAVEMENTS SHALL BE PLACED AND COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY WITH A
MOISTURE CONTENT WITHIN 3% OF OPTIMUM AS DETERMINED BY ASTM D1557. AGGREGATE BASE SHALL BE OBSERVED AND TESTED BY A
QUALIFIED GEOTECHNICAL ENGINEER OR TECHNICIAN.
29.GRADING GENERAL: UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE CHANGES. COMPLY WITH COMPACTION
REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS INDICATED. SLOPE GRADES TO DIRECT WATER AWAY FROM
BUILDINGS AND TO PREVENT PONDING.
30.TESTING AGENCY: CONTRACTOR SHALL ENGAGE A QUALIFIED INDEPENDENT GEOTECHNICAL ENGINEERING TESTING AGENCY TO PERFORM
FIELD QUALITY-CONTROL TESTING.
31.FOOTING SUBGRADE TESTING: EACH ISOLATED FOOTING SHALL INCLUDE AT LEAST ONE TEST PROBE. TEST PROBES SHALL BE PERFORMED
EVERY 20 LINEAR FEET IN CONTINUOUS FOOTINGS.
32.BUILDING SLAB AREA TESTING: AT SUBGRADE AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST 1 TEST PER LIFT FOR EVERY 2500
SQ. FT. OR LESS OF BUILDING SLAB, BUT IN NO CASE FEWER THAN 3 TESTS.
33.PAVEMENT AREA TESTING: AT SUBGRADE AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY LIFT FOR EVERY
2,500 SQUARE FEET OF PAVEMENT AREA, BUT IN NO CASES FEWER THAN 3 TESTS.
34.UTILITY TRENCH BACKFILL TESTING: ONE TEST FOR EACH 200 CUBIC YARDS OF FILL BACKFILL PLACED OR ONE TEST PER 200 LINEAR FEET OF
TRENCH FOR EACH LIFT; WHICHEVER IS LESS.
35.FOUNDATION WALL BACKFILL: AT EACH COMPACTED BACKFILL LAYER, AT LEAST 1 TEST PER LIFT FOR EACH 50 FEET OR LESS OF WALL LENGTH,
BUT NO FEWER THAN 2 TESTS.
36.WHEN TESTING AGENCY REPORTS THAT SUBGRADES, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION SPECIFIED, SCARIFY
AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL TO DEPTH REQUIRED; RECOMPACT AND RETEST UNTIL SPECIFIED COMPACTION IS
OBTAINED.
37.DISPOSAL: REMOVE SURPLUS SOIL AND WASTE MATERIAL, INCLUDING UNSATISFACTORY SOIL, TRASH, AND DEBRIS, AND LEGALLY DISPOSE OF IT
OFF OWNER'S PROPERTY.
GENERAL:
1.EXISTING UTILITIES ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY, AND NO RESPONSIBILITY IS ASSUMED BY THE OWNER OR
ENGINEER FOR THEIR ACCURACY OR COMPLETENESS.
2.CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UNDERGROUND
UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. CONTRACTOR SHALL HAVE SITE MARKED BY DIGGER'S HOTLINE AND
SHALL HAVE PRIVATE UTILITIES MARKED BY A PRIVATE UTILITY LOCATOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY
ALL ELEVATIONS, LOCATIONS, AND SIZES OF EXISTING UTILITIES AND SHALL CHECK ALL UTILITY CROSSINGS AND PROPOSED
CONNECTIONS FOR CONFLICTS/DISCREPENCIES PRIOR TO INITIATING CONSTRUCTION. REPORT ANY CONFLICTS OR DISCREPECIES
TO THE ENGINEER SO REDESIGN MAY OCCUR IF NEEDED.
3.LENGTHS OF ALL UTILITIES ARE TO CENTER OF STRUCTURES OR FITTINGS AND MAY VARY SLIGHTLY FROM PLANS. LENGTHS SHALL
BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
SANITARY SEWERAGE:
1.ALL PRIVATE SANITARY SEWER WORK SHALL BE IN ACCORDANCE WITH THE DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES
(DSPS) PLUMBING CODE - CHAPTERS SPS 382 AND SPS 384 AND CITY OF MUSKEGO STANDARD SPECIFICATIONS.
2.ALL PUBLIC SANITARY SEWER WORK SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR SEWER AND WATER
CONSTRUCTION IN WISCONSIN, LATEST EDITION (STANDARD SPECIFICATIONS) AND LOCAL MUNICIPAL REQUIREMENTS.
3.PVC SEWER PIPE AND FITTINGS: ASTM D 3034, SDR 35, WITH BELL-AND-SPIGOT ENDS WITH RUBBER GASKETED JOINTS IN
ACCORDANCE WITH CHAPTER 8.10.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN,
LATEST EDITION. JOINTS SHALL CONFORM TO ASTM D-3212.
4.MANHOLES: STANDARD PRECAST REINFORCED CONCRETE MANHOLES CONFORMING TO ASTM C478, SECTION 8.39.0 OF THE
STANDARD SPECIFICATIONS AND CONFORMING TO FILE NOS. 12, 13 AND 15 OF THE STANDARD SPECIFICATIONS. DIAMETER AND DEPTH
AS INDICATED ON PLANS. MANHOLE SIZES TO BE VERIFIED BY CONTRACTOR AND SHOP DRAWINGS SHALL BE PROVIDED TO THE
ENGINEER FOR REVIEW PRIOR TO ORDERING STRUCTURES.
5.MANHOLES DEEPER THAN FOUR FEET SHALL BE PROVIDED WITH MANHOLE STEPS CONFORMING TO SECTION 8.40.0 OF THE
STANDARD SPECIFICATIONS.
6.SEWERS SHALL BE INSTALLED IN CONFORMANCE WITH SECTION 3.2.0 OF THE STANDARD SPECIFICATIONS. INSTALL PROPER SIZE
INCREASERS, REDUCERS AND COUPLINGS WHERE DIFFERENT SIZES OR MATERIALS OF PIPES AND FITTINGS ARE CONNECTED.
INSTALL TRACER PIPE OVER NON-METALLIC PIPING IN ACCORANCE WITH SPS SECTION 382.30(11)(H) AND 382.36(7)(D).
7.PIPE JOINT CONSTRUCTION: FOLLOW PIPING MANUFACTURER'S RECOMMENDATIONS; JOIN PVC SEWER PIPE ACCORDING TO ASTM
D2321 AND ASTM D 3212 FOR ELASTOMERIC GASKET JOINTS. JOIN DISSIMILAR PIPE MATERIALS WITH NONPRESSURE-TYPE, FLEXIBLE
COUPLINGS
7.PROVIDE AND INSTALL CLEANOUTS IN ACCORDANCE WITH SPS CHAPTER 382.35. INSTALL CLEANOUTS AND RISER EXTENSIONS FORM
SEWER PIPES TO PROPOSED GRADE. INSTALL PIPING SO CLEANOUTS OPEN IN DIRECTION OF FLOW IN SEWER PIPE. USE LIGHT DUTY,
TOP LOADING CLASSIFICATION CLEANOUTS IN EARTH OR UNPAVED FOOT TRAFFIC AREAS; USE MEDIUM DUTY, TOP-LOADING
CLASSIFICATION CLEANOUTS IN PAVED FOOT TRAFFIC AREAS; USE HEAVY DUTY, TOP-LOADING CLASSIFICATION CLEANOUTS IN
VEHICULAR TRAFFIC AREAS. SET CLEANOUT FRAMES AND COVERS IN PAVEMENT AREAS FLUSH WITH PAVEMENT SURFACE.
8.CLASS B COMPACTED TRENCH SECTION (FILE NO. NO. 4 OF STANDARD SPECIFICATIONS) SHALL BE UTILIZED. BEDDING AND COVER
MATERIAL SHALL BE IN ACCORDANCE WITH SECTION 8.43.0 OF THE STANDARD SPECIFICATIONS.
9.TRENCH BACKFILL MATERIAL SHALL BE GRANULAR BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OF THE STANDARD
SPECIFICATIONS BENEATH AND WITHIN FIVE FEET OF PAVEMENT AREAS; COMPACTED SPOIL BACKFILL IN ACCORDANCE WITH SECTION
8.43.5 OF THE STANDARD SPECIFICATIONS MAY BE USED BENEATH LANDSCAPE AREAS.
10.MANHOLE INSTALLATION SHALL BE IN ACCORDANCE WITH SECTION 3.5.0 OF THE STANDARD SPECIFICATIONS. SET MANHOLE RIMS TO
ELEVATIONS INDICATED ON PLANS.
11.AFTER INSTALLATION OF SEWER PIPE CLEAN ALL DEBRIS FROM SEWER AND INSPECT INTERIOR OF PIPING TO DETERMINE WHETHER
LINE DISPLACEMENT OR OTHER DAMAGE HAS OCCURRED. CONDUCT DEFLECTION TESTING OF INSTALLED PIPE IN ACCORDANCE WITH
SECTION 3.2.6(I)4 OF THE STANDARD SPECIFICATIONS; REPLACE ANY PIPE SECTION NOT PASSING THE DEFLECTION TESTING USING
NEW PIPE MATERIALS. TEST NEW BUILDING SEWER IN ACCORDANCE WITH SECTION 5.4.0 OF THE STANDARD SPECIFICATIONS.
REPLACE LEAKING PIPE USING NEW PIPE MATERIALS AAND REPEAT TESTING UNTIL LEAKAGE IS WITHIN ALLOWANCES SPECIFIED.
SITE CLEARING:
1.EXCEPT FOR STRIPPED TOPSOIL OR OTHER MATERIALS INDICATED TO REMAIN ON OWNER'S PROPERTY, CLEARED MATERIALS
SHALL BECOME CONTRACTOR'S PROPERTY AND SHALL BE REMOVED FROM PROJECT SITE.
2.MINIMIZE INTERFERENCE WITH ADJOINING ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES DURING
SITE-CLEARING OPERATIONS.
3.SALVABLE IMPROVEMENTS: CAREFULLY REMOVE ITEMS INDICATED TO BE SALVAGED AND STORE ON OWNER'S PREMISES WHERE
INDICATED.
4.UTILITY LOCATOR SERVICE: NOTIFY UTILITY LOCATOR SERVICE FOR AREA WHERE PROJECT IS LOCATED BEFORE SITE CLEARING.
5.DO NOT COMMENCE SITE CLEARING OPERATIONS UNTIL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN
PLACE.
6.PROTECT AND MAINTAIN BENCHMARKS AND SURVEY CONTROL POINTS FROM DISTURBANCE DURING CONSTRUCTION.
7.LOCATE AND CLEARLY FLAG TREES AND VEGETATION TO REMAIN OR TO BE RELOCATED.
8.PROTECT EXISTING SITE IMPROVEMENTS TO REMAIN FROM DAMAGE DURING CONSTRUCTION; RESTORE DAMAGED IMPROVEMENTS
TO THEIR ORIGINAL CONDITION, AS ACCEPTABLE TO OWNER.
9.LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP OFF UTILITIES INDICATED TO BE REMOVED; ARRANGE WITH UTILITY COMPANIES
TO SHUT OFF INDICATED UTILITIES.
10.EXISTING UTILITIES: DO NOT INTERRUPT UTILITIES SERVING FACILITIES OCCUPIED BY OWNER OR OTHERS UNLESS PERMITTED BY
THE OWNER AND THEN ONLY AFTER ARRANGING TO PROVIDE TEMPORARY UTILITY SERVICES.
11.FILL DEPRESSIONS CAUSED BY CLEARING AND GRUBBING OPERATIONS WITH SATISFACTORY SOIL MATERIAL UNLESS FURTHER
EXCAVATION OR EARTHWORK IS INDICATED; PLACE FILL MATERIAL IN HORIZONTAL LAYERS NOT EXCEEDING A LOOSE DEPTH OF 8
INCHES, AND COMPACT EACH LAYER TO A DENSITY EQUAL TO ADJACENT ORIGINAL GROUND.
12.REMOVE SOD AND GRASS BEFORE STRIPPING TOPSOIL.
13.STRIP TOPSOIL TO WHATEVER DEPTHS ARE ENCOUNTERED IN A MANNER TO PREVENT INTERMINGLING WITH UNDERLYING SUBSOIL
OR OTHER WASTE MATERIALS.
14.STOCKPILE TOPSOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS WITHOUT INTERMIXING WITH SUBSOIL. GRADE AND SHAPE
STOCKPILES TO DRAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST.
15.REMOVE EXISTING ABOVE- AND BELOW-GRADE IMPROVEMENTS AS INDICATED AND AS NECESSARY TO FACILITATE NEW
CONSTRUCTION.
16.SAWCUT ALL PAVEMENTS FULL DEPTH PRIOR TO REMOVAL; SAWCUTS SHALL BE IN STRAIGHT LINES PERPENDICULAR AND/OR
PARALLEL TO EXISTING PAVEMENT JOINTS AND PAVEMENT EDGES.
17.REMOVE SURPLUS SOIL MATERIAL, UNSUITABLE TOPSOIL, OBSTRUCTIONS, DEMOLISHED MATERIALS, AND WASTE MATERIALS
INCLUDING TRASH AND DEBRIS, AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY.
18.SEPARATE RECYCLABLE MATERIALS PRODUCED DURING SITE CLEARING FROM OTHER NONRECYCLABLE MATERIALS. STORE OR
STOCKPILE WITHOUT INTERMIXING WITH OTHER MATERIALS AND TRANSPORT THEM TO RECYCLING FACILITIES.
SITE WATER SERVICE:
1.COMPLY WITH STANDARDS OF STATE PLUMBING CODE (SPS CH. 382, 384), LOCAL WATER UTILITY REQUIREMENTS AND STANDARDS OF
AUTHORITIES HAVING JURISDICTION FOR FIRE-SUPPESSION AND WATER SERVICE PIPING INCLUDING MATERIALS, FITTINGS,
APPURTENANCES, INSTALLATION, TESTING, SERVICE TAPS, ETC. IN CASE OF CONFLICT BETWEEN THESE SPECIFICATIONS AND STATE
PLUMBING CODE OR LOCAL JURISDICTIONAL AUTHORITY, STATE PLUMBING CODE AND LOCAL JURISDICTIONAL AUTHORITY
REQUIREMENTS GOVERN.
2.ALL PUBLIC WATER SHALL BE IN ACCORDANCE WITH CITY OF MUSKEGO STANDARD SPECIFICATIONS.
3.DO NOT INTERRUPT SERVICE TO FACILITIES OCCUPIED BY OWNER OR OTHERS UNLESS PERMITTED BY OWNERS OF SUCH FACILITIES
AND THEN ONLY AFTER ARRANGING TO PROVIDE TEMPORARY WATER-DISTRIBUTION SERVICE.
4.WATER SERVICE PIPING MAY BE EITHER DUCTILE IRON WATER PIPE OR PVC WATER PIPE AS ALLOWED BY THE LOCAL WATER UTILITY.
5.DUCTILE IRON WATER PIPE CONFORMING TO THE REQUIREMENTS OF THE AMERICAN NATIONAL STANDARD FOR DUCTILE IRON PIPE,
CENTRIFUGALLY CAST, AWWA C151/A21.51 - LATEST REVISION AND REQUIREMENTS OF CHAPTER 8.18.0 OF THE STANDARD
SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN, LATEST EDITION.
a.CLASS 52
b.CEMENT MORTAR LINING AND INTERNAL AND EXTERNAL BITUMINOUS COATS IN ACCORDANCE WITH SECTION 51.8 OF AWWA C151.
c.PUSH-ON GASKET PIPE
d.PLAIN RUBBER GASKETS
e.BONDING STRAPS TO PROVIDE ELECTRICAL CONDUCTIVITY WITHOUT FIELD TESTING
5.JOINTS FOR DUCTILE IRON PIPE: JOINTS SHALL BE RUBBER GASKET JOINTS; CONFORM TO THE REQUIREMENTS OF AMERICAN
NATIONAL STANDARD FOR RUBBER GASKET JOINTS FOR DUCTILE IRON PRESSURE PIPE AND FITTINGS (ANSI/AWWA C111/A21.11,
LATEST EDITION)
6.FITTINGS FOR DUCTILE IRON PIPE: CONFORM TO THE REQUIREMENTS OF AMERICAN NATIONAL STANDARD FOR DUCTILE IRON AND
GRAY IRON FITTINGS, 3” THROUGH 48” FOR WATER ANSI/AWWA C110/A21.10, LATEST EDITION); CLASS 250 MECHANICAL JOINT PIPE
FITTINGS; CEMENT LINED; ALL BELLS; ENTIRE FITTING TARRED; CONDUCTIVE MECHANICAL JOINT (NO LEAD) RUBBER GASKETS,
FLANGES, AND BOLTS.
7.PVC AWWA PIPE: AWWA C900, CLASS 200 WITH BELL END WITH GASKET AND WITH SPIGOT END AND MEETING REQUIREMENTS OF
CHAPTER 8.20.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN. FITTINGS SHALL BE IN
ACCORDANCE WITH CHAPTER 8.22.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN.
PUSH-ON-JOINT, DUCTILE IRON FITTINGS : AWWA C110 AND C111. MECHANICAL -JOINT, DUCTILE IRON FITTINGS: AWWA C153,
DUCTILE-IRON COMPACT PATTERN. GLANDS, GASKETS AND BOLTS: AWWA C111, DUCTILE IRON GLANDS, RUBBER GASKETS AND STEEL
BOLTS.
8.GATE VALVES: CONFORM TO AWWA C-500 AND STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN
SUITABLE FOR DIRECT BURY.
9.VALVE BOXES: CAST IRON CONFORMING TO ASTM DESIGNATION A-48, CLASS 20 AND STANDARD SPECIFICATIONS FOR SEWER AND
WATER CONSTRUCTION IN WISCONSIN.
10.FIRE HYDRANTS: N/A
11.WATER MAIN CONNECTION: TAP WATER MAIN WITH SIZE AND LOCATION INDICATED ON PLAN IN ACCORDANCE WITH LOCAL WATER
UTILITY REQUIREMENTS. COORDINATE CONNECTION WITH LOCAL WATER UTILITY.
12.GENERAL WATER PIPE INSTALLATION: IN ACCORDANCE WITH CHAPTER 4.3.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND
WATER CONSTRUCTION IN WISCONSIN.
13.INSTALL DUCTILE-IRON, WATER-SERVICE PIPING ACCORDING TO AWWA C600 AND CHAPTER 4.4.0 OF THE STANDARD SPECIFICATIONS
FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN.
14.ALL DUCTILE IRON PIPE SHALL BE ENCASED IN POLYETHYLENE PER AWWA C105, LATEST EDITION AND IN ACCORDANCE WITH CHAPTER
4.4.4 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN. ALL JOINTS AND FITTINGS SHALL
HAVE POLYETHYLENE ENCASEMENT INSTALLED PER MANUFACTURER'S REQUIREMENTS AND PROCEDURES.
15.INSTALL PVC AWWA PIPE ACCORDING TO ASTM F645 AND AWWA M23 AND CHAPTER 4.6.0 OF THE STANDARD SPECIFICATIONS FOR
SEWER AND WATER CONSTRUCTION IN WISCONSIN.
16.INSTALL THRUST RESTRAINT AT ALL OFFSET FITTINGS USING MECHANICAL JOINT RESTRAINTS. CONCRETE THRUST BLOCKS MAY ONLY
BE USED IF ALLOWED BY LOCAL WATER UTILITY.
17.INSTALL WATER SERVICE PIPING SUCH THAT THERE IS A MINIMUM OF 6' OF COVER OVER THE TOP OF THE WATER SERVICE PIPING.
18.BEDDING AND COVER FOR WATER SERVICE PIPING SHALL BE IN ACCORDANCE WITH SECTION 4.3.3 AND FILE NO. 36 OF THE STANDARD
SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN, LATEST EDITION. TRENCH BACKFILL SHALL BE GRANULAR
BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN
WISCONSIN, LATEST EDITION ON-SITE.
STORM DRAINAGE:
1.ALL PRIVATE STORM SEWER WORK SHALL BE IN ACCORDANCE WITH THE DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES
(DSPS) PLUMBING CODE - CHAPTERS SPS 382 AND SPS 384 AND LOCAL MUNICIPAL REQUIREMENTS.
2.ALL PUBLIC STORM SEWER WORK SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR SEWER AND WATER
CONSTRUCTION IN WISCONSIN, LATEST EDITION (STANDARD SPECIFICATIONS) AND LOCAL MUNICIPAL REQUIREMENTS.
3.PVC SEWER PIPE AND FITTINGS: ASTM D 3034, SDR 35, WITH BELL-AND-SPIGOT ENDS WITH RUBBER GASKETED JOINTS IN
ACCORDANCE WITH CHAPTER 8.10.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN,
LATEST EDITION. JOINTS SHALL CONFORM TO ASTM D-3212.
4.REINFORCED CONCRETE PIPE: ASTM C76 WITH BELL AND SPIGOT ENDS AND GASKETED JOINTS WITH ASTM C443 RUBBER GASKETS
IN ACCORDANCE WITH CHAPTER 8.6.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN,
LATEST EDITION.
5.HDPE PIPE: ADS N12 PIPE AS APPROVED ON THE DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES PLUMBING PRODUCT
REGISTER.
6.CATCH BASINS: STANDARD PRECAST CONCRETE CATCH BASINS CONFORMING TO CHAPTER 3.6.0 OF THE STANDARD
SPECIFICATIONS AND IN GENERAL CONFORMANCE WITH FILE NO. 26 OF THE STANDARD SPECIFICATIONS. DEPTH AND DIAMETER AS
INDICATED ON PLANS. CATCH BASIN SIZES TO BE VERIFIED BY CONTRACTOR AND SHOP DRAWINGS SHALL BE PROVIDED TO THE
ENGINEER FOR REVIEW PRIOR TO ORDERING STRUCTURES.
7.FRAMES AND GRATES: AS INDICATED ON PLANS. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING SPECIFIED FRAME/GRATE IS
COMAPATIBLE WITH STRUCTURE; IF NOT, NOTIFY ENGINEER.
8.MANHOLES: STANDARD PRECAST REINFORCED CONCRETE MANHOLES CONFORMING TO ASTM C478, SECTION 8.39.0 OF THE
STANDARD SPECIFICATIONS AND CONFORMING TO FILE NOS. 12, 13 AND 15 OF THE STANDARD SPECIFICATIONS. DIAMETER AND
DEPTH AS INDICATED ON PLANS. MANHOLE SIZES TO BE VERIFIED BY CONTRACTOR AND SHOP DRAWINGS SHALL BE PROVIDED TO
THE ENGINEER FOR REVIEW PRIOR TO ORDERING STRUCTURES.
9.MANHOLES AND CATCH BASINS DEEPER THAN FOUR FEET SHALL BE PROVIDED WITH MANHOLE STEPS CONFORMING TO SECTION
8.40.0 OF THE STANDARD SPECIFICATIONS.
10.SEWERS SHALL BE INSTALLED IN CONFORMANCE WITH SECTION 3.2.0 OF THE STANDARD SPECIFICATIONS. INSTALL PROPER SIZE
INCREASERS, REDUCERS AND COUPLINGS WHERE DIFFERENT SIZES OR MATERIALS OF PIPES AND FITTINGS ARE CONNECTED.
INSTALL TRACER PIPE OVER NON-METALLIC PIPING IN ACCORANCE WITH SPS SECTION 382.30(11)(H) AND 382.36(7)(D).
11.PROVIDE AND INSTALL CLEANOUTS IN ACCORDANCE WITH SPS CHAPTER 382.35. INSTALL CLEANOUTS AND RISER EXTENSIONS FORM
SEWER PIPES TO PROPOSED GRADE. INSTALL PIPING SO CLEANOUTS OPEN IN DIRECTION OF FLOW IN SEWER PIPE. USE LIGHT DUTY,
TOP LOADING CLASSIFICATION CLEANOUTS IN EARTH OR UNPAVED FOOT TRAFFIC AREAS; USE MEDIUM DUTY, TOP-LOADING
CLASSIFICATION CLEANOUTS IN PAVED FOOT TRAFFIC AREAS; USE HEAVY DUTY, TOP-LOADING CLASSIFICATION CLEANOUTS IN
VEHICULAR TRAFFIC AREAS. SET CLEANOUT FRAMES AND COVERS IN PAVEMENT AREAS FLUSH WITH PAVEMENT SURFACE.
12.CLASS B COMPACTED TRENCH SECTION (FILE NO. NO. 4 OF STANDARD SPECIFICATIONS) SHALL BE UTILIZED. BEDDING AND COVER
MATERIAL SHALL BE IN ACCORDANCE WITH SECTION 8.43.0 OF THE STANDARD SPECIFICATIONS.
13.TRENCH BACKFILL MATERIAL SHALL BE GRANULAR BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OF THE STANDARD
SPECIFICATIONS BENEATH AND WITHIN FIVE FEET OF PAVEMENT AREAS; COMPACTED SPOIL BACKFILL IN ACCORDANCE WITH
SECTION 8.43.5 OF THE STANDARD SPECIFICATIONS MAY BE USED BENEATH LANDSCAPE AREAS.
14.MANHOLE INSTALLATION SHALL BE IN ACCORDANCE WITH SECTION 3.5.0 OF THE STANDARD SPECIFICATIONS. SET MANHOLE RIMS
TO ELEVATIONS INDICATED ON PLANS.
15.CATCH BASIN INSTALLATION SHALL BE IN ACCORDANCE WITH SECTION 3.6 OF THE STANDARD SPECIFICATIONS. CATCH BASIN
EXCAVATION AND PREPARATION SHALL BE IN ACCORDANCE WITH SECTION 3.5.4(A) AND (B) OF THE STANDARD SPECIFCIATIONS.
FRAMES AND GRATES SHALL BE SET TO THE ELEVATIONS SHOWN ON THE PLANS.
16.AFTER INSTALLATION OF SEWER PIPE CLEAN ALL DEBRIS FROM SEWER AND INSPECT INTERIOR OF PIPING TO DETERMINE WHETHER
LINE DISPLACEMENT OR OTHER DAMAGE HAS OCCURRED. CONDUCT DEFLECTION TESTING OF INSTALLED PIPE IN ACCORDANCE
WITH SECTION 3.2.6(I)4 OF THE STANDARD SPECIFICATIONS; REPLACE ANY PIPE SECTION NOT PASSING THE DEFLECTION TESTING
USING NEW PIPE MATERIALS.
SITE WATER SERVICE CONT.:
19.INSTALL TRACER WIRE FOR NON-METALLIC WATER SERVICES IN ACCORDANCE WITH SPS SECTION 382.40(8)(K). TRACER WIRE
INSULATION COLOR SHALL BE BLUE FOR POTABLE WATER SERVICE PIPING.
20.DUCTILE-IRON PIPING, RUBBER GASKETED JOINTS IN ACCORDANCE WITH SECTION 4.4.2 OF THE STANDARD SPECIFICATIONS FOR
SEWER AND WATER CONSTRUCTION IN WISCONSIN.
21.PVC PIPING GASKETED JOINTS: USING JOINING MATERIALS ACCORDING TO AWWA C900. CONSTRUCT JOINTS WITH ELASTOMERIC
SEALS AND LUBRICANTS ACCORDING TO ASTM D2774 OR ASTM D3139 AND PIPE MANUFACTURER'S WRITTEN INSTRUCTIONS.
22.CONDUCT HYDROSTATIC TESTS IN ACCORDANCE WITH CHAPTER 4.15.0 OF THE STANDARD SPECIFICATIONS FOR SEWER AND WATER
CONSTRUCTION IN WISCONSIN.
23.CLEAN AND DISINFECT WATER SERVICE PIPING IN ACCORDANCE WITH SPS CHAPTER 82.40(8)(I) AND AWWA C651.
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
SP
E
C
I
F
I
C
A
T
I
O
N
S
DRAWING NO.
DRAWN BY:
DATE:
PROJECT NO:
CHECKED BY:
APPROVED BY:
NO. REVISION DATE BY
SHEET NO.:
PA
R
K
L
A
N
D
T
O
W
N
E
C
E
N
T
E
R
MU
S
K
E
G
O
,
W
I
S
C
O
N
S
I
N
15577 SPECS.dwg
www.thesigmagroup.com
1300 West Canal Street
Milwaukee, WI 53233
Phone: 414-643-4200
Fax: 414-643-4210
TH
E
G R O U PSingle Source. Sound Solutions.
TPM
9-15-15
15577
JBL
CTC
C 501
Fi
l
e
:
I:
\
E
N
E
R
C
O
N
\
1
5
5
7
7
_
N
e
w
P
a
r
k
l
a
n
d
M
a
l
l
\
0
6
0
C
A
D
\
C
-
C
i
v
i
l
\
5
0
0
P
r
o
d
u
c
t
i
o
n
-
C
i
v
i
l
P
l
a
n
s
\
5
0
8
-
S
p
e
c
i
f
i
c
a
t
i
o
n
s
\
1
5
5
7
7
S
P
E
C
S
.
d
w
g
ASPHALTIC PAVING:
1.THE COMPOSITION, PLACING AND CONSTRUCTION OF ASPHALTIC PAVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF
SECTIONS 450, 455, 460, 465, AND 475 OF THE STATE OF WISCONSIN STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE
CONSTRUCTION, LATEST EDITION (WISDOT STANDARD SPECIFICATIONS).
2.CONTRACTOR SHALL PROVIDE PRODUCT DATA FOR EACH TYPE OF PRODUCT INDICATED - INCLUDE TECHNICAL DATA AND TESTED PHYSICAL AND
PERFORMANCE PROPERTIES; JOB-MIX DESIGNS: CERTIFICATION THAT MIX MEETS OR EXCEEDS WISDOT STANDARD SPECIFICATIONS; AND
MATERIAL CERTIFICATES CERTIFYING COMPLIANCE WITH WISDOT STANDARD SPECIFICATIONS.
3.MANUFACTURER QUALIFICATIONS: MANUFACTURER SHALL BE REGISTERED WITH AND APPROVED BY THE DOT OF THE STATE IN WHICH PROJECT
IS LOCATED.
4.ENVIRONMENTAL LIMITATIONS: DO NOT APPLY ASPHALT MATERIALS IF BASE COURSE IS WET OR EXCESSIVELY DAMP OR IF THE FOLLOWING
CONDITIONS ARE NOT MET: APPLY TACK COAT WHEN AMBIENT TEMPERATURE IS ABOVE 50 DEGREES FARENHEIGHT AND WHEN TEMPERATURE
HAS NOT BEEN BELOW 35 DEGREES FARENHEIGHT FOR 12 HOURS IMMEDIATELY PRIOR TO APPLICATION; PLACE ASPHALTIC CONCRETE SURFACE
COURSE WHEN TEMPERATURE IS ABOVE 40 DEGREES FARENHEIGHT; BASE COURSE MAY BE PLACED WHEN AIR TEMPERATURE IS ABOVE 30
DEGREES FARENHEIGHT AND RISING. PROCEED WITH PAVEMENT MARKING ONLY ON CLEAN, DRY SURFACES. DO NOT APPLY BELOW THE
MINIMUM PAVEMENT TEMPERATURE AS RECOMMENDED BY THE MANUFACTURER.
5.AGGREGATES SHALL BE IN ACCORDANCE WITH SECTION 460.2.2 OF THE WISDOT STANDARD SPECIFICATIONS.
6.ASPHALT MATERIALS SHALL BE IN ACCORDANCE WITH CHAPTER 455 OF THE WISDOT STANDARD SPECIFICATIONS.
7.PAVEMENT MARKING PAINT: PROVIDE PAINT FROM THE WISCONSIN DEPARTMENT OF TRANSPORTATION'S APPROVED PRODUCTS LIST. COLOR
SHALL BE WHITE UNLESS INDICATED OTHERWISE ON PLANS.
8.HOT-MIX ASPHALT: ASPHALTIC BINDER COURSE AND SURFACE COURSE SHALL BE MIXTURE E-1 FOR REGULAR DUTY PAVEMENT AND E3 FOR
HEAVY DUTY PAVEMENT COMPLYING WITH THE WISDOT STANDARD SPECIFICATIONS.
9.AGGREGATE BASE COURSE BENEATH PAVEMENTS: SHALL BE 1-1/4” DENSE GRADED BASE COURSE CONFORMING TO SECTION 305 OF THE
WISDOT STANDARD SPECIFICATIONS.
10.PAVEMENT PLACEMENT GENERAL: ASPHALT CONCRETE PAVING EQUIPMENT, WEATHER LIMITATIONS, JOB-MIX FORMULA, MIXING, CONSTRUCTION
METHODS, COMPACTION, FINISHING, TOLERANCE AND PROTECTION SHALL CONFORM TO THE REQUIREMENTS OF THE APPROPRIATE SECTIONS
OF THE WISDOT STANDARD SPECIFICATIONS.
11.PREPARE AND PROOFROLL SUBGRADES AND AGGREGATE BASE COURSE AS OUTLINED IN EARTH MOVING SPECIFICATIONS PRIOR TO
PLACEMENT OF ASHPHALT PAVEMENTS.
12.SWEEP LOOSE GRANULAR PARTICLES FROM SURFACE OF AGGREGATE BASE COURSE PRIOR TO PAVEMENT PLACEMENT. DO NOT DISLODGE OR
DISTURB AGGREGATE EMBEDDED IN COMPACTED SURFACE OF BASE COURSE.
13.SPREAD AND FINISH ASPHALTIC MIXTURE IN ACCORDANCE WITH SECTION 450.3.2.5 OF THE WISDOT STANDARD SPECIFICATIONS. PAVEMENT
THICKNESSES SHALL BE AS INDICATED ON THE PLANS.
14.PROMPTLY CORRECT SURFACE IRREGULARITIES IN PAVING COURSE BEHIND PAVER. USE SUITABLE HAND TOOLS TO REMOVE EXCESS MATERIAL
FORMING HIGH SPOTS. FILL DEPRESSIONS WITH HOT-MIX ASPHALT TO PREVENT SEGREGATION OF MIX; USE SUITABLE HAND TOOLS TO SMOOTH
SURFACE.
15.COMPACT ASPHALTIC PAVEMENT IN ACCORDANCE WITH SECTION 450.3.2.6 OF THE WISDOT STANDARD SPECIFICATIONS.
16.PROTECTION: AFTER FINAL ROLLING, DO NOT PERMIT VEHICULAR TRAFFIC ON PAVEMENT UNTIL IT HAS COOLED AND HARDENED. ERECT
BARRICADES TO PROTECT PAVING FROM TRAFFIC UNTIL MIXTURE HAS COOLED ENOUGH NOT TO BECOME MARKED.
17.THICKNESS TOLERANCE: COMPACT EACH COURSE TO PRODUCE THE THICKNESS INDICATED WITHIN PLUS/MINUS ¼ INCH FOR BINDER COURSE
AND PLUS ¼ INCH FOR SURFACE COURSE, NO MINUS.
18.SURFACE SMOOTHNESS TOLERANCE: COMPACT EACH COURSE TO PRODUCE A SURFACE SMOOTHNESS WITHIN THE FOLLOWING TOLERANCES
AS DETERMINED BY USING A 10-FOOT STRAIGHTEDGE APPLIED TRANSVERSELY OR LONGITUDINALLY TO PAVED AREAS: BINDER COURSE: ¼ INCH;
SURFACE COURSE: 1/8 INCH. REMOVE AND REPLACE ALL HUMPS OR DEPRESSIONS EXCEEDING THE SPECIFIED TOLERANCES.
19.DO NOT APPLY PAVEMENT-MARKING PAINT UNTIL LAYOUT, COLORS, AND PLACEMENT HAVE BEEN VERIFIED WITH ENGINEER.
20.APPLY MARKINGS TO A DRY SURFACE FREE FROM FROST. REMOVE DUST, DIRT, OIL, GREASE, GRAVEL, DEBRIS OR OTHER MATERIAL THAT MAY
PREVENT BONDING TO THE PAVEMENT.
21.APPLY PAINT AS THE MANUFACTURER SPECIFIES WITH MECHANICAL EQUIPMENT TO PRODUCE PAVEMENT MARKINGS, OF DIMENSIONS
INDICATED, WITH UNIFORM, STRAIGHT EDGES. APPLY AT MANUFACTURER'S RECOMMENDED RATES AT A MINIMUM RATE OF 17.6 GALLONS/MILE
FOR A CONTINUOUS 4” LINE.
22.TESTING AGENCY: CONTRACTOR SHALL ENGAGE A QUALIFIED INDEPENDENT TESTING AND INSPECTING AGENCY TO PERFORM FIELD TESTS AND
INSPECTIONS AND TO PREPARE TEST REPORTS.
1.CITY RESUBMITTAL 3/23/16 TPM
2.CITY RESUBMITTAL 5/27/16 TPM
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Approval of a water main easement for Rainbow Day Care property on
Princeton Drive (tax key 2172-030-006).
Date: June 16, 2016
As part of the development of the Rainbow Day Care property the Fire Department
is requiring that a fire hydrant be located closer to the building that it is currently.
We have a hydrant along the roadway that can be moved closer to the building,
however, we need an easement for the hydrant so we can maintain it. The attached
document does this and there is no cost to the City.
Recommendation for Action by Committee:
Approve the attached water main easement for the relocation of a fire hydrant.
Page 1 of 1