Loading...
Plan Commission Packet - 5/3/2016 CITY OF MUSKEGO PLAN COMMISSION AGENDA May 3, 2016 6:00 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF THE MINUTES OF THE APRIL 6, 2016 MEETING NEW BUSINESS FOR CONSIDERATION RESOLUTION #PC 028-2016 - Approval of a Preliminary Plat for the Edgewater Heights Subdivision located in the NW & NE 1/4 of Section 21 (Tax Key No. 2241.999). RESOLUTION #PC 029-2016 - Approval of a Mother-In-Law Unit for the Hartmann/Woppert property located in the NE 1/4 of Section 24 (Tax Key 2253.040 / W129 S8859 Boxhorn Reserve Drive). RESOLUTION #PC 030-2016 - Recommendation to Council to Amend the Zoning Map of the City of Muskego for Ener-Con Companies for Parkland Towne Center Development located in the NW 1/4 of Section 10 (Tax Key No. 2198.984 / Janesville Road) from B-4 Highway Business District to a PD-Planned Development for the Development known as Parkland Towne Center. RESOLUTION #PC 031-2016 - Approval of a Building, Site and Operation Plan for Ener- con Companies for the Parkland Towne Center Development located in the NW 1/4 of Section 10 (Janesville Road / Tax Key No. 2198.984). RESOLUTION #PC 032-2016 - Approval of a Certified Survey Map for the Ener- Con Companies for the Parkland Towne Center Development located in the NW 1/4 of Section 10 (Janesville Road / Tax Key No. 2198.984). RESOLUTION #PC 033-2016 - Approval of Commercial Signage for the Parkland Towne Center Development located in the NW 1/4 of Section 10 (Janesville Road / Tax Key No. 2198.984). MISCELLANEOUS BUSINESS ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. Plan Commission Agenda 2 May 3, 2016 ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136. Unapproved CITY OF MUSKEGO PLAN COMMISSION MINUTES April 6, 2016 7:00 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER Mayor Kathy Chiaverotti called the meeting to order at 6:00 PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Mayor Chiaverotti, Ald. Madden, Commissioners Noah (arrived at 7:02 PM), Jacques, and Buckmaster. Also present Director Muenkel and Recording Secretary McMullen. Excused: Jerry Hulbert and Jeremy Bartlett STATEMENT OF PUBLIC NOTICE The meeting was noticed in accordance with the open meeting laws on April 1, 2016. APPROVAL OF THE MINUTES OF THE MARCH 1, 2016 MEETING Commissioner Jacques made a motion to approve the minutes of March 1, 2016. Alderman Madden seconded. Motion Passed 5 in favor. PUBLIC HEARING Public Hearing for RD Meyer & Associates requesting an amendment to their Conditional Use Permit in accordance with the Muskego Zoning Ordinance for the purpose of adding additional mini-storage units on the property located at W145 S6550 Tess Corners Drive / Tax Key Number 2165.998.012 With no questions or comments, Mayor Chiaverotti closed the Public Hearing at 7:05 PM. CONSENT BUSINESS Recommended for approval en gross. Commissioner Jacques made a motion to approve consent business engross. Alderman Madden seconded. Motion Passed 5 in favor. RESOLUTION #PC 021-2016 - Approval of a Two Lot Extraterritorial Certified Survey Map for the JS Development LLC property located in the Town of Waterford. RESOLUTION #PC 022-2016 - Approval for the outdoor sale of plants and flowers for Holtz Garden Centers at the Elliot's Ace Hardware property located in the NE 1/4 of Section 3 (Tax Plan Commission Minutes 2 April 6, 2016 Key No. 2169.999.007 / S64 W15732 Commerce Center). NEW BUSINESS FOR CONSIDERATION RESOLUTION #PC 020-2016 - Approval of a Building, Site, and Operation Plan Amendment and Conditional Use Grant Amendment for RD Meyer & Associates located in the NE 1/4 of Section 2 (Tax Key 2165.998.012 / W145 S6550 Tess Corners Drive). Commissioner Buckmaster made a motion to approve RESOLUTION #PC 020-2016 - Approval of a Building, Site, and Operation Plan Amendment and Conditional Use Grant Amendment for RD Meyer & Associates located in the NE 1/4 of Section 2 (Tax Key 2165.998.012 / W145 S6550 Tess Corners Drive). Commissioner Jacques seconded. Commissioner Fiedler made a motion to amend RESOLUTION #PC 020-2016 by removing the following: BE IT FURTHER RESOLVED, That the new mini-storage buildings should be designed to match the other smaller scale mini-storage buildings on site. BE ITH FURTHER RESOLVED, That the new buildings need to contain at least 40% masonry products on each elevation as that was approved on the other mini-storage buildings when they were new and said masonry product can either be stone face CMU or a masonry product that would look similar to the vinyl brick siding used on the main building. Commissioner Buckmaster seconded. Motion to Amend Resolution #PC 020-2016 Passed 5 in favor. Motion to Approve Passed 5 in favor. RESOLUTION #PC 023-2016 - Recommendation to Common Council to Amend the Zoning Map of the City of Muskego for Neumann Companies Inc. (Edgewater Heights Subdivision)from RSE - Suburban Estates District and SW - Shoreland Wetland District to CPD (Conservation Planned Development) and SW-Shoreland Wetland District for properties located in the NE 1/4 of Section 21 (Tax Key No. 2241.999 / W182 S8756 Racine Ave). RESOLUTION #PC 024-2016 - Approval of a Building, Site and Operation Plan Amendment for Bob Hoormann for the properties located in the NW 1/4 of Section 10 (Tax Key Nos. 2198.998 & 2198.995 / S72 W16498 Janesville Road). Commissioner Jacques made a motion to approve RESOLUTION #PC 024-2016 - Approval of a Building, Site and Operation Plan Amendment for Bob Hoormann for the properties located in the NW 1/4 of Section 10 (Tax Key Nos. 2198.998 & 2198.995 / S72 W16498 Janesville Road). Commissioner Fiedler seconded. Motion Passed 5 in favor. RESOLUTION #PC 025-2016 - Recommendation to Common Council to Rezone the Schaefer property from RC-2 Country Residence District to RS-2 Suburban Residence District and Approval of a Two Lot Certified Survey Map for the property located in the NE 1/4 of Section 14 (Tax Key No. 2213.999.002 / W141 S8070 Durham Drive). Plan Commission Minutes 3 April 6, 2016 Commissioner Jacques made a motion to approve RESOLUTION #PC 025-2016 - Recommendation to Common Council to Rezone the Schaefer property from RC-2 Country Residence District to RS-2 Suburban Residence District and Approval of a Two Lot Certified Survey Map for the property located in the NE 1/4 of Section 14 (Tax Key No. 2213.999.002 / W141 S8070 Durham Drive). Alderman Madden seconded. Motion Passed 5 in favor. RESOLUTION #PC 026-2016 - Approval of a Building, Site, and Operation Plan Amendment for Tollefsen Steel located in the NW 1/4 of Section 16 (Tax Key 2221.018 / S82 W18664 Gemini Drive). Commissioner Buckmaster made a motion to approve RESOLUTION #PC 026-2016 - Approval of a Building, Site, and Operation Plan Amendment for Tollefsen Steel located in the NW 1/4 of Section 16 (Tax Key 2221.018 / S82 W18664 Gemini Drive). Commissioner Jacques seconded. Motion Passed 5 in favor. RESOLUTION #PC 027-2016 - Approval of a Building, Site and Operation Plan for Muskego City Hall and Police Department located in the NE 1/4 of Section 16 (Tax Key No. 2221.993 / W182 S8200 Racine Ave). Commissioner Fiedler made a motion to approve RESOLUTION #PC 027-2016 - Approval of a Building, Site and Operation Plan for Muskego City Hall and Police Department located in the NE 1/4 of Section 16 (Tax Key No. 2221.993 / W182 S8200 Racine Ave). Commissioner Jacques seconded. Motion Passed 5 in favor. MISCELLANEOUS BUSINESS ADJOURNMENT Commissioner Jacques made a motion to adjourn at 7:46 PM. Commissioner Fiedler seconded. Motion Passed 5 in favor. Respectfully submitted, Kellie McMullen, Recording Secretary City of Muskego Plan Commission Supplement PC 028-2016 For the meeting of: May 3, 2016 REQUEST: Approval of a Preliminary Plat – Edgewater Heights Woods Road & Racine Avenue / Tax Key No. 2241.999 NW & NE ¼ of Section 21 PETITIONER: Neumann Companies INTRODUCED: May 3, 2016 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 028-2016 The petitioner has submitted the Preliminary Plat for the Edgewater Heights subdivision. The proposal includes 37 single-family lots and 4 outlots. The development would be accessed off Racine Avenue and Woods Road. This land previously had a proposal, under the same subdivision name, by a different developer with a different layout back in 2008. That layout featured larger lots (one acre plus in size) wi th no major areas being preserved as open space. That developer decided to not proceed with that development at that time. As such a new developer has now revised the plans to change this development to a conservation subdivision. The new plan focuses i n preserving at least 50% of the total development as permanent open spaces. PLAN CONSISTENCY PC 028-2016 Comprehensive Plan: The 2020 Plan depicts the properties for low-density residential development (densities of 0.5 – 0.99 units per acre). The proposal is consistent with the plan and no amendments to the plan are required as densities of .79 units/acre are proposed. Zoning: The property was recently rezoned to a Conservation Planned Development District - CPD-6 Edgewater Heights (allowing parcels no less than 18,000 square feet in area and 100 feet in minimum average width) and SW Shoreland Wetland District. The SW zoning covers all wetlands on site. Currently Lot 15 is only 16,786 SF and it needs to be enlarged to 18,000 SF or larger in size. Park and Conservation Plan: The Park and Conservation Plan identifies portions of this lot as medium conservation priority. These areas contain wetlands which are mostly located within Outlot 2. Also, this development is shown as being located within the Big Muskego Wildlife Area, which further encourages a conservation type development in this area. Street System Plan: All interior right-of-ways are proposed to be dedicated to the proper widths. Additional right-of-way dedications may be required near the Woods Road access. Adopted 208 Sanitary Sewer Service Area: The property is within the sewer service area. The parcels will be served by municipal sewer. Only a portion of the development is shown to be located within the RCA district and as such the developer will need to request to be added to the RCA district. Water Capacity Assessment District: The lots will be serviced by municipal water. The plat is consistent with the Plan. STAFF DISCUSSION PC 028-2016 History The original petition for this property was from Alesci Homes back in 2006-2008. At that time an RS-2 zoned subdivision was proposed looking for lots at 20,000 SF and 110’ in width throughout the property. The petitioner found that they could develop about 57 single family lots then. The rezoning process ended up allowing an RSE zoning which allowed lots at 40,000 SF and 150’ in width. This reduction in density was agreed upon d ue to the environmental lands in the area. The Council and Plan Commission approved a preliminary plat in 2008 under the RSE zoning and a total of 34 lots were found at the time. No further development came forward for this parcel after the preliminary p lat as the developer backed out during the housing crash. Current Proposal Neumann Companies recently took over the development and in early 2016 they received a rezoning from RSE and SW to CPD-6 Edgewater Heights (Conservation Planned Development District) and SW. Based on that rezoning the proposal now shows the 55.6 acre parcel being subdivided per the City’s Conservation Subdivision land division ordinances. The general conservation subdivision codes require the following:  A yield plan under the existing underlying zoning to show how many parcels may be allowed on the parcel if developed under a normal platting process  That 50% or more of the land is conserved.  That bonus lots (up to five (5)) may be provided if 50% or more of the land is conserved AN D managed/remediated in different ways. One of the large reasons that the petitioner has made considerable changes to the original plat layout is due to the delineation of many more wetland complexes then back in 2008. The WIDNR requires that wetland deli neations are updated every five (5) years and this new delineation now shows many more areas of wetlands that have to be considered. The yield plan was derived under the existing zoning of RSE and showed that a total of 34 lots might be found. Using this base density the proposed conservation preliminary plat shows 37 lots laid out in a fashion that preserves about 51.5% of the main subdivision acreage as open space. The narrative provided notes that the petitioner will remediate and manage the conservati on open spaces of the plat in order to be allowed bonus parcels. In this case the developers asked for a total of three (3) bonus parcels for their preservation of 50% of the land, the proposed addition of pathways throughout the conservation development, and their proposed remediation/management of the conservation lands. The 37 lots create a density of .79 units/acre which is well in line with the City’s Comprehensive Plan density of “Low Density Residential” of .5 -.99 units/acre. The CPD rezoning allowed lots as low as 18,000 SF in area. All lots within the current preliminary plat will need to meet that minimum. The largest lot within the proposed subdivision is currently shown at 30,200 SF, with the average lot size being about 21,700 SF. Currently Lot 15 is only 16,786 SF and it needs to be enlarged to 18,000 SF or larger in size. The layout includes 37 single-family lots and 4 outlots. Outlots 1 & 4 are stated as being retained by the developer for potential future sale or division. Outlots 2 & 3 are to be owned by the lots owners within this development. Outlots 2 & 3 are to be kept as permanent open space areas for conservation purposes. Outlot 1 is not counted as Stormwater Management Plan: Stormwater is shown to be accommodated in the outlots in the development. open space given its possible future sale or division. There are some concerns with this since the outlot is within the CPD zoning boundary and since this then means that lots 21-28 will not be bordered by open space lands, as is required as part of the conservation development requirements. As such Outlot 1 should be retained as permanent open space owned by the subdivision lot owners or adjusted so that more of the wetland areas are within the outlot for preservation and to include areas of permanent open space adjacent to Lots 21-28, as is required by code. It also may be helpful to see a future concept for the possible future development of Outlot 1. Also, if a portion of Outlot 1 remains for possible future development, any possible development/construction of said outlot may need to proceed with a CPD zoning amendment since that outlot is covered by the approved CPD-6 zoning district and that would be a modification/addition to the allowance of the specific zoning approval. There are technical corrections/updates that exist and the Resolution is drafted to allow approval subject to these technical corrections being addressed before construction plans and the final plat can be approved. Some of the more important correction are as follows:  The access to this development off of Woods Road needs to be finalized.  Approvals from proper State and/or Federal officials for the wetland crossing proposed within the development.  The wetland delineation report, DNR wetland concurrence, and proper State mandated wetland setback distances must be provided to the City.  Wetlands should be removed from lot where ever possible.  Restoration and enhancements to the open space areas must be included as part of the construction and landscape plans for this development. Some of these items include: o Trails and recreational areas will be provided within the outlots. o The upland area on Outlot 2 will be restored to native prairie plantings with a management plans for perpetual maintenance. o Conservation easement will be established to further ensure protections on Outlot 2 and on the wetland area. The misc. items required in the resolution are as follows: BE IT FURTHER RESOLVED, That all wetlands on private lots or close to borders of private lots should be lined with split rail fences as part of the subdivision construction plans. BE IT FURTHER RESOLVED, A Subdivider’s Agreement and Letter of Credit must be approved by the Council and all subdivision improvements made and accepted before any Final Plat approvals can be allowed. STAFF RECOMMENDATION PC 028-2016 Approval of Resolution #PC 028-2016 MUSK EG Othe City of Ar ea o f Inte restI06501,300 Fee t Ag en da Item(s) Pr op er tie s Zon in g D istr ic ts Rig ht -o f-Way Hy dr og rap hy Supp lem ental MapRESOLUTION #PC 02 8-2016 Ed ge wa te r H eig htsRacine Ave J A N E S V I L L E L O O M I S R D RA CIN E AV DURHAM W O O D S CO LL EG E Pre p ar ed b y C ity o f Mu ske g o P la n n in g D e p ar tm e nt Da te : 4 /2 5/2 0 16 RESOLUTION #P.C. 028-2016 APPROVAL OF A PRELIMINARY PLAT FOR THE EDGEWATER HEIGHTS SUBDIVISION LOCATED IN THE NW & NE ¼ OF SECTION 21 (TAX KEY NUMBER 2241.999 / WOODS ROAD & RACINE AVENUE) WHEREAS, On March 21, 2016 a preliminary plat was submitted by Neumann Companies for the Edgewater Heights Subdivision located in the NW & NE ¼ of Section 21, and WHEREAS, Previous preliminary plat approvals took place in 2008 under a different developer for this property using conventional subdivision principals, but since that time the previous developer decided not to proceed with the project and Neumann Companies is now proposing a conservation subdivision in this same location, and WHEREAS, A rezoning was granted by the Common Council under Ordinance #1404 on April 12, 2016 to be able to proceed with the proposed development using the conservation principals, and WHEREAS, Said plat proposes 37 single-family lots and 4 outlots, and WHEREAS, Outlots 2 & 3 are proposed for permanent open space preservation, wetland protection, and stormwater management, and WHEREAS, Outlots 1 & 4 are stated as being retained by the developer for potential future sale or division, and WHEREAS, This CPD - Planned Development District allows lot sizes as low as 18,000 SF in area and minimum average widths of at least 100 feet, and WHEREAS, The 2020 Comprehensive Plan has the area as Low Density Residential and the proposal meets this requirement under the Conservation Planned Development zoning previously approved, and WHEREAS, The development will be serviced by City sewer and City water, and WHEREAS, Enhancements and restoration of the open space areas will occur including the following items:  Trails and recreational areas will be provided within the outlots,  The upland area on Outlot 2 will be restored to native prairie plantings with a management plans for perpetual maintenance,  Conservation easement will be established to further ensure protections on Outlot 2 and on the wetland area. THEREFORE BE IT RESOLVED, That the Plan Commission recommends approval to the Common Council of a Preliminary Plat for the Edgewater Heights Subdivision, located in the NW & NE ¼ of Section 21 and will be receptive to the submittal of a final plat, subject to resolution of technical discrepancies as identified by the City Planning Department and City Engineers, and payment of all applicable fees in Section 18.14 of the Land Division Ordinance and outstanding assessments if applicable. BE IT FURTHER RESOLVED, That Outlot 1 will need to be altered to provide permanent open space areas adjacent to lots 21-28 and it also needs to encompass more of the wetlands in this area to ensure their preservation. BE IT FURTHER RESOLVED, That all wetlands on private lots or close to borders of private lots should be lined with split rail fences as part of the subdivision construction plans. BE IT FURTHER RESOLVED, A Subdivider’s Agreement and Letter of Credit must be approved by the Council and all subdivision improvements made and accepted before any Final Plat approvals can be allowed. BE IT FURTHER RESOLVED, That a digital file of this Plat shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: May 3, 2016 ATTEST: Kellie McMullen, Recording Secretary City of Muskego Plan Commission Supplement PC 029-2016 For the meeting of: May 3, 2016 REQUEST: Approval of a Mother-in-Law/Family Unit Tax Key No. 2253.040 / W129 S8859 Boxhorn Reserve Drive NE ¼ of Section 24 PETITIONER: Beverly Hartman / Rebecca Woppert INTRODUCED: May 3, 2016 LAST AGENDA: N/A PREPARED BY: Adam Trzebiatowski, AICP BACKGROUND PC 029-2016 The petitioner is proposing to construct a mother-in-law/family unit within a newly propose home at the above address in the new Aster Hills Estates subdivision. Mother-in-law/family units are allowed as a permitted accessory use in residential zonings subject to certain conditions. STAFF DISCUSSION PC 029-2016 As stated, mother-in-law/family units are allowed as a permitted accessory use in residential zonings subject to the following conditions: Mother-in-Law/Family Units: Any portion of a single family residence, intended to be occupied by a resident(s) related through blood, marriage or adoption to a host residence occupant, being no greater than 800 square feet in size, that has an independent wing or area that is self-supporting in terms of livable needs (i.e. unit includes a kitchen, bath, den and bedroom), but is dependent on utility infrastructure of the primary residence. Access to this wing or area may be obtained via one door to the outside and a second non-lockable door or passage way to the main portion of the host residence. Access is permitted to a garage area having no service door. All such requests are subject to building, site, and operational plan approval of the Plan Commission following written notice being distributed by the Plan Commission to neighboring property owners within 100 feet of the subject property. The petitioned mother-in-law/family unit shows that it will be used by related persons to the family, will be self-supporting in livable needs and will have a passage to the main residence (via the stairs) and a door to the outside (patio door). The mother-in-law/family unit is located within the basement of the home. This basement area has a full exposure. This lower level also has an additional garage that could be used by the person(s) that uses the mother-in-law/family unit. The area defined by the owners and builder as the mother-in-law/family unit is 783 square feet in size. The proposal meets all of the code requirements. STAFF RECOMMENDATION PC 029-2016 Approval of Resolution # PC 029-2016 MUSK EG Othe City of Ar ea o f Inte restI070140 Fee t Ag en da Item(s) Pr op er tie s Zon in g D istr ic ts Rig ht -o f-Way Hy dr og rap hy Supp lem ental MapRESOLUTION #PC 02 9-2016 Ha rtman n/Wo pp ertW129 S88 59 Bo xh or n R es er ve D riv e J A N E S V I L L E L O O M I S R D RA CIN E AV DURHAM W O O D S CO LL EG E Pre p ar ed b y C ity o f Mu ske g o P la n n in g D e p ar tm e nt Da te : 4 /2 5/2 0 16 RESOLUTION #P.C. 029-2016 APPROVAL OF A MOTHER-IN-LAW UNIT FOR THE HARTMANN/WOPPERT PROPERTY LOCATED IN THE NE ¼ OF SECTION 24 (TAX KEY NO. 2253.040 / W129 S8859 BOXHORN RESERVE DRIVE) WHEREAS, On April 15, 2016 a petition for a mother-in-law/family unit was submitted by HBT Construction of Wisconsin LLC (Homes by Towne) for the Hartmann/Woppert Family for a property located in the NE ¼ of Section 24, (Tax Key No. 2253.040 / W129 S8859 Boxhorn Reserve Drive), and WHEREAS, Said property is zoned PD-49 Aster Hills Estates Planned Development District where a mother-in-law/family unit is allowed as a permitted accessory use as long as the following objectives are met: 1. Must be occupied by a resident(s) related through blood, marriage or adoption to a host residence occupant. 2. Must be no greater than 800 square feet in size. 3. Must have an independent wing or area that is self -supporting in terms of livable needs (i.e. unit includes a kitchen, bath, den and bedroom), but is dependent on utility infrastructure of the primary residence. Access to this wing or area may be obtained via one door to the outside and a second non-lockable door or passage way to the main portion of the host residence. Access is permitted to a garage area having no service door. 4. Subject to Plan Commission approval with written notice to residents within 100 feet of the property, and WHEREAS, The petitioned mother-in-law/family unit shows that it will be used by related persons to the family, will be self -supporting in livable needs and will have a passage to the main residence and a door directly to the outside, and WHEREAS, The petitioned mother-in-law/family unit is proposed to be 783 square feet in size. THEREFORE BE IT RESOLVED, That the Plan Commission approves of the mother-in- law/family unit for the Hartmann/Woppert residence located in the NE ¼ of Section 24, (Tax Key No. 2253.040 / W129 S8859 Boxhorn Reserve Drive). BE IT FURTHER RESOLVED, The mother-in-law/family unit must be used by related persons to the family, must be self-supporting in livable needs, must have a non-lockable passage to the main residence and a door to the outside, and cannot exceed 800 square feet. BE IT FURTHER RESOLVED, That the Plan Commission approves of the mother-in-law/family unit at 783 square feet. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: May 3, 2016 ATTEST: Kellie McMullen, Recording Secretary City of Muskego Plan Commission Supplement PC 030-2016 For the meeting of: May 3, 2016 REQUEST: Rezoning from B-4 Highway Business District to a PD- Planned Development District Tax Key Nos. 2198.984 NW ¼ of Section 10 PETITIONER: Ener-Con Companies Inc. INTRODUCED: May 3, 2016 LAST AGENDA: N/A PREPARED BY: Jeff Muenkel, AICP BACKGROUND PC 030-2016 The petitioner has submitted a rezoning request for the former Parkland Mall parcel to go from the B-4 Highway Business District to a new PD Planned Development District. A Planned development Zoning District allows a developer to request various zoning requirements outside which may be the norm in order to support their proposed development. The details surrounding the proposed PD are found below. PLAN CONSISTENCY PC 030-2016 Comprehensive Plan: The 2020 Plan depicts the areas for Commercial use. The proposal is consistent with the Plan. Park and Conservation Plan: A future trail need is found in the plan along Lannon. The proposal would install a trail along the east side of Lannon as part of the building of this development. The proposal is consistent with the Plan. Conservation Plan: No acquisition or management priorities are depicted in this area. The proposal is consistent with the Plan. Street System Plan: A future CSM would dedicate any lands on Janesville and Lannon at a future time. The proposal is consistent with the Plan. Adopted 208 Sanitary Sewer Service Area: Public sanitary sewer serves the property. The proposal is consistent with the Plan. Water Capacity Assessment District: The property is served by public water service. The proposal is consistent with the Plan. Stormwater Management Plan: Stormwater management would be required for the future concept development shown as part of the rezoning. The proposal is consistent with the Plan. Redevelopment District #2 Plan The Community Development Authority recommended approval of the TID incentives associated with this development at their April meeting. The CDA specifically took into consideration the objectives in in the adopted RD #2 Plan as well. The RD #2 Plan objectives associated to this development proposal are found detailed below in this supplement. DISCUSSION PC 030-2016 Ener Con Companies is petitioning for a rezoning for th e former Parkland Mall property (Tax Key No. 2198.984) to go from the existing B-4 Highway Business District to a PD Planned Development District to be known as the Parkland Towne Center Development. The 2020 Comprehensive Plan identifies this area as Comm ercial and no Comp Plan change is required as part of this rezoning. See the side-by-side zoning map attached for location and district details. Also, please see the developer rezoning submittal attached that includes a narrative about their request, the site plan, a concept certified survey map, residential renderings/building elevations, various civil plans, and a study on solar access in regards to the proposed multi-family structures. The Parkland Towne Center Planned Development contains approximatel y 10.5 acres of mixed use development along Janesville Road to the south and Lannon Road to the west. The development will generally contain the following:  Approximately 53,500 square feet of commercial buildings generally consisting of a 30,000 square fo ot structure, a 12,000 square foot structure, a 7,500 square foot structure, and a 4,000 square foot structure.  Three (3) multi-family structures with 30 units a piece. Each structure to total 4 stories and be approximately 21,600 square feet each in size. The petitioner is requesting this planned development rezoning in order to allow certain restrictions of existing underlying zoning districts to be flexible. A planned development district allows different land uses to co -exist as well establishing that individual uses/structures need not comply with the specific building location, height, building size, lot size, and open space requirements of the underlying basic zoning districts. This is provided that the spirit and intent of such requirements are com plied with in the total development plan for such projects consistent with the criteria as established in the “basis for approval” section of the zoning code (discussed more below). The Parkland Towne Center planned development district is requested for the following reasons:  The development to be conceptually developed per the submittal; subject to future city approvals of civil plans, BSOs, CSM and other approvals.  The multi-family buildings not to exceed 43’9” feet as measured by code. (NOTE: The cit y measures from the 43’9” mark and not the elevator shaft portion as mentioned in the developer supplement).  The multi-family buildings to have up to 30 units in any one structure.  Commercial and residential buildings on the site to have varying setbacks offsets, floor area ratios, and open space ratios.  Lot lines to cross between developments including allowance of land locked parcels subject to easements.  Paving, parking space, and access ways to cross property lines throughout the development. Here are some notes about existing comparable zoning districts. The Plan Commission can gauge what variances are being requested based on this comparable information:  The highest downtown zoning district (DR-1) has a 35-foot maximum.  The most intense Muskego multi-family zoning district (RM-1) allows up to 16 units in any one building.  The most intense Muskego multi-family zoning district (RM-1) allows buildings per the following requirements - Front Setback of 40 feet, Side Setbacks of 20 feet, floor area ratio ma x of 30%, Open space per dwelling unit of 4,000 SF.  The most intense Muskego downtown commercial zoning districts allow buildings per the following requirements - Front Setback of 10 feet (DR-1), Side Setbacks of 5 feet (DR-1), floor area ratio max of 30% (B- 4 district), Open space per dwelling unit of 2,500 SF (DR-1).  The Certified Survey Map submitted in the supplement shows that multiple cross access easements will be required and a land locked parcel will exist. This type of item is subject to Plan Com mission approval by code regardless of the PD request, however it should be noted that these variances will exist as part of the Planned Development.  The future paving, parking space, and access ways to cross property lines throughout the development are subject to Plan Commission approval by code regardless of the PD request, however it should be noted that these variances will exist as part of the Planned Development. Density The maximum allowable density for residential units in a mixed use Planned Deve lopment District is determined by dividing the gross area of the planned development (Exclusive of existing public right -of-way or public open space easement, which currently none exist) by the square feet per family as required by the district intended. The 90 units proposed are on approximately 10.76 acres which equates to 5,207 SF per dwelling unit. The proposal meets the planned development requirements for density. A planned development allows a developer to request up to a 10% bonus in residential units but this bonus is not requested by Ener Con. Planned Development Zoning Ordinance A planned development zoning district is written in the City’s zoning code to allow development, subject to Council determination, as follows: This district is intended to allow for greater freedom, imagination, and flexibility in the development of land while insuring substantial compliance to the intent of the normal district regulations of this ordinance. To this intent it allows diversification and variation in the relationship of uses, structures, open spaces, and heights of structures in developments conceived, and planned as comprehensive and cohesive unified projects. It is further intended to encourage more rational and economic development with relationship to public services, and to encourage the preservation of open land. Individual uses and structures in a Planned Development Project District need not comply with the specific building location, height, building size, lot size, and open space requirements of the underlying basic district provided that the spirit and intent of such requirements are complied with in the total development plan for such project consistent with the criteria as established in the basis for approval below. Basis For Approval As noted above the City of Muskego Zoning Code for Planned Developments is very specific in what the Council and Planning Commission shall base their rezoning decision upon. Sections 17:9.04(1)A, B, & E note this basis below: CHAPTER 39 9.04 BASIS FOR APPROVAL (1) Basis for Approval: The Plan Commission in making its recommendations and the Common Council in making its determination shall give consideration and satisfy themselves as to the following: A. That the proponents of the proposed developmen t have demonstrated that they intend to start construction within a reasonable period following the approval of the project and requested overlay of the PD District, that the project appears economically sound, that adequate financing is possible, and that the development will be carried out according to a reasonable construction schedule satisfactory to the City. B. That the proposed development is consistent in all respects to the spirit and intent of this Ordinance, is in conformity with the general plans for community development, would not be contrary to the general welfare and economic prosperity of the City or of the immediate neighborhood, that the specific development plans have been prepared with competent professional advice and guidance, and that the benefits and improved design of the resultant development justifies the variation from the normal requirements of this Ordinance through the application of the PD Planned Development Overlay District. E. In the case of PD Planned Development Overlays for mixed use developments: 1. That the proposed mixture of uses produces a unified composite which is compatible within itself and which as a total developmental entity is compatible with the surrounding neighborhood and consisten t with the general objectives of the Comprehensive Plan. 2. That the various types of uses conform to the general requirements as herein set forth, applicable to projects of such use character. 3. The allowable maximum residential density may be computed by dividing the gross area of the planned development by the square feet per family as required by the district intended (This is inclusive of the area of the other proposed uses in the development)(Ex. PD on 12 acres of land with 8 acres for multi -family residential and 4 acres for commercial still equals approximately 104 units (12 acres / 5,000 square feet per unit) upon recommendation of the Plan Commission that the increased density is justified in terms of the relationship to the denser area, the commercial area, open areas, service demand, and the total quality and character of the project. 4. The total allowable maximum density may increase no more than 10% above the amount of units calculated above upon recommendation of the Plan Commission that the increased density is justified in terms of the relationship to open areas, service demand, and the total quality and character of the project. City Plans Various adopted city plans discuss the development of the f ormer Parkland Mall site as per below: 2020 Comprehensive Plan The Comprehensive Plan was adopted under the Wisconsin Statute Smart Growth regulations back in 2008. The city looked to the downtown Janesville Road area as being a focal point during the planning years for this plan. In particular, the property discussed herein is specifically discussed as a “desired development area” in the plan. The following is written in the Comp Plan in relation to downtown development: Downtown Note (Shown as Note #4 on 2020 Future Land Use Map) Much discussion in this document relates to the future development of the City’s downtown. The intent of the Downtown note is to promote development and redevelopment in what is known as Muskego’s downtown. The general area for the downtown is those properties found along Janesville Road from Pioneer Drive to Bay Lane Drive. The downtown DDA was created to allow the revival and redevelopment of these properties in order to create new opportunities for the parcel owners. This a rea is intended to encourage mixed-use, compact development that is sensitive to the environmental characteristics of the land and facilitates the efficient use of services. The category diversifies and integrates land uses within close proximity to each other, and it provides for the daily retail and customer service needs of the residents. Land uses and development in the downtown area should closely follow the land uses noted on the Land Use Map, although an endless amount of other opportunities exist f or properties in this area. The City should utilize the Community Development Authority and Mayor’s Task Force on Economic Development in implementing the redevelopment via the concepts noted in the Redevelopment District #2 Plan and the various Mayor’s Task Force Downtown Committee Reports. The 2020 Plan does specifically identify the Redevelopment District #2 as well. The 2020 Plan notes the same text found in the Redevelopment District #2 Plan notes found below. Lastly, the 2020 Plan has specific recommendations regarding this downtown area. Here is the text from the Economic Development recommendation section of the Plan: The downtown of Muskego (generally located along Janesville Road) should be focused upon in order to facilitate groupings of viable businesses. The downtown should work around the future Janesville Road reconstruction project to incorporate a sense of place and destination for residents and visitors. The following recommendations are sought to aid the future viability of Mus kego’s downtown:  Explore the formulation of a Business Improvement District (BID) pursuant to Wisconsin Statutes once increased development of the “downtown” takes place.  Encourage, where applicable, a high degree of commercial, retail, office, and reside ntial use in the downtown area. Continue to allow amendments to the Zoning Code, when required, to permit greater flexibility in the uses of downtown property.  Work towards a “park-once-and-walk” downtown.  Amend the Downtown Design Guide to reflect the identities and boundaries found within the “downtown.” Redevelopment District #2 Plan & Downtown Design Guide The CDA recommended approval of the TID 11 to the Council earlier in April and had discussions that the conceptual plans met the conceptual guidelines found in the RD #2 Plan. Those conceptual guidelines are found below. These same principles are found in the city’s adopted Downtown Design Guide as well. Lastly, it is important to note that the Redevelopment District #2 Plan has been around since 2003 and has always promoted mixed use development (multi-family residential with commercial uses) for the former Parkland Mall parcel. ACDO #3 “DOWNTOWN REVIVAL” ACDO #3 is considered the central downtown of the City of Muskego. The area with the most redevelopment potential is found along the north side of Janesville Road between Lannon Drive and Parkland Drive and includes the 10-acre former Parkland Mall site. The area is currently comprised of single-family residential uses along the west side of Lanno n Drive. Commercial zoning and land uses are found in place for the parcels abutting Janesville Road, which includes the former Parkland Mall site. Redevelopment in this area should seek to enhance the image, profile, and use of Downtown Muskego. Given its central location, the site plays a crucial role in the future viability of the Janesville Road commercial district. Equally important, the site provides an opportunity to begin to reshape Downtown Muskego from a disparate collection of aging commercial structures to a functional and symbolic city center befitting a community of over 20,000. New development at the former Parkland Mall site can help set higher standards of design with a renewed emphasis on community image and the cost effective provision of public services. Moreover, a quality project at this location will provide the downtown area, and indeed the entire community, with an identity reflecting the local quality of life and the affluence of city households – in short, a visual and economic anchor for the currently attenuated and uncentered Janesville Road corridor. Widely accepted development and planning principles suggest that new development should help the downtown and City compete in an increasingly competitive and quality-conscious real estate environment, while providing alternative housing and shopping opportunities in close proximity. The vision for the Parkland Mall site should encompass a mixed-use development utilizing traditional neighborhood development standards. Area r esidents should feel a new sense of place, as a development must provide a downtown identity. Commercial and residential uses are envisioned providing a one -stop convenience of institutional and public services. Overall, this project should demonstrate market driven principles that work within the Muskego’s economic landscape. The following key planning elements are to be used as a guide for the development/redevelopment of the portion of this area that abuts Janesville Road (Note: A development may include other elements not listed OR may exclude some of the elements below as any new development should be market driven): Design Character  Traditional town center/modern ‘main-street’  Buildings squarely facing the street  Buildings closer to street, parking behind  Pedestrian scale – walkable, accented storefronts  Taller building profiles – downtown centerpoint and landmark  Variable roof-lines.  Transitional massing blending with surrounding architecture  Sense of place/downtown identity Use Mix  Possible upper end condos (professionals & ‘empty nesters’)  Destination and convenience retail  Smaller floorplate retail  Shared parking  Multiple purpose trips  Convenience Density  Possible Mid-Rise heights: Somewhat higher than City norm  Built in consumer market for downtown businesses  Greater TIF revenues  More efficient public services/utilities  Activity center  Downtown anchor and landmark Marketing Plan/Economic Development Strategic Plan: It is important to note that the city has an adopted Marketing Plan and Economic Development Strategic Plan that promote the orderly development of the parcel proposed for development. The desired development requirements are similar to the items discussed above in the Comp Plan and Redevelopment Plan. The “Downtown Janesville Ro ad” is a study recommendation area in the plan and here is the text from the Marketing Plan in relation to recommendations for that area from the adopted Marketing Plan. Downtown Janesville Road Muskego lacks a traditional retail core. Providing coordinated streetscape, signage and architectural design standards for properties in the downtown portion of Janesville Road can create an identity for this key commercial district. This unique commercial area should be emphasized by highlighting the existing residential and green areas which separate the downtown portion of Janesville Road from the regional development at the Racine and Moorland intersections. Demolition and right of way expansion as part of the Janesville Road reconstruction project will open up several corner parcels for redevelopment, with the potential to create visual landmarks and introduce neighborhood signage at key intersections. This, in addition to the streetscape improvements as part of the street reconstruction, will create a more ped estrian and community-focused corridor which encourages visitors to spend more time in the corridor. Uncertainty surrounding right-of-way acquisition for the road construction project has limited private property investment along the corridor. Although the planning phase is now complete, many businesses are still hesitant to invest, fearing that construction will negatively impact their business. However, having a number of properties simultaneously undergoing improvements would help to convey activity and spur additional investment. Encouraging property owners to time projects to coincide with the end of construction can further leverage the significant investment in the streetscape component with improved public perception and business marketing. Enhancin g the existing Building and Site Grant program to include a permit fee moratorium, or allowing interior capital improvements which can accommodate desired business types (i.e. public restrooms, hoods/vents, etc) can facilitate this type of coordinated inve stment activity. Longer-term, opportunities to create a downtown commercial and recreation node will capitalize on Muskego’s unique lakefront amenities and encourage the significant area residential population to visit the downtown. The presence of both Big and Little Muskego Lake, the Muskego Recreation Trail and existing recreation businesses such as Mather Lanes and the High Tide on or adjacent to this corridor create potential synergies. The City should capitalize on future lakefront park opportunitie s to drive increased property tax revenues by encouraging higher density mixed -use properties in the surrounding area. Priorities for future waterfront park space should be to provide lake views from Janesville Road while also accommodating internal uses which will activate the space and provide event and gathering space serving the entire community. The ability to secure a return on investment for what would require a significant City investment suggests that efforts to facilitate surrounding ancillary development through adjacent property consolidation to facilitate increased density, should coincide with park improvements. This would provide greater incentive to encourage additional private sector investment around what should be a key focal point for downtown redevelopment. Discussions with adjacent property owners to market larger redevelopment opportunities spanning multiple sites can help to encourage larger scale and higher density uses on surrounding parcels. An additional long-term opportunity is to encourage infill development on rear areas of deep parcels through conditional use zoning. Encouraging horizontal mixed-use development can increase the value of Janesville Road parcels and encourage long-term higher density uses on the commercial frontage. Multifamily development should target younger and empty nest demographics which are currently underserved in the community. Expanding the range of housing available will help retain young adult and aging residents and provide an adjacent customer base for local retail. Apartment demand is projected to grow in comparison to single family development. Identifying areas to accommodate this demand in ways that cater to desirable demographic segments will facilitate continued growth in Muskego. Recommendation #22 Focus recruitment efforts on identified target sectors.  Local household-serving retail and restaurant  Service retail or office users that serve the local households (real estate agents, accounting, fitness, health & medical, etc)  Multifamily housing Recommendation #23 Develop community-oriented shopping districts focusing on smaller-scale specialty goods, restaurants and entertainment establishments. Focus on improving pedestrian experience through quality architecture, public gathering spaces, transparent facades and pedestrian-scale development. Recommendation #24 Pursue strategic infill / redevelopment of key Janesville Road properties. Wherever possible, encourage density for more customers and TIF value. Focus on maximizing investment around district entrance intersections. Recommendation #25 Target opportunities for mixed-use, multi-story development to bring more office and residential density to the corridor and the center of the community. Look to focus density around neighborhood shopp ing nodes, future waterfront access and other amenities or key intersections. Recommendation #28 Look for opportunities for high-quality multifamily development in areas with less commercial viability or on rear lots. Use incentives to ensure units are attractive to the target household market such as young professionals and existing wealthy households looking to downsize. Future Building, Site, and Operation Plan After approval of the rezoning the developer would have to come back thru Planning Commis sion to receive formal approval of a BSO plan for each structure on the rezoning concept plan. In fact, Plan Commission will note that the developer has a BSO in front of Plan Commission tonight for the multi-family dwellings and a certified survey to bre ak up the lands per the rezoning concept is also found. Public Hearing The Council held the public hearing for this request at their Tuesday April 26th meeting. Staff would encourage Plan Commission to listen to the meeting by going to the City’s website under “Government-Boards & Committees-Common Council” when they get time. You can click on the most current agenda which will take you to a video link. Please contact city staff for help in reaching this weblink if need be. Plan Commission will find that twenty (20) people spoke at the hearing with people both in favor and against. Here are some of the questions/issues that came up that staff stated we would address:  Many concerns on stormwater affecting Freedom Square and the general neighborhood: As Plan Commission knows every development is solely responsible for storm water management on their development site. A new development has to add stormwater management practices that meet current city and state codes which includes ensuring that their proposed new development does not allow water to leave the site in any direction without being controlled. The same is the case with the Parkland Towne Center proposal. Currently, the entire property simply drains to the north via underground stormwater pipes a nd sheet runoff to the pond that exists in the Freedom Square condo development. There is no actual stormwater management today. The proposed stormwater management for the Parkland Towne Center Development is in the approval process from the city’s Public Works Department. At this time, the PW Department has found that the developers are actually proposing a stormwater management system that is above and beyond code requirements . Development of the site and management of the stormwater will actually benef it the general neighborhood rather than hinder it per the following: 1. The plan shows they will be removing 81.14% of the suspended solids, while codes only require 40% removal. 2. The storm water management plan will be reducing the flow rate dramatically. The amount of water leaving the site during a 100 year storm event after the development occurs will be equal to that which leaves the site today after a 2 year storm event. Basically, the flow rate after development will be far less than today. 3. The 2 year runoff volume will be reduced from the current 30.53 cubic feet per second (cfs) down to 1.42cfs. This is over a 95% reduction to the flow rate durin g the 2 year event.  Increased traffic concern for Lannon Drive, Parkland Drive and Briargate Lane to the north: The developer has a completed traffic impact analysis as part of the submittal to staff. Based on that analysis they are showing in their infrastructure plans some considerable improvements to Lannon Drive and to Janesville Road as well as to interior turning lanes going out to both roadways. 1. Lannon Drive: The infrastructure plans show that the developer’s southern entrance/exit will have a full intersection. The existing boulevard will be removed and turning lanes for users going south and north on Lannon will be added. Further, the entrance/exit will be three lanes wide allowing a patron entering the site their own lane and patrons exiting the site two lanes with one dedicated for southbound users to Lannon Drive and one lane for northbound users to Lannon Drive. The development also shows an entrance/exit to the north along Lannon Drive that is more reserved for the apartments. The plans show that they will open the boulevard along Lannon here as well so people can easily travel any direction along Lannon and not have to make any U-turn’s in the boulevard of Lannon Drive. 2. Janesville Road: The infrastructure plans show that a new access will be created along Janesville in line with the Pick n Save entrance/exit. Just like Pick n Save they will b e adding one lane to come into the development two lanes to come out of the development with one dedicated to turn right and one dedicated to go straight or turn left. Further, Waukesha County is mandating that the developers now install a right turn lane along Janesville for users traveling east. 3. Easement behind Post Office Building: The developers are looking to secure an easement behind the Post Office building for future trucking. Easements have actually existed here between the properties to share access in some way in the past. While the developers are securing this easement for the benefit of all the businesses, the Plan Commission would still have control over trucking times and access at the time of a BSO for the future grocer planned there. 4. Parkland-Briargate Traffic: People mentioned that many people already turn right onto Parkland Dive from Janesville Road and then cut over on Briargate Lane to get to Lannon Drive going north . While a future apartment owner may want to use such a route we would think that such a cut thru would continue to be done by existing home owners who live up Lannon north of Briargate Lane regardless of the proposed development. Given that the development is on a County highway, and the development is including many new and improved access points, it may be hard to decipher if any more road updates would aid this existing problem.  The proposed mix of uses and development proposed isn’t what the city desires: Please see the adopted city plans referenced in this supplement. Over a decade of adopted plans seem to support the notion of mixed uses and a higher density residential with possible heights. It should be noted that the CDA approved a concept plan (With 108 units residential / 66,000 SF in commercial) and a conceptual TIF (in the amount of up to $5.4 mil) back in October 2004. The mix of uses at that approval were in separate buildings and not actual mixes of residential in the same structure. The Redevelopment District #2 Plan design guidelines were the same as they are today with the exception that the city added a guideline that any proposed development should be “market driven” now. The CDA has found that those guidelines are predominantly met at their recent April 2016 meeting for the development being proposed.  Fire Department: Many mentioned that the height of the apartment buildings would not be able to be managed by the Fire Department today. This was brought up a decade ago as well but we have found that the Fire Department has a 100 foot ladder truck to support this type of development at the proposed 43’9”. As shown below in a discussion on height, the city has many structures approaching 40 feet in height. Further, the apartments will be required to be fully sprinkled buildings.  Height: Please see height discussion below in the staff recommendation section on how the city calculates height and thoughts on discussing height issues.  Sunlight: An individual mentioned that sunlight will be blocked at times due to the new development. The developers have provided a solar study attached to their submittal herein. The solar study shows that shadowing will occur at various times to a couple homes northwest of the development, but fairly minimal due to the angle of the sun in Wisconsin. Lastly, it should be noted that since this solar study was completed the developers have submitted a new site plan (attached in supplement) that now has the Apartment Building #3 20 feet from the west property line as opposed to 10 feet prior. This will allow the large coniferous treel ine to stay along with adequate space for more landscaping.  Open Space: Some people mentioned they would like to see more open space or a park space as part of the plan. The development is showing some green space around the future proposed clubhouse/pool . It is yet to be determined by the developers what will become of this open space area and that would most likely occur at the time of BSO approval of the clubhouse at a future time. The BSO for the apartments does show this area as being general open landscaped greenspace until such time. As mentioned in the rezoning, the PD request would allow the development as presented. The DR -1 zoning district allows one residential unit per 2,500 square feet of open space. While there is open space surrounding each apartment building and open areas around the pool/clubhouse, the overall development shows about 3.78 acres of pervious area which results in approximately 1,830 SF of open space per dwelling unit. The developers are looking to get the PD approved showin g that the development proposed fits the development market for a downtown mix of high density residential uses with commercial uses. Further they believe that the amenities and open space shown for the apartment complex meets the market demand. The developers have submitted as part of their TIF proposal a market study for the proposed apartments. With the development as presented the developers are showing that rents will average $1,697 and will have an absorption rate of 5 a month.  Water Table: Individuals mentioned that they wondered what the science was behind the mentioned water table being high on the property which leads to the higher heights of the residential structures. The developers did complete a geotechnical study prior to approvals. Below is a section from the study regarding the water presence in the area. Also, it should be noted that high amounts of fill material are found throughout the site which leads to high over-excavation costs for any future building on the site as well. The city does have a code requirement for developments that a structure should be at least 2 feet above any perched water table. STAFF RECOMMENDATION PC 030-2016 Approval of Resolution PC 030-2016. Finding that the submittal meets the Comprehensive Plan and that the PD proposal passes the “Basis for Approval” test of the zoning code in Section 9.04. Further, approval based on the following contingencies that are found in the current resolution:  BE IT FURTHER RESOLVED, That this resolution recommends to the Council to include in the ordinance that the rezoning only takes effect upon approval and execution of Plan Commission approved BSO Plans for all elements of the proposed development and Common Council approved developer’s agreements outlining developer improvements when applicable.  BE IT FURTHER RESOLVED, That Plan Commission approvals (Building, Site and Operation Plans, Condo Plats, CSMs, etc.) will be required in the future for all uses shown in the concept plan for this proposed rezoning. Staff has based the approval recommendation on the following supporting information: 1. The Plan Commission will be able to review the various BSOs for each individual building in the future which will more adequately assure that the uses adapt to the surrounding neighborho od in relation to landscaping, lighting, screening, operation times, trucking, and the like. 2. The basis for approval sections of the zoning code are substantially met including the following – a. Section 9.04(A) asks that the developer show that they can rea sonably carry out the desired development plan associated with the rezoning request. Running parallel to this rezoning request is a Tax Incremental Financing request before the Common Council. Staff can assure the Planning Commission that a developer’s agreement is being orchestrated that ensures the developer meet many construction schedules before receiving any financing. The developer has been thru extensive pre - development activities leading up to this rezoning as well. The city is in receipt of the fol lowing documents from the developer as part of their pre -development efforts: traffic impact study, geotechnical study, title report, bank commitments, environmental studies, market analysis, full civil plans, and property appraisals. The civil plans are of important note as the plans are in position for full approvals from the city and outside agencies (MNSD and DNR) by mid -May. Thus the developer could be moving dirt as early as mid-May with the approvals herein. b. Section 9.04(B) asks if the proposed development is consistent in all respects to the spirit and intent of this Ordinance and is in conformity with the general plans for community development. Given the decade’s worth of adopted plans noted above that promote mixed use development for the form er Parkland Mall site, staff finds that this objective is met. However, it should be noted that individual tweaks may need to be made to the building, site and operation plans of each structure in order for them to better fit in the immediate neighborhood in relation to screening, landscaping, and operation times, etc. In all, the development is consistent though with the spirit and intent of the city’s codes and adopted plans. Section 9.04(B) goes on to discuss that the development “….would not be contrary to the general welfare and economic prosperity of the City or of the immediate neighborhood, that the specific development plans have been prepared with competent professional advice and guidance, and that the benefits and improved design of the resultant development justifies the variation from the normal requirements of this Ordinance through the application of the PD Planned Development Overlay District.” Although each individual structure is to be reviewed on its own BSO Plan merit in the future by Planning Commission, this is the part of the code where we should consider the variations to the zoning code that the developers are specifically requesting per the following: i. Multi-family height variation: The developers are requesting a height for the m ultifamily structures to be at 43’9” as measured by code. Currently, the city’s DR -1 Downtown Revival Zoning District, which allows residential and commercial uses in combination, allows a maximum height of 35 feet. Thus, staff sees this request as a variation of approximately 8’9”. The developers have noted that the need for the higher roofline is due to the water table being high in the vicinity of the footings and foundations for the structures. Although the height of the proposed structures are higher than the city norm there is some substantiation for the proposal. The adopted Redevelopment Plan for the parcel has been adopted since 2003 and has always had two guidelines associated with the thoughts for the future development of this parcel in relation to heights: Design Character-Taller building profiles – downtown centerpoint and landmark & Density-Possible Mid-Rise heights: Somewhat higher than City norm. Various concept plans over the years (including in the initial Redevelopment Plan itself) for the parcel have been presented as well to have possible heights outside city norm. The main objective is to determine what heights should be the maximum allowed. Staff believes that the height presented of 43’9” is adequate if the Plan Commission and Cou ncil first agree that the building sizes and mix of uses is allowed. If we determine that the building sizes and density presented are allowable and that we see that the proposal fits into the various adopted plans, we should be OK with the presented height variation. Staff bases this thought that the height variation requested is 8’9” from the maximum allowed by our DR -1 zoning district of 35 feet. If we are following the Redevelopment District #2 Plan guideline, buildings may be found higher than the norm in this area of the city than the 8’9” difference doesn’t represent much of a variation. This is due to the fact that the very mass of the building is still going to be ever present in this downtown location of Janesville Road at a height of 35 feet or at 43’9”. If the Muskego adopted plans wanted to create a new sense of place, or centerpoint for our downtown, the presented proposal should fulfill that objective as a passerby will see that the proposed structures are of a unique size and shape for Muskego regardless if the height is between 35’ to the proposed 43’9”. In relation to height, staff has been asked for some comparables in the community. This should be prefaced that Muskego does not have any buildings like the proposed multi family structures in Muskego. However, here are some examples: -Muskego High School PAC: 51’ -St.Paul’s Gym: 39’ -InPro Office: 35’ to peak -GE on Moorland: 30’ -North Shore Bank across street: 30’ to peak (NOTE: also ~7’ above Janesville Road) Lastly, it should be noted that Muskego’s code measures from the average front grade elevation of a structure to the midpoint of the highest gable roof. Thus, heights tend to be higher than what Muskego codes state. For example, there are many two story single family homes in Muskego well above the 30-foot height requirement for a single family residential district due to how the code measures heights. It isn’t uncommon for a two-story home to be 35’ or higher while an exposed rear portion of a dwelling could be in the 40 -foot height mark. A recent example would be the home being built just west of the Hillendale/Racine intersection on the north side of Hillendale Drive. This home is 40 feet to the peak. ii. Amount of units in each multi-family building: The developers are requesting that each multi- family building have up to 30 units each. Muskego’s existing most intense multi-family zoning district (RM-1) allows up to 16 units in any one structure. Staff doesn’t see that the 30 units in one structure affects the development or neighborhood area any differently than a 16 unit structure given that proper BSO requirements are sought and the overall unit density parameters allowed by the PD are followed. iii. Setback/offset variations: The developers are requesting that the buildings, both residential and commercial, be placed as shown on the submitted site plans. All the placements would be subject to a future Plan Commission Building, Site, and Operation Plan for other proper placements of parking, utilities, and landscaping. Overall, the placements of the buildings meet one of the city’s underlying zoning codes for a downtown mixed use, residential, or commercial zoning. The following zoning districts would usually apply to this downtown area for Plan Commission reference:  RM-1 multi-family zoning district allows buildings per the following requirements - Front Setback of 40 feet, Side Setbacks of 20 feet, floor area ratio max of 30%, Open space per dwelling unit of 4,000 SF.  DR-1 Downtown Revival Mixed Use District allows buildings per the following requirements - Front Setback of 10 feet, Side Setbacks of 5/10 feet, floor area ratio max of 40% (B-4 district), Open space per dwelling unit of 2,500 SF.  B-4 Highway Business District (existing zoning) allows buildings per the following requireme nts - Front Setback of 40 feet, Side Setbacks of 10/15 feet, floor area ratio max of 30% (B -4 district). c. Section 9.04(E) asks if the proposed mix of uses and overall density conform to code and the Comprehensive Plan. Staff finds again that the use mix conforms to the objectives of the area for the Comprehensive Plan as noted in the Comp Plan text noted above. Further, the residential unit density proposed for the development (90 units) meets code without the need for a bonus. The open space found in the proposal seems to be consistent with a high density downtown development as presented. MUSK EG Othe City of Ar ea o f Inte restI0350700 Fee t Ag en da Item(s) Pr op er tie s Zon in g D istr ic ts Rig ht -o f-Way Hy dr og rap hy Supp lem ental MapRESOLUTION #PC 03 0-2016 En er -con C om pan iesS74 W 170 00 Ja nes v ille Ro ad J A N E S V I L L E L O O M I S R D RA CIN E AV DURHAM W O O D S CO LL EG E Pre p ar ed b y C ity o f Mu ske g o P la n n in g D e p ar tm e nt Da te : 4 /2 5/2 0 16 RESOLUTION #P.C.030-2016 RECOMMENDATION TO COUNCIL TO AMEND THE ZONING MAP OF THE CITY OF MUSKEGO FOR ENER-CON COMPANIES FOR A PROPERTY LOCATED IN THE NW ¼ OF SECTION 10 (TAX KEY NO. 2198.984) FROM B-4 HIGHWAY BUISNESS DISTRICT TO A PD – PLANNED DEVELOPMENT FOR A DEVELOPMENT KNOWN AS PARKLAND TOWNE CENTER WHEREAS, A petition for a rezoning was submitted by Ener-Con Companies, Inc. to rezone the property along Janesville Road just east of Lannon Drive known as the former Parkland Mall site (Tax Key No. 2198.984/Janesville Road), and WHEREAS, The rezoning request is to amend the existing zoning from B-4 Highway Business District to a PD – Planned Development District for a new development entitled the Parkland Towne Center, and WHEREAS, A Planned Development District allows different land uses to co-exist as well establishing that individual uses/structures need not comply with the specific building location, height, building size, lot size, and open space requirements of the underlying basic zoning districts provided that the spirit and intent of such requirements are complied with in the total development plan for such projects consistent with the criteria as established in the “basis for approval” section of the zoning code, and WHEREAS, The Parkland Towne Center planned development district is requested for the following reasons:  The development to be conceptually developed per the submittal subject to future city approvals of civil plans, BSOs, CSM and other approvals,  The multi-family buildings not to exceed 43’9” feet as measured by code,  The multi-family buildings to have up to 30 units in any one structure,  Commercial and residential buildings on the site to have varying setbacks , offsets, floor area ratios, and open space ratios,  Lot lines to cross between developments including allowance of land locked parcels subject to easements,  Paving, parking space, and access ways to cross property lines throughout the development, and WHEREAS, A Public Hearing for the rezoning was heard before the Common Co uncil on April 26, 2016, and WHEREAS, The 2020 Comprehensive Plan identifies this area for commercial land uses and the proposal is consistent with the Comprehensive Plan, and WHEREAS, The property is currently served by municipal sani tary sewer and municipal water. THEREFORE BE IT RESOLVED,That the Plan Commission does hereby recommend approval to the Common Council to rezone the Parkland Towne Center property located in the NW ¼ of Section 10 (Tax Key No. 2198.984) from B-4 Highway Business District to a PD- Planned Development District. BE IT FURTHER RESOLVED, The Plan Commission has carefully considered the standards described in Section 9.04 of the City Zoning Code, and has concluded that the proposed development will satisfy such conditions. BE IT FURTHER RESOLVED, That this resolution recommends to the Council to include in the ordinance that the rezoning only takes effect upon approval and execution of Plan Commission approved BSO Plans for all elements of the proposed development and Common Council approved developer’s agreements outlining developer improvements when applicable. BE IT FURTHER RESOLVED, That Plan Commission approvals (Building, Site and Operation Plans, Condo Plats, CSMs, etc.) will be required in the future for all uses shown in the concept plan for this proposed rezoning. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: May 3, 2016 ATTEST: Kellie McMullen, Recording Secretary RREEAALL EESSTTAATTEE:: DDEEVVEELLOOPPEERRSS BBUUIILLDDEERRSS PPRROOPPEERRTTYY MMAANNAAGGEEMMEENNTT SSAALLEESS 8575 W. Forest Home Ave., Suite 160 Greenfield, WI 53228 Office (414) 425-4939 Fax: (414) 425-4946 RezoningApplication ProjectNarrative ParklandTowneCenter,LLC C/OEnerConCompaniesInc. 8575WForestHomeAve.#160 Greenfield,WI53228 (Applicant) ParklandTowneCenter S74W17000JanesvilleRd. Muskego,WI53150 (Project) TheCityofMuskego 2292016 Project/Siteinformation: Location:S74W17000JanesvilleRd.Muskego,WI53150 Applicant:EnerConCompaniesInc. LandUse:Currentlyvacant Zoning:CurrentlyzonedB4,HighwayBusinessDistrict. ProposaltorezonePD,PlannedDevelopment. ParcelArea: Lot1–5.198Acres(or226,432squareft.) Lot2–2.943Acres(or128,212squareft.) Lot3–.679Acres(or29,585squareft.) Lot4–1.260Acres(or54,873squareft.) Lot5–.679Acres(or29,559squareft.) BuildingHeight:The30unitresidentialbuildingswillhaveflatroofswithacopingheight ofapproximately43’9”.Thehighestpointofthebuildingwillbetheelevatorshaftlocatednear themiddleoftheflatroofataheightofapproximately47’8”. PropertyDescription: ThatpartoftheNorthwest1/4ofSection10,inTown5North,Range20East,bounded anddescribedasfollows: CommencingattheSouthwestcornerofsaid1/4Section;thenceNorth1°09'27"Westalong theWestlineofsaid1/4Section,774.00feettoapoint;thenceNorth88°50'33"Eastonaline atrightanglestotheWestlineofsaid1/4Section,50.00feettoapointintheEastlineof LannonRoad,saidpointbeingthepointofbeginningofthelandtobedescribed;thence continuingNorth88°50'33"EastonalineatrightanglestotheWestlineofsaid1/4Section, 100.00feettoapoint;thenceNorth1°09'27"WestonalineparalleltotheWestlineofsaid1/4 Section,200.00feettoapoint;thenceSouth77°35'Eastonaline293.37feettoapoint;thence South27°33'Eastonaline210.00feettoapoint;thenceNorth62°27'Eastonaline160.00 feettoapoint;thenceSouth27°33'Eastonaline28.22feettoapoint;thenceNorth62°27' Eastonaline16.08feettoapoint;thenceSouth27°33'Eastonalineatrightanglestothe NortherlylineofJanesvilleRoad(S.T.H."24")417.31feettoapointintheNortherlylineof JanesvilleRoad;thenceSouth62°27'WestalongtheNortherlylineofsaidJanesvilleRoad, 726.81feettoapoint;thenceNorth27°04'Westonaline176.80feettoapoint;thenceSouth 88°50'33"WestonalineatrightanglestotheWestlineofsaid1/4Section,106.00feettoa pointintheEastlineofsaidLannonRoad;thenceNorth1°09'27"WestalongtheEastlineof saidLannonRoad,541.84feettothepointofbeginning.SaidlandbeingintheCityofMuskego, CountyofWaukesha,andStateofWisconsin. TaxKeyNo:MSKC2198.984 Address:S74W17000JanesvilleRoad ProjectDescription: This10.76acrepieceoflandisconsideredtobeaprimelocationforredevelopmentin theCityofMuskego.Givenitscentrallocation,thissiteplaysacrucialroleinthefutureofthe CityofMuskegoandistheperfectlocationforaTowneCenter.Thedevelopmentwillconsistof (3)30unithighendapartmentbuildingsalongwith23,500squarefeetofretail/officespaceand a30,000squarefootgrocerastheanchortenant.Thedevelopmentisgoingtogiveanewimage andwalkabilitytotheCityofMuskego.Themixeduseisgoingtobebeneficialtobothcurrent andfutureresidents.Withtheretail/officeandgrocerystorethissitehasthepotentialtocreate aonestopconveniencetoallMuskegoResidents.AttachedareCivilengineeringplansprepared bytheSigmaGroupincludingasiteplan,erosioncontrolplan,roadwayplan,trafficcontrolplan, gradingplan,utilityplan,andwaterandsewerplan.Alsoattachedarethemostuptodate buildingplansalongwithcoloredrenderingsoftheproposed30unitbuildings. PlannedDevelopmentRequests: ParklandTowneCenter,LLCwouldliketorequestaheightwaiverasthethreeresidential apartmentbuildingswillexceedthebuildingheightrestrictioncurrentlysetbytheCityof Muskego.Duetogroundconditionsnotbeingsuitableforundergroundparking,thebuildings willexceedthebuildingheightlimitation.Theresidentialbuildingshavebeendesigned specificallyforthesoilconditionsatthesitewithgradelevelparkingtoppedbythreeresidential floors.Theyhavebeendesignedwithflatroofswithacopingheightofapproximately43’9”.The highestpointofthebuildingwillbetheelevatorshaftlocatednearthemiddleoftheflatroofat aheightofapproximately47’8”.Aheightwaiverallowinganextensionof13’9”isrequested. ParklandTowneCenter Brick:Boston 2 ndand3 rdfloorofelevation FiberCementPanel:#713CS(orsimilarcolor) Cornerpillarsofelevation HardiePlankLapSiding:HeatheredMoss(orsimilarcolor) 4 thfloorofelevation DecorativeBlock:Redhueatthelower3courses,buff/grahamatuppercourses Gradelevelofelevation Note:colorsmayrenderdifferentlyonprintasopposedtophysicalsamples P/L P/L P/L P/L P/L P/ L P/ L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L PROPOSED FUTURE GROCERY (30,000 SF) FFE = 809.00 PROPOSED FUTURE COMMERCIAL (12,000 SF) FFE: 811.80 PROPOSED FUTURE COMMERCIAL (4,000 SF) FFE = 811.80 PROPOSED FUTURE COMMERCIAL (7,500 SF) FFE = 808.87 22 11 8 17 20 19 9 9 1212 12 10 10 12 20 14 33 11 9 PO O L 14 2 8 3 9 9 PROPOSED BUILDING 21,600 SF FFE = 809.00 P / L P/L P/ L P/LP/L P/L P/L P/L P / L T T T T T T T T T T T T T T T T T T T T T T T W W W W TT E E E E W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N W G G W E T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E T T T T T T T T G SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA S A N S A N W W E G SA N G G G G G G G G G G G G G G G G G G X CTV T T T T T T T T T T T T T T T T T 12" C M P INV : 8 0 5 . 4 5 12" C M P INV : 8 0 4 . 9 0 12" C M P INV : 8 0 4 . 8 8 12" C M P INV : 8 0 4 . 7 9 48" C C P INV : 7 9 7 . 2 2 FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO 60" C C P INV : 7 9 6 . 3 7 "V" C H A N N E L : 796 . 5 5 SA N MH 1 SA N MH 3 SA N MH 4 SA N MH 5 SA N MH 6 SA N MH 7 SA N MH 8 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH 4 ST M MH 5 ST M MH 6 ST M MH 7 ST M MH 8 ST M MH 9 ST M MH 1 0 P/ L P/ L P/LP/L P/L P/L OV E R A L L G R A D I N G P L A N DRAWING NO. DRAWN BY: DATE: PROJECT NO: CHECKED BY: APPROVED BY: NO. REVISION DATE BY SHEET NO.: PA R K L A N D T O W N E C E N T E R MU S K E G O , W I S C O N S I N 15577 GRADING.dwg www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 TH E G R O UPSingle Source. Sound Solutions. CJS 11-24-15 15577 JBL JBL Fi l e : I : \ E N E R C O N \ 1 5 5 7 7 _ N e w P a r k l a n d M a l l \ 0 6 0 C A D \ C - C i v i l \ 5 0 0 P r o d u c t i o n - C i v i l P l a n s \ 5 0 5 - G r a d i n g P l a n \ 1 5 5 7 7 G R A D I N G . d w g C 200 GENERAL NOTES: 1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. 2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES. 4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES. 5. DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF PAVEMENT. 6. WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND RAMPS, PAVING, AND CURB AND GUTTER SHALL BE COMPLETED PER MUNICIPAL AND/OR COUNTY REQUIREMENTS AND STANDARDS. 7. EARTHWORK SHALL BE IN ACCORDANCE WITH GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. 5 5 EXISTING CONTOUR PROPOSED CONTOUR LEGEND: PROPOSED CURB & GUTTER SPOT GRADE T/C: TOP OF CURB GRADE FL: FLOW LINE CURB GRADE PROPOSED ASPHALT SPOT GRADE100.00 100.50 T/C 100.00 FL GRAPHIC SCALE 00 50' 100' THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED. PRELIMINARY A C401 CURB & GUTTER (ACCEPT) A C401 CURB & GUTTER (REJECT) B C4015" THICK CONCRETE WALK C C401 ASPHALT SURFACE (HEAVY DUTY ) PROPOSED STORM INLET PROPOSED STORM MANHOLE PROPOSED SANITARY MANHOLE C C402 A C402 B C402 JANESVILLE RD LA N N O N D R . STORM WATER BASIN HWL=805.54 NWL=800 STORM WATER BASIN B C403 E C403 REINFORCED TURF MATTING C C403 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' UTILITY EASEMENT 30' WATER UTILITY EASEMENT 40' UTILITY EASEMENT A C403 REPLACE EXISTING PATH AS NECESSARY OVERLAND FLOW PATH PROPOSED FUTURE PROPERTY LINE PROPOSED FUTURE PROPERTY LINE PROPOSED FUTURE PROPERTY LINE REINFORCED TURF MATTING C C403 REPLACE MANHOLE COVER WITH TEMPORARY GRATE. REFER TO STORM STRUCTURE TABLE ON SHEET C402. REPLACE MANHOLE COVER WITH TEMPORARY GRATE. REFER TO STORM STRUCTURE TABLE ON SHEET C402. P/L P/L P/L P/L P/ L P/ L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L PROPOSED FUTURE GROCERY (30,000 SF) FFE = 809.00 PROPOSED FUTURE COMMERCIAL (12,000 SF) FFE: 811.80 PROPOSED FUTURE COMMERCIAL (4,000 SF) FFE = 811.80 PROPOSED FUTURE COMMERCIAL (7,500 SF) FFE = 808.87 PO O L 9 PROPOSED BUILDING 21,600 SF FFE = 809.00 P / L P/L P/ L P/LP/L P/L P/L P/L P / L T T T T T T T T T T T T T T T T T T T T T T T W W W W TT E E E E W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N W G G W E T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E T T T T T T T T G SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA S A N S A N ST ST W W E G SA N G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST S T ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTST ST ST X CTV T T T T T T T T T T T T T T T T T 12" C M P INV : 8 0 5 . 4 5 12" C M P INV : 8 0 4 . 9 0 12" C M P INV : 8 0 4 . 8 8 12" C M P INV : 8 0 4 . 7 9 48" C C P INV : 7 9 7 . 2 2 FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO 60" C C P INV : 7 9 6 . 3 7 "V" C H A N N E L : 796 . 5 5 SA N MH 1 SA N MH 3 SA N MH 4 SA N MH 5 SA N MH 6 SA N MH 7 SA N MH 8 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH 4 ST M MH 5 ST M MH 6 ST M MH 7 ST M MH 8 ST M MH 9 ST M MH 1 0 P/ L P/ L P/LP/L P/L P/L >> > > > > > > > > > > > > > > > > > EXISTING STORM TO BE REUSED > > > W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SANSANSAN SA N SA N SA N SA N SA N W W SANSANSANSAN > > EXISTING STORM TO BE REUSED 10 . 0 ' > 12 5 ° ' 84° ' UT I L I T Y P L A N DRAWING NO. DRAWN BY: DATE: PROJECT NO: CHECKED BY: APPROVED BY: NO. REVISION DATE BY SHEET NO.: PA R K L A N D T O W N E C E N T E R MU S K E G O , W I S C O N S I N 15577 UTILITY.dwg www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 TH E G R O UPSingle Source. Sound Solutions. TPM 12-4-15 15577 JBL JBL GENERAL NOTES: 1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. 2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES. 4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES. 5. ALL UTILITIES WITHIN 5 FEET OF PAVED AREAS SHALL REQUIRE GRANULAR BACKFILL. SLURRY BACKFILL IS REQUIRED FOR ALL WORK IN PUBLIC RIGHT OF WAY. 6. PRIVATE STORM INLETS IN PAVEMENT SHALL REQUIRE DRAIN TILE STUBS OF 10 FEET IN TWO DIRECTIONS FOR SUBDRAINAGE. RIM GRADE FOR STORM INLETS IN CURB AND GUTTER ARE FLOW LINE GRADES. 7. WORK IN PUBLIC RIGHT OF WAY SHALL FOLLOW MATERIAL AND INSTALLATION REQUIREMENTS PER MUNICIPAL AND/OR COUNTY. 8. PRIVATE STORM SEWER 12-INCH DIAMETER OR LARGER SHALL BE HDPE. BELOW 12-INCH DIAMETER SHALL BE PVC SDR-35 ASTM D3034. PRIVATE WATER MAIN SHALL BE CLASS 150 DR 18 PVC CONFORMING TO AWWA C-900. PRIVATE SANITARY SEWER SHALL BE PVC SDR-35 ASTM D3034. 9. COORDINATE FINAL LOCATION AND DESIGN OF PRIVATE UTILITY SERVICES (ELECTRIC, GAS, PHONE, CABLE) WITH UTILITY COMPANIES. 10. FOR PUBLIC SANITARY SEWER PLAN AND PROFILE DESIGN REFER TO SHEET C301 AND C302. 11. FOR PUBLIC WATER PLAN AND PROFILE DESIGN REFER TO SHEET C303 - C305. W SAN > E T G PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED ELECTRICAL SERVICE PROPOSED TELEPHONE SERVICE PROPOSED GAS SERVICE Fi l e : I : \ E N E R C O N \ 1 5 5 7 7 _ N e w P a r k l a n d M a l l \ 0 6 0 C A D \ C - C i v i l \ 5 0 0 P r o d u c t i o n - C i v i l P l a n s \ 5 0 6 - U t i l i t y P l a n \ 1 5 5 7 7 U T I L I T Y . d w g LEGEND: C 300 GRAPHIC SCALE 00 50' 100' THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED. PRELIMINARY ST EXISTING STORM SEWER PROPOSED STORM INLET PROPOSED STORM MANHOLE PROPOSED SANITARY MANHOLE C C402 A C402 B C402 PROPOSED WATER VALVE PROPOSED WATER HYDRANT UTILITY CROSSING 8" WATER INV: 798.28 6" SAN. INV: 800.81 UTILITY CROSSING 8" WATER INV: 798.27 8" SAN. INV: 800.24 UTILITY CROSSING 8" WATER INV: 798.65 15" STM. INV: 801.77 UTILITY CROSSING 8" WATER INV: 798.50 30" STM. INV: 800.41 UTILITY CROSSING 6" SAN INV: 800.75 15" STM. INV: 801.76 UTILITY CROSSING 12" WATER INV: 800.43 8" SAN. INV: 797.72 UTILITY CROSSING 8" WATER INV: 798.14 EX. 24" STM. INV: 800.89 UTILITY CROSSING 8" SAN INV:799.43 18" STM. INV: 803.55 UTILITY CROSSING 8" SAN INV: 798.52 12" STM. INV: 804.47 UTILITY CROSSING 8" SAN INV: 797.72 12" WATER INV: 800.43 40' UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT D C402 JANESVILLE RD LA N N O N D R . COORDINATE WORK WITHIN THE RIGHT OF WAY WITH THE PUBLIC ROAD IMPROVEMENTS . COORDINATE WORK WITHIN THE RIGHT OF WAY WITH THE PUBLIC ROAD IMPROVEMENTS . COORDINATE WORK WITHIN THE R.O.W WITH THE PUBLIC ROAD IMPROVEMENTS . UTILITY CROSSING 8" WATER INV: 797.78 24" STM. INV: 800.11 W W W E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN S G G GEE E E E E E E E E E E E E E E E E E E E E E E E E E T W W WSA N SA N G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G T GR A V E L GR A V E L G FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO SA N MH 3 SA N MH 4 SA N MH 5 P/LP/LP/LP/L TTTTTTTTTTTTTTTTTTTTTTT T T TTT TTTTTTT E E E E E E W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W E E T T T T T T T T T T G G SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SA N SA N SA N SA N STST ST S T S T S T S T S T STSTST T T T T T T T T TTTTTTTTTTTTTTTTTTT T GR A S S GR A S S GR A S S BI T U M I N O U S PA V E M E N T BIT.PAD EX I S T I N G BU I L D I N G GRASSGRASS LT P BA S E LT P BA S E 12 " C M P IN V : 8 0 5 . 4 5 12 " C M P IN V : 8 0 4 . 9 0 12 " C M P IN V : 8 0 4 . 8 8 12 " C M P IN V : 8 0 4 . 7 9 DU M P S T E R CO N T A I N M E N T SA N MH 1 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH 9 P/L P/L P/L 17 . O LANNON DRIVE SI T E P L A N DRAWING NO. DRAWN BY: DATE: PROJECT NO: CHECKED BY: APPROVED BY: NO. REVISION DATE BY SHEET NO.: PA R K L A N D T O W N E C E N T E R D E V E L O P M E N T JA N E S V I L L E R O A D A N D L A N N O N D R I V E I M P R O V E M E N T S MU S K E G O , W I S C O N S I N 15577 - Public Site.dwg www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 TH E G R O UPSingle Source. Sound Solutions. Fi l e : I : \ E N E R C O N \ 1 5 5 7 7 _ N e w P a r k l a n d M a l l \ 0 6 0 C A D \ C - C i v i l \ 5 0 0 P r o d u c t i o n - P u b l i c \ 5 0 3 - S i t e D i m e n s i o n P l a n \ 1 5 5 7 7 - P u b l i c S i t e . d wg LEGEND: C 003 A C401 CURB & GUTTER (REJECT) THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED. PRELIMINARY B C401ASPHALT SURFACE PJI 1-25-16 15577 JBL JBL GRAPHIC SCALE 00 30' 60' 12.0' 100.0'72' 31" CONCRETE CURB AND GUTTER (REJECT) 8-INCH WHITE EPOXY PAVEMENT MARKING (SOLID)8-INCH WHITE EPOXY PAVEMENT MARKING (2' LINE, 6' GAP) SLOPED CONCRETE MEDIAN NOSE W/YELLOW EPOXY PAVEMENT MARKING 12.0' 12.0' 12.0' 8-INCH WHITE EPOXY PAVEMENT MARKING (2' LINE, 6' GAP) PAVEMENT MARKING WHITE EPOXY ARROW TYPE 2 8-INCH WHITE EPOXY PAVEMENT MARKING (SOLID) PAVEMENT MARKING WHITE EPOXY ARROW TYPE 1 PAVEMENT MARKING WHITE EPOXY ARROW TYPE 2 8-INCH WHITE EPOXY PAVEMENT MARKING (2' LINE, 6' GAP)8-INCH WHITE EPOXY PAVEMENT MARKING (SOLID) 8-INCH WHITE EPOXY PAVEMENT MARKING (2' LINE, 6' GAP) 4-INCH DOUBLE YELLOW EPOXY PAVEMENT MARKING 100.0' 80.0' 4-INCH WHITE EPOXY PAVEMENT MARKING INSTALL NEW TYPE "C" BASE AND RELOCATE EXISTING BANNER POLE. PULL BACK EXISTING WIRING (3 #10 AND 1 #10 GROUND) TO NEAREST PULL BOX OR POLE. CONNECT NEW CONDUIT TO EXISTING AS SHOWN. PULL EXISTING WIRE THROUGH NEW CONDUIT TO NEW POLE LOCATION AND RECONNECT. PULL BACK EXISTING WIRING (3 #10 AND 1 #10 GROUND) TO NEAREST PULL BOX OR POLE. CONNECT NEW CONDUIT TO EXISTING AS SHOWN. PULL EXISTING WIRE THROUGH NEW CONDUIT TO NEW POLE LOCATION AND RECONNECT 11.0' PAVEMENT MARKING WHITE EPOXY ARROW TYPE 2 CONCRETE DRIVE APPROACH 5" CONCRETE SIDEWALK 5" CONCRETE SIDEWALK HMA PAVEMENT RELOCATE EXISTING ATMOSPHERIC VACUUM BREAKER AND IRRIGATION VALVE BOX BEHIND CURB. INSTALL NEW IRRIGATION PIPING, TRACER WIRE, AND ELECTRIC LINES TO MATCH EXISTING. CONCRETE SIDEWALK 5-INCH D C402 CONCRETE DRIVEWAY 7-INCH PAVEMENT MARKING WHITE EPOXY WORDS 100.0'66.0' CONCRETE DRIVE APPROACH 5" CONCRETE SIDEWALK HMA PAVEMENT CONCRETE DRIVE APPROACH 5" CONCRETE SIDEWALK HMA PAVEMENT 31" CURB AND GUTTER (TYP) CONCRETE MEDIAN NOSE 5" CONCRETE SIDEWALK ADA RAMPA C402 ADA RAMPB C402 REINSTALL BRICK PAVERSE C401 C C401 C C402 GENERAL NOTES: 1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. 2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES. 4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES. 5. DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF PAVEMENT. 6. WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND RAMPS, PAVING, AND CURB AND GUTTER SHALL BE COMPLETED PER MUNICIPAL AND/OR COUNTY REQUIREMENTS AND STANDARDS. 31" CURB AND GUTTER NOTE: ALL IMPROVEMENTS WITHIN JANESVILLE ROAD ROW SHALL BE IN ACCORDANCE WITH THE WISDOT STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURE CONSTRUCTION, LATEST EDITION. NOTE: ALL IMPROVEMENTS WITHIN LANNON DRIVE ROW SHALL BE IN ACCORDANCE WITH THE CITY OF MUSKEGO STANDARD SPECIFICATIONS. W W W E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN S G G GEE E E E E E E E E E E E E E E E E E E E E E E E E E T W W WSA N SA N G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G T GR A V E L GR A V E L G FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO SA N MH 3 SA N MH 4 SA N MH 5 P/LP/LP/LP/L P P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L P/L P/L TTTTTTTTTTTTTTTTTTTTTTT TT TTTTTTTTTT E E E E E E W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W E T T T T T T T T T G G SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SA N SA N SA N SA N STST S T T S T S T S T S T STSTST T T T T T T T TTTTTTTTTTTTTTTTTTT T GR A S S GR A S S GR A S S BI T U M I N O U S PA V E M E N T BIT.PAD EX I S T I N G BU I L D I N G GRASSGRASS LT P BA S E LT P BA S E 12 " C M P IN V : 8 0 5 . 4 5 12 " C M P IN V : 8 0 4 . 9 0 12 " C M P IN V : 8 0 4 . 8 8 12 " C M P IN V : 8 0 4 . 7 9 DU M P S T E R CO N T A I N M E N T SA N MH 1 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH P/L P/L P/L > > P/L P/L P/LP/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L LANNON DRIVE RO A D W A Y G R A D I N G P L A N DRAWING NO. DRAWN BY: DATE: PROJECT NO: CHECKED BY: APPROVED BY: NO. REVISION DATE BY SHEET NO.: PA R K L A N D T O W N E C E N T E R D E V E L O P M E N T JA N E S V I L L E R O A D A N D L A N N O N D R I V E I M P R O V E M E N T S MU S K E G O , W I S C O N S I N 15577 PUBLIC GRADING.dwg www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 TH E G R O UPSingle Source. Sound Solutions. PJI 1-25-16 15577 JBL JBL Fi l e : I : \ E N E R C O N \ 1 5 5 7 7 _ N e w P a r k l a n d M a l l \ 0 6 0 C A D \ C - C i v i l \ 5 0 0 P r o d u c t i o n - P u b l i c \ 5 0 5 - G r a d i n g P l a n \ 1 5 5 7 7 P U B L I C G R A D I N G . d w g C 200 GENERAL NOTES: 1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. 2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES. 4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES. 5. DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF PAVEMENT. 6. WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND RAMPS, PAVING, AND CURB AND GUTTER SHALL BE COMPLETED PER MUNICIPAL AND/OR COUNTY REQUIREMENTS AND STANDARDS. 7. EARTHWORK SHALL BE IN ACCORDANCE WITH GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. 5 5 EXISTING CONTOUR PROPOSED CONTOUR B C402ASPHALT SURFACE LEGEND: PROPOSED CURB & GUTTER SPOT GRADE T/C: TOP OF CURB GRADE FL: FLOW LINE CURB GRADE PROPOSED ASPHALT SPOT GRADE100.00 100.50 T/C 100.00 FL GRAPHIC SCALE 00 30' 60' THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED. PRELIMINARY INSTALLED BY OTHERS. COORDINATE UTILITY CONSTRUCTION WITHIN R.O.W. WITH PARKLAND MALL DEVELOPMENT. PARKLAND MALL DEVELOPMENT. NOT IN CONTRACT. REFER TO CIVIL PLANS FOR INFORMATION. PARKLAND MALL DEVELOPMENT. NOT IN CONTRACT. REFER TO CIVIL PLANS FOR INFORMATION. ALL IMPROVEMENTS IN LANNON DRIVE SHALL BE IN ACCORDANCE WITH CITY OF MUSKEGO STANDARD SPECIFICATIONS. ALL IMPROVEMENTS IN JANESVILLE ROAD SHALL BE IN ACCORDANCE WITH WISDOT STANDARD SPECIFICATIONS. City of Muskego Plan Commission Supplement PC 031-2016 For the meeting of: May 3, 2016 REQUEST: Building Site and Operation Plan – Parkland Towne Center Multi-family Buildings Tax Key No. 2198.984 NW ¼ of Section 10 PETITIONER: Ener-Con Companies INTRODUCED: May 3, 2016 LAST AGENDA: N/A PREPARED BY: Jeff Muenkel, AICP BACKGROUND PC 031-2016 The petitioner, Ener Con Companies, is requesting a Building Site and Operation Plan (BSO) to allow three (3) multi-family buildings as part of their proposed Parkland Towne Center Development. PLAN CONSISTENCY PC 031-2016 Comprehensive Plan: The 2020 Plan depicts the areas for commercial use. The proposal is consistent with the Plan subject to a PD Planned Development rezoning. Zoning: The property is zoned B-4 Highway Business District. However, a PD Planned Development zoning is currently under consideration that would allow the uses as presented herein. The resolution would be subject to that rezoning occurring. Adopted 208 Sanitary Sewer Service Area: Public sanitary sewer serves this area. The proposal is consistent with the plan. Water Capacity Assessment District: The property is serviced with water. The proposal is consistent with the Plan. Stormwater Management Plan: On-site stormwater management is part of the Parkland Towne Center development and part of the proposal. All stormwater ponds would have to be approved and constructed prior to occupancy of the structures. The proposal is consistent with the Plan. DISCUSSION PC 031-2016 The submittal is included in the supplement consisting of a narrative, site plans, grading/utility plans, landscape plan, building elevations, floor plans, colored renderings, lighting and signage plans. As stated above, the petitioner requests approvals for the new multi-family buildings as part of the Parkland Towne Center Development. The multi-family development is to be named The View at Parkland. Each structure would consist of four stories and have thirty (30) units of 1 -2 bedroom apartments. The proposal is part of the Parkland Towne Center development which is currently under consideration for a PD Planned Development zoning by Plan Commission and Council as well. Overall, the developers are seeking approval for all three (3) multi-family buildings in the BSO at this time and it is the developer’s intent to build the structures in a sequence presented on the site from south to north (Building #1 thru Building #3). Per the developers bank commitment, a new building would not start construction until an ~85% occupancy rate of the building before. It is consistent that the developer submits an accompanying BSO Plan to Plan Commission during a rezoning submittal if it works in their timeline so Plan Commission can have the most relevant information in basing their decisions. Architecture The buildings are proposed to have four sided architecture and be fully clad in masonry products. The buildings are presented with the parking garage on the first floor and the living areas on the 2 nd thru 4th floors. Material changes and colors are shown from floor to floor for some added uniqueness. The developers have shown in other submittals that the need for building on a slab is due to poor soil conditions. The structures are clad with the following: First Floor: Decorative block with a “red” color on the first three courses and a “buff/graham” color on the upper courses. Windows with galvanized sunshades would be found throughout the first floors as well to break up the façade and adapt it to the rest of the structure. Second-Third Floors: These floors are mainly clad with a Boston Brick and windows will have stone sills and lintels of a masonry grey color. Fourth Floor: The upper floor is proposed to be clad with a hardie lap siding in a “heather ed moss” color. Corners: Each corner of the structure will be cladded in a greyish fiber cement panel Other: Roofing coping will be an aluminum in a grey color. Outside decks are shown for each of the units and decks will be prominent on along the longer facades of the structure. The t op floor of the decks will be covered with aluminum coping roofs. The decks and sundeck on top of the first floor will have aluminum fencing with similar colors to the main structure. The Downtown Design Guide and the General Design Guide apply to this area. Overall, the General Design guide is met as the building is presented with four -sided architecture and has well over the 50% masonry requirement. The Downtown Design Guide intent looks to promote the same principles as the Redevelopment District #2, which staff noted below. The rest of the Downtown Design Guide simply promotes all the requirements that the city has already enforced as part of this project including 50% masonry, four -sided architecture, screening, and landscaping. A copy of the overal l guide is in this supplement for Plan Commission reference. Overall, as presented in the rezoning Resolution #030 -2016 discussion, staff finds that the Downtown Design Guide principles and requirements are mainly met. It should be noted that these are simply guidelines and not a checklist that all have to apply for an approval. The adopted Redevelopment District #2 guide actually goes on to say that a project should be submitted that the developer can show is market driven as well. The Design Guide looks to promote the same characteristics as the Redevelopment District including, but not limited to, the following principles:  Enhance the image, profile, and use of downtown Muskego  Provide a new sense of place with a downtown identity  Demonstrate market driven principles that work within the economic landscape of Muskego  Provide the downtown area, and indeed the entire community, with an identity that adequately reflects the local quality of life and the affluence of City households  Promote the following types of uses: Design Character  Traditional town center/modern ‘main-street’  Buildings squarely facing the street  Buildings closer to street, parking behind  Pedestrian scale – walkable, accented storefronts  Taller building profiles – downtown centerpoint and landmark  Variable roof-lines  Transitional massing blending with surrounding architecture  Sense of place/downtown identity Use Mix  Possible upper end condos (professionals & ‘empty nesters’)  Destination and convenience retail (no ‘big boxes’)  Smaller floor plate retail  Shared parking  Multiple purpose trips  Convenience Density  Possible Mid-Rise heights: Somewhat higher than City norm  Built in consumer market for downtown businesses  Greater TIF revenues  More efficient public services/utilities  Interconnected activity centers  Downtown anchor and landmark Site Plan The overall site consists of the Parkland Towne Center development that includes commercial entities on the south side along Janesville Road but also includes the three multifamily buildings t o the north along Lannon Drive. All access points to the development will have upgraded intersections and streets as noted in the rezoning supplement under PC Res. #030-2016. The primary access points to the multifamily development will be two (2) access points off of Lannon Drive. A larger access point will occur to the south of Building #1 and will facilitate more traffic for the commercial entities. A smaller access point will be found north of Building #2. The interior roads will be of appropriate wi dth for two way access and for appropriate fire needs. The site plans shows curb and gutter on the entire site. A new recreation trail will exist on the west sides of Buildings #1 -2 along Lannon Drive that will connect down to the Janesville Road trail system. The rest of the site surrounding the multifamily structures is small amounts of greenspace that will be consumed by landscaping as discussed further below. A clubhouse/pool is scheduled for the area east of the Building #2. That area is shown to be landscaped in the landscape plan but would be subject to a future BSO Plan once the developer s are ready. Parking Parking for the multi-family buildings consists of fifty-two (52) indoor stalls each. There are also forty (40) outdoor stalls reserved for the multi-family structures with approximately 13 outdoor stalls reserved for each building. The code for multiple family is two (2) enclosed parking spaces per dwelling unit with additional visitor parking as well. The development is obviously unique to Muskego as there are no 30 unit structures of smaller apartment nature in the area. Muskego parking codes are subject to Plan Commission discretion and waiver. By unit count the development is showing 1.73 enclosed parking stalls per unit. When adding t he 13 outdoor parking stalls dedicated to each building a total of 65 parking stalls are found which equates to 2.17 parking stalls per unit. The developers are showing that each building will have twenty-four (24) two-bedroom units and six (6) one-bedroom units. The developers have indicated that they are allocating one parking space per bedroom, however two (2) two-bedroom users will only get one inside space and could be assigned an outdoor space if necessary. The remainder of outdoor spaces would be s olely for visitors. A market study was completed by the developers and is attached to the supplement for Plan Commission perusal. The market study was based on the development as presented to Plan Commission knowing the amount of parking and size/quality of each residential unit. Overall, the market study does show an absorption rate of five (5) apartments per month with fairly high rents. The market study sees that the majority of the units will be rented to singles or empty nesters as they are absorbed. The developers have indicated to staff that based on their anticipated renters they believe that the amount of parking is sufficient. Ener Con has indicated that they have similar apartments in Greenfield under the same scenarios without issue. Outdoor parking stalls are shown as 9’x18’ in size. Traditionally we have approved stall sizes of 10’x20’ which is our code standard unless Plan Commission allows a waiver. As we have discussed over the last few BSO submittals this past year staff is OK with the 9x18 size. First, this is a compact development due to being in the heart of the downtown and along the county highway. Second, the common norm in the general area has settled in at 9’x18’ stalls in the southeastern WI area and we should be consistent for economic development reasons. Lastly, if Plan Commission recalls, the city is going thru a recodification of all city codes during 2016 and staff has the change to our parking stall code requirement to the 9’x18’. As we indicated in the past, Staff has had multiple conversations with a couple groups that look at zoning codes in relation to greenspace preservation and stormwater management reduction needs. The groups have pointed out numerous times that our larger parking stall code is a detriment to greenspace compared to other communities as well. Zoning/Comp Plan The building is presented under the requirements of a PD Planned Development zoning as part of the overall Parkland Towne Center development. Subject to that rezoning approval the buildings s how the setbacks of 10 feet from the west property line for Buildings #1 and #2 and a setback of 20 feet from the west property line for Building #3. It should be noted that Building #3 is adjacent to single family home sites and the developers have this larger setback in order to install screening. As described in the rezoning supplement under PC Resolution #030-2016, the rezoning approval would allow the mix of uses and structure locations/sizes to exist as presented. The height of the structures are shown as 43’9” as measured by city code. An elevator shaft approaches 47’ but is allowed per code. The discussion surrounding the height is within the supplement for Resolution #030-2016 and would be allowed if the PD rezoning is approved as well. The Comprehensive Plan is met under a PD rezoning approval as well. Fire Department Approval The overall site plan for the Parkland Towne Center development has b een reviewed by the Fire Department for access and utility needs. The resolution is still subject to any p ossible changes to the site plan that may be required based upon the final Fire Department review. Dumpsters/Outdoor Storage All refuse will be contained inside the building. No outdoor storage of any kind is allowed for the building or tenants. Landscaping A full landscape plan is part of the submittal that shows how the landscaping will be accomplished for all three proposed multi-family buildings and their surroundings. The landscape plan has been reviewed by the City Forester and the resolution is subjec t to any changes by the City Forester at building permit time for each structure. In all, each building is surrounded with a wealth of foundation plantings as well as various trees surrounding the perimeters along the adjoining roadways. Since the multi-family buildings will be erected at different time’s staff has illustrated a separate color coded map herein to show Plan Commission what landscaping must be accomplished at which times during the developer’s construction process. Such a sequence should assure that the site has landscaping at all times and isn’t too desolate. Per the map herein, the color orange denotes what landscaping must take place when the utilities and road infrastructure is installed for the overall Parkland Towne Center developme nt, the color blue denotes what landscaping would be associated with the occupancy of building #1, and the color yellow for what landscaping would need to be installed before occupancy of future buildings #2 and #3. Plan Commission will note that much of the landscaping will have to take place even with the initial construction of the overall Parkland Towne Center development which will include landscaping around the storm ponds, streets, and the northwest border (screening for adjoining residential homes). Additional landscaping would occur on the Parkland Towne Center development for the individual commercial sites as well as the future clubhouse/pool that would need BSO approval in the future. Signage There is no wall signage proposed for the multi-family structures. Two locations are shown in the submittal for brick pillars to denote the entrances to the multi-family development. The brick pillars will denote signage as “The View at Parkland.” Miscellaneous wayfinding signage may be found in the future by doorways and parking lots and those would be subject to future permitting if needed. Lighting No lighting is part of the submittal for the actual multi-family sites. The developers will have lighting along the main road going thru the Parkland Towne Center development though as shown in a supplemental drawing in the submittal. No pole lights are to be put along the frontage roads of the multi -family buildings. More than likely there will be wall pack lights required at entrances and the resolut ion is subject to review of the lighting details and assurance that any wall pack lights are zero degree cutoff fixtures. Staff has also included in the resolution that a max of 0.5 foot-candles can be found along any property lines per code. Further the resolution states that wall pack lights should be kept to entrances/exists solely. Given the layout of the buildings there should be very minimal locations for lights around the perimeter of any one structure. Sewer, Water, & Stormwater Stormwater management will be taken care for this site as part of the overall Parkland Towne Center development buildout. Municipal water and sewer services will be installed as well. Other The following are also part of the Plan Commission resolution: BE IT FURTHER RESOLVED, That all bollards must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any new handicap signs be incorporated into bored bollards. BE IT FURTHER RESOLVED, That all roof top and ground mechanicals (including HVA C devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and shall be approved by the Planning Division before the issuance of building permits. STAFF RECOMMENDATION PC 031-2016 Approval of Resolution PC 031-2016 as the presented structures meet the objectives and concepts in the city’s redevelopment plan and design guides. Approval is subject to the PD - Planned Development rezoning being recommended by Planning Commission earlier in the meeting. If so, the resolution is also subject to the Council recommending approval of the rezoning. MUSK EG Othe City of Ar ea o f Inte restI0440880 Fee t Ag en da Item(s) Pr op er tie s Zon in g D istr ic ts Rig ht -o f-Way Hy dr og rap hy Supp lem ental MapRESOLUTION #PC 03 2-2016 En er -con C om pan iesS74 W 170 00 Ja nes v ille Ro ad J A N E S V I L L E L O O M I S R D RA CIN E AV DURHAM W O O D S CO LL EG E Pre p ar ed b y C ity o f Mu ske g o P la n n in g D e p ar tm e nt Da te : 4 /2 5/2 0 16 RESOLUTION #P.C. 031-2016 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR MULTI-FAMILY RESIDENTIAL STRUCTURES FOR THE PARKLAND TOWNE CENTER DEVELOPMENT LOCATED IN THE NW ¼ OF SECTION 10 (JANESVILLE ROAD / TAX KEY NO. 2198.984) WHEREAS, Plans were submitted by Ener-con Companies for a Building, Site and Operation Plan for three (3) multi-family structures for the property located in the NW ¼ of Section 10 (Janesville Road / Tax Key No. 2198.984), and WHEREAS, The multi-family structures are part of the Parkland Towne Center development, and WHEREAS, The submittal includes narrative, site plans, grading/utility plans, landscape plan, building elevations, floor plans, colored renderings, lighting and signage plans, and WHEREAS, The petitioner requests approvals for three (3) new multi-family buildings as part of the Parkland Towne Center Development to be named The View at Parkland, and WHEREAS, The developers are seeking approval for all three (3) multi-family buildings in the BSO at this time and it is the developer’s intent to build the structures in a sequence presented on the site from south to north (Building #1 thru Building #3), and WHEREAS, Each structure is approximately 21,600 square feet and would consist of four stories and have thirty (30) units of 1-2 bedroom apartments, and WHEREAS, The property is zoned B-4 Highway Business District and a PD Planned Development zoning is currently under consideration that would allow the uses as presented herein, and WHEREAS, The 2020 Plan Depicts the area for commercial use and is consistent with the Plan subject to a PD Planned Development rezoning, and WHEREAS, The buildings are proposed to have four sided architecture and be fully clad in masonry products consisting of the following:  First Floor: Decorative block with a “red” color on the first three courses and a “buff/graham” color on the upper courses and windows with galvanized sunshades would be found throughout the first floors as well to break up the façade and adapt it to the rest of the structure,  Second-Third Floors: These floors are mainly clad with a Boston Brick and windows will have stone sills and lintels of a masonry grey color,  Fourth Floor: The upper floor is proposed to be clad with a hardie lap siding in a “heathered moss” color,  Corners: Each corner of the structure will be cladded in a greyish fiber cement panel,  Other: Roofing coping will be an aluminum in a grey color; outside decks are shown for each of the units and decks will be prominent on along the longer facades of the structure and the top floor of the decks will be covered with aluminum coping roofs; The decks and sundeck on top of the first floor will have aluminum fencing with similar colors to the main structure, and WHEREAS, The buildings are presented with the parking garage on the first floor and the living areas on the 2nd thru 4th floors and the developers have shown that the need for building on a slab is due to poor soil conditions, and WHEREAS, The Downtown Design Guide and the General Design Guide apply to this area, and WHEREAS, The overall site consists of the Parkland Towne Center development that includes commercial entities on the south side along Janesville Road but also includes the three multifamily buildings to the north along Lannon Drive, and WHEREAS, The primary access points to the multifamily development will be two (2) access points off of Lannon Drive with a larger access point to the south of Building #1 and a smaller access point will be found north of Building #2, and WHEREAS, A new recreation trail will exist on the west sides of Buildings #1-2 along Lannon Drive that will connect down to the Janesville Road trail system, and WHEREAS, Parking for the multi-family buildings consists of fifty-two (52) indoor stalls each and there are forty (40) outdoor stalls reserved for the multi-family structures, and WHEREAS, The code for multiple family is two (2) enclosed parking spaces per dwelling unit with additional visitor parking and this code is subject to Plan Commission discretion, and WHEREAS, By unit count the development is showing 1.73 enclosed parking stalls per unit and when adding the 13 outdoor parking stalls dedicated to each building a total of 65 parking stalls are found which equates to 2.17 parking stalls per unit, and WHEREAS, Outdoor parking stalls are shown as 9’x18’ in size, and WHEREAS, The overall site plan for the Parkland Towne Center development has been reviewed by the Fire Depart for access and utility needs, and WHEREAS, All refuse will be contained inside the building and no outdoor storage is requested, and WHEREAS, A full landscape plan is part of the submittal that shows how the landscaping will be accomplished for all three proposed multi-family buildings and their surroundings, and WHEREAS, Since the multi-family buildings will be erected at different development time’s staff has illustrated a separate color coded map on what landscaping must be accomplished at which times during the developer’s construction process, and WHEREAS, Two locations are shown in the submittal for brick pillars to denote the entrances to the multi - family development, and WHEREAS, No lighting is part of the submittal for the actual multi-family sites, and WHEREAS, The developers will have lighting along the main road going thru the Parkland Towne Center development, and WHEREAS, Stormwater management will be taken care for this site as part of the overall Parkland Towne Center development buildout, and WHEREAS, The site is served by municipal water and sanitary sewer services. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site, and Operation Plan for multifamily buildings for Ener-Con Companies for the property located in the NW ¼ of Section 10 (Janesville Road / Tax Key No. 2198.984). BE IT FURTHER RESOLVED, That this resolution is subject to the rezoning being approved by the Common Council as part of Council Ordinance #1406. BE IT FURTHER RESOLVED, That the 9’x18’ parking stalls are allowed as part of this approval. BE IT FURTHER RESOLVED, That the landscape plan is subject to City Forester approval before building permit issuance. BE IT FURTHER RESOLVED, That the landscaping installation schedule shall follow the staff landscape map as presented in the PC 031-2016 supplement. BE IT FURTHER RESOLVED, That all monument and wall signage will need separate permits from the City when desired. BE IT FURTHER RESOLVED, Any future building lighting for entrance/exists will require to be wall pack lights and zero degree cutoff. BE IT FURTHER RESOLVED, That a max of 0.5 foot-candles can be found along any property lines per code for any future lighting. BE IT FURTHER RESOLVED, That wall pack lights should be kept to entrances/exists solely. BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals at the time of building permits and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, That all bollards must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, That any new handicap signs be incorporated into bored bollards. BE IT FURTHER RESOLVED, That all roof top and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and shall be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: May 3, 2016 ATTEST: Kellie McMullen, Recording Secretary RREEAALL EESSTTAATTEE:: DDEEVVEELLOOPPEERRSS BBUUIILLDDEERRSS PPRROOPPEERRTTYY MMAANNAAGGEEMMEENNTT SSAALLEESS 8575 W. Forest Home Ave., Suite 160 Greenfield, WI 53228 Office (414) 425-4939 Fax: (414) 425-4946 www.ener-con.com BSO Application Parkland Towne Center Tax Key Numbers: 2198-984 Applicant Info: Ener-Con Companies Inc. c/o Parkland Towne Center, LLC 8575 W Forest Home Ave. Suite 160 Greenfield, WI 53228 kpokwinski@ener-con.com Phone: (414) 425-4939 Fax: (414) 425-4946 Owner: Muskego Adventures, Inc. An Illinois Corporation Consulting Firms: The Sigma Group 1300 West Canal Street Milwaukee, WI 53233 Paul Meier Architecture (414) 581-0003 Giles Engineering Associates Inc. N8W22350 Johnson Dr. Suite A1 Waukesha, Wi 53186 Gestra Engineering Inc. 191 W. Edgerton Ave. Milwaukee, WI 53207 Zoning District: PD, Planned Development Parcel Area: Parcel A: 5.884 Acres Parcel B: 2.937 Acres Parcel C: 1.26 Acres Parcel D: .679 Acres Project Description: We propose to develop the vacant property located at S74W17000 Janesville Road in Muskego formerly known as Parkland Mall. This vacant land located along the gateway of Muskego is an ideal location for a town center. The parcel will include four commercial buildings (30,000 sf, 12,000 sf, 7,500 sf and a 4,000 sf) with various retail users. In addition, the proposed plan will include three 30 unit apartment buildings. Each building will be four stories with grade level parking. This 10.76 acre piece of land is considered to be a prime location for redevelopment in the City of Muskego. Given its central location, this site plays a crucial role in the future of the City of Muskego and is the perfect location for a Towne Center. High end apartment buildings along with 23,500 square feet of retail/office space and a 30,000 square foot grocer as the anchor tenant will create a new image and walkability to the City of Muskego. The mixed use is going to be beneficial to both current and future residents. With the retail/office and grocery store, this site has the potential to create a one-stop convenience to all Muskego Residents. The current condition of the land is a low vacant lot. The ground is littered with old rubble, foundation, and waste from the demolished Parkland mall. Test digging was completed and uncovered a myriad of debris underneath the lot surface. The lot was then used as a tree farm generating approximately $38.00 per year in real estate tax. The city’s tax revenue will greatly increase due to consumer’s attraction to the retail development as well as the 90 upscale apartments added to the tax base and increase value and walkability to the surrounding properties. This development will create and retain local jobs. It is estimated that the additional 53,500 square feet of retail space has the potential to create over 100 local job opportunities. The 30 unit residential buildings will be constructed of the highest quality materials consisting of decorative block, brick, Hardie plank siding, and fiber cement paneling. Each apartment building foot print will be approximately 21,600 square feet with grade level parking and three additional floors of residential units. The retail section of the development is to be determined. However, a proposed grocer will anchor this development operating 7am to 9pm daily. A traffic analysis has been completed by Traffic Analysis and Design Inc. finding that traffic on Janesville west of Lannon Drive will increase at a rate of 1.7% and traffic east of Lannon drive will increase by 2.3% resulting in an average increase in traffic of 2%. The traffic generation is relatively small compared to the overall improvements and benefits to the city and its residents. T T T T T T T T T T T T T T T T T T T T T T T W W W TT E E E E W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N W G G W E T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E T T T T T T T T G SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N W W E G SA N G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST X CTV T T T T T T T T T T T T T T T T T 12" C M P INV : 8 0 5 . 4 5 12" C M P INV : 8 0 4 . 9 0 12" C M P INV : 8 0 4 . 8 8 12" C M P INV : 8 0 4 . 7 9 48" C C P INV : 7 9 7 . 2 2 FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO 60" C C P INV : 7 9 6 . 3 7 "V" C H A N N E L : 796 . 5 5 SA N MH 1 SA N MH 3 SA N MH 4 SA N MH 5 SA N MH 6 SA N MH 7 SA N MH 8 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH 4 ST M MH 5 ST M MH 6 ST M MH 7 ST M MH 8 ST M MH 9 ST M MH 1 0 ST M CB 1 ST M CB 2 ST M CB 3 ST M CB 4 ST M CB 6 ST M CB 1 0 ST M CB 9 ST M CB 8 ST M CB 1 1 ST M CB 1 3 ST M CB 1 2 ST M CB 1 5 ST M CB 1 6 22 11 8 17 20 19 9 9 1212 12 10 10 12 20 14 33 11 9 FU T U R E PO O L 14 2 8 3 9 9 PO S S I B L E F U T U R E AC C E S S D R I V E GRAPHIC SCALE 00 50' 100' JANESVILLE RD LA N N O N D R . www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 G R O UPSingle Source. Sound Solutions. PROPOSED FUTURE GROCERY (30,000 SF) FFE = 810.00 B PROPOSED FUTURE COMMERCIAL (12,000 SF) FFE: 811.80 C PROPOSED FUTURE COMMERCIAL (4,000 SF) FFE = 811.80 PROPOSED FUTURE COMMERCIAL (7,500 SF) FFE = 808.87 A PROPOSED BUILDING 21,600 SF FFE = 809.00 3 PROPOSED BUILDING 21,600 SF FFE = 809.00 2 PROPOSED BUILDING 21,600 SF FFE = 809.00 1 D 414–425–3134 (AT THE CORNER OF LANNON DRIVE & JANESVILLE ROAD, MUSKEGO, WI) BRAND NEW APARTMENT HOMES OCCUPANCY 2017 PROPOSED CONSTRUCTION STARTING JUNE 2016 WWW.FORESTGREENREALTY .COM Offered By: EXTERIOR •SECURED ACCESS ENTRY •I NDOOR PARKING •LARGE TERRACE 2ND FLOOR UNITS •LARGE BALCONIES 3RD AND 4TH FLOOR UNITS INTERIOR •SPACIOUS OPEN CONCEPT FLOOR PLAN •9 FT CEILINGS •I MPRESSIVE GOURMET STYLE KITCHEN •STAGGERED MAPLE CABINETRY •CROWN MOLDING •PANTRY •CUSTOM GRANITE OR QUARTZ COUNTERTOPS •CURVED COUNTER-HEIGHT ISLAND •UPGRADED STAINLESS STEEL APPLIANCE PACKAGE •GENEROUSLY SIZED BEDROOM SUITES •LARGE WALK-IN CLOSETS •PRIVATE FULL BATHS •TALL HEIGHT VANITY CABINETS •MASTER BATH OVERSIZED TILED SHOWER W/SEAT AND DUAL SINKS •I N-UNIT LAUNDRY WITH FULL SIZE FRONT LOAD WASHER AND DRYER •POWDER BATH •PRIVATE STORAGE UNITS Note: square footage of units are approximate and may be subject to change RESORT STYLE AMENITIES •CLUBHOUSE •FITNESS CENTER •HEATED OUTDOOR POOL 1 BEDROOM 975 SQ. FT. INTERIOR UNITS: 104, 204, 304 2 BEDROOM 1,405 SQ. FT. I NTERIOR UNITS: 103, 105, 107 203, 205, 207 303, 305, 207 1 BEDROOM + DEN 1,150 SQ. FT. INTERIOR UNITS: 106, 206, 306 2 BEDROOM 1,435 SQ. FT. END UNITS: 101, 102, 109 201, 202, 209 301, 302, 309 2 BEDROOM + DEN 1530 SQ. FT. I NTERIOR UNITS: 108, 208, 308, 2 BEDROOM + DEN 1530 SQ. FT. END UNITS: 110, 210, 310 High Quality Construction Another Quality Development By Over 30 years in business www.ener-con.com PET FRIENDLY 1 DOG UP TO 40 POUNDS AND 1 CAT OR 2 DOGS WITH A COMBINED WEIGHT OF 50 POUNDS WITH ADDITIONAL SECURITY DEPOSIT BREED RESTRICTIONS APPLY *CONVENIENTLY LOCATED IN THE HEART OF MUSKEGO *WALKABILITY TO RETAIL ESTABLISHMENTS AND RESTAURANTS *NEAR LITTLE MUSKEGO LAKE N LITTLE MUSKEGO LAKE Rent Unit Direction Bedrooms Brm / Brm / Den Sq Ft* Bath Total Sq Ft* $1,905 101 North West 2 13x17 / 10x12 2.5 1,435 $1,905 102 North East 2 13x17 / 10x12 2.5 1,435 $1,855 103 West 2 12x17 / 10x12 2.5 1,405 $1,310 104 East 1 12x6 1.5 975 $1,855 105 West 2 12x17 / 10x12 2.5 1,405 $1,535 106 East 1+D 11x16 / 11x10 1.5 1,150 $1,855 107 West 2 12x17 / 10x12 2.5 1,405 $2,015 108 East 2+D 13x7/10x12/8x12 2.5 1,530 $1,905 109 South West 2 13x17 / 10x12 2.5 1,435 $2,025 110 South East 2+D 13x17 / 10x12/8x12 2.5 1,530 $1,890 201 North West 2 13x17 / 10x12 2.5 1,435 $1,890 202 North East 2 13x17 / 10x12 2.5 1,435 $1,840 203 West 2 12x17 / 10x12 2.5 1,405 $1,300 204 East 1 12x6 1.5 975 $1,840 205 West 2 12x17 / 10x12 2.5 1,405 $1,520 206 East 1+D 11x16 / 11x10 1.5 1,150 $1,840 207 West 2 12x17 / 10x12 2.5 1,405 $2,000 208 East 2+D 13x17/10x12/8x12 2.5 1,530 $1,890 209 South West 2 13x17 / 10x12 2.5 1,435 $2,010 210 South East 2+D 13x17 / 10x12/8x12 2.5 1,530 $1,895 301 North West 2 13x17 / 10x12 2.5 1,435 $1,895 302 North East 2 13x17 / 10x12 2.5 1,435 $1,845 303 West 2 12x17 / 10x12 2.5 1,405 $1,305 304 East 1 12x6 1.5 975 $1,845 305 West 2 12x17 / 10x12 2.5 1,405 $1,525 306 East 1+D 11x16 / 11x10 1.5 1,150 $1,845 307 West 2 12x17 / 10x12 2.5 1,405 $2,005 308 East 2+D 13x17/10x12/8x12 2.5 1,530 $1,895 309 South West 2 13x17 / 10x12 2.5 1,435 $2,015 310 South East 2+D 13x17 / 10x12/8x12 2.5 1,530 *Apx. Square Footage The View at Towne Center Ask About Our Rent Special! Coming Early 2017 At the corner of Lannon Drive and Janesville Road 8575 W. Forest Home Ave Suite 140 Greenfield, WI 53228 www.forestgreenrealty.com Office: 414.425.3134 Fax: 414.425.4946 ParklandTowneCenter Brick:Boston 2 ndand3 rdfloorofelevation FiberCementPanel:#713CS(orsimilarcolor) Cornerpillarsofelevation HardiePlankLapSiding:HeatheredMoss(orsimilarcolor) 4 thfloorofelevation DecorativeBlock:Redhueatthelower3courses,buff/grahamatuppercourses Gradelevelofelevation Note:colorsmayrenderdifferentlyonprintasopposedtophysicalsamples P/L P/L P/L P/L P/L P/ L P/ L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L PROPOSED FUTURE GROCERY (30,000 SF) FFE = 809.00 PROPOSED FUTURE COMMERCIAL (12,000 SF) FFE: 811.80 PROPOSED FUTURE COMMERCIAL (4,000 SF) FFE = 811.80 PROPOSED FUTURE COMMERCIAL (7,500 SF) FFE = 808.87 22 11 8 17 20 19 9 9 1212 12 10 10 12 20 14 33 11 9 PO O L 14 2 8 3 9 9 PROPOSED BUILDING 21,600 SF FFE = 809.00 P / L P/L P/ L P/LP/L P/L P/L P/L P / L T T T T T T T T T T T T T T T T T T T T T T T W W W W TT E E E E W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N W G G W E T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E T T T T T T T T G SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA S A N S A N W W E G SA N G G G G G G G G G G G G G G G G G G X CTV T T T T T T T T T T T T T T T T T 12" C M P INV : 8 0 5 . 4 5 12" C M P INV : 8 0 4 . 9 0 12" C M P INV : 8 0 4 . 8 8 12" C M P INV : 8 0 4 . 7 9 48" C C P INV : 7 9 7 . 2 2 FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO 60" C C P INV : 7 9 6 . 3 7 "V" C H A N N E L : 796 . 5 5 SA N MH 1 SA N MH 3 SA N MH 4 SA N MH 5 SA N MH 6 SA N MH 7 SA N MH 8 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH 4 ST M MH 5 ST M MH 6 ST M MH 7 ST M MH 8 ST M MH 9 ST M MH 1 0 P/ L P/ L P/LP/L P/L P/L OV E R A L L G R A D I N G P L A N DRAWING NO. DRAWN BY: DATE: PROJECT NO: CHECKED BY: APPROVED BY: NO. REVISION DATE BY SHEET NO.: PA R K L A N D T O W N E C E N T E R MU S K E G O , W I S C O N S I N 15577 GRADING.dwg www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 TH E G R O UPSingle Source. Sound Solutions. CJS 11-24-15 15577 JBL JBL Fi l e : I : \ E N E R C O N \ 1 5 5 7 7 _ N e w P a r k l a n d M a l l \ 0 6 0 C A D \ C - C i v i l \ 5 0 0 P r o d u c t i o n - C i v i l P l a n s \ 5 0 5 - G r a d i n g P l a n \ 1 5 5 7 7 G R A D I N G . d w g C 200 GENERAL NOTES: 1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. 2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES. 4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES. 5. DIMENSIONS ARE FROM FACE OF CURB OR EDGE OF PAVEMENT. 6. WORK WITHIN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT LIMITED TO DRIVEWAY OPENINGS, SIDEWALK AND RAMPS, PAVING, AND CURB AND GUTTER SHALL BE COMPLETED PER MUNICIPAL AND/OR COUNTY REQUIREMENTS AND STANDARDS. 7. EARTHWORK SHALL BE IN ACCORDANCE WITH GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. 5 5 EXISTING CONTOUR PROPOSED CONTOUR LEGEND: PROPOSED CURB & GUTTER SPOT GRADE T/C: TOP OF CURB GRADE FL: FLOW LINE CURB GRADE PROPOSED ASPHALT SPOT GRADE100.00 100.50 T/C 100.00 FL GRAPHIC SCALE 00 50' 100' THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED. PRELIMINARY A C401 CURB & GUTTER (ACCEPT) A C401 CURB & GUTTER (REJECT) B C4015" THICK CONCRETE WALK C C401 ASPHALT SURFACE (HEAVY DUTY ) PROPOSED STORM INLET PROPOSED STORM MANHOLE PROPOSED SANITARY MANHOLE C C402 A C402 B C402 JANESVILLE RD LA N N O N D R . STORM WATER BASIN HWL=805.54 NWL=800 STORM WATER BASIN B C403 E C403 REINFORCED TURF MATTING C C403 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' UTILITY EASEMENT 30' WATER UTILITY EASEMENT 40' UTILITY EASEMENT A C403 REPLACE EXISTING PATH AS NECESSARY OVERLAND FLOW PATH PROPOSED FUTURE PROPERTY LINE PROPOSED FUTURE PROPERTY LINE PROPOSED FUTURE PROPERTY LINE REINFORCED TURF MATTING C C403 REPLACE MANHOLE COVER WITH TEMPORARY GRATE. REFER TO STORM STRUCTURE TABLE ON SHEET C402. REPLACE MANHOLE COVER WITH TEMPORARY GRATE. REFER TO STORM STRUCTURE TABLE ON SHEET C402. P/L P/L P/L P/L P/ L P/ L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/LP/LP/LP/LP/LP/LP/LP/LP/LP/LP/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L PROPOSED FUTURE GROCERY (30,000 SF) FFE = 809.00 PROPOSED FUTURE COMMERCIAL (12,000 SF) FFE: 811.80 PROPOSED FUTURE COMMERCIAL (4,000 SF) FFE = 811.80 PROPOSED FUTURE COMMERCIAL (7,500 SF) FFE = 808.87 PO O L 9 PROPOSED BUILDING 21,600 SF FFE = 809.00 P / L P/L P/ L P/LP/L P/L P/L P/L P / L T T T T T T T T T T T T T T T T T T T T T T T W W W W TT E E E E W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N W G G W E T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E EWWWWWWWWWWWWWWWWWWWWWWWWW SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E T T T T T T T T G SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA S A N S A N ST ST W W E G SA N G G G G G G G G G G G G G G G G G G G G G ST ST ST ST ST ST ST S T ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTST ST ST X CTV T T T T T T T T T T T T T T T T T 12" C M P INV : 8 0 5 . 4 5 12" C M P INV : 8 0 4 . 9 0 12" C M P INV : 8 0 4 . 8 8 12" C M P INV : 8 0 4 . 7 9 48" C C P INV : 7 9 7 . 2 2 FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO 60" C C P INV : 7 9 6 . 3 7 "V" C H A N N E L : 796 . 5 5 SA N MH 1 SA N MH 3 SA N MH 4 SA N MH 5 SA N MH 6 SA N MH 7 SA N MH 8 SA N MH 9 ST M MH 1 ST M MH 2 ST M MH 3 ST M MH 4 ST M MH 5 ST M MH 6 ST M MH 7 ST M MH 8 ST M MH 9 ST M MH 1 0 P/ L P/ L P/LP/L P/L P/L >> > > > > > > > > > > > > > > > > > EXISTING STORM TO BE REUSED > > > W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SANSANSAN SA N SA N SA N SA N SA N W W SANSANSANSAN > > EXISTING STORM TO BE REUSED 10 . 0 ' > 12 5 ° ' 84° ' UT I L I T Y P L A N DRAWING NO. DRAWN BY: DATE: PROJECT NO: CHECKED BY: APPROVED BY: NO. REVISION DATE BY SHEET NO.: PA R K L A N D T O W N E C E N T E R MU S K E G O , W I S C O N S I N 15577 UTILITY.dwg www.thesigmagroup.com 1300 West Canal Street Milwaukee, WI 53233 Phone: 414-643-4200 Fax: 414-643-4210 TH E G R O UPSingle Source. Sound Solutions. TPM 12-4-15 15577 JBL JBL GENERAL NOTES: 1. THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS DRAWING IS BASED ON FIELD LOCATIONS AND/OR RECORDS FURNISHED BY MUNICIPALITIES AND UTILITY COMPANIES. THE LOCATION AND ACCURACY OF WHICH CANNOT BE GUARANTEED. THERE MAY BE ADDITIONAL UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. 2. VERIFY ACTUAL LOCATIONS AND INVERTS IN THE FIELD. ANY POTENTIAL ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. WORK TO BE COMPLETED IS INDICATED IN BOLD TYPE LINES AND EXISTING CONDITIONS ARE INDICATED BY LIGHT TYPE LINES. 4. ELECTRONIC CIVIL FILES ARE AVAILABLE UPON WRITTEN REQUEST. DO NOT USE ELECTRONIC CIVIL FILES TO LAYOUT FOUNDATIONS, COLUMN LINES, LIGHT POLES, OR OTHER NON CIVIL SITE WORK. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDING AND ARCHITECTURAL FEATURES. 5. ALL UTILITIES WITHIN 5 FEET OF PAVED AREAS SHALL REQUIRE GRANULAR BACKFILL. SLURRY BACKFILL IS REQUIRED FOR ALL WORK IN PUBLIC RIGHT OF WAY. 6. PRIVATE STORM INLETS IN PAVEMENT SHALL REQUIRE DRAIN TILE STUBS OF 10 FEET IN TWO DIRECTIONS FOR SUBDRAINAGE. RIM GRADE FOR STORM INLETS IN CURB AND GUTTER ARE FLOW LINE GRADES. 7. WORK IN PUBLIC RIGHT OF WAY SHALL FOLLOW MATERIAL AND INSTALLATION REQUIREMENTS PER MUNICIPAL AND/OR COUNTY. 8. PRIVATE STORM SEWER 12-INCH DIAMETER OR LARGER SHALL BE HDPE. BELOW 12-INCH DIAMETER SHALL BE PVC SDR-35 ASTM D3034. PRIVATE WATER MAIN SHALL BE CLASS 150 DR 18 PVC CONFORMING TO AWWA C-900. PRIVATE SANITARY SEWER SHALL BE PVC SDR-35 ASTM D3034. 9. COORDINATE FINAL LOCATION AND DESIGN OF PRIVATE UTILITY SERVICES (ELECTRIC, GAS, PHONE, CABLE) WITH UTILITY COMPANIES. 10. FOR PUBLIC SANITARY SEWER PLAN AND PROFILE DESIGN REFER TO SHEET C301 AND C302. 11. FOR PUBLIC WATER PLAN AND PROFILE DESIGN REFER TO SHEET C303 - C305. W SAN > E T G PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED ELECTRICAL SERVICE PROPOSED TELEPHONE SERVICE PROPOSED GAS SERVICE Fi l e : I : \ E N E R C O N \ 1 5 5 7 7 _ N e w P a r k l a n d M a l l \ 0 6 0 C A D \ C - C i v i l \ 5 0 0 P r o d u c t i o n - C i v i l P l a n s \ 5 0 6 - U t i l i t y P l a n \ 1 5 5 7 7 U T I L I T Y . d w g LEGEND: C 300 GRAPHIC SCALE 00 50' 100' THE UNDERGROUND UTILITY INFORMATION SHOWN ON THIS MAP IS BASED ON FIELD MARKINGS AND INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND COMPLETENESS CANNOT BE GUARANTEED. PRELIMINARY ST EXISTING STORM SEWER PROPOSED STORM INLET PROPOSED STORM MANHOLE PROPOSED SANITARY MANHOLE C C402 A C402 B C402 PROPOSED WATER VALVE PROPOSED WATER HYDRANT UTILITY CROSSING 8" WATER INV: 798.28 6" SAN. INV: 800.81 UTILITY CROSSING 8" WATER INV: 798.27 8" SAN. INV: 800.24 UTILITY CROSSING 8" WATER INV: 798.65 15" STM. INV: 801.77 UTILITY CROSSING 8" WATER INV: 798.50 30" STM. INV: 800.41 UTILITY CROSSING 6" SAN INV: 800.75 15" STM. INV: 801.76 UTILITY CROSSING 12" WATER INV: 800.43 8" SAN. INV: 797.72 UTILITY CROSSING 8" WATER INV: 798.14 EX. 24" STM. INV: 800.89 UTILITY CROSSING 8" SAN INV:799.43 18" STM. INV: 803.55 UTILITY CROSSING 8" SAN INV: 798.52 12" STM. INV: 804.47 UTILITY CROSSING 8" SAN INV: 797.72 12" WATER INV: 800.43 40' UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT 30' WATER UTILITY EASEMENT D C402 JANESVILLE RD LA N N O N D R . COORDINATE WORK WITHIN THE RIGHT OF WAY WITH THE PUBLIC ROAD IMPROVEMENTS . COORDINATE WORK WITHIN THE RIGHT OF WAY WITH THE PUBLIC ROAD IMPROVEMENTS . COORDINATE WORK WITHIN THE R.O.W WITH THE PUBLIC ROAD IMPROVEMENTS . UTILITY CROSSING 8" WATER INV: 797.78 24" STM. INV: 800.11 City of Muskego DOWNTOWN DESIGN GUIDE Prepared by: City of Muskego Planning Department, Community Development Authority, & The City of Muskego Plan Commission Amended on January 16, 2007 City of Muskego Downtown Design Guide ACKNOWLEDGEMENTS Honorable Mayor John R. Johnson Common Council Council President Nancy Salentine, District 4 Alderman Tracy Snead, District 1 Alderman Chris Buckmaster, District 2 Alderman Neil Borgman, District 3 Alderman Bob Melcher, District 5 Alderman Tina Schaefer, District 6 Alderman Eileen Madden, District 7 Plan Commission Mayor John R. Johnson Alderman Chris Buckmaster Mr. Jerald Hulbert Mr. Michael Michalski Ms. Neome Schaumberg Mr. Russ Stinebaugh Mr. James Burke Planning Department Staff Jeff Muenkel AICP, Planning Director Adam Trzebiatowski, Associate Planner Tom Zagar, City Forester John Wisniewski, GIS Coordinator Sean Meehan, Planning/GIS Intern Matt Kulinski, Conservation Technician Kellie Renk, Secretary City of Muskego Downtown Design Guide RESOLUTION #P.C. 007-2007 APPROVAL OF AMENDMENTS TO ALL CITY OF MUSKEGO DESIGN GUIDES TO BRING THEM INTO COMPLIANCE WITH THE CHAPTER 17 ZONING CODE REVISIONS AND CURRENT CITY POLICIES WHEREAS, The City of Muskego maintains seven (7) Design Guides in order to serve as a reference in guiding and reviewing future development for citizens, developers, and commissioners, and WHEREAS, There is a General Design Guide that applies to the entire City along with six (6) other area specific Design Guides that are unique to the character of each said area, and WHEREAS, The six (6) area specific Design Guides are as follows: Business Park, Downtown, Durham Hill, Historic Crossroads, Moorland Corridor South, and Racine Avenue Gateway, and WHEREAS, Said guides sets the minimum design standard for building, site, and operation plans that are to be submitted to the City for more complete and accurate Planning Staff and Plan Commission review, and WHEREAS, Said guides are prepared under the authority of Section 62.23 of the Wisconsin State Statutes and Chapter 17 of the City of Muskego Zoning Ordinance being deemed necessary to promote the public health, safety, morals and welfare of the City of Muskego, and WHEREAS, The guides require various updates due to policy changes and/or references to the new zoning code as per PC Resolution #004-2007. THEREFORE BE IT RESOLVED, That the Plan Commission recommends approval of the proposed amendments to the seven (7) City of Muskego Design Guides. Plan Commission City of Muskego Adopted: January 16, 2007 Defeated: Deferred: Introduced: January 16, 2007 ATTEST: Kellie Renk, Recording Secretary City of Muskego Downtown Design Guide CITY OF MUSKEGO DOWNTOWN DESIGN GUIDE SECTION 1 - PREAMBLE 1.01 Authority 1 1.02 Purpose 1 1.03 Scope 1 1.04 Citation of Guide 1 SECTION 2 – GEOGRAPHIC AREA 2.01 Downtown 2 A. Area 2 B. Intent 2 SECTION 3 – DESIGN STANDARDS 3.01 General Requirements 3 A. Applicability 3 B. Buildings 3 C. Colors 3 D. Parking Areas 3 E. Landscaping 4 F. Signage 4 G. Lighting 4 H. Cross Access 4 I. Corporate Identity 4 SECTION 4 - ILLUSTRATIONS 4.01 Appropriate Development 5 SECTION 5 - COMPLIANCE 5.01 In Perpetuity 5 APPENDIX I Area Map 6 APPENDIX II Illustrations of Appropriate Designs 7 – 9 City of Muskego Downtown Design Guide 1 DOWNTOWN DESIGN GUIDE CITY OF MUSKEGO SECTION 1 PREAMBLE 1.01 AUTHORITY The Downtown Design Guide (Guide) is prepared by the Planning Department for adoption by the Plan Commission of the City of Muskego, and for transmittal to the Common Council of the City of Muskego, pursuant to Section 62.23 of the Wisconsin Statutes and Chapter 17of the City of Muskego Zoning Ordinance, and The City of Muskego Comprehensive Land Use Plan, deeming it necessary to promote the public health, safety, morals and welfare. 1.02 PURPOSE The general purpose of this Guide is to aide the Planning Staff and Plan Commission in the planning, design and re-design of the built environment of the Downtown area so as to enhance and unify its visual character while avoiding monotony and repetition. These standards will also assist in fostering sound, functional, attractive and quality development. The provisions hereof shall be liberally construed in favor of the City and shall be considered as minimum requirements for the Downtown area. 1.03 SCOPE It is not the intent of this Guide to repeal, abrogate, annul, impair or interfere with any existing easements, covenants, or agreements between parties or with the rules, regulations, or permits previously adopted or issued pursuant to laws: provided, however, that where this Guide in any way imposes greater standards than are required by other rules, regulations or permits or by easements, covenants or agreements, the provisions of this Guide shall be the guide. 1.04 CITATION OF GUIDE This Guide shall be cited as follows, e.g.: Downtown Design Guide, Section 1.04. City of Muskego Downtown Design Guide 2 SECTION 2 GEOGRAPHIC AREA 2.01 DOWNTOWN A. Area. The downtown areas shall be defined as those lands adjacent to Janesville Road, on the north and south sides, extending from Bay Lane on the east to Pioneer Drive on the west. The downtown area shall extend the depth of the parcels (See Map in Appendix 1.). B. Intent. This area is identified as offering a wide range of commercial activities and services in Muskego. It is the goal of this document to maintain the viability and improve and unify the visual aspects of the downtown area. The Downtown Design Guide Area falls within the adopted Redevelopment District #2 boundary area. The purpose of the Redevelopment Plan is to revitalize a declining urban area, spur reinvestment in the community, and to transform it into a better place to live, work and play. The Design Guide looks to promote the same characteristics as the Redevelopment District including, but not limited to, the following principles: • Enhance the image, profile, and use of downtown Muskego • Provide a new sense of place with a downtown identity • Demonstrate market driven principles that work within the economic landscape of Muskego • Provide the downtown area, and indeed the entire community, with an identity that adequately reflects the local quality of life and the affluence of City households • Promote the following types of uses: Design Character ¾ Traditional town center/modern ‘main-street’ ¾ Buildings squarely facing the street ¾ Buildings closer to street, parking behind ¾ Pedestrian scale – walkable, accented storefronts ¾ Taller building profiles – downtown centerpoint and landmark ¾ Variable roof-lines ¾ Transitional massing blending with surrounding architecture ¾ Sense of place/downtown identity Use Mix ¾ Possible upper end condos (professionals & ‘empty nesters’) ¾ Destination and convenience retail (no ‘big boxes’) ¾ Smaller floor plate retail ¾ Shared parking ¾ Multiple purpose trips ¾ Convenience Density ¾ Possible Mid-Rise heights: Somewhat higher than City norm ¾ Built in consumer market for downtown businesses ¾ Greater TIF revenues ¾ More efficient public services/utilities ¾ Interconnected activity centers ¾ Downtown anchor and landmark City of Muskego Downtown Design Guide 3 SECTION 3 DESIGN STANDARDS 3.01 GENERAL REQUIREMENTS A. Applicability. To advance the ideals as stated above, the following design standards are implemented in the defined area of the downtown. These standards shall apply to all development and re-development of business and multi-family properties within its boundaries. B. Buildings 1. Buildings shall be constructed to be harmonious with their natural and built surroundings while avoiding repetition and monotony. Building designs shall utilize materials which reflect a residential character. Brick exterior treatment is required. Materials such as decorative masonry and/or natural materials (i.e. stone work) must comprise up to 50% of the buildings exterior treatment; an exterior synthetic plaster system may be used as an accent material. The coloring of all brick, decorative masonry or stone shall be expressed as integral to the product and not painted on the surface of said product. Four-sided architecture will be mandatory within the Downtown District. 2. Upon a minimum of five affirmative votes of the Plan Commission members, designs which present variations on the standards expressed in Section 3.01.A.(1) may be permitted if it is found that: a. The proposed design sets an exceptional standard whose design, quality, longevity, durability and value will equal or exceed that which this document endeavors to promote b. The proposed design will not create substantial detriment to adjacent properties c. The proposed design will not establish an undesirable precedent. 3. A quality design which maximizes the value of the proposed project, while protecting or enhancing neighboring values is required. Four sided architecture which utilizes similar building materials and design for all sides of a proposed structure is required. New and innovative styles of architecture are encouraged and each design will be reviewed upon it’s own merit and how it fits in with the surrounding uses and structures. 4. Roof top mechanical installations shall be appropriately screened so as to block the view from adjacent streets and properties. Such screening shall match or compliment the overall theme of the building. 5. Outdoor storage of materials and commercial vehicles shall be strictly prohibited. Storage of vehicles or materials/supplies must be screened from surrounding view whenever possible. C. Colors utilized in the project design shall be non-florescent. Earth tones such as grays, greens, browns, burgundies, and tans are required. However, all proposed color schemes shall be reviewed on their individual merit based upon building design, building materials, longevity of the color choice(s) (fad/non-fad), statement in relation to overall theme, character and color of adjacent structures, mass/size of the proposed and adjacent structure(s), unity with existing structures on the project site. D. Parking areas shall be designed to avoid a "sea of asphalt" syndrome. The parking field in which the main activities of parking and travel are conducted shall have tree plantings at the minimum rate of one (1) tree for every ten (10) parking spaces. The perimeter of the parking field City of Muskego Downtown Design Guide 4 shall provide for a lawn area in which trees and shrubs will be planted so as to allow ample snow storage capacity yet avoid damage to plantings from same. Perimeter plantings shall be at the rate of a minimum of one tree and/or shrubbery grouping for every 50 lineal feet. E. Landscaping 1. Landscaping shall be designed to compliment the built and natural environment of the subject project and adjacent sites. Existing tree lines should be preserved. If removal of existing tree lines is required due to its undesirable nature, new plantings that result in no less of a screening effect shall be required when adjacent to residential uses. 2. Minimum specifications for landscaping are as follows: 2.5 inch minimum diameter measured six (6) inches above grade for deciduous trees; Six (6) foot minimum height for coniferous trees; 24 inch minimum height for shrubs; yard areas shall be sodded. 3. In addition to the guidelines expressed for parking areas in Section 3.01.C above, plantings shall be required around the foundation of buildings. The Plan Commission shall review the placement, numbers and sizes to determine appropriateness. 4. Final landscaping approvals are under the City Forester and other details as per the City Forester may be necessary. F. Signage 1. Signage shall be designed in unity with the building design through the use of the same or similar materials and colors. Ground or monument signs shall be strongly encouraged. Neon tubed accent lighting shall be strongly discouraged unless the same serves to accent an architectural feature of the building it is mounted on. 2. The base of all signs shall be landscaped with plantings. The landscaped area shall at a minimum equal the square footage of the sign face (per the Zoning Ordinance). 3. All other aspects of signage shall be in keeping with the requirements of the Sign Ordinance of the City of Muskego. G. Lighting shall be down cast, cutoff, sodium fixtures not exceeding 15 feet in height (including the light pole base and/or pedestal). Lighting shall be positioned so as not to cause glare on adjacent properties and streets (Maximum of 0.5 foot-candles at lot lines). At a minimum, site lighting marking the entrance to businesses and multi-family developments shall match or compliment that which may be chosen by the City as standard decorative street lighting. Bollards for pole lighting shall not exceed 6 inches above grade. H. Cross access to and between neighboring properties shall be implemented wherever possible. The goal in this requirement is to remove as much incidental, site to site traffic from Janesville Road thus reducing the possibility of traffic conflicts and accidents. Cross access drives may be either the interconnection of parking lots or the construction of a separate drive. In either case, the minimum drive isle width should be no less than 24 feet. When considering provision for cross access, the Plan Commission may allow decreased side and rear yard offsets for parking and drive areas but only if such decreases are a result of the provision of cross access. I. Corporate identity shall not be prohibited yet the Plan Commission shall not recognize same as the driving factor in the design of the facility. Corporate identity shall be apparent yet reserved in its display. The driving factor in the design of any facility shall be the criteria as expressed in this document. City of Muskego Downtown Design Guide 5 SECTION 4 ILLUSTRATIONS 4.01 APPROPRIATE DEVELOPMENT In Appendix 2 of this document is a group of photographs which the Plan Commission of the City of Muskego have found to illustrate good and appropriate design, applicable to the downtown area. Appendix 2 is available in the Planning Office for public viewing. Copies of the Downtown Design Guide are also available in the Planning Office and online at http://www.gomuskego.com/planning. SECTION 5 COMPLIANCE 5.01 IN PERPETUITY Per the City of Muskego Zoning Ordinance, Compliance in Perpetuity is required in that "Any Building, Site and Operational Plan granted through the authority of this Section shall be perpetually binding upon the development to the extent that: all buildings and structures shall be maintained in a tasteful, safe and appropriate manner; all landscaping shall be periodically groomed and/or replaced when necessary; all drive, parking and pedestrian areas shall be kept in a safe and passable condition. All repairs and maintenance shall be executed in a timely manner". City of Muskego Downtown Design Guide 6 APPENDIX I City of Muskego Downtown Design Guide 7 APPENDIX II Example of Appropriate Material Types and Usage Example of Four-Sided Architecture Example of Four-Sided Architecture & Screening of Outdoor Storage City of Muskego Downtown Design Guide 8 Corporate Identity is Apparent but not a Driving Design Factor Pedestrian Friendly Design & Common Area Parking Lot Placement Behind the Building, Landscaping Treatments, and Pedestrian Access City of Muskego Downtown Design Guide 9 Upgraded Building Materials Upgraded Architectural Features & Accents City of Muskego Plan Commission Supplement PC 032-2016 For the meeting of: May 3, 2016 REQUEST: Certified Survey Map S74 W17000 / Tax Key No. 2198.984 NW ¼ of Section 10 PETITIONER: Ener-con Companies INTRODUCED: May 3, 2016 LAST AGENDA: N/A PREPARED BY: Jeff Muenkel, AICP BACKGROUND PC 032-2016 The petitioner is proposing to divide one parcel by Certified Survey Map to create four (4) parcels. The lots will range in size from 0.679 acres to 5.884 acres. The CSM would divide the property in an appropriate form for the proposed Parkland Towne Center development that is under discussion for a Planned Development rezoning by the Plan Commission and Common Council. PLAN CONSISTENCY PC 032-2016 Comprehensive Plan: The 2020 Plan depicts the areas for commercial use. The proposal is consistent with the Plan. Zoning: The property is zoned B-4 Highway Business District, however, the parcel is under approvals to change to a PD Planned Development District. The CSM is consistent with a new PD approval. Park and Conservation Plan: A trail is required along Lannon Drive and would be required upon future development of this property. The proposal is consistent with the Plan. Street System Plan: Proper dedications are shown for Janesville and Lannon. The proposal is consistent with the Plan. Adopted 208 Sanitary Sewer Service Area: Public sanitary sewer serves this area. The proposal is consistent with the plan. Water Capacity Assessment District: The property is serviced with water. The proposal is consistent with the Plan. Stormwater Management Plan: On-site stormwater management will be required upon future development of this property. The proposal is consistent with the Plan. DISCUSSION PC 032-2016 Upon review of the CSM, the bulk requirements of the code appear to be met. There are some minor technical corrections that need to occur that will need to be addressed before the CSM can be signed by the City and recorded. The CSM resolution is subject to engineering changes. The CSM proposes lots necessary for the support of the Parkland Towne Center development being proposed by Ener Con per the PD Planned Development zoning in front of the Plan Commission and Council at this time. The approval of the CSM in the Plan Commission resolution is subject to Ener Con receiving planned development rezoning approval. The Parkland Towne Center development shows that a future lot would need to be created in the center of the development to support a future commercial structure. A future CSM would have to break this parcel off since only four parcels can take place on any one CSM. The PD zoning approval would allow this future land locked parcel at that time. STAFF RECOMMENDATION PC 032-2016 Approval of Resolution PC 032-2016 MUSK EG Othe City of Ar ea o f Inte restI0280560 Fee t Ag en da Item(s) Pr op er tie s Zon in g D istr ic ts Rig ht -o f-Way Hy dr og rap hy Supp lem ental MapRESOLUTION #PC 03 1-2016 En er -con C om pan iesS74 W 170 00 Ja nes v ille Ro ad J A N E S V I L L E L O O M I S R D RA CIN E AV DURHAM W O O D S CO LL EG E Pre p ar ed b y C ity o f Mu ske g o P la n n in g D e p ar tm e nt Da te : 4 /2 5/2 0 16 RESOLUTION #P.C. 032-2016 APPROVAL OF A CERTIFIED SURVEY MAP FOR THE ENER-CON COMPANIES PROPERTY LOCATED IN THE NW ¼ OF SECTION 10 (JANESVILLE ROAD / TAX KEY NO. 2198.984) WHEREAS, A Certified Survey Map was submitted by Ener-Con Companies for a four (4) lot land division for the property located in the NW ¼ of Section 10 (Janesville Road / Tax Key No. 2198.984), and WHEREAS, The four parcels vary in size from 0.679 acres to 5.884 acres and are for future residential and commercial uses, and WHEREAS, The property is zoned B-4, Highway Business District and is currently subject to a PD Planned Development zoning which would allow the CSM as presented, and WHEREAS, The 2020 Plan Depicts the area for commercial uses and the proposal is consistent with the plan, and WHEREAS, The site is served by m unicipal water and sanitary sewer services. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map for Ener-Con Companies for the property located in the NW ¼ of Section 10 (Janesville Road / Tax Key No. 2198.984), subject to technical discrepancies as identified by the City Engineers, and payment of all applicable fees in Section 18.14(3) of the Land Division Ordinance and outstanding assessments if applicable. BE IT FURHTER RESOLVED, That the CSM is subject to the PD Planned Development Parkland Towne Center zoning being approved by the Common Council in order to allow the lot sizes and proposed layouts. BE IT FURHTER RESOLVED, That all technical corrections from the CSM review will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: May 3, 2016 ATTEST: Kellie McMullen, Recording Secretary City of Muskego Plan Commission Supplement PC 033-2016 For the meeting of: May 3, 2016 REQUEST: Monument Signage – Parkland Towne Center Tax Key No. 2198.984 PETITIONER: Ener Con Companies INTRODUCED: May 3, 2016 LAST AGENDA: N/A PREPARED BY: Jeff Muenkel, AICP BACKGROUND PC 033-2016 A signage proposal is for the future Parkland Towne Center development. The proposal includes a large monument sign along Janesville Road and a smaller identification sign along Lannon Drive. DISCUSSION PC 033-2016 Plans were submitted by Ener Con Companies for two (2) new signs for the proposed future Parkland Towne Center located along Janesville Road. Section 16.09(9) of the Zoning Code states the following: “A sign identifying a shopping center or grouping of stores in excess of 50,000 sq. ft. in area may be permitted with the approval of the Plan Commission by the modification of the regulations of the district in which they are located applicable to the height, size and location of such sign consistent with the spirit and intent of the regulations in that district.” At this time Ener Con Companies is seeking approvals for the “Parkland Towne Center” development thru the Common Council and an associated PD Planned Development zoning is pending for said development. The proposed development has commercial structures in excess of 50,000 square feet. One (1) monument sign for the businesses of the future Parkland Towne Center is proposed with dimensions of 20 feet in height and 13.5 feet in width. The monument sign is to be located along Janesville Road and a smaller sign denoting “The Shops at Towne Center” would be located along Lannon Drive. There is no detailed landscape plan at this time for the proposed signage. It should be noted that an option to have an electronic readerboard is part of the submittal on the main larger monument sign. The resolution reads that an electronic readerboard option is approved and that the readerboard may not exceed 25% of the sign, which is part of the city zoning code. Approval of the signage as proposed is contingent in the resolution on approvals for the Parkland Towne Center PD development by the Common Council. Further, the signage is dependent upon permits being approved of the first commercial building for the development. A landscape plan would need to be submitted for the area around the base of each sign according to the General Design Guide before the sign permits can be released. STAFF RECOMMENDATION PC 033-2016 Approval of Resolution PC 033-2016 MUSK EG Othe City of Ar ea o f Inte restI0330660 Fee t Ag en da Item(s) Pr op er tie s Zon in g D istr ic ts Rig ht -o f-Way Hy dr og rap hy Supp lem ental MapRESOLUTION #PC 03 3-2016 En er -Con C om pan iesJanesville R oad J A N E S V I L L E L O O M I S R D RA CIN E AV DURHAM W O O D S CO LL EG E Pre p ar ed b y C ity o f Mu ske g o P la n n in g D e p ar tm e nt Da te : 4 /2 8/2 0 16 RESOLUTION #P.C. 033-2016 APPROVAL OF SIGNAGE FOR THE PARKLAND TOWNE CENTER LOCATED IN THE NW ¼ OF SECTION 10 (JANESVILLE ROAD / TAX KEY NO. 2198.984) WHEREAS, Plans were submitted by Ener Con Companies for two (2) new signs for the proposed Parkland Towne Center located on Janesville Road (Tax Key No. 2198.984), and WHEREAS, Section 16.09(9) of the Zoning Code states the following, “A sign identifying a shopping center or grouping of stores in excess of 50,000 sq. ft. in area may be permitted with the approval of the Plan Commission by the modification of the regulations of the district in which they are located applicable to the height, size and location of such sign consistent with the spirit and intent of the regulations in that district.”, and WHEREAS, The Parkland Towne Center development is proposed for the property that will have commercial entities in excess of 50,000 SF, and WHEREAS, One (1) monument sign for the businesses of the future Parkland Towne Center is proposed with dimensions of 20 feet in height and 13.5 feet in width, and WHEREAS, An option to have an electronic readerboard is part of the submittal on the main larger monument sign, and WHEREAS, The monument sign is to be located along Janesville Road and a smaller sign denoting “The Shops at Towne Center” would be located along Lannon Drive, and WHEREAS, The property is zoned B-4, Highway Business District and is currently subject to a PD Planned Development zoning, and WHEREAS, There are no detailed landscape plans at this time for the proposed signage. THEREFORE BE IT RESOLVED, That the Plan Commission approves of the monument signage for the proposed Parkland Towne Center located on Janesville Road (Tax Key No. 2198.984). BE IT FURTHER RESOLVED, That the signage proposed is contingent on approvals for the Parkland Towne Center PD development by the Common Council. Further, that the signage may be erected upon the permits being approved of the first commercial building for the development. BE IT FURTHER RESOLVED, That an electronic readerboard option is approved and that the readerboard may not exceed 25% of the sign, and BE IT FURTHER RESOLVED, That the Plan Commission grants the requested sign area and height per Section 16.09(9) of the Zoning Code. BE IT FURTHER RESOLVED, That a landscape plan will need to be submitted for the area around the base of each sign according to the General Design Guide before the sign permit can be released. BE IT FURTHER RESOLVED, The Engineering Department will have to review the proposed placement of the new sign to be sure that no easements are being encroached upon. BE IT FURTHER RESOLVED, That the actual location of the new monument sign be delivered to the Planning Department before the permit is issued to ensure that the sign does not encroach into the public Right-of-Way. BE IT FURTHER RESOLVED, That the sign plans are approved as submitted and a copy of said plans be kept on file in the Building Department and that all aspect of this plan shall be maintained in perpetuity unl ess otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: Introduced: May 3, 2016 ATTEST: Kellie McMullen, Recording Secretary