Loading...
Parks and Conservation Packet - 11/3/2015 CITY OF MUSKEGO PARKS AND CONSERVATION COMMITTEE AGENDA November 3, 2015 5:30 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF THE MINUTES OF THE SEPTEMBER 1, 2015 MEETING NEW BUSINESS 1. Park Plan Update/Recommendations 2. Aster Hills Neighborhood Park Name 3. 2016 Budget Items DIRECTOR’S REPORT 1. Public Works Director's Report 2. Conservation Coordinator's Report 3. Recreation Manager's Report COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW Announcements only. No discussion or action will be taken. ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, MUSKEGO CITY HALL, (262) 679-4136. Unapproved CITY OF MUSKEGO PARKS AND CONSERVATION COMMITTEE MINUTES September 1, 2015 5:30 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER Toby Whipple called the meeting to order at 5:30 PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Toby Whipple, Ald. Bob Hammel, Jerry Hulbert, Sharon Roy, Brett Hyde, Bill Miller, Paul Peardon, Howard Schneider (5:42 PM), and Director Muenkel. Absent: Len Pilak STATEMENT OF PUBLIC NOTICE The meeting was noticed in accordance with the open meeting laws. APPROVAL OF MINUTES FROM AUGUST 4, 2015. Brett Hyde made a motion to approve the minutes of August 4, 2015 with correction on page 1, New Business Budgeting Recommendations; Jerry Hulbert made a motion to only do grading and seeding in the Aster Hills Park. Bill Miller seconded. Motion Passed 7 in favor. NEW BUSINESS 2016 Budget Items  Capital Update  Park Arthur Baseball Fields  Proposed Pickleball Modifications in Lion's Park Brett Hyde made a recommendation to Council for approximately $32,000 to install fencing on the three northernmost sides of the Park Arthur baseball fields along with foul ball safety modifications. Paul Peardon seconded. Motion carried 7 in favor 0 opposed. Howard Schneider arrived at 5:42 PM. Jerry Hulbert made a recommendation to Council for $20,000 for Pickleball modifications at Lion's Park contingent on 25% being raised from private entities up front. Brett Hyde seconded. Motion carried 8 in favor 0 opposed. Park Plan Update/Recommendations Launch/Access Fee Discussion Aster Hills Neighborhood Park Name DIRECTOR’S REPORT Public Works Director's Report Conservation Coordinator's Report Recreation Manager's Report COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW Announcements only. No discussion or action will be taken. ADJOURNMENT Jerry Hulbert made a motion to adjourn at 6:30 PM. Howard Schneider seconded. Motion Passed 8 in favor. CITY OF MUSKEGO Staff Report to Parks & Conservation Committee November 3, 2015 Meeting To: Common Council From: Jeff Muenkel, AICP EDFP Subject: Parks, Conservation, & Recreation Plan Update Date: October 22, 2015 Park Assessments Over the past month staff has been heavily active in completing park assessments as well as meeting with all the individual clubs and youth organizations. Completing these assessments and having these meetings are key in determining the efficiencies as well as the future needs of our park system. We have taken a unique approach in the assessments in order to gauge various perspectives on future recommendations for our parks. The assessments consisted of Jeff Muenkel (planning/design perspective), Tammy Dunn (recreation perspective), Dave Simpson (maintenance perspective), and Tom Zagar (conservation/landscaping perspective). Conservation assessments are coming soon. Please find attached our various park assessments to date. These assessments will evolve into the new Park Plan with actual recommendations over time. The meeting notes with our recreation groups are also attached. We’re hoping that by meeting with the groups we can decipher their true needs for the future and ultimately come up with a plan that makes the groups more efficient in the future. Determining exact areas for specific sports over the course of the next five years will be one of those recommendations we want to uncover. Take some time to think about the assessments we have completed and come prepared with your own notes about what future needs you may see in our parks. Items can be related to maintenance, recreation, landscaping, and more. Staff plans on getting a working document together for continual review starting in January 2016. Park Surveys A survey to residents has always been a part of the planning process for the new Plan. In the past we have sent out surveys to surrounding residents of particular parks to gauge the usability of the park as well as thoughts from the residents on what they like/dislike about the park. Staff intends to send out a survey similar to the ones that were done in the past in January 2016. At this time staff is drafting the survey format and should have it ready for our December meeting. Staff would like to discuss with the Committee how they would like a survey drafted. As we see it there are a couple options: 1. One defined survey that goes to all residents in the community and discusses questions about Muskego’s parks and conservation areas in more generalities. Also requests their thoughts on improvements and wish lists. 2. Multiple surveys that goes to residents within a mile or so of each park and conservation area. Has more defined questions on the park they live next to as well as questions on general Muskego parks, recreation, and conservation. Notes from past meeting inquiries by the Committee: -Staff is identifying opportunities for Frisbee Golf -Staff is working on the future of the rugby programs -The wayfinding signs along the ATC/WE Energies trails are maintained by the city. Assessment of these trail systems is also found attached. Bluhm Farm Park Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: None    Observations  North Side:  USE: Heavy baseball/softball (Club & MAA) use on Fields #3 and #4 (mid May‐mid July); Heavy MAA  football use between Fields #3 and #4 (Aug.‐mid Oct.); Ample parking for each sport  ‐No signage denoting park on north side  ‐Dumpster & enclosure not used  ‐No landscaping on Bluhm north   ‐City water close to Bluhm north bathroom building now  ‐Mowing grass east of Field #3    South Side:  USE: Heavy baseball (Club & MAA) use on Fields #1 and #2 (mid May‐mid July); Muskego Rugby use on  turf west of baseball Field #2 (Aug.‐mid Oct.); Ample parking lot; 2‐5 yr old & 5‐12 yr old playground;  basketball hoop; rentable pavilion with bathrooms; conservation trails.  ‐Main signage old wood sign that requires maintenance  ‐Bleachers for baseball fields #1 and #2 aging and a safety concern  ‐Pine Mature Trees maintenance issue  ‐Have garbage can plan (many around and alternate types)  ‐Railroad ties sticking out of ground around parking lot serve no purpose  ‐Prairie planting behind Field #1, along first base side, causes issues with baseball programming  ‐Fencing around Fields #1 and #2 aging  ‐Benches on Fields #1 and #2 subpar. Don’t extend along whole dugout and cramped  ‐Pavilion needs painting; especially wood timbers  ‐Appears a portion of the park was graded for a former ice skating rink  ‐No signage/map for overall park and trail system  ‐Dumpster should be kept here; enclosure aging   ‐Basketball hoop is in parking lot  ‐Excellent trail system through environmental lands on Bluhm south; not made know or marked well    Rec Club Discussion Observations:  ‐Bluhm south short of parking on baseball game days  ‐Lights on any/all Bluhm baseball/softball fields would help to expand programs and alleviate need for  other fields in city. Lights would work well on Bluhm north for MAA football programming as well.  ‐Bluhm south baseball/softball fields need more maintenance on fencing, dugouts, benches, bleachers    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Add main park sign on north side and replace south main sign (low maintenance signage that is  consistent throughout all parks)  ‐Possibly add a sign with an overall park map noting amenities; Add trail identification/interpretive  signage  ‐Keep basketball hoop as is but consider new half court outside of parking lot in future via road program  ‐Possibility to establish ice skating rink here again if desired  ‐Consider connecting northern building to water now that it is close  ‐*Purchase one new set of bleachers for fields #1 and #2; Remove old  ‐*Replace dugouts on Fields #1 and #2. Expand and install new benches  ‐*Replace fencing around Fields #1 and #2 (w/in 5 years)  ‐*Consider adding lights to baseball/softball/football fields to increase usage and availability  ‐*Add more parking at Bluhm south for baseball/softball  ‐^Consider tree planting plan and plant trees on Bluhm north; Use Urban Forestry Grant when available    Maintenance Recommendations:  ‐Remove dumpster & enclosure from Bluhm north  ‐Redevelop/paint dumpster enclosure on Bluhm south  ‐Stock park with same consistent garbage can; remove all others  ‐Paint Pavilion once consistent park pavilion color is established  ‐Remove pine trees from Bluhm south  ‐Remove railroad ties sticking out of ground around south parking lot  ‐Remove prairie planting behind Field #1, along first base side, and return to open turf    Veterans Park Assessment – 9/23/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: None    Observations  USE: Large park with pavilion, playground, open turf, and conservation related trails. Used heavily by  resident and for summer rec programming.  ‐Overall signage and path system signage should be better found throughout Veterans Park to  Settlement to Horn (Map boards, QR Codes, etc.)  ‐Landscape bed in Vets area to west in rough shape.  ‐Mulch areas around mature trees weedy and maintenance issue.  ‐Turf around pavilion/playground has issues.   ‐Pavilion needs repainting and replacing of various boards.  ‐Storage area directly adjacent to under covering in pavilion is currently under‐utilized by City Parks  system as it is currently utilized by Lion’s Club for storage of annual MuskegoFest.  ‐Large turf area found in middle of park that is underutilized. Mainly due to festival scheduled for last  weekend in August of each year.   ‐Bird (Swallow) problem under pavilion.   ‐Grill by pavilion could use replacement.  ‐Playground in good shape. Need of some minor repairs or re‐coatings in future.  ‐More shade around playground needed.  ‐More recreational opportunities could be found in park to benefit everyday users as well as summer rec  program.   ‐Boardwalk in central woods is aging; future repairs required.    Rec Club Discussion Observations:  ‐Summer Rec Program utilizes pavilion and lands all summer months.  ‐No use of large turf area by club programs.    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Add overall interpretive and path system signage throughout Veterans Park to Settlement to Horn (Map  boards, QR Codes, etc.)  ‐^*Determine new landscape plan for donated landscaped raised bed area west Vets Park.  Missing  bench here, update raised landscape bed, has former fountain thus a chance to add another water  feature; Woman’s club was help in past here and may be future maintainer?  ‐Find alternative for Lion’s Club MuskegoFest materials so storage area can be used by rec programs for  increased safety/efficiency of program.  ‐Determine how turf area could fulfill rec needs in community yet fit around fair schedule.  ‐Replace lights in pavilion to avoid bird nesting problem. NOTE: Barn swallows, while not endangered,  are a protected species.  We may legally remove nests but cannot if eggs are already laid.  ‐Buy and install new grill next to pavilion.  ‐Add more shade trees around playground or add shade structures (playground is built to allow such  structures from manufacturer).  ‐More recreational opportunities could be found in park to benefit everyday users as well as summer rec  program. Examples would be Tetherball, Basketball half court (currently use temp hoop), sand  volleyball, and/or sprayground.    Maintenance Recommendations:  ‐Replace mulch rings around mature trees in park with turf. Protect trunks of trees with material if  needed.  ‐Re‐seed turf areas around pavilion/playground.  ‐Repaint pavilion and replace soffit boards as needed (consistent color with rest of parks); Repaint doors  that are currently white a darker color.  ‐Replace deck boards on boardwalk as needed.    Settlement Centre Assessment – 9/23/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Landscape Settlement building site (complete ‐ needs maintenance)    Observations  USE: Lands with Historical Society buildings upon them. Large Old Town Hall building used for rec  programming and Historical Society Museum in basement.   ‐Main Settlement sign requires maintenance and not maintained well as of now  ‐Overall signage and path system signage should be better found throughout Veterans Park to  Settlement to Horn (Map boards, QR Codes, etc.)  ‐Structural repairs needed for various Historical Society buildings.  ‐Old barn in woods could be great asset once open for business in future.  ‐Landscaping around Old Town Hall in need of care.  Could add more trees in areas.  ‐Less mowing could be done in some areas.   ‐Summer Rec program heavy use at this location. Permanent basketball hoop need here.  ‐Old Town Hall: Used for rec programming and requires maintenance inside/outside. Aging building.   ‐Dumpster required at this location; 4x4 extensions on enclosure still showing though.  ‐More paths could be found in the beautiful woods east of Settlement.     Rec Club Discussion Observations:  ‐None    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐*Consider adding low maintenance main sign for Settlement in future.  ‐Add overall interpretive and path system signage throughout Veterans Park to Settlement to Horn (Map  boards, QR Codes, etc.)  ‐*Identify structural repairs needed for various Historical Society buildings yearly and cost share where  possible.  ‐ Make old barn area in forest an amenity for future. Once barn is allowed full accessibility it can be used  for future rec events and/or public rental. Very unique amenity. Parking may be issue to overcome.  ‐Add permanent basketball hoop by or in parking lot here for summer rec program.   ‐^Extend more paths in woods east of Settlement area connecting to Horn Field.  ‐Old Town Hall: Add features to building to possibly be used for future various dance/gymnastics  programs (mirrors).    Maintenance Recommendations:  ‐Landscaping around Old Town Hall in need of care. Consider new overall plan for landscaping around  Old Town Hall. Need for foundation plantings on west side? Add less landscaping and have stone base  around ADA access on northeast side of building (add turf instead on slope)?  ‐^Add more trees east of parking lot between dumpster and garden.  ‐Identify more no‐mow areas. East of parking lot one of these areas.   ‐Remove 4x4 extensions on dumpster enclosure.  ‐Continue yearly Old Town Hall maintenance.   Schmidt Park Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Re‐pave asphalt basketball courts thru road program (Completed)    Observations  USE: Small neighborhood park with access to north and south and no parking lots. Contains large open  turf area, two (2) tennis courts, half court of basketball, and 2‐5 yr old/5‐12 yr old playgrounds.  ‐Main signage on north and south sides are old wood signs that require maintenance  ‐Tennis court fencing in bad shape with gaps all along bottom.  ‐No parking is found at this park, yet demand is there with tennis programming and possible increased  use of open turf are for soccer and other sports.  ‐A lot of open “flat” turf; not used for any club or recreation programs  ‐Playground 6 years old and in good shape  ‐Benches surrounding playground need replacement  ‐No lines on basketball court  ‐Backstop on southeast corner of park unused and aged    Rec Club Discussion Observations:  ‐Tennis lessons here in fall/spring with eight (8) kids at a time    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Replace main park signs (low maintenance signage that is consistent throughout all parks)  ‐Replace tennis court fencing to alleviate bottom gaps. Full replacement or simpler addition of fencing  for repair.  ‐Investigate need for more parking dependent on future programming and use. Best location would be  off of north entrance and Conrad Court.  ‐Replace benches around playground  ‐Line basketball court if desired  ‐Remove backstop in park if desired for other programming needs  ‐Open turf area could be used for rugby or soccer in future; parking may be required though if so    Maintenance Recommendations:  ‐None    Park Arthur Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations  1. Add baseball fields (Completed during planning period)  2. Rink for in‐line skating in summer and ice skating in winter (No action during planning period  3. Additional parking areas (Completed during planning period)  4. Equestrian and pedestrian trails (Completed during planning period)  5. Possible sale of west half of park (Recommendation added during planning period but not acted  upon); discussion of grading west half for football and soccer fields during planning period, but  never acted upon (initial grading cost high)    Observations  USE: Multi‐use community park with ample parking lots, rentable large pvlion with  bathrooms/concessions, high grade lighted baseball fields (4), lighted sledding hill, archery, and  conservation trails that allow equestrian.  ‐Baseball fields and all turf areas of park are in rough shape and need top dressing.  ‐Field Numbers on baseball fields small and hard to find.  ‐Landscaping lacking around park (trees and around power boxes).  ‐Main entrance signs on north and south are new and composite materials. However, some former Code  numbers exist that will require removal.  ‐Park amenities aren’t found via signage well from parking lots; Trail signage lacking.  ‐Many more park amenities are lacking for a community park this size which could include: playground,  Frisbee golf, ice rink, sand volleyball  ‐West side of park continues to be underutilized.  ‐Problem with people driving on the southern access trail off of Martin Drive.   ‐Are large stones required along main drive (maintenance issue, not aesthetically pleasing..)? Cars could  get in turf areas in many other ways.   ‐Keep dumpster here but there is no enclosure.  ‐Lot of open areas that may be used for Frisbee golf.  ‐Less areas to mow here identified  ‐Dog park request has come up in past and could be utilized with ease on SW portion of Park Arthur.  ‐Path up sledding hill hard to manage (holes/ruts)  ‐ADA accessibility to bleachers on all four baseball diamonds hard to manage  ‐Sledding hill has dangerous sides shut down for sledding via signage; how else can this be managed?    Rec Club Discussion Observations:  ‐Heavy usage of baseball fields by club teams; mainly games  ‐Scoreboards requested for fields with definite cost share thru clubs/MAA  ‐Playground requested where parents can see kids  ‐Remote concession stand by fields #1‐3 requested  ‐Hitting/Pitching cages between Fields #2‐3 requested    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Consider 2011‐2016 plan recommendations for site that were uncompleted:  1. Rink for in‐line skating in summer and ice skating in winter (Could still be considered per  recommendations below).  2. Possible sale of west half of park (Not recommended in 2017 planning period as other  recommendations for future of area could be found per below).  ‐Update main entrance signs with proper Code numbers. Consider using this style for rest of community.  ‐Possibly add a sign with an overall park map noting amenities  ‐Add trail identification/interpretive signage  ‐Add more trail loops; Add trail section out north east portion of central woods    ‐Have larger field number signs on baseball fields and in locations seen from parking lots.  ‐Landscaping lacking around park (trees and around power boxes).  ‐Keep dumpster here but there is no enclosure.  ‐Consider other park amenities for this community park including: Add playground (east of pavilion so  kids can be seen by parents from baseball fields), ice rink (good possibility might be west of pavilion),  Sand volleyball, Frisbee golf (especially if west side of park is ever utilized.  ‐Consider options/costs for utilizing west side of park for future (dog park, football, rugby, soccer); If  developed there should be costs sharing from groups to make this area a destination for a particular  sport.  ‐*Investigate dog park: Dog park option for west side seems to be best, low cost option at this time.   Kiwanis willing to provide considerable costs and access to west side from south parking lot can be done  with rather ease.  ‐Add better ADA accessibility to bleachers on all four baseball diamonds  ‐*Add scoreboards to baseball fields contingent on cost share (or in full) by clubs/MAA  ‐Add remote concession stand by fields #1‐3 contingent on cost share (or in full) by clubs/MAA  ‐Hitting/Pitching cages between Fields #2‐3 contingent on cost share (or in full) by clubs/MAA  ‐Upgrade all baseball facilities contingent on cost share options presented by clubs/MAA    Maintenance Recommendations:  ‐*Re‐seed/Top‐dress all turf areas around park.   ‐Add dumpster enclosure w/gate.  ‐Add bollards to southern access trail along Martin Drive (people drive in/out this path thinking it is an  access way).  ‐Remove large stones along main drive. Cars could get in turf areas in many other ways.  ‐Re‐identify mowed areas. Some could be less.  ‐Re‐grade path up sledding hill; possible use of TB/millings  ‐Remove overgrown tree/bush at Martin Drive west entrance  ‐Mow sledding hill in fall so as to restrict usage of sledding patrons around the sides of the hill.      Muskego Centre Park Assessment – 10/27/15  Present: ComDev Director Jeff Muenkel    2011‐2016 Plan Recommendations: None    Observations  USE: Sitting park along Pioneer Drive that abuts Pilak Creek  ‐Clean and well maintained.  ‐Overgrowth along creek bed. Bench overlooking creek can’t even view creek.    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐None    Maintenance Recommendations:  ‐Remove vegetation/stumps along whole shoreline   Moorland Park Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations  1. Potential for Skateboard Park to move to another location (Never considered during planning  period)  2. Potential to sell buildable acreage of Moorland Park (Never considered during planning period)  3. Landscaping around parking area, playground, sand volleyball, basketball court exploration,  shelter w/bathrooms (All never considered during planning period)  4. Spray ground (Never considered during planning period, but need for spray ground discussed  during planning period)  5. Fieldhouse with gym space exploration (Not considered during planning period; need not there)    Observations  USE: Large park with turf area to east and west, large parking lot centrally located next to skatepark and  2‐5 yr old/5‐12 yr old playgrounds.  ‐Signage: Main signage on SW corner of Sandalwood and Moorland is old wood sign that requires  maintenance. Small sign at entrance to parking lot. Skatepark signage beat up and missing wording.  “Inpro Skatepark” sign in good condition. No signage noting trails around park or park amenities.  ‐Woodchips uneven throughout playground.   ‐Dumpster and port‐a‐potty good here. Enclosure for porta‐a‐potty weakening/ADA ramp off. Enclosure  for dumpster needs doors.  ‐Cameras not functioning anymore.  ‐Landscaping around park minimal  ‐Frontage of Sandalwood deteriorated with miscellaneous prairie plantings; prairie failing in those  locations anyway.  ‐Connect trail from Candlewood Creek Subdivision and nature area from the south better to the main  parking lot area of Moorland Park (currently goes out to Moorland Road); consider more loops in  conservation area, connection to pond to the south. Possible to stock pond ourselves with fish and have  fish rec program at this location.  ‐Good location to expand park amenities including sand volleyball, rentable pavilion  (bathrooms/electric).   ‐Cleanup tree line in back of playground and skate park could use cleanup/out  ‐Senior contingent in area; focus on senior sports may be good.     Rec Club Discussion Observations:  ‐Open turf area mainly used for Kickers soccer for both games and practices. Mainly use east portion.  ‐Turf at Moorland spotty and hard. Could use re‐dressing.    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Consider 2011‐2016 plan recommendations for site:  1. Potential for Skateboard Park to move to another location (Not found as needed in 2017  planning period)  2. Potential to sell buildable acreage of Moorland Park (Not found as needed in 2017 planning  period as site is good for future of soccer program and other city park/rec amenities)  3. Landscaping around parking area, playground, sand volleyball, basketball court exploration,  shelter w/bathrooms (All part of 2017 planning recommendations below)  4. Spray ground (Better locations might now exist in future such as Veterans Park or Idle Isle Park)  5. Fieldhouse with gym space exploration (Not found as needed in 2017 planning period or distant  future)  ‐Replace main park sign (low maintenance signage that is consistent throughout all parks).  ‐Add updated overall signage plan for park denoting rules and regs  ‐Add trail sign system  ‐Add sand volleyball court and/or basketball here.  ‐Add rentable pavilion with bathrooms/electric.  ‐Update camera system if needed  ‐*Possibility to add rubber base at least under swing system. Would help with ADA. Cost? Grant  possibility.  ‐*Re‐dress open turf areas to make facility more utilized for soccer in future (Kickers help).  ‐*Re‐grade/seed the mounded prairie plantings along Sandalwood frontage, to west of park, would  open up more turf area and expand soccer possibilities.  ‐*Create landscape plan for park. Urban forestry grants?  ‐*Consider location for Pickleball/Bocce here due to senior contingent in area.  ‐Update trail system with signed connections to Candlewood Creek Subdivision and other nature areas  to the south (more loops, etc.). Consider stocking storm pond to south with fish and have fish rec  program at this location in future (small pier).    Maintenance Recommendations:  ‐Redistribute the woodchips in the playground here to keep even  ‐Mow out the prairie plantings along the frontage of Sandalwood. Improve aesthetics and safety.   ‐*Re‐grade/seed the mounded prairie plantings along Sandalwood to west of park would open up more  turf area and expand soccer possibilities.  ‐Maintain porta‐a‐potty enclosure; hookup ADA ramp  ‐Add enclosure doors for dumpster area.  ‐Cleanup tree line in back of playground and skate park      Manchester Hill Park Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: None    Observations  USE: 2‐5 yr old and 5‐12 yr old playgrounds to north, central parking lot, and open turf area for soccer in  middle. Rentable pavilion along conservation trails and pond to south. Pond used for ice skating in  winter months.  ‐Main signage old wood sign that requires maintenance  ‐Dumpster/enclosure not required  ‐Port‐a‐Potty here OK  ‐Not all areas of park need to be mowed.  ‐Possibility to increase rentals here with cleanup of various items and additions of other items (Ex.  bathrooms and more parking).  ‐Great trail system but lacks identification.  ‐Ice rink enhancements a possibility here  ‐Pond enhancements would make park more desirable  ‐Playground aging and in use of touchups (15 yrs+ old)  ‐ADA access from parking lot to playground not good.  ‐Mature trees with large mulch rings unmaintained and weedy.  ‐Middle tree line between pavilion and soccer fields divides park a bit.    Rec Club Discussion Observations:  ‐Kickers use this area as their practice fields; alternate as game fields from year to year. Maintenance  needed for filling of holes and high traffic areas.    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Replace main park sign (low maintenance signage that is consistent throughout all parks)  ‐^Better mark/promote/identify trails.  ‐*Add asphalt connection path from parking lot to playgrounds to enhance ADA  ‐*Pond enhancements: Consider fish stocking program (Fisheries grants), Horizontal pier, shoreline  cleanup to make access more desirable up to and around pavilion.  ‐Ice rink enhancements (access, pond cleanup, etc.)  ‐*Consider playground replacement in next five years or maintenance touchups. Location change may  be desired if new playground found.  ‐Ice rink enhancements (access, pond cleanup, etc.)  ‐Consider adding bathrooms (location may be more appropriate between soccer fields and pavilion) and  more parking closer to pavilion (could have own access off of Parkland Drive).    Maintenance Recommendations:  ‐Remove dumpster & enclosure.  ‐Re‐identify what areas need to be mowed.  ‐*Work with Kickers and their maintenance crew on cost sharing and curing soccer field maintenance  form season.  ‐Clean out middle tree line dividing soccer fields and pavilion; possible clear‐cut on west portion and  clean out east portion.  ‐Remove large mulch rings around more mature trees and replace with grass for easier maintenance;  protect trunks with some type of drain tile plastic if needed.      Lions Park Assessment – 9/15/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Repave basketball court via road program (Completed)    Observations  USE: Neighborhood park with practice quality baseball field, playground, storage structure with  bathrooms, pickleball court, full court basketball, and 8 space parking lot. Open turf area primarily used  for peewee Muskego Youth Football.  ‐Main signage old wood sign that requires maintenance  ‐Parking lot is in fair condition (10 years of life left).  ‐No ADA access from parking lot to basketball court.  ‐Pickleball addition in 2015 heavily used. Schedule for four (4) more Pickleball courts, replacing  basketball court, in 2016.  ‐Increased parking demand found here due to Pickleball usage. Alternatives may be needed.  ‐No handicap parking.  ‐Asphalt around building and pathways aging. Rough and not easily traversed especially ADA concern.  ‐No good seating around Pickleball and playground.   ‐Building in good condition and currently used for storage and restrooms. Leaks in interior wall of men’s  bathroom found.  ‐Building could be converted for future concessions if rec programs for park warranted.  ‐Painting of outside of structure needed, has some old cover‐up graffiti on south side of building.  ‐Limited lighting around building.  ‐Building is on well system. Water very brown and staining plumbing.  ‐Storage room in building consists of storage for Public Works and Pickleball items.  ‐Baseball diamond isn’t used like in the past; dirt infield has since filled in with grass. Baseball backstop  and foul line fencing still exists. Fencing works well to box in turf area of park. Backstop could use re‐ fencing.  ‐Smoother transition for ADA is needed at playground.  ‐Mature trees with large mulch rings unmaintained and weedy.  ‐More trees could be used around playground for future shade opportunities. More trees could be  added down Lions Park Drive to frame in park.  ‐Appears park used to be flooded in an area along the SW portion for an outdoor ice rink.    Rec Club Discussion Observations:  ‐ Open turf area primarily used for peewee Muskego Youth Football and suffices to date.    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Add trail connection from parking lot to nearest courts (aids ADA as well).  ‐Replace main sign (low maintenance signage that is consistent throughout all parks); sign better suited  at south end of park.  ‐Add more parking if required. Overflow could be allowed at end of Lions Park Drive. Safety concern  when parking on roadways though. Could add parking along perimeter of park along Lions Park Drive  (would require culverts).  ‐Add handicap parking closer to building and tie into pathways  ‐Replace asphalt around building and pathways in 2‐5 years. Rough and not easily traversed especially  ADA concern.  ‐*Add more seating around Pickleball and playground.  ‐*Consideration for usage of structure for concessions.  ‐ *Consider spot lighting around building for increased safety.  ‐Consider hooking storage structure to city water in future; would have to run about 450’ from the  north.  ‐Determine long term need of baseball backstop; Re‐fence or remove when known.  ‐*Possible future bocce ball location that would work well with Pickleball programming.  ‐^Create tree plan for around playground and down Lions Park Drive. Urban Forestry grant possibility.  ‐Need for outdoor ice rink? If so, park may facilitate    Maintenance Recommendations:  ‐^Painting outside of structure. If done, a new standard exterior color for rec structures in the parks  should be considered.  ‐Repair leaks in interior wall of men’s bathroom.  ‐Add smoother transition to playground for ADA aid.  ‐Remove large mulch rings around more mature trees and replace with grass for easier maintenance;  protect trunks with some type of drain tile plastic if needed.    Lee Hubka Park Assessment – 9/15/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations:  None    Observations   USE: Small park off of Gold Drive that houses two (2) full court basketball courts along with  miscellaneous hard surface space (2,000+ SF). Has access to Little Muskego Lake channel to east.  ‐Question on how much this park is used and/or accessed?  ‐Pavement is flat and relatively uncracked. Pavement could use a re‐lining and possibly resurface in next  couple years.  ‐Floodplain encumbers this whole lot.  ‐Where are property lines? Seems in orthophotos that parcel extends further north and neighbor might  be using this space?  ‐Considered as Lake Access #4. Being a lake access is very unknown to public and not advertised at park.  This is actually access to channel that leads to Little Muskego Lake.  ‐Channel found to be very shallow and covered with stones. Channel access very hard to navigate (no  trail, overgrown, shoreline overgrown as well).  ‐No parking is found here; only street parking. Ditches along street leave cars into street a bit.  ‐Chance to turn one basketball court plus the extra asphalt space here into tennis court if desired.    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Key question on a survey to residents is how much this park is used and for what purposes.  ‐Basketball court pavement could use a re‐lining and possibly resurface in next couple years.   ‐Survey of park in future may be required to determine and formally mark property lines.  ‐New Plan will see this water access as Channel Access #1. Signage denoting channel access should be  found.  ‐If off‐street parking is desired it could be found in existing hard surface area next to basketball courts  (would require removal of fencing and new culvert access).  ‐Tennis court could replace north basketball court. However, trees in surrounding area create some  maintenance concerns.    Maintenance Recommendations:  ‐^Cleanup access to channel/shoreline and make conservation amenity; define a path (TB/crushed  gravel)    Kurth Park Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager Tammy  Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Grade and seed southern section for athletic use once need is identified  (Completed during planning period).    Observations  USE: Park running north to south for over a ¼ mile. Houses mainly soccer activities (+ fill‐in football practices)  with club baseball field to north.  Parking lots at north and south entrances. Bathroom/storage structure to north.  Tennis courts and one basketball hoop to north.  ‐Main signage on both north and south sides are old wood signs that requires maintenance  ‐Storage building needs repainting and has graffiti (Storage building used for Warriors baseball equipment).  ‐Dumpster/enclosure not required anymore.  ‐Parking is overloaded during soccer game days (Issues with drop‐off/pick‐up). Complaints about parking from  area residents as well as from people coming for soccer games; police ticket cars ($68) for parking along  residential streets at this time.  ‐Basketball court in parking lot and not safe long –term.  ‐ADA access to tennis courts not found.  ‐Path around northwest central part of park needs care. Used to be TB/gravel like rest of path and is now mostly  grass.  ‐Bathrooms in storage building and in OK condition.  ‐Creek runs along park east edge and is mainly blocked with vegetation.    Rec Club Discussion Observations:  ‐Kurth heavy for Milwaukee Kickers soccer club. Used for main practice fields as well as some game fields. Game  fields generally at Kurth north and south with practices at Kurth central (however, alternates from year to year).   Better signage needed to direct people from north to south (map?)   More parking needed at Kurth north  ‐Kurth north baseball field used by Warriors Baseball.   Right field line needs tree trimming as it is creeping on field of play.   Fencing curling at bottom in some locations   Home run fence would be desirable    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Replace main park signs on north and south sides (low maintenance signage that is consistent throughout all  parks).  ‐Add wayfinding signs and/or map of park amenities by parking lots  ‐*If Kurth remains central soccer location, parking lot expansion should be looked at for north side (possibly east  of storage building).  ‐Consider removal of basketball hoop for safety or create new separate basketball area in park if desired by  neighborhood.  ‐Determine if path around northwest central part of park needs to be TB/gravel or simply could be returned to  turf with other source of hard surface path found throughout park.  ‐*Add homerun and foul line fencing at baseball field.  ‐Possibility to clean up creek edge and make amenity of park and trail system.    Maintenance Recommendations:  ‐Repaint storage building and use uniform city color.  ‐Remove dumpster/enclosure.  ‐Add ADA access hard surface path to tennis courts main gate.  ‐^Trim trees along right field line at Kurth baseball field north  ‐Fix base of baseball field fence where curling  Jensen Park Assessment – 9/15/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Research building life efficiency (During planning period ‐ Facilities  Study completed and found that building is past useful life and other opportunities should be found.)    Observations  USE: Large size baseball field found here that is minimally used and in need of a lot of maintenance.  Large parking lot to rear for rec activities, playground, and two‐story rec programming structure.  ‐Recreational building in bad condition inside/out (smell, bathrooms terrible, unclean); Upstairs a great  dance studio.  ‐Playground newer and in great shape.  ‐Parking lot at dead end right now  ‐Parking lot orientation could change without rec building  ‐Undesirable trees around parking lot and outfield.  ‐Baseball field in rough shape; grades along infield and down lines are off, fences in bad condition, need  new benches, bleacher area behind backstop a mess of seating (old timbers, old cement (failing), new  decking, etc.).  ‐Port‐a‐potty area could use cleanup  ‐Main signage old wood sign that requires maintenance  ‐Unused flag pole found here.    Rec Club Discussion Observations:  ‐Field very minimally used for club baseball/softball practices (last resort)  ‐A lot of open turf that may be used well for soccer.     Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Remove existing recreation building and find alternative for programming opportunity expansion in  community.  ‐Re‐orient parking lot and get rid of unneeded hardscape if building goes away.  ‐Parking lot could be one‐way for safety and have exit at Silver Drive (not one there now).  ‐*Determine future need of baseball field here. Possible reclamation here for soccer fields instead of  existing baseball field. Ample parking with availability to add more with ease.  ‐Replace main sign (low maintenance signage that is consistent throughout all parks)    Maintenance Recommendations:  ‐Remove undesirable trees around parking lot and outfield.  ‐Determine future need of baseball field here; If open turf area is desired remove all baseball field  related items and re‐grade and seed area.  ‐Cleanup around port‐a‐potty area and set policy for port‐a‐potties in future (location, size, color,  enclosure, etc.)  ‐Remove unused flag pole.      Idle Isle Park Assessment – 9/15/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Consider adding more beach (Not completed)    Observations  USE: Year round use with year round recreational opportunities. Includes boat launches, beach, rentable  pavilion, picnicking, playgrounds, fishing pier, walking trails, general open recreational space.  ‐Plenty of space for more parking lot to the west off existing; utilize if recreational opportunities are  expanded.  ‐Overall parking lot pavement has 5‐10 years life other than re‐striping from time to time.  ‐Existing parking lot access to pavilion odd (Currently blocked off by movable wooden barrier).  ‐Stones around parking lot not doing job. (maintenance issue, not aesthetically pleasing).  ‐Single garbage cans everywhere and random.  ‐Two (2) enclosed dumpster locations exist in park and in main thoroughfare, high‐profile areas (next to  boat launch and one at entrance to park).   ‐Boat wash station is 200’ hose extending from pavilion all the way to the boat launch. Safety hazard and  is not a permanent option.  ‐Playground aging but in good shape with some maintenance needed in next 5 years; No ADA  accessibility to existing playground equipment. Playground not close to beach area.  ‐Trail along lake frontage great asset. No connection though around balance of park.   ‐ Many groups gather towards SW lakefront point with the shade and playground close. Opportunity for  another shelter/gazebo towards SW lakefront point. Rental/revenue opportunities for events along with  overall beautiful location.  ‐Existing shelter only has space for day to day use of beach activities. Another shelter could expand on  opportunities.  ‐Beautiful and durable memorial benches along lake frontage trail (2 found so far). Opportunity to build  on this aesthetic theme.  ‐Beach heavily used yet not that desirable. Opportunity to increase beach space to the west.  ‐Lake frontage around whole park very undesirable. Most all communities with river/lake frontage walks  maintain the shoreline and make it an amenity. Shoreline restoration project should be considered  along with beach extension project.   ‐Many kayakers found using lake and channels surrounding park all accessing water from Idle Isle. Great  location for kayakers and paddle boarders due to channel calmness surrounding park.  ‐Weed machines are allowed to be parked along the lake frontage trail just west of the beach along  main vistas of park to the lake. Unmaintained piers to access the weed machines found along shoreline  here as well.  ‐Boat launch area unkept and signage barely readable with overgrowth of weeds around them.   ‐Signage for entrance to park and around park very unorganized and difficult to decipher/understand.   ‐Park hidden from public; what can be done to wayfind better?   ‐Staff sits and collect fees from opposite side of street of cars entering; area of setup not too pleasing.  ‐Waterbugs using the city portion of concession area in pavilion in their day to day use (Not part of their  agreement).   ‐Coniferous trees around playground a maintenance problem.  ‐Lack of shade trees around park; opportunity for consistent landscaping program for park.     Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Idle Isle Park has potential to become jewel destination for Muskego residents and outside visitors alike  if overall pan of investment takes place.  Staff has learned from the lake park discussions over the past  five years that the biggest complaint was that “….city doesn’t take care of their main lake park (Idle Isle)  as it is…..so why invest in any lake park….”, thus a strong opportunity exists here. Staff recommends that  Idle Isle Park takes center stage over the next decade for investment in the Muskego community  including these main recommendations:   Create a consultant led park revitalization plan that focuses on park beautification/rejuvenation,  increased usability, revenue opportunities, awareness, and accessibility. Such plan to include  final park revitalization concept plan/map along with costs to complete.   Incorporate all observations/recommendations into revitalization plan.   Begin any maintenance items that Public Works crews could be completing as time allows.  ‐Opportunity to treat Idle Isle Park and beach like a County Park that is staffed for daily maintenance,  lifeguards, concessions, and rentals (kayak/paddle boarding). Revitalizing park should lead to such  consideration as this could lead to revenue as well as making this a destination.  ‐Add more parking to west of existing lot as recreational opportunities are expanded. Consider one‐way  parking lot layout to maximize space and safety.   ‐Master site plan may require removal of wide vehicular access to pavilion straight from main parking lot  ‐Master site plan should consider alternatives to blocking traffic from parking lots to turf area other than  stones.  ‐*Find permanent solution to boat wash station.  ‐Master site plan should consider keeping existing playground but consider newer larger playground  system more accessible to beach area; ADA accessibility to existing (and any new) playgrounds should  be created.  ‐Master site plan should consider trail loop around water frontage of whole park for increased  walkability and recreational opportunity at park.  ‐Master site plan should consider opportunity for another shelter/gazebo towards SW lakefront point  that could be used for rentals/revenue. Great locational asset of park found here.  ‐Overall another location for another open air shelter for rental is great opportunity as existing shelter  only has space for day to day use of beach activities.  ‐^Add more memorial benches along lake frontage trail; keep to same theme for any seating area.  ‐Increase beach to the west of existing beachfront. Costs from donors.  ‐Lake frontage around whole park very undesirable. Shoreline restoration project should be considered  along with beach extension project. Shoreline restoration would include removing all weeds/brush/old  trees along shoreline throughout park and replace with grass and new riprap.  ‐Master site plan should consider weed machines finding new locations not along the main vistas of the  frontage of the park to the southern portion of the lake.  ‐New Signage plan for entire park should be accomplished.  ‐Wayfinding signage to park should be looked into more to have park marketed better in future.  ‐ Master site plan should consider area for staff to collect fees and provide information in safer format  and more desirable location to entering vehicles.  ‐Find end use for city portion of concession area and ensure any Waterbug use of this area is first  approved in an agreement (Current agreement up in 2017).  ‐Setup policies for use of city portion of concession area for private use. Use for future rentals via  recreation program OR for leasable private use. Should be request for proposal process and not first  come first serve if private use is desired in future.  ‐Master site plan should include tree planting plan for rest of park recognizing preservation of vistas  while increasing shade opportunities in certain areas; tree plan along a lake frontage trail.      Maintenance Recommendations:  ‐Resurface parking lots in 5‐10 years; restripe as needed  ‐Consider plan to have unmovable garbage can locations in strategic places in park.  ‐Minimize dumpster locations with enclosure to one central location; removing enclosure and container  at entrance would be advisable.  ‐*^Boat launch area should be revitalized with new signage and low maintenance vegetation/hardscape.  ‐Remove all coniferous trees around playground.    Horn Park Assessment – 9/23/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Replace roof, research building life efficiency at Horn (Half of Horn  building razed and reduced to storage as of late 2015)    Observations  USE: Large baseball field with many amenities including fencing, bleachers, bullpens, and netting.  Storage structures with concessions and bathrooms. Playground and swings. Conservation trails  surrounding.  ‐Overall signage and path system signage should be better found throughout Veterans Park to  Settlement to Horn (Map boards, QR Codes, etc.)  ‐Main signage along Pioneer Drive is old wood sign that requires maintenance  ‐Fence dividing parking lot on south side now; used to be used for Safety City.  ‐Concrete approach from old Horn structure unneeded.   ‐Overhanging limb of tree along playground a safety concern.  ‐Opportunity for more trails cut in woods south of park building.   ‐Dumpster here unneeded.  ‐Batting cage along left field line and bullpen along right field line in rough shape.  ‐Homerun fence cleanup needed.   ‐Bleachers in odd locations.    Rec Club Discussion Observations:  ‐Various Baseball clubs (Rebels/Avalanche) use Horn for practices and/or games from April‐October  ‐Lighting here could open up more opportunities in future.  ‐Poor left field drainage  ‐Better maintenance of bullpens/hitting cage  ‐Bring scoreboard back to life     Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Replace main park sign (low maintenance signage that is consistent throughout all parks)  ‐Add overall interpretive and path system signage throughout Veterans Park to Settlement to Horn (Map  boards, QR Codes, etc.)  ‐^Cut new trails south of storage structure and throughout forest area. Cut thru fence.  ‐*^Cleanup batting cage along left field line and bullpen along right field line.   ‐New homerun fence a possible need in future.  ‐Determine if lighting is needed here for better programming efficiency in future.    Maintenance Recommendations:  ‐Remove fence dividing parking lot; re‐line parking lot to increase parking for area.  ‐Remove concrete approach to old Horn building.  ‐Remove tree, or limb of tree, over playground for safety OR consider moving playground to more  desirable location.  ‐Remove dumpster at this location.  ‐Remove growth along fence lines.  ‐Move bleachers to appropriate locations  ‐Fix scoreboard  ‐Fix drainage issue in left field.   Freedom Square Assessment – 9/22/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: None    Observations  ‐USE: Small neighborhood park with parking lot (shared with commercial business to south), a tennis  court, and a full court basketball court.  ‐Many weeds growing thru aging courts.  ‐Tennis court net broken  ‐Need for this parcel/park in future?  NOTE: No complaints about condition of park in recent past    Rec Club Discussion Observations:  ‐No rec programs exist here    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Determine need for this park; possibility to off‐load this parcel as commercial use or to adjoining  southern commercial owner    Maintenance Recommendations:  ‐Kill weeds in courts  ‐Fix tennis court netting    Denoon Park Assessment – 10/2/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations: Investigate effect of removing basketball court here (Court kept and  re‐paved in fall 2015)    Observations  USE: Large community park with ample turf area for soccer, football, and baseball uses. Many parking  lots to pavilion (no bathrooms/electric), conservation trail system, playgrounds, and boat launch to Lake  Denoon.  ‐Main signage on north and west entrances is older and high maintenance.  ‐Overall signage and path system signage should be better here (Map boards, QR Codes, etc.)  ‐Entire park hard surfaces re‐paved in late 2015  ‐Pavilion is open air picnic area without water for bathrooms or electric.  ‐Port a potties near front pavilion.  ‐Rocks around pavement areas maintenance issue and not required.  ‐Split rail fence along frontage of park deteriorating.  ‐Playground not in desirable location for park users. Not ADA accessible as well.  ‐Possible opportunity for rentable pavilion closer to boat launch parking lot.  ‐Basketball court repaved and re‐fenced in late 2015 but a bit still un‐accessible; Scout to add pine trees  for wind screening on basketball court in early 2016.  ‐Great mix of open lands and conservation lands for future frisbee golf opportunity.   ‐Less mowing of areas identified in various locations  ‐Rec trial from Kelsey going south could be more meandering for better character rather than be straight  line.  ‐More mowing identified in some areas .  ‐Define back trail that goes along back yards of residents to the east (gravel or define with allowing  some of the area to be longer grass). Work with these owners. Signage need as well.  ‐Lake not very accessible to public; relatively unknown to public from front of park.  ‐Boat launch could use a dredging as is shallow.  ‐General landscape cleanup around launch needed.   ‐Sides of boat launch have dangerous holes.  ‐Boat launch turnabout island could use less maintenance materials so equipment doesn’t have to come  this whole way.  ‐Pedestrian wooden bridge along conservation trail has some needs for future safety.    Rec Club Discussion Observations:  ‐Open turf area along west side of park heavily used by Kickers Soccer for games and practices.  ‐One baseball field in central area of park used minimally by baseball clubs (6 games in 2015). Gets wet  easily and in rougher shape than other fields in community.  ‐Approximately four (4) Cross Country meets held here by School District.  ‐Muskego Football Club desires separate location that they can invest in for distant future. Open turf  area and location desirable here for them.   ‐Northern turf by soccer area is in rough shape/gets wet easy    Recommendations (* denotes cost‐share possibility; ^ denotes volunteer project possibility)  Core Recommendations:  ‐Many possible recommendations for this park. Could be best suited for an overall separate master park  plan to setup all the various recommendations below in a well‐planned out way.  ‐Consider renaming to “Lake” Denoon Park? More marketable?  ‐Replace main park sign (low maintenance signage that is consistent throughout all parks)  ‐Possibly add a sign with an overall park map noting amenities; Add trail identification/interpretive  signage  ‐Determine how to make basketball court more accessible to rest of park.  ‐Find way to make the lake more accessible to public than just a boat launch. Bring trail system down to  boat launch area; path going from launch to the water’s edge already; add boardwalk with possible  extended pier for people to view lake and/or possibly fish.  ‐Possibly use water hydrants that are found north of pavilion, from school well, not city water; chance to  tie off these for future bathrooms.  No electric at pavilion which would be needed as well.  ‐Consider moving playground to around back parking lot or more visible location of main recreational  activities in park. Create safer environment. Work on making playground more ADA accessible.  ‐Explore pavilion addition towards rear parking lot.  ‐*Determine frisbee golf possibility here. Ability to have course in open areas as well as meandering  through conservation trail area  ‐Define back trail that goes along back yards of residents to the east (gravel and/or define with allowing  some of the area to be longer grass). May have to re‐survey property lines. Work with these owners.  Add directional signage as well.  ‐*Dredge boat launch for easier navigation (grants?)  ‐*Establish area for Muskego Youth Football here for long term game and practice facilities. Central area  of park has plenty of space to facilitate. Remove baseball field and work with Muskego Kickers on their  needs to west.  ‐Evaluate need to re‐grade/seed north half of turf area where it is rough and gets wet easily.    Maintenance Recommendations:  ‐Remove split rail fence along frontage of park.  ‐Remove rocks around pavement areas for less maintenance.  ‐Identify areas to mow less (north trail leading to Kelsey; keep wide enough for cross country runners  though).  ‐Identify areas to mow more (Around back parking lot)  ‐Removal of some brush/tree lines in areas by back parking lot for safety/aesthetics  ‐Mow rec trail from Kelsey going south to be more meandering rather than be straight line.  ‐Cleanup around launch (trees, brush, buckthorn)  ‐Fix cement area around boat launch that has holes.  ‐Replace grass with decorative stone in boat launch turnaround island for less maintenance.  ‐Pedestrian wooden bridge along conservation trail: redo south side boardwalk approach; pound in pink  colored posts for safety; remove railroad ties for safety on south side of bridge leading to bridge on the  hill (allow to grow fallow and just have existing path be used; possibly add stone on slope trail).      Little Muskego Lake Boat Launch Assessments – 10/7/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation Manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations  None    OVERALL  Assessment Observations/Recommendations  ‐Consider Renumbering since some are now defunct; clockwise around lake; re‐use existing signs; #6  missing from past anyway…  ‐Consider picnic tables and/or permanent benches at vista accesses  ‐Consider split rail fencing better denoting property accesses in most locations    Pearl Drive  Assessment Observations/Recommendations  ‐Keep as Lake Access #1  ‐City mows/maintains  ‐Cleanup lake frontage; make access sign more apparent  ‐Cleanup brush along Pearl Drive frontage; move access sign to roadway where it can be seen.  ‐Another good exploited access for paddle boarding/kayaking    Emerald Drive  Assessment Observations/Recommendations  ‐Keep as Lake Access #2  ‐Remove pine tree along Emerald  ‐Has small removable pier (by PW)  ‐Remove overgrown brush (vines) and small trees along lake frontage   ‐Another good exploited access for paddle boarding/kayaking    #3 Diamond Drive  Assessment Observations/Recommendations  ‐Keep as Lake Access #3  ‐Has great frontage that could use string trimming up to shoreline  ‐Good area for fishing rec program due to deeper depths and island here  ‐Have pier section here for increased fishing  ‐Add new picnic table  ‐Another good exploited access for paddle boarding/kayaking    Ruby Drive  Assessment Observations/Recommendations  ‐Make Lake Access #4, was Lake Access #5  ‐Not much use  ‐Could be a good, calm exploited access for paddle boarding/kayaking  ‐Frontage brush cleanup and/or tree trimming would be needed    Pleasant View Drive (LAUNCH)  Assessment Observations/Recommendations  ‐Make Lake Access #5, was Lake Access #15  ‐Boat Launch here where people pay launch fees/have stickers  ‐Beautiful Vista (only one on east side of lake); benches (room here to make seating area/picnic table?)  ‐Increase launch sticker patrols; however, no parking at this launch as is  ‐Too much signage/references old code numbers; have all launches have the same uniformed signage;  add access point sign here; ‐Paybox cleanup (no maintenance stone base around paybox/sign?)  ‐Cement approach on launch in great condition  ‐Weed conveyor sits here during summer months.   ‐LML District financial partner here?    NOTE: There is no #6 lake access currently; old lands from past possibly?    Schubring Drive  Assessment Observations/Recommendations  ‐Make Lake Access #6, was Lake Access #14  ‐Path entrance under forest canopy; clean up brush in forest; define path   ‐Access actually includes open land along west property line. Define with split rail fence and maintain  ‐Remove garbage can and old jet ski lift  ‐Nice picnic table here; add permanent bench    Center Drive  Assessment Observations/Recommendations  ‐Make Lake Access #7, wasn’t numbered in past  ‐Not numbered as taken on by city during last planning period; number this area and place signage  ‐Tree near frontage needs removal  ‐Very nice access with no immediate needs  ‐Has pier for docking boats; people dock and walk to Janesville Road from here    Michi Drive  Assessment Observations/Recommendations  ‐Make Lake Access #8, was Lake Access #13  ‐Define with split rail fencing as this access is tough to navigate  ‐Remove island of brush on south side and return to mow able grade or riprap  ‐Clean out brush and invasive brush along trail on north end all the way to lake edge  ‐Remove large ash tree  ‐Not too desirable of a view/access    Park Drive  Assessment Observations/Recommendations  ‐Make Lake Access #9, was Lake Access #12  ‐Area for parking  ‐Whole access from road could use upkeep.  ‐Path to frontage has failing asphalt and hard to maintain edges; remove stone and weeds and replant  with long grasses around trail  ‐Stairwell down to frontage in disrepair; consider removal of all railroad ties/asphalt and return to turf.  Flatten out area at base by pier for picnic table or permanent bench  ‐Clean up treeline of invasive/junk brush.  ‐Make vista more manageable; access sign seen from lake   ‐Move pier lower if stairwell grade is redone    Kingston Drive  Assessment Observations/Recommendations  ‐Make Lake Access #10, was Lake Access #16  ‐Small pier; everything in good condition as is    Lincoln Drive  Assessment Observations/Recommendations  ‐Make Lake Access #11, was Lake Access #17  ‐Picnic table here in good condition  ‐Do snowmobiles enter here? If so, make more know (signage); current signage denotes no motorized  vehicles…    Oak Grove Drive  Assessment Observations/Recommendations  ‐Make Lake Access #12, was Lake Access #11  ‐Smallest access at 13 feet wide; noted on access signs  ‐Good shape and maintained  ‐Remove No parking signs on telephone poles along oak Grove (put up by neighbors?)    Oak Court (LAUNCH)  Assessment Observations/Recommendations  ‐Make Lake Access #13, was Lake Access #9  ‐Boat Launch here where people pay launch fees/have stickers  ‐Increase launch sticker patrols; however, no parking at this launch as is  ‐Too much signage/references old code numbers; have all launches have the same uniformed signage;  add access point sign here  ‐Cement approach on launch in good condition with cracking; consider replacement in 5 years  ‐Weed conveyor sits here during summer months and there is not ample room for conveyor and  launching of boats  ‐Widen launch; can clean up west side with less maintenance material (currently weeds and could be  groomed gravel); could use east side space to make bigger as city owns while homeowner maintains  ‐Re‐ riprap culvert area/clean up weeds  ‐Paybox cleanup  ‐Improve approach to lake frontage when widening  ‐LML District financial partner here?    Shore Drive  Assessment Observations/Recommendations  ‐Make Lake Access #14, was Lake Access #8  ‐Large pier with lifts for Police boat and Police wave runner  ‐Gravel parking area along road for Police; consider paving in future  ‐Clean up lake frontage; removal of cattails in full or at least around pier access  ‐Neighbor dumping of vegetation has occurred by frontage that needs cleanup  ‐Cleanup of lake frontage will make lake access sign more apparent for lake users  ‐Another good exploited access for paddle boarding/kayaking  ‐Police needs here?    Lochcrest Blvd  Assessment Observations/Recommendations  ‐Make Lake Access #15, was Lake Access #10  ‐Access from end of Lochcrest Blvd and also at north end of Shore Lane. Property actually extends west  to Lochcrest Blvd west as well (See map)  ‐People can park at end of Lochcrest  ‐Remove bad tree that can fall toward lake frontage  ‐Lake access sign needed at end of Shore Lane; maybe Lochcrest west as well (This area is around private  lots though)?  ‐Water frontage has nice pier (ownership unknown?)  ‐Another good exploited access for paddle boarding/kayaking      Hillview Drive (LAUNCH)  Assessment Observations/Recommendations  ‐Make Lake Access #16, was Lake Access #7  ‐Boat Launch here where people pay launch fees/have stickers  ‐Increase launch sticker patrols; however, no parking at this launch as is  ‐Neighbors private subdivision lake frontage lot adjoining to north  ‐Lake access not numbered or signed well here; have all launches have the same uniformed signage; add  access point sign here  ‐Cement approach on launch in good condition with cracking; consider replacement in 5 years  ‐Weed conveyor sits here during summer months with ample room for launch traffic      Lee Hubka Park  Assessment Observations/Recommendations  ‐See Lee Hubka Park Recs  ‐Have sign denoting “LML Channel Access #1” (instead of old Lake Access #4) and have Silver Creek be  Channel Access #2 instead of “Lake Access” point.    Silver Drive  Assessment Observations/Recommendations  ‐Access to Dam along LML Channel; Dam pending removal from WDNR  ‐Remove invasive brush along creek outlet along owned area  ‐Remove old electric box (WE Energies?)  ‐Define access with fence line to avoid west neighbor property issue  ‐Have sign denoting “LML Channel Access #2” (instead of old Lake Access #19) and have Lee Hubka Park  be Channel Access #1 instead of “Lake Access” point.      Idle Isle Park  Assessment Observations/Recommendations  ‐Not a numbered lake access anymore, just main park land  ‐See Idle Isle Park Recs    Big Muskego Lake Boat Launch Assessments – 10/2/15  Present: ComDev Director Jeff Muenkel, Public Works Director David Simpson, Recreation manager  Tammy Dunn, & City Conservationist Tom Zagar    2011‐2016 Plan Recommendations  None    Boxhorn Boat Launch  Assessment Observations/Recommendations  ‐City owns storage building on east end; consider selling to Boxhorn Gun Club but preserve easement to  launch  ‐Redo Signage by launch  ‐Cleanup around sign (use no‐maintenance materials in future; stone)  ‐Remove dumpster  ‐Remove concrete blocks and tower around dumpster  ‐Consider adding new boardwalk with fishing/docking/viewing pier on south side of existing boat launch  pier; would allow area boats to dock and visit commercial entity as well; commercial entity cost sharing?  ‐Add new port‐a‐john plus structure surround  ‐We maintain City portion of parking lot on our own, but usually cost share for the eastern access with  commercial entity and/or Boxhorn Gun Club  ‐Have commercial entity enclose their dumpsters per code    Durham Boat Launch  Assessment Observations/Recommendations  ‐Remove dumpster  ‐Make area no maintenance (no mowing)  ‐Add new port‐a‐john plus structure surround  ‐Remove small pole light along front north portion of launch area; Consider adding a couple lights to  tornado pole to spread light over balance of parking lot.  ‐Remove post (w/out sign) by pier  ‐Remove split rail that is deteriorating around parking lot.  ‐Clean up brush around parking lot (push brush back a bit that is encroaching)  ‐Add better directional signage from overflow lot to main launch (have people cross Durham and use  trail, not private lot owners lots).  ‐Clean up brush along Durham for better view corridors.    ATC Trail Assessments – 10/15/15  Present: ComDev Director Jeff Muenkel    2011‐2016 Plan Recommendations  None    North Trail  Assessment Observations/Recommendations  ‐Public Works installs new millings from west gateway to Woods Road (horse trail portion) in late 2015; install  millings throughout whole trail as work can take place; many parts of trail with some overgrowth and undefined  ‐Crossing of County Hwy L by substation near Broke Spoke bar could use better detail for safety for both trail users  and cars; find way to wrap trail around substation better in future instead of having users go down highway for a  couple hundred feet  ‐First large trail system sign begins at Woods Road (in bad shape)  ‐Various benches exist along trail  ‐Overall signage should be evaluated:  ‐Traffic control signs exist at some locations but not others  ‐Some traffic control signs old and failing  ‐Brown wooden signs old/failing and not at every crossing  ‐First Adopt a Trail sign begins at Woods Road portion; some in bad shape  ‐No gateway signage at west end denoting trail system  ‐First sign is at Crowbar denoting equestrian trail (start/end?)  ‐First map sign is at Crowbar; Map signs built and installed by scout a few years back; map signs facing  west to east  ‐Signage tagged to various posts inconsistently    Hwy 36 Trail  Assessment Observations/Recommendations  ‐Install millings throughout whole trail as work can take place; many parts of trail with some overgrowth and  undefined (especially south of Muskego Dam)  ‐No portion of trail extends northeast into Franklin (stops at North Cape); consider this extension and partnering  with Franklin in future  ‐Need trail to cut thru boulevard of Champions Drive along Hwy 36; currently people have to go around in traffic or  over grass/curb  ‐Remove vision corner shrub along Champions Drive trail portion  ‐No benches exist along trail  ‐Overall signage should be evaluated:  ‐Traffic control signs exist at some locations but not others; especially not found at private driveways  ‐Better traffic control bike crossing signs at intersection of Muskego Dam/Hwy 36 for safety  ‐Some traffic control signs old and failing  ‐No signs about trail in this Hwy 36 portion like found on northern ATC trail  ‐First Adopt a Trail sign begins at North Cape Road portion; in bad shape  ‐No gateway signage at either end denoting trail system  ‐No map signage along this trail system  ‐Opportunities to note environmental areas along trail could be found  ‐Wind Lake Canal Public Access at sound end of trail (which is within Muskego proper) is a great community asset.  Well maintained by WDNR with ample gravel parking. Good place for Muskego signage about trail system  (gateway). Public boat access to Wind Lake; may be more of a sportsman’s entrance as channel is shallow here.  Great pedestrian/bike bridge that is owned/maintained by city is found here. Can be promoted as good fishing  spot and/or fishing access spot.  Environmental education signage location.  Can DNR remove dumpster here?    Other Recs: Update Adopt a Park/Trail/Access Program. Ensure groups continually committed every year. Have  one separate excel table and terms/conditions sheet for all adopt programs      Muskego Club Assessments – 2015    Muskego Youth Football: Meeting on 9/30/15 w/ Bill & Brian    Main Contacts:  Bill Wisialowski (bill.wisialowski@fisglobal.com  414.795.4523)  Brian Roper (roper.b@gmail.com 414‐427‐8732)    Current Facilities Used:  ‐Play all games on Johnson Field at the Muskego High School. Agreement with MNSD to use these  facilities, but have back end priority.  ‐Games played Saturday mornings from Sept‐Oct.  ‐Practices are during weekdays at various locations around Muskego parks including Muskego  Elementary School grounds, Bay Lane Middle School grounds, Mill Valley Elementary School grounds,  Kurth Park, and Lions Park  ‐Practices work around Kickers practices as needed at the above locations  ‐Practices take place from August‐October  # of participants in the 2015 season: 331 players in grades 1‐8 and 65 cheerleaders in grades 5‐8    Future Aspirations:  ‐Would like to have one dedicated game facility that they would invest substantial monies in.  ‐Ideal location would be with the city.  ‐Have $75,000‐$100,000 for investment activities  ‐Need approximately 130 yard x 70 yard area for game day field  ‐Would like availability for electric/water/parking long term (Can have up to 90 cars at a time during  game days)  ‐Would grade area as need be    Staff Recommendations:  ‐Purpose existing open turf area on central area of Denoon Park for long term game day facility for club.  ‐Possibly purpose more of this area for long‐term practice area as well depending on need of baseball  and Kickers here as well.  ‐More parking would be required  ‐Officially designate area for club and let them submit plan of investment (should include phases of  desired buildout: grading, fencing, concessions, stands, parking, water/electric, etc.). City can determine  investment level upon review of plan.           Muskego Kickers Soccer: Meeting on 10/22/2015 w/ Dan & Tracy    Main Contacts:  Dan Salton (muskegodan@gmail.com   Home: (262) 347‐4209/Mobile: (414) 510‐1774)  Tracy Blair (              )    Current Facilities Used:  ‐Season is spring (mid April‐mid June) and fall (Aug‐Nov)  ‐Play all games on Saturday with some Sunday on fields at Kurth (north), Moorland (east), Denoon  (upper)  Manchester Hill, Moorland  ‐Practices are M‐Th on weekdays at various locations around Muskego parks including: Kurth  (middle/south), Moorland, Manchester Hill, Muskego El, Mill Valley, Tess Corners    ‐Practices work around: Park use, Cross Country Meets  ‐Practices take place from Sept to Nov 10 and April to June     # of participants in the 2015 season: 300+ kids on 35 teams; U6‐U10 majority of club with some U10+  here and there (most go on to Select teams); U6 biggest part of club with 60+ kids)    Other notes:  ‐Some other outside Muskego clubs use Denoon (upper) as well without scheduling  ‐Important to note that Milwaukee Kickers oversees all satellite Kickers clubs including Muskego Kickers  club; Milwaukee Kickers overall club has own employed field maintenance staff  ‐Cross Country meets need workarounds sometimes on Lake Denoon in Fall months    Future Aspirations:  ‐More parking at Kurth  ‐Better signage of fields at Kurth  ‐Turf at Moorland could use re‐dressing; Moorland west especially if ever used for soccer  ‐Northern half of Denoon (lower) in rough shape/gets wet      Staff Recommendations:  ‐Have meeting with Milwaukee Kickers Club and how they can utilize their employed maintenance staff  in Muskego. Can Public Works staff share some yearly maintenance duties (filing holes/reseeding, etc.)  with Kickers maintenance staff each year?   ‐Is Muskego County park and option for open turf? Answer: Only open turf area is south of pond and  isn’t a consistent grade. Will not pursue this option further at this time.  ‐Could any outfields of baseball fields be used? Do we want/need to?  ‐Could Jensen become open turf area and/or reclaimed future soccer location?       Muskego Boys Rugby: Meeting on ______ w/ Zach & Jack    Main Contacts:  Zach Albert (Coach) (muskegorugby@gmail.com)  Jack Albert (Dad) (JackA@tcrllc.com)    Current Facilities Used:  ‐Play all games on fields Bluhm Park Fields  ‐Games played on ______________________ (day) from _____________ to _____________ (months)  ‐Practices are during weekdays at various locations around Muskego parks including:  _______________________________________________________________________________  ‐Practices work around: ___________________________________________________________  ______________________________________________________________________________  ‐Practices take place from _____________________________________________________________  ______________________________________________________________________________  # of participants in the 2015 season: ______________    Future Aspirations:          Staff Recommendations:                                  Muskego Girls Rugby: Meeting on ______ w/ Kristin    Main Contacts:  Kristin Stephens (muskegogirlsrugby@gmail.com 414‐702‐0241)    Current Facilities Used:  ‐Play all games on fields Bluhm Park Fields (normally) for fall 2015 at Denoon.  ‐Games played on ______________________ (day) from _____________ to _____________ (months)  ‐Practices are during weekdays at various locations around Muskego parks including:  _______________________________________________________________________________  ‐Practices work around: ___________________________________________________________  ______________________________________________________________________________  ‐Practices take place from _____________________________________________________________  ______________________________________________________________________________  # of participants in the 2015 season: ______________    Future Aspirations:          Staff Recommendations:                                    Muskego Athletic Association: Meeting on 10/20/15 w/ Ed, Jim, & Brian    Main Contacts:  Ed Horwath (President) (edh@themaa.org  baseball/softball)  Jim Becker  (jbecker97@wi.rr.com  football)  Brian Morrow (brianm@themaa.org 262‐391‐0817 Storm Girls Softball)    Current Facilities Used:  Baseball/Softball (Rec program with residency)  ‐1,000 participants in 2015  ‐Teams have one practice a week mainly utilizing Park Arthur, Bluhm, Mill Valley, and sometimes Bay  Lane; High School fields used for games/tournaments only  ‐Games mainly at Park Arthur, Bluhm, Mill Valley, and sometimes Bay Lane; Senior girls sometimes at  junior/varsity High School fields  ‐Season runs from mid May‐mid July  ‐Senior League runs from schools out‐ end of July    Football (Rec program w/o residency)  ‐225 participants in 2015 on 31 teams (Teams age levels: 5/6, 7/8, 9/10, 11/13, future: 14/16)  ‐Practices take place at Bluhm Park North; some teams practice in random open turf areas around city  ‐Games all at Bluhm Park North on Saturdays 8 am  ‐Season runs from Aug.‐mid Oct.    Storm Girls Softball (Rec program w/o residency)  ‐Storm is affiliated with MAA but is the select level above the MAA rec level  ‐~156 participants in 2015 on 13 girls/boys Storm teams  ‐Practice at all Muskego fields; varies on the age of the girls team  ‐Play games at Muskego High School softball fields and Bay Lane #2 for the youngest girls  ‐Game days are usually doubleheaders. Start at 5:30 pm to get in two during a given night (Tues/Weds  nights mainly)    Future Aspirations:  Storm Girls Softball   ‐Have 2 adjoining lighted fields for future softball use. Storm softball could be in another league that  starts doubleheaders at 6:30 if lighted area existed. Consider Mill Valley or more preferably Bluhm north  ‐Ensure base pegs are updated yearly or looked at; many bases not fitting into pegs during year    Baseball/Softball Rec  ‐Bluhm south short on parking during game days  ‐Lights on Bluhm south would expand possibilities for program  ‐Scoreboards at Park Arthur Fields #1‐3; would fundraise  ‐Park Arthur: Playground, remote concession stand closer to Fields #1‐3, Hitting/Pitching Cage by Fields  #1‐3  ‐Ensure base pegs are updated yearly or looked at; many bases not fitting into pegs during year  ‐Bay Lane fields could use work; balls roll back into fair territory along foul line base paths; #1 gets  parking lot drainage and could be re‐graded; #3 issues in past as well  ‐Mill Valley fields have lip along outfield grass, not an even grade    Football  ‐Have lights at Bluhm; can fit three (3) nice fields here and lights would open up other game/practice  days during week; have 300+ people on Saturday mornings  ‐Don’t like Denoon alternative for proximity, thus, sharing with Muskego Football Club not valid option.    FINANCES: No real cash on hand for major improvements (all in on Park Arthur); However, could  fundraise for specific items as need be.    Staff Recommendations:                                     Muskego Select Baseball Groups: Meeting on 10/23/15 w/ David, Paul, Jim, Tim, & Mike    Main Contacts:    Storm Boys –  David Brandstatter  414‐406‐1568    david.brandstatter@kone.com    Paul Peardon  414‐254‐4488  paulpeardon@gmail.com  Warriors ‐  Jim Prusinski  414‐690‐9711  jdp@paceelectricinc.com  Rebels  Tim Kleiman  414‐333‐0548  tkleiman@inprocorp.com    Richard Stathus  414‐422‐9795  richstat@sbcglobal.net  Impact  Brian Prusinski  414‐897‐1420  bgprusinski@gmail.com  Avalanche Mike Dunn  262‐939‐6768  dunnz4@outlook.com   Raiders‐ Brian Schwager  414‐477‐1814  b.d.schwager@na.modine.com      Current Facilities Used:  ‐Games played every day of the week including weekend games/tournaments  ‐Game Field use is late‐April (when dry enough for use) through August for many of the programs.  ‐Practices are during weekdays/weekends at various locations around Muskego parks including Bluhm,  Denoon, Horn, Jensen, Kurth, Park Arthur and school district fields at Bay Lane and Mill Valley  ‐Practices work around park rentals at Bluhm and school events on the school fields  ‐Practices take place from April‐October    ‐Rebels and Avalanche practice and play at Horn only    ‐Denoon field not great and rarely used; very wet at times    # of participants in the 2015 season:  Storm Boys ‐84 participants U8‐U14 (Muskego Only)  Warriors ‐ 78 participants U8‐U14   boys/girls?  Rebels – 11 or 24 participants  boys/girls?  Age group? (done in approx. 2 years)  Impact – 11 participants  boys/girls?   Age group?  Avalanche – 11 or 24 participants   boys/girls?    Age group?  Raiders – 1 team (done after 2015 season)  boys/girls?  Age group?  160+ families    Future Aspirations:  ‐Continue field reserving program!  ‐Park Arthur Field #4 needs more ADA accommodations closer to backstop area  ‐Desire bullpen/batting cages up around Fields #2‐3 in Park Arthur (Cost share opportunity w/ City and  MAA)  ‐Re‐seed Park Arthur Fields #1‐3 and surrounds  ‐Add scoreboards to #1‐4 (Cost share opportunity w/ City and MAA)  ‐Add lighting to Park Arthur fields or even some to Bluhm to open up more field time; would open up  weekly fields then as well.  ‐Lighting at Horn could open up more field time as well.  ‐Kurth north needs tree trimming along right field line; needs new fencing (current curled); homerun  fence (have money possibly for fencing help)  ‐Horn has poor left field drainage that could use a look at for re‐grading; bullpens need better  maintenance; scoreboard needs to be brought back to life if possible; remove old fence to open up  parking lot  ‐Bay Lane #3 has grade issues  ‐City should market Park Arthur more  ‐Segregate monies made form Park Arthur rentals to go back to maintenance and new amenities at  baseball fields        Staff Recommendations:  ‐Figure out way to continue current field reservation program  ‐Mick re‐seeded Park Arthur #4 a year ago and worked well; touch base with Mick of cost and best time  if we re‐seeded rest of fields and surrounds.  ‐Look into cost of lighting at a field or two as well as cost sharing  ‐Bring together MAA and baseball clubs for possible cost sharing of scoreboards and/or bullpens at Park  Arthur fields  ‐Remove fence in parking lot at Horn and look to other ways to upgrade Horn field and surrounds; make  scoreboard work  ‐Aid tree trimming of right field at Kurth north; look into cost of re‐fencing Kurth north and see about  cost sharing with teams  ‐Add ADA accommodations to Park Arthur Field #4     CITY OF MUSKEGO Staff Report to Parks & Conservation Committee November 3, 2015 Meeting To: Common Council From: Jeff Muenkel, AICP EDFP Subject: Aster Hills Estates Neighborhood Park Name Date: October 22, 2015 The Committee should continue discussion on a future name for the Aster Hills Estates Subdivision neighborhood park area. The Committee asked staff to look into some history and that information can be found below. A general Muskego name or a particular historical related name could work. Any ideas are encouraged! Staff is particular fond of bulletpoint #2 due to the good history behind it.  The previous property owner of this parcel had been under the name “Kolaga” for only about the past decade. Before that however it was owned by the “Schaefer” family for more than 80 years prior. This same Schaefer family owned and farmed many more acres of Muskego land to the north as well during this time period.  There is a group that is still in existence today named the Sandhill Booster Club that gives back to less fortunate people. The group was formed in 1956 by a group of farmers who happened to include the “Schaefer” famers that owned the Aster Hills land (as noted above). As a matter of fact, the name “sandhill” for the booster club came when one of the farmers looked up at his hill of farmland close by and thought of sandhill due to the farmland being so flush with natural sand. This sandhill they were looking at happens to be the same land Aster Hills Estates sits today. Sandhill Park??  We also uncovered the early Indian Chief’s name who oversaw the Little and Big Muskego Lake areas. While we thought that may be a unique name it was found that the history of that particular Chief may not suit us the best.  We did find that one of the first settlers to dwell here, among the Potawatomi Tribe of Indians, was a French trader named Amable Vieau (Pronounced: “Vo”). It appears Mr. Vieau lived closer to Little Muskego Lake though. Here is an excerpt from the Muskego Historical Society’s Webpage about Mr. Vieau: Amable Vieau First Known White Man in Muskego Amable Vieau was the son of Jacques Vieau, the noted fur trader and father -in- law of Solomon Juneau. He was born in Green Bay, Wi. Amable settled among the Potowatomie people in Waukesha County in 1825 and furnished them with calico, beads, tobacco and ammunition in exchange for fur pelts. He was known to have mastered nine tribal dialects from his long association with the native peoples. After the fur trade concluded, according to an article in the Waukesha Freeman upon his death in November 1887, "Mr. Vieau selected a location in the present town of Muskego and became a farmer there, hunting and trapping, however, in proper season. Of powerful and robust figure, with ever healthful spirits and an overwhelming tendency to prevent suffering and distress whenever possible, he lived as a patriarch among his neighbors at Muskego til a new civilization had grown on about him and the last of his Pottawattomie friends had departed forever. Let the name of of Amable Vieau be held in honor and respect in this part of Wisconsin as that of a manly Christian of innumerable virtues and without malice, hatred or uncharitableness". A month after his death, an article in the Waukesha Freeman notes, "The wife of Amable Vieau, at Muskego, has been allowed 320 acres of land in the Indian territory by the government, the share of the allotment to the Indians, to which her husband was entitled". He is not credited with being Muskego's first white settler but he wa s living in Muskego before any other known white man arrived. -New 10’ high fencing CITY OF MUSKEGO Staff Report to Parks & Conservation Committee November 3, 2015 Meeting To: Common Council From: Jeff Muenkel, AICP EDFP Subject: 2016 Budget Items Date: October 22, 2015 Staff wanted to update the Committee on the 2016 budget. The Council approved the 2016 budget on Tuesday October 27, 2015. Thus the following Parks related projects are good for the year 2016. Staff will keep the Committee updated as these projects get designed and ultimately bid in early 2016.  Aster Hills Neighborhood Park: $200,000 for initial grading and seeding  Pickleball Courts at Lions Park: $15,000 (with $5,000+ in private funding)  Park Arthur Baseball Fencing: $32,000  Hwy OO Rec Trail (Design and Construction): $540,000  Martin Drive Rec Trail from Janesville to Lannon (Design only): $60,000  Woods Road Rec Trail from Racine to Windover (Design and Construction) & from Windover to Janesville (Design only): $275,000 ~7,500 SF of surface -Add 3 Pickleball Courts here -New 10’ high fencing -New 10’ high fencing -New 10’ foot high fencing Page 1 of 2 CITY OF MUSKEGO Staff Report to Parks and Conservation Committee To: Parks and Conservation Committee From: David Simpson, P.E., Director of Public Works/City Engineer Subject: Director of Public Works Report Date: October 27, 2015 I have included general information and project specific updates related to Parks maintenance for your use. Should any questions arise please don’t hesitate to contact me directly. Maintenance Items  Fox Services LLC has been completing Lawn Mowing and Grounds Maintenance for the contracted parks and certain facilities. We have not had any resident concerns.  Denoon Park Split Rail Fence- Split rail fencing located at Denoon Park is in need of repairs. The vast majority of the fence is rotted or damage beyond repair and would need to be replaced. I would like to discuss this at a future meeting including the possibility of removing the fence completely. Facilities  Horn Park Building- Demolition of the oldest portion of this building is underway. DPW crews have completed demolition and contractors have been hired to complete the plumbing, electrical, and new wall construction. I hope to complete the project within the next 4-6 weeks. We will also be setting the garage area up in the existing building for the Recreation Department to have additional dedicated storage of their own. 2015 Park Improvements  Denoon Park- All roadways, parking lots, and the basketball court have been resurfaced in conjunction with the 2015 road program.  Park Arthur- A paved pathway leading from the north parking lot to the three northern baseball fields and back to the pavilion has been completed. Concrete pads have been added to the dugouts of the three small fields as a separately quoted project which we expect to start in the next few weeks. The dugouts are also being fenced in at the expense of the baseball organizations in the coming weeks.  Bluhm Park- The Developer of Belle Chasse Subdivision has completed the boardwalk improvement, Rugby field and walkway from Durham Drive to the Park. The field will likely be ready for play no earlier than the fall of 2016 or spring of 2017.  WE Energies Trail Improvement- The City retained all asphalt millings as part of the 2014 and 2015 road improvement programs in order to utilize Page 2 of 2 them to construct and repair gravel recreational pathways with a very low material cost. We have utilized all available materials and have constructed the pathway from the western border of the City to Lannon Drive. We will continue placement in future years as more material becomes available. I did receive one complaint regarding the material not compacting well enough for bike riding. I am hopeful that it just needs time to compact with rain because we haven’t received complaints about the section that was done years ago with the same material. Please let me know if anyone else has the same concern. Memo To: Parks and Conservation Committee From: Tom Zagar CC: Jeff Muenkel Date: October 28, 2015 Re: Conservation Coordinator Report The following is an update of projects related to Lakes, Forestry, and Conservation:  Marine Biochemists has essentially completed the assessment of the aquatic plant community of Big Muskego Lake. This survey will provide data as to the make-up of plants in Big Muskego Lake and Bass Bay which is especially important in light of the Starry Stonewort invasion.  The annual drawdown on Little Muskego Lake is underway and will lower the lake approximately 2 feet. Staff recently removed the informational buoys regarding Starry Stonewort in the “Hillview Drive” Bay.  Earth work has been completed on the Big Muskego Lake State Wildlife Area (BMLSWA) wetland restoration project outlined in previous reports to this committee. The site is already capturing more water in its shallow ponds and bermed areas. We will plant the area this fall with a diversity of prairie and wetland plant species with seed purchased and significant amounts collected by volunteers. As noted earlier this MMSD grant funded project will be completed by the year’s end. Coordination with our partners Ducks Unlimited and Wisconsin DNR has been good, resulting in this project proceeding relatively smoothly.  On October 15 the Muskego High School Science Club visited Badertscher Preserve where they took an interpretive hike with the Conservation Coordinator. They spent a portion of their time collecting prairie seed that will be utilized in the aforementioned wetland restoration project.  The Conservation Coordinator met with the Muskego-Norway School District Superintendent Dr. Kelly Thompson and Scott Schenke - a representative from the area’s Rotary Club (Whitnall Park Rotary) to discuss restoration of school district land adjacent to Engel Conservation Area. This project could form a greater contiguous area of conservancy and provide opportunities for student participation in restoration projects as well as creating an area more proximate to the high school for outdoor classroom activities.  Fall is the time we will resume the ongoing task of controlling invasive shrubs in conservation sites. A group from Fox River church has shown interest in volunteering to assist us and other shrub removal will be completed by a contractor. Community Development Department  Page 2  We have submitted a DNR Urban Forestry grant to help fund tree care needs. If successful, the grant will provide funding for staff training, purchase of equipment, tree pruning, and treatment of ash trees for Emerald Ash Borer. CITY OF MUSKEGO Staff Report to Parks & Conservation Committee November 3, 2015 To: Parks & Conservation Committee From: Tammy Dunn, Recreation Manager Subject: Recreation Program Miscellaneous Updates Date: October 28, 2015 Please find the following items in relation to various recreation programs/activities in the city. Such items don’t require committee action but can certainly be discussed during the Miscellaneous Business portion of the meeting. 1. We are currently finishing up the Winter/Spring Program Guide. By meeting time, the guide should be at the printer and mailed the week of November 9. We will be back up to 64 pages. With the loss of the swim program at Franklin, we had a smaller book in the fall, but have added more programming and gone back up to the 64 page guide as in past years. This guide will also include a 4 page pullout for the refuse/recycling schedule for the city. 2. We have been working with the Muskego Festival Committee to finalize a new agreement o f the storage area at Veterans Memorial Park shelter as the current agreement was up in June. An extension was approved by the Parks and Conservation Committee to extend the agreement through the end of the year. A finalized agreement will be presented at the December Parks & Conservation Committee meeting. 3. Muskego Chamber will be using the Old Settlement Centre and Old Town Hall for their annual Country Christmas on Saturday, November 21. This event encompasses the entire settlement area, both upper and lower levels of the Old Town Hall and the park and boardwalk. We have seen an increase in rental of the Old Town Hall. In 2014 we had a total of 11 rentals, with a revenue of $1,145.00. For 2015, we currently have had a total of 25 rentals, with a revenue of $4,435.00. We still have openings for rentals in both November and December. 4. Rentals of our facilities were up as a whole for 2015. This year we brought in $8,090 in rentals as compared to $3,890 in 2014.