COMMITTEE OF THE WHOLE Packet - 8/20/2015
CITY OF MUSKEGO
COMMITTEE OF THE WHOLE AGENDA
August 20, 2015
6:00 PM
City Hall, W182 S8200 Racine Avenue
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
STATEMENT OF PUBLIC NOTICE
APPROVAL OF AGENDA
APPROVAL OF MINUTES - July 28, 2015
NEW BUSINESS
1. Capital Fund Budgets - Expenditure & Borrowing
a. Police
b. IT
c. Library
d. Engineering/DPW/Utilities
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
ADJOURNMENT
Possible reconvening of the Committee of the Whole immediately following Common Council
Meeting of the same date to continue work on agenda items
NOTICE
IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF
THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION
WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL
BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE.
ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS
SERVICE, MUSKEGO CITY HALL, (262) 679-4100.
Unapproved
CITY OF MUSKEGO
COMMITTEE OF THE WHOLE MINUTES
July 28, 2015
6:10 PM
City Hall, W182 S8200 Racine Avenue
CALL TO ORDER
Mayor Chiaverotti called meeting to order at 6:10 pm
PLEDGE OF ALLEGIANCE
ROLL CALL
Present: Ald. Wolfe, Hammel, Borgman, Engelhardt, Kubacki, Madden and Kapusta. Also
present Deputy Clerk Blenski, Director Simpson and Utility Superintendent Kloskowski.
STATEMENT OF PUBLIC NOTICE
Deputy Clerk Blenski stated the meeting was properly noticed.
APPROVAL OF AGENDA
APPROVAL OF MINUTES - July 14, 2015
Alderman Borgman made a motion to approve July 14, 2015 minutes.
Alderman Kubacki seconded.
Motion passed 7 in favor.
NEW BUSINESS
1. Facility Needs Department of Public Works
John Sabinash of Zimmerman Architecural Studios, Inc. presented a review of the Public
Works and Utility Facilities.
Mayor Chiaverotti and Director Simpson initiated discussion regarding the City aquiring an
adjacent one-acre property. The current owner intends to relocate within the City. There is
already a building on the property, which means the City would not have to spend on the cold
storage building, with property allowing for future growth. The consensus was that Director
Simpson should proceed to research the aquisition. This will be discussed further at the
upcoming COW budget meeting.
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
ADJOURNMENT
Possible reconvening of the Committee of the Whole immediately following Common Council
Meeting of the same date to continue work on agenda items
Alderman Madden made a motion to adjourn at 6:47 pm.
Alderman Kubacki seconded.
Motion passed 7 in favor.
PROPOSED
5-YEAR CAPITAL PLAN
2016 - 2020
Prepared by
City of Muskego
Finance & Administration Department
Thursday, August 20, 2015
W182 S8200 Racine Avenue, Muskego, WI 53150-0749
Waukesha County, Wisconsin
(262) 679-4100
Table of Contents
5-Year Capital Improvements Program
2016 – 2020
I
2016 Capital Expenditure Summary ......................................................... 1
Summary of All Projects .......................................................................... 2
Detailed 5-Year Project Description ......................................................... 3
Finance & Administration .......................................................................... 5
– Election Equipment .................................................................. 5
Building Maintenance ................................................................................. 6
– Facilities Planning – City Hall ..................................................... 6
– Agricultural Farm Barn Repairs/Roof ......................................... 7
Information Technology ............................................................................. 8
– Core Switch ................................................................................ 8
– UPS Batteries ............................................................................. 9
– Aristotle Insight Software ............................................................ 10
– Switch Replacement ................................................................... 11
– Microsoft Exchange Upgrade ..................................................... 12
– Email Archiving ........................................................................... 13
– Multi-Function Print Device Replacements ................................ 14
Police .......................................................................................................... 15
– Tactical Team Headset Replacement ...................................... 15
– Police Facility ............................................................................ 16
– Officer Body Camera ................................................................ 17
– Water Patrol Boat Replacement ............................................... 18
– Additional Patrol Vehicle .......................................................... 19
– Taser Replacement .................................................................. 20
Table of Contents
5-Year Capital Improvements Program
2016 – 2020
II
TC Volunteer Fire Department ................................................................. 21
– Pager Replacements ................................................................ 21
Library ........................................................................................................ 22
– Outdoor Lighting Improvements ............................................... 22
– Carpeting .................................................................................. 23
Public Works – Engineering Division ...................................................... 24
– Moorland Reconstruction .......................................................... 24
– Baylane Drive Reconstruction .................................................. 25
– Hillendale Drive Phase I & II ..................................................... 26
Public Works Division ............................................................................... 27
– Industrial Park Lighting ............................................................. 27
– Pick-Up Truck Replacement .................................................... 28
– Front End Loader ..................................................................... 29
– Light Duty Boom Truck ............................................................. 30
– Skid Loader w/ Bucket ............................................................. 31
– Stump Grinder .......................................................................... 32
– Salt Shed Garage Door ............................................................ 33
– City Garage Maintenance/Addition (70%) ................................ 34
– Motor Grader ............................................................................ 35
– Cargo Van ................................................................................ 36
– Asphalt Roller ........................................................................... 37
– Replace Tri-Deck Mower .......................................................... 38
– Replace Roadside Mower ........................................................ 39
– Back Hoe .................................................................................. 40
Table of Contents
5-Year Capital Improvements Program
2016 – 2020
III
Water Utility ............................................................................................... 41
– Meters ....................................................................................... 41
– Truck ......................................................................................... 42
– City Garage Maintenance/Addition (15%) ................................. 43
– Water Tower Painting ................................................................ 44
– Well #4 Abandonment ............................................................... 45
– Water Tower Cleaning & Inspections ........................................ 46
– Hillendale Booster Station ......................................................... 47
Sewer Utility ..................................................................................... 48
– Truck ......................................................................................... 48
– City Garage Maintenance/Addition (15%) ................................ 49
– Private Property I & I ................................................................ 50
– Communication Controls Radio ................................................ 51
– Lift Station Upgrades ................................................................ 52
– Camera ..................................................................................... 53
Special Revenue Funds .................................................................. 54
– Storm Water Management – Lake Street ................................. 54
– Storm Water Management - Flintlock ....................................... 55
– Park Dedication/Improvement Projects .................................... 56
CAPITAL CAPITAL PARK STORM WORKING
PROJECT DEPARTMENT EXPENDITURE BORROWING DEDICATION WATER CAPITAL TOTAL
FUNDING (Landfill)(Utilities)
ELECTION EQUIPMENT (Council Approved 5/26/15) FINANCE & ADMINISTRATION $8,382 $8,382
AGRICULTURAL FARM BARN REPAIRS/ROOF BUILDING MAINTENANCE $14,000 $14,000
COOR SWITCH INFORMATION TECHNOLOGY $9,500 $9,500
UPS BATTERIES INFORMATION TECHNOLOGY $5,000 $5,000
ARISTOTLE INSIGHT SOFTWARE INFORMATION TECHNOLOGY $14,000 $14,000
TACTICAL TEAM HEADSET REPLACEMENT POLICE $8,000 $8,000
REPLACEMENT PAGERS TC VOLUNTEER FIRE DEPT $6,550 $6,550
OUTDOOR LIGHTING IMPROVEMENTS LIBRARY $14,535 $14,535
CARPETING LIBRARY $30,000 $30,000
MOORLAND RECONSTRUCTION DPW-ENGINEERING $40,000 $40,000
BAYLANE DRIVE RECONSTRUCTION DPW-ENGINEERING $160,000 $160,000
INDUSTRIAL PARK LIGHTING DPW $20,000 $20,000
PICKUP TRUCK REPLACEMENT DPW $40,000 $40,000
FRONT END LOADER DPW $178,000 $178,000
LIGHT DUTY BOOM TRUCK DPW $80,000 $80,000
SKID LOADER W/ BUCKET DPW $68,000 $68,000
STUMP GRINDER DPW $9,000 $9,000
SALT SHED GARAGE DOOR DPW $12,000 $12,000
CITY GARAGE MAINTENANCE/ADDITION DPW & UTILITIES $3,969,500 $700,500 $4,670,000
METERS WATER UTILITY $75,000 $75,000
TRUCK WATER UTILITY $17,500 $17,500
TRUCK - 25% DPW REIMBURSEMENT WATER UTILITY $46,250 $46,250
WATER TOWER PAINTING WATER UTILITY $350,000 $350,000
WELL #4 ABANDONMENT WATER UTILITY $30,000 $30,000
TRUCK SEWER UTILITY $17,500 $17,500
TRUCK - 25% DPW REIMBURSEMENT SEWER UTILITY $46,250 $46,250
PRIVATE PROPERTY I & I (MMSD Reimbursement)SEWER UTILITY $250,000 $250,000
COMMUNICATION CONTROLS RADIO SEWER UTILITY $30,000 $30,000
LAKE STREET STORM SEWER STORMWATER $85,000 $85,000
FLINTLOCK STORM SEWER STORMWATER $75,000 $75,000
PARKS PROJECTS PARK DEDICATION/IMPROVE $1,095,000 $1,095,000
TOTAL CAPITAL PORJECTS $716,967 $4,458,250 $1,095,000 $160,000 $1,074,250 $7,504,467
(Debt Issuance)
CITY OF MUSKEGO - 2016 BUDGET
CAPITAL EXPENDITURE SUMMARY
(Landfill)(Landfill)
Page 1
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
2016 - 2020 Totals
A. PROJECT IDENTIFICATION
1. Project Name:Summary of All Projects
2. Department:All Departments
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 1,242,146 406,432 398,982 203,532 158,200 75,000
Vehicle Replacement 553,000 155,000 148,000 40,000 130,000 80,000
Arch/Engineering 894,000 569,000 150,000 0 175,000 0
Land/ROW/Site Prep 440,000 10,000 80,000 150,000 0 200,000
Construction 27,392,000 4,777,000 19,550,000 900,000 1,765,000 400,000
Other 2,220,785 1,587,035 418,125 70,000 71,875 73,750
TOTAL 32,741,931 7,504,467 20,745,107 1,363,532 2,300,075 828,750
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.532,750 30,000 117,125 120,000 121,875 143,750
601 Sewer Working Cap.1,188,250 794,250 169,000 70,000 135,000 20,000
401 GO Borrowing 24,094,000 3,269,000 19,250,000 0 1,575,000 0
Water Borrowing 1,939,250 1,189,250 350,000 0 0 400,000
Sewer Borrowing 000000
410 Capital Expenditure 2,732,681 716,967 608,982 923,532 218,200 265,000
202 Park Dedication &1,095,000 1,095,000 0000
203 Park Improvements
216 Storm Water 160,000 160,000 0000
503 Library Funds 000000
601 Other Funding - MMSD 1,000,000 250,000 250,000 250,000 250,000 0
TOTAL 32,741,931 7,504,467 20,745,107 1,363,532 2,300,075 828,750
Check Total (0) (0) (0) (0) 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 000000
2. Materials 000000
3. Total Cost 000000
4. Offsetting Rev or Savings 000000
5. Net impact 000000
Page 2
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION 2016 - 2020
Page Totals 2016 2017 2018 2019 2020
General Government
Finance & Administration
Election Equipment 5 25,146 8,382 8,382 8,382 - -
Total 25,146 8,382 8,382 8,382 - -
Building Maintenance
Facilities Planning - City Hall 6 4,000,000 - 4,000,000 - - -
Agricultural Farm Barn Repairs/Roof 7 14,000 14,000 - - - -
Total 4,014,000 14,000 4,000,000 - - -
Information Technology
Core Switch 8 9,500 9,500 - - - -
UPS Batteries 9 5,000 5,000 - - - -
AristotleIInsight Software 10 14,000 14,000 - - - -
Switch Replacement 11 20,000 - 20,000 - - -
Microsoft Exchange Upgrade 12 7,000 - 7,000 - - -
Email Archiving 13 6,500 - 6,500 - - -
Multi-Function Print Device Replacements 14 22,500 - - 7,500 - 15,000
Total 84,500 28,500 33,500 7,500 - 15,000
Total General Government 4,123,646 50,882 4,041,882 15,882 - 15,000
Public Safety
Police Department
Tactical Team Headset Replacement 15 8,000 8,000 - - - -
Police Facility 16 13,000,000 - 13,000,000 - - -
Officer Body Camera 17 100,000 - 100,000 - - -
Water Patrol Boat Replacement 18 15,000 - - 15,000 - -
Additional Patrol Vehicle 19 35,000 - - - 35,000 -
Tasr Replacement 20 10,000 - - - - 10,000
Total 13,168,000 8,000 13,100,000 15,000 35,000 10,000
TC Volunteer Fire Department
Replacement Pagers 21 29,500 6,550 7,100 7,650 8,200 -
Total Public Safety 13,197,500 14,550 13,107,100 22,650 43,200 10,000
Recreation & Education
Library
Outdoor Lighting Improvements 22 14,535 14,535 - - - -
Carpeting 23 90,000 30,000 20,000 20,000 20,000 -
Total 104,535 44,535 20,000 20,000 20,000 -
Total Recreation & Education 104,535 44,535 20,000 20,000 20,000 -
Page 3
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION 2016 - 2020
Page Totals 2016 2017 2018 2019 2020
Public Works
PW-Engineering
Moorland Reconstruction 24 720,000 40,000 80,000 600,000 - -
Baylane Drive Reconstruction 25 2,410,000 160,000 2,250,000 - - -
Hillendale Drive Phase I & II 26 2,075,000 - 150,000 150,000 1,575,000 200,000
Total 5,205,000 200,000 2,480,000 750,000 1,575,000 200,000
Department of Public Works (DPW)
Industrial Park Lighting 27 20,000 20,000 - - - -
Pickup Truck Replacement 28 185,000 40,000 50,000 - 55,000 40,000
Front End Loader 29 178,000 178,000 - - - -
Light Duty Boom Truck 30 80,000 80,000 - - - -
Skid Loader w/ Bucket 31 68,000 68,000 - - - -
Stump Grinder 32 9,000 9,000 - - - -
Salt Shed Garage Door 33 12,000 12,000 - - - -
City Garage Maint/Add (DPW & Utilities) 34 3,269,000 3,269,000 - - - -
Motor Grader 35 100,000 - 100,000 - - -
Cargo Van 36 60,000 - 60,000 - - -
Asphalt Roller 37 50,000 - - 50,000 - -
Replace Tri-Deck Mower 38 40,000 - - 40,000 - -
Replace Roadside Mower 39 25,000 - - 25,000 - -
Back Hoe 40 100,000 - - - 100,000 -
Total 4,196,000 3,676,000 210,000 115,000 155,000 40,000
Total Public Works 9,401,000 3,876,000 2,690,000 865,000 1,730,000 240,000
Total General Fund 26,826,681 3,985,967 19,858,982 923,532 1,793,200 265,000
Utilities
Water Utility
Meters 41 275,000 75,000 50,000 50,000 50,000 50,000
Truck 42 346,500 63,750 67,125 70,000 71,875 73,750
City Garage Maint/Add (DPW & Utilities) 43 700,500 700,500 - - - -
Water Tower - Painting 44 700,000 350,000 350,000 - - -
Well #4 Abandonment 45 30,000 30,000 - - - -
Water Tower Cleaning & Inspections 46 20,000 - - - - 20,000
Hillendale Booster Station 47 400,000 - - - - 400,000
Total 2,472,000 1,219,250 467,125 120,000 121,875 543,750
Sewer Utility
Truck 48 142,750 63,750 19,000 20,000 20,000 20,000
City Garage Maint/Add (DPW & Utilities) 49 700,500 700,500 - - - -
Private Property I & I 50 1,000,000 250,000 250,000 250,000 250,000 -
Communication Controls Radio 51 30,000 30,000 - - - -
Lift Station Upgrades 52 215,000 - 50,000 50,000 115,000 -
Camera 53 100,000 - 100,000 - - -
Total 2,188,250 1,044,250 419,000 320,000 385,000 20,000
Total Utilities 4,660,250 2,263,500 886,125 440,000 506,875 563,750
Special Revenue Funds
Storm Water Management-Lake Street 54 85,000 85,000 - - - -
Storm Water Management-Flintlock 55 75,000 75,000 - - - -
Park Dedication 56-57 1,095,000 1,095,000 - - - -
Total 1,255,000 1,255,000 - - - -
GRAND TOTAL 32,741,931 7,504,467 20,745,107 1,363,532 2,300,075 828,750
Page 4
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Election Equipment
2. Department:Finance & Administration
3. Description:Council authorized approval of election equipment contract governmental agreement with
Waukesha County on May 26th, 2015. The City will be billed for 1/3 of the total cost (less
trade-ins) over a 3-year period, non-interest bearing.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 25,146 8,382 8,382 8,382 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 25,146 8,382 8,382 8,382 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 25,146 8,382 8,382 8,382 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 25,146 8,382 8,382 8,382 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:
410.08.90.02.6506
Page 5
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Facilities Planning
2. Department:Building Maintenance
3. Description:Various studies have been provided by Zimmerman Architectural Studies Inc. Committee
discussions lean towards maintaining a Police/City Hall campus whether at the current or a new
location. Project time period spans over 3 years with an estimated cost for all projects
combined in excess of $18,000,000.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 4,000,000 0 4,000,000 0 0 0
Testing 000000
Other 000000
TOTAL 4,000,000 0 4,000,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 4,000,000 0 4,000,000 0 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 4,000,000 0 4,000,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
401.08.90.09.6550
Page 6
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Agricultural Farm Barn Repairs/Roof
2. Department:Building Maintenance
3. Description:An initial structural analysis was completed for the Agricultural Farm Barn in order to determine
what work would be needed to bring the structure into conformance with modern building codes
so that the building can be occupied. An additional $4,000 is needed for final design and
inspection for engineering. If volunteers and city crews complete the anticipated work (which
includes reroofing the building wings) the material cost would likely be no greater than $10,000.
If a contractor is needed the cost would increase.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 00000 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 4,000 4,000 0 0 0 0
Land/ROW/Site Prep 00000 0
Construction 10,000 10,000 0 0 0 0
Testing 00000 0
Other 00000 0
TOTAL 14,000 14,000 0 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.00000 0
601 Sewer Working Cap.00000 0
410 Trnsfr w/in CPF 00000 0
401 GO Borrowing 00000 0
Water Borrowing 00000 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 14,000 14,000 0 0 0 0
202 Park Ded. Funds 00000 0
Cable Funds 00000 0
Stormwater Funds 00000 0
Other Source-Cable 00000 0
TOTAL 14,000 14,000 0 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:8/1/2002
Revised Date:8/8/2003
7/13/2004
410.08.90.09.6504
Page 7
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Core Switch
2. Department:Information Technology
3. Description:Replacement of data center core network switch.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 9,500 9,500 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 9,500 9,500 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 9,500 9,500 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 9,500 9,500 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.90.14.6514
Page 8
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:UPS Batteries
2. Department:Information Technology
3. Description:Replacement of data center UPS batteries
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 5,000 5,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 5,000 5,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 5,000 5,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 5,000 5,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.90.14.6515
Page 9
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:AristotleInsight Software
2. Department:Information Technology
3. Description:IT compliance, governance and metrics reporting software.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 14,000 14,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 14,000 14,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 14,000 14,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 14,000 14,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.90.14.6519
Page 10
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Switch Replacements
2. Department:Information Technology
3. Description:Replace all non POE HP procurve switches at all city facilities.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 20,000 0 20,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 20,000 0 20,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 20,000 0 20,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 20,000 0 20,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/8/2003
Revised Date:7/29/2014
410.08.90.14.6513
Page 11
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Microsoft Exchange Upgrade
2. Department:Information Technology
3. Description:Email system upgrade
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 7,000 0 7,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 7,000 0 7,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 7,000 0 7,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 7,000 0 7,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/19/2010
Revised Date:7/29/2014
7/20/2015
410.08.90.14.6520
Page 12
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Email Archiving
2. Department:Information Technology
3. Description:Replace existing email archiving appliance.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 6,500 0 6,500 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 6,500 0 6,500 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 6,500 0 6,500 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 6,500 0 6,500 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/10/2009
Revised Date:7/21/2014
7/20/2015
410.08.90.14.6518
Page 13
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Multi-Function Printing Device Replacements
2. Department:Information Technology
3. Description:Finance & Admin - 2018
Library & Recreation - 2020
PW - 2022
Police & CDD - 2025
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 22,500 0 0 7,500 0 15,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 22,500 0 0 7,500 0 15,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 22,500 0 0 7,500 0 15,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 22,500 0 0 7,500 0 15,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/29/2013
Revised Date:7/21/2014
410.08.90.14.6503
Page 14
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Tactical Team Headset Replacement
2. Department:Police Department
3. Description:Replace 13+ year old headsets for communicating during tactical situations.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 8,000 8,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 8,000 8,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 8,000 8,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 8,000 8,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2013
Revised Date:7/21/2014
410.08.91.20.6511
Page 15
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Police Facility
2. Department:Police Department
3. Description:Construction of new Police facility to replace existing building.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 13,000,000 0 13,000,000 0 0 0
Testing 000000
Other 0 0000
TOTAL 13,000,000 0 13,000,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 13,000,000 0 13,000,000 0 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 13,000,000 0 13,000,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2007
Revised Date:
401.08.91.20.6550
Page 16
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Officer Body Camera
2. Department:Police Department
3. Description:Individual body worn camera for each officer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 100,000 0 100,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 100,000 0 100,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 100,000 0 100,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 100,000 0 100,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/1/2015
Revised Date:
410.08.91.20.6512
Page 17
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Water Patrol Boat Replacement
2. Department:Police Department
3. Description:Replace 15 year old boat which is used to patrol lakes within the City of Muskego.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 15,000 0 0 15,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 15,000 0 0 15,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 15,000 0 0 15,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 15,000 0 0 15,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6513
Page 18
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Police Patrol Vehicle
2. Department:Police Department
3. Description:Add an additional patrol vehicle to police fleet.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 35,000 0 0 0 35,000 0
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 35,000 0 0 0 35,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 35,000 0 0 0 35,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 35,000 0 0 0 35,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.91.20.6517
Page 19
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Taser Replacement
2. Department:Police Department
3. Description:Replace 10+ year old Tasers
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 10,000 000010,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 10,000 000010,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 10,000 000010,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 10,000 000010,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/21/2014
Revised Date:
Revised Date:
410.08.91.20.6518
Page 20
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Equipment
2. Department:Tess Corners Volunteer Fire Department
3. Description:10 replacement pagers for toning out fire and rescue calls @ $600 each (2015 - 2019).
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 29,500 6,550 7,100 7,650 8,200 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 29,500 6,550 7,100 7,650 8,200 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 29,500 6,550 7,100 7,650 8,200 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 29,500 6,550 7,100 7,650 8,200 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:
401.08.91.21.6504
Page 21
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Outdoor Lighting Improvements
2. Department:Library
3. Description:The Library lot has 21 light poles and 5 bollards (walkway lighting) which were installed when the
Library was built in 2000. The five bollards have experienced corrosion over time and need to
be refinished, which involves removal, stripping and repainting. Currently, the 21 poles have a
total of 25 150 watt high pressure sodium lamps. The 5 bollards each have a 50 watt high
pressure sodium bulb. Retrofitting all of these lights to LED lighting will provide energy savings
while maintaining the lighting quality.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 14,535 14,535 0000
TOTAL 14,535 14,535 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 14,535 14,535 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 14,535 14,535 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6506
DETAILED PROJECT DESCRIPTION
Page 22
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Carpeting
2. Department:Library
3. Description:The current Library building opened over 15 years ago, and the carpeting throughout the
building will be reaching the end of its expected life. Rather than replace the carpeting
throughout the building in a single year, the Library is planning to replace different segments
over the course of a few years. In 2016, the carpeting in the children's area will be replaced
as part of a redesign.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 90,000 30,000 20,000 20,000 20,000 0
TOTAL 90,000 30,000 20,000 20,000 20,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 90,000 30,000 20,000 20,000 20,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 90,000 30,000 20,000 20,000 20,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
410.08.90.71.6507
Page 23
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Moorland Reconstruction
2. Department:DPW- Engineering
3. Description:Design and reconstruction of Moorland Road from Janesville to McShane and the intersection
of Woods Road and Moorland Road will be converted to a roundabout. A grant has been
secured for 80% of the costs. The figures below are for our 20% match of the total project cost.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 40,000 40,000 0000
Land/ROW/Site Prep 80,000 0 80,000 0 0 0
Construction 600,000 0 0 600,000 0 0
Testing 000000
Other Contingency 000000
TOTAL 720,000 40,000 80,000 600,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 720,000 40,000 80,000 600,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source-TIF 000000
TOTAL 720,000 40,000 80,000 600,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2012
Revised Date:7/18/2014
7/20/2015
410.08.91.19.6303
Page 24
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Baylane Drive Reconstruction
2. Department:DPW-Engineering
3. Description:Reconstruct Bayland Drive from Janesville Road to Woods Road and add pedestrian
facilities.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 150,000 150,000 0000
Land/ROW/Site Prep 10,000 10,000 0000
Construction 2,250,000 0 2,250,000 0 0 0
Testing 000000
Other 000000
TOTAL 2,410,000 160,000 2,250,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 2,250,000 0 2,250,000 0 0 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 160,000 160,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,410,000 160,000 2,250,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2015
410.08.91.19.6504
Page 25
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Drive Reconstruction
2. Department:DPW-Engineering
3. Description:Phase I (2017-2019)
Reconstruct Hillendale Drive from Racine Avenue to College Avenue including an off road
multi-use pathway. This would be a full reconstruction with right-of-way acquisition.
Total project length is approximately 1.2 miles.
Note: The limits of this work may be expanded to Field Drive based on future discussions.
Phase II (2019-2020+)
Reconstruct Hillendale Drive from Janesville Road to Racine Avenue including an off road
multi-use pathway for a portion. This would be a full reconstruction with right-of-way acquisition.
Total project length is approximately 1.7 miles.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 325,000 0 150,000 0 175,000 0
Land/ROW/Site Prep 350,000 0 0 150,000 0 200,000
Construction 1,400,000 0 0 0 1,400,000 0
Testing 000000
Other 000000
TOTAL 2,075,000 0 150,000 150,000 1,575,000 200,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 1,575,000 0 0 0 1,575,000 0
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 500,000 0 150,000 150,000 0 200,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 2,075,000 0 150,000 150,000 1,575,000 200,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/18/2014
7/20/2015
410.08.91.19.6507
Page 26
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Industrial Park Lighting
2. Department:Public Works
3. Description:Replace the remaining failed street lights in the Industrial Park.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 20,000 20,000 0000
Testing 000000
Other 000000
TOTAL 20,000 20,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 20,000 20,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
402 Other Source 000000
TOTAL 20,000 20,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2015
410.08.93.51.6502
Page 27
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Pickup Truck Replacement
2. Department:Public Works
3. Description:Pickup truck to replace existing truck.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 185,000 40,000 50,000 0 55,000 40,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 185,000 40,000 50,000 0 55,000 40,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 185,000 40,000 50,000 0 55,000 40,000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 185,000 40,000 50,000 0 55,000 40,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/18/2014
Revised Date:7/20/2015
410.08.93.51.6507
Page 28
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Frond End Loader
2. Department:Public Works
3. Description:Replace existing front end loader.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 178,000 178,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 178,000 178,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 178,000 178,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 178,000 178,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/18/2014
410.08.93.51.6514
Page 29
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Light Duty Boom Truck
2. Department:Public Works
3. Description:Purchase light duty boom truck for light duty projects such as flag and banner installation,
maintenance and street light maintenance.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 80,000 80,000 0000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 80,000 80,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 80,000 80,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 80,000 80,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/18/2014
7/20/2015
410.08.93.51.6515
Page 30
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Skid Loader w/ Bucket
2. Department:Public Works
3. Description:Replace existing Skid Loader
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 68,000 68,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 68,000 68,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 68,000 68,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 68,000 68,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/18/2014
410.08.93.51.6516
Page 31
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Stump Grinder
2. Department:Public Works
3. Description:Purchase Stump Grinder.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 9,000 9,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 9,000 9,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 9,000 9,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 9,000 9,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2015
410.08.93.51.6517
Page 32
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Salt Shed Garage Door
2. Department:Public Works
3. Description:Existing door has worn beyond repair and no longer functions.
Replace existing door.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 12,000 12,000 0000
Testing 000000
Other Contingency 000000
TOTAL 12,000 12,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 12,000 12,000 0000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 12,000 12,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
410.08.93.51.6518
Page 33
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:City Garage Maintenance/Addition
2. Department:Public Works / Utilities
3. Description:Replace Existing Roof & HVAC = $1,075,000 (split 70/30 DPW/Utilities).
Build Cold Storage Building = $905,000 (split 70/30 DPW/Utilities).
Mechanics Area Addition Plus extra area = $2,580,000 (split 70/30 DPW/Utilities).
Locker Room = $405,000 (split 70/30 DPW/Utilities)
Break Room = $203,000 (split 70/30 DPW/Utilities)
All in Project Cost Including Economy of Scale Reductions ($498,000)= $4,670,000
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 262,500 262,500 0000
Land/ROW/Site Prep 000000
Construction 3,006,500 3,006,500 0000
Testing 000000
Other Contingency 000000
TOTAL 3,269,000 3,269,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 3,269,000 3,269,000 0000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
215 Conservation Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 3,269,000 3,269,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/20/2015
401.08.93.51.6550
Page 34
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Motor Grader
2. Department:Public Works
3. Description:Moved from 2014 to 2017.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 100,000 0 100,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 100,000 0 100,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 100,000 0 100,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 100,000 0 100,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/24/2013 7/20/2015
7/18/2014
410.08.93.51.6520
DETAILED PROJECT DESCRIPTION
Page 35
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Cargo Van
2. Department:Public Works
3. Description:Purchase cargo van for sign replacements and election equipment transportation.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 60,000 0 60,000 0 0 0
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 60,000 0 60,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
401 Trnsfr w/in CPF 000000
GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 60,000 0 60,000 0 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 60,000 0 60,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/18/2014
410.08.93.51.6521
Page 36
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Asphalt Roller
2. Department:Public Works
3. Description:Moved from 2017 to 2018.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 50,000 0 0 50,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 50,000 0 0 50,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 50,000 0 0 50,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 50,000 0 0 50,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/13/2009
Revised Date:7/24/2013 7/20/2015
410.08.93.51.6522
Page 37
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Replace Tri-Deck Mower
2. Department:Public Works
3. Description:Replace Existing Tri-Deck mower used for mowing parks.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 40,000 0 0 40,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 40,000 0 0 40,000 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 40,000 0 0 40,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 40,000 0 0 40,000 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 00
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/13/2015
Revised Date:7/20/2015
410.08.93.51.6523
Page 38
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A PROJECT IDENTIFICATION
1. Project Name:Replace Roadside Mower
2. Department:Public Works
3. Description:Replace Existing Tractor used for roadside mowing.
B EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 25,000 0 0 25,000 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 25,000 0 0 25,000 0 0
C FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 25,000 0 0 25,000 0 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 25,000 0 0 25,000 0 0
D ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 00
5. Net impact 000000
E.DESCRIPTION HISTORY
Original Date:7/24/2013
Revised Date:7/20/2015
410.08.93.51.6510
Page 39
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Back Hoe
2. Department:Public Works
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 100,000 0 0 0 100,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other Contingency 000000
TOTAL 100,000 0 0 0 100,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 100,000 0 0 0 100,000 0
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 100,000 0 0 0 100,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/1/2007
Revised Date:7/24/2013 7/20/2015
7/18/2014
410.08.93.51.6524
Page 40
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Meters
2. Department:Water Utility
3. Description:
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 275,000 75,000 50,000 50,000 50,000 50,000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 000000
TOTAL 275,000 75,000 50,000 50,000 50,000 50,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.200,000 0 50,000 50,000 50,000 50,000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 75,000 75,000 0000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 275,000 75,000 50,000 50,000 50,000 50,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.00.00.00.1953
Page 41
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Truck
2. Department:Water Utility
3. Description:2016 - P/U Truck $35,000 split 50/50 Wtr/Swr
2017 - P/U Truck $38,000 split 50/50 Wtr/Swr
2018 - P/U Truck $40,000 split 50/50 Wtr/Swr
2019 - P/U Truck $40,000 split 50/50 Wtr/Swr
2024 - Confined Space Truck every 15 years split 50/50 Wtr/Swr
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 96,500 17,500 19,000 20,000 20,000 20,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other - 25% DPW 250,000 46,250 48,125 50,000 51,875 53,750
TOTAL 346,500 63,750 67,125 70,000 71,875 73,750
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.282,750 0 67,125 70,000 71,875 73,750
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 63,750 63,750 0000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 346,500 63,750 67,125 70,000 71,875 73,750
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.00.00.00.1962
Page 42
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No: 605.00.00.00.1975
A. PROJECT IDENTIFICATION
1. Project Name:City Garage
2. Department:DPW/Utilities
3. Description:Refer to City Garage Memo
Total of $112,500 for architechture for Utilities split 50/50 Water/Sewer
Total of $1,288,500 for architechture for Utilities split 50/50 Water/Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 00000 0
Vehicle Replacement 00000 0
Stormwater 00000 0
Arch/Engineering 56,250 56,250 0 0 0 0
Land/ROW/Site Prep 00000 0
Construction 644,250 644,250 0 0 0 0
Testing 00000 0
Other 00000 0
TOTAL 700,500 700,500 0 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 00000 0
605 Water Working Cap.00000 0
601 Sewer Working Cap.00000 0
410 Trnsfr w/in CPF 00000 0
401 GO Borrowing 00000 0
Water Borrowing 700,500 700,500 0 0 0 0
Sewer Borrowing 00000 0
100 Gen Fund Balance 00000 0
Other Fund Fd Bal 00000 0
State Aid 00000 0
210 Landfill Funds 00000 0
202 Park Ded. Funds 00000 0
Forfeiture Funds 00000 0
Stormwater Funds 00000 0
Other Source 00000 0
TOTAL 700,500 700,500 0 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 00000 0
E. DESCRIPTION HISTORY
Original Date:7/31/2008
Revised Date:7/18/2014
Page 43
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
Struct Impr
A. PROJECT IDENTIFICATION
1. Project Name:Water Tower - Painting
2. Department:Water Utility
3. Description:Paint Water Towers0
Approximately every 15 years.
2016 - Mercury Drive
2017 - Hillendale
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000 00
Testing 000000
Other 700,000 350,000 350,000 0 0 0
TOTAL 700,000 350,000 350,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 700,000 350,000 350,000 0 0 0
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 700,000 350,000 350,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.54.06.50.5702 or Exp
605.00.00.00.1941
Page 44
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Well #4 Abandonment
2. Department:Water Utility
3. Description:Abandon Well #4 that is a low producing well that is in need of repairs that would not be cost
effective to repair and is very high energy costs to run because of depth.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 30,000 30,000 0000
Testing 000000
Other 000000
TOTAL 30,000 30,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.30,000 30,000 0000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 30,000 30,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/23/2014
Revised Date:
605.00.00.00.1968
Page 45
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
Struct Impr
A. PROJECT IDENTIFICATION
1. Project Name:Water Tower Cleaning & Inspections
2. Department:Water Utility
3. Description:Done every 5 years for Hillendale Drive, Mercury Drive and Commerce Drive
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 20,000 000020,000
TOTAL 20,000 000020,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.20,000 000020,000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 20,000 000020,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.54.06.50.5702 or Exp
605.00.00.00.1941
Page 46
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Hillendale Booster Station
2. Department:Water Utility
3. Description:Will boost zone along Hillendale and Racine. Thus far, residents in this area have not shown
interest in connection.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 400,000 0000400,000
Testing 000000
Other 000000
TOTAL 400,000 0000400,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 400,000 0000400,000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 400,000 0000400,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
605.00.00.00.1964
Page 47
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Truck
2. Department:Sewer Utility
3. Description:2016 - P/U Truck $35,000 split 50/50 Wtr/Swr
2017 - P/U Truck $38,000 split 50/50 Wtr/Swr
2018 - P/U Truck $40,000 split 50/50 Wtr/Swr
2019 - P/U Truck $40,000 split 50/50 Wtr/Swr
2024 - Confined Space Truck every 15 years split 50/50 Wtr/Swr
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 96,500 17,500 19,000 20,000 20,000 20,000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other - 25% DPW 46,250 46,250 0000
TOTAL 142,750 63,750 19,000 20,000 20,000 20,000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.142,750 63,750 19,000 20,000 20,000 20,000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 142,750 63,750 19,000 20,000 20,000 20,000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/25/2013
601.00.00.00.1922
Page 48
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Cold Storage Building
2. Department:DPW/Utilities
3. Description:Refer to City Garage Memo
Total of $112,500 for architechture for Utilities split 50/50 Water/Sewer
Total of $1,288,500 for architechture for Utilities split 50/50 Water/Sewer
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 56,250 56,250 0000
Land/ROW/Site Prep 000000
Construction 644,250 644,250 0000
Testing 000000
Other 000000
TOTAL 700,500 700,500 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.700,500 700,500 0000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 700,500 700,500 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/31/2008
Revised Date:7/18/2014
601.00.00.00.1903
Page 49
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Private Property I & I
2. Department:Sewer Utility
3. Description:Will be reimbursed by the MMSD,
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 1,000,000 250,000 250,000 250,000 250,000 0
Testing 000000
Other 000000
TOTAL 1,000,000 250,000 250,000 250,000 250,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source-MMSD 1,000,000 250,000 250,000 250,000 250,000 0
TOTAL 1,000,000 250,000 250,000 250,000 250,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
601.65.00.00.6516
Page 50
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Communication Controls Radio
2. Department:Sewer Utility
3. Description:Update last 10 remaining outdated equipment for SCADA and Controls Radio for lift stations.
Upgrade Equipment - $25,000
Programming & Install - $5,000
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 25,000 25,000 0000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other 5,000 5,000 0000
TOTAL 30,000 30,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.30,000 30,000 0000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 30,000 30,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:
601.00.00.00.1925
Page 51
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Lift Station Upgrades
2. Department:Sewer Utlilty
3. Description:Upgrade control modules and panels and place in an above ground enclosure.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 215,000 0 50,000 50,000 115,000 0
Testing 000000
Other 000000
TOTAL 215,000 0 50,000 50,000 115,000 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.215,000 0 50,000 50,000 115,000 0
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 215,000 0 50,000 50,000 115,000 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:
Revised Date:7/25/2013
601.00.00.00.1924
Page 52
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Camera
2. Department:Sewer Utility
3. Description:Replace existing camera that televises sewer lines.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 100,000 0 100,000 0 0 0
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 000000
Testing 000000
Other-Bldg. Repair 000000
TOTAL 100,000 0 100,000 0 0 0
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.100,000 0 100,000 0 0 0
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 100,000 0 100,000 0 0 0
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:8/1/2005
Revised Date:7/24/2013
601.00.00.00.1903
Page 53
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Lake Street Storm Sewer
2. Department:Stormwater/Engineering
3. Description:Construct storm sewer to replace existing storm sewer that is failing and is on private property.
Located on Lake Street and Hiawatha with first phase being contruction in 2015 from
Muskego Drive down to the lake.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 85,000 85,000 0000
Testing 000000
Other 000000
TOTAL 85,000 85,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
216 Stormwater Funds 85,000 85,000 0000
Other Source 000000
TOTAL 85,000 85,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
216.08.00.00.6549
54
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Flintlock Trail Storm Sewer
2. Department:Stormwater/Engineering
3. Description:Reconstruct existing storm sewer that has deteriorated. Will likely have to use a mix of open
cut and trenchless technologies and will discuss at Public Works Committee.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 000000
Construction 75,000 75,000 0000
Testing 000000
Other 000000
TOTAL 75,000 75,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Ded. Funds 000000
Forfeiture Funds 000000
216 Stormwater Funds 75,000 75,000 0000
Other Source 000000
TOTAL 75,000 75,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/20/2015
Revised Date:
216.08.00.00.6550
55
CITY OF MUSKEGO, WISCONSIN
CAPITAL IMPROVEMENTS PROGRAM
DETAILED PROJECT DESCRIPTION
Project No:
Account No:
A. PROJECT IDENTIFICATION
1. Project Name:Parks Projects
2. Department:Park Dedication
3. Description:Listing - following page.
B. EXPENDITURE SCHEDULE
Subproj. Expend. category TOTAL 2016 2017 2018 2019 2020
Equipment 000000
Vehicle Replacement 000000
Stormwater 000000
Arch/Engineering 000000
Land/ROW/Site Prep 0 0000
Construction 000000
Testing 000000
Other 1,095,000 1,095,000 0000
TOTAL 1,095,000 1,095,000 0000
C. FUNDING SOURCE(S)
Fund Revenue category
100 Gen Fd Op Budget 000000
605 Water Working Cap.000000
601 Sewer Working Cap.000000
410 Trnsfr w/in CPF 000000
401 GO Borrowing 000000
Water Borrowing 000000
Sewer Borrowing 000000
100 Gen Fund Balance 000000
Other Fund Fd Bal 000000
State Aid 000000
210 Landfill Funds 000000
202 Park Dedication &1,095,000 1,095,000 0000
203 Park Improvement 000000
Stormwater Funds 000000
Other Source 000000
TOTAL 1,095,000 1,095,000 0000
D. ANNUAL OPERATING IMPACT (if any)
1. Personnel 0
2. Materials 0
3. Total Cost 0
4. Offsetting Rev or Savings 0
5. Net impact 000000
E. DESCRIPTION HISTORY
Original Date:7/6/2012
Revised Date:
202 & 203.08.94.74.XXXX
Page 56
CITY OF MUSKEGO, WISCONSIN
PARK DEDICATION SPECIAL REVENUE PROGRAM FUND
DETAILED PROJECT LISTING
PROJECT
NAME DESCRIPTION ACCOUNT # TOTAL 2016 2017 2018 2019 2020
Astor Hills Neighborhood Park Partial Buildout (Grading/Seeding). Full Buildout = $825,000 203.08.94.74.6501 200,000 200,000 0 0 0 0
Future Trails (Install & Eng. Services)Hwy OO - (Aster Hills to Hwy 36) design and construction.202.08.94.74.6573 540,000 540,000 0 0 0 0
Martin Drive - (Janesville to Lannon) design cost for 2016. 60,000 60,000
Woods Road - (Racine Ave to Janesville Rd) design in-house and construction in 2016 up to Windover Drive. 275,000 275,000
Note #1: Price includes getting a consultant to design portion from Windover to Janesville in 2016,
however this portion would have to be constructed in later years due to difficulty of design.
Note #2: Look to get MNSD to cost share construction on their owned land.
Lannon Road (Janesville to Martin) Engineering Fees to plan/develop cost = $60,000 REMOVED
Janesville Road (west of Racine Ave to Jimmy's Car Wash) = $50,000 (Engineering in-house)
(Note: Contingent on land acquisition needs)REMOVED
Tennis Courts - School District MNSD Cost Share if desired by MNSD in 2016 202.08.94.74.6536 20,000 20,000 0 0 0 0
TOTAL EXPENDITURES 1,095,000 1,095,000 0 0 0 0
GO Borrowing 000000
Park Dedication (Landfill Funds)895,000 895,000 0 0 0 0
Park Improvements (Subdivider Fees)200,000 200,000 0 0 0 0
Other Source - Sports Organizations 000000
TOTAL FUNDING SOURCE 1,095,000 1,095,000 0 0 0 0
EXPENDITURE SCHEDULE
FUNDING SOURCE
AMOUNT
Page 1